Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Earth Return Vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Post-Shuttle EVA Operations on ISS

The EVA hardware used to assemble and maintain the ISS was designed with the assumption that it would be returned to Earth on the Space Shuttle for ground processing, refurbishment, or failure investigation (if necessary). With the retirement of the Space Shuttle, a new concept of operations was developed to enable EVA hardware (EMU, Airlock Systems, EVA tools, and associated support equipment and consumables) to perform ISS EVAs until 2016 and possibly beyond to 2020. Shortly after the decision to retire the Space Shuttle was announced, NASA and the One EVA contractor team jointly initiated the EVA 2010 Project. Challenges were addressed to extend the operating life and certification of EVA hardware, secure the capability to launch EVA hardware safely on alternate launch vehicles, and protect EMU hardware operability on orbit for long durations.

West, Bill↗

Conceptual analysis of a lunar base transportation system

Important to the planning for a lunar base is the development of transportation requirements for the establishment and maintenance of that base. This was accomplished as part of a lunar base systems assessment study conducted by the NASA Langley Research Center in conjunction with the NASA Johnson Space Center. Lunar base parameters are presented using a baseline lunar facility concept and timeline of developmental phases. Masses for habitation and scientific modules, power systems, life support systems, and thermal control systems were generated, assuming space station technology as a starting point. The masses were manifested by grouping various systems into cargo missions and interspersing manned flights consistent with construction and base maintenance timelines. A computer program that sizes the orbital transfer vehicles (OTV's), lunar landers, lunar ascenders, and the manned capsules was developed. This program consists of an interative technique to solve the rocket equation successively for each velocity correction (delta V) in a mission. The delta V values reflect integrated trajectory values and include gravity losses. As the program computed fuel masses, it matched structural masses from General Dynamics' modular space-based OTV design. Variables in the study included the operation mode (i.e., expendable vs. reusable and single-stage vs. two-stage OTV's), cryogenic specific impulse, reflecting different levels of engine technology, and aerobraking vs. all-propulsive return to Earth orbit. The use of lunar-derived oxygen was also examined for its general impact. For each combination of factors, the low-Earth orbit (LEO) stack masses and Earth-to-orbit (ETO) lift requirements are summarized by individual mission and totaled for the developmental phase. In addition to these discrete data, trends in the variation of study parameters are presented.

Hoy, Trevor D.↗

A Comparison of Transportation Systems for Human Missions to Mars

There are many ways to send humans to Mars. Credible technical reports can be traced to the 1950's. More recently, NASA has funded major studies that depict a broad variety of trajectories, technologies, stay times, and costs. Much of this data is still valid with direct application to today's exploration planning. This paper presents results comparing these studies with particular emphasis on the in-space transportation aspects of the mission. Specifically, comparisons are made on propulsion systems used for getting the crew and mission equipment from Earth orbit to Mars orbit, descending and ascending from the surface, and returning to Earth orbit. Areas of comparison for each of these phases include crew size, mission mass, propellant mass, delta v, specific impulse, transit time, surface stay time, aero-braking, and others. Data is analyzed to demonstrate either strong trends toward particular technologies or diverging solutions.

Bipropellants↗

Manual control aspects of orbital flight

Studies of spacecraft rendezvous and docking operations began in the Gemini program in preparation for the two dockings required to send a crew to the moon and return them safely to Earth. However, the goal of getting to the moon before the end of the decade was of greater concern than mission optimization so little or no time or money was expended in researching human factors implications of operational aspects such as braking gates or control modes. Also, with sixteen operational dockings over a six year period (12 Apollo, 3 Skylab, and 1 ASTP) in the United States space program, economies of scale were not yet available to justify extensive research into decreasing the time or fuel necessary for a successful docking. With an operational space station era approaching in which orbital maneuvering vehicle (OMV), orbital transfer vehicle (OTV), shuttle orbiter, and other traffic will play a major role, a concerted research effort now could help avoid many potential problems later in addition to increasing safety, fuel economy, and productivity. A knowledge of manual control capabilities associated with piloted spaceflight could help save a life if the operational flight envelope can be safely enlarged to include faster dockings that currently envisioned. For example, current and future research is designed to acquire the appropriate information.

Brody, Adam R.↗

The J-2X Upper Stage Engine: From Design to Hardware

NASA is well on its way toward developing a new generation of launch vehicles to support of national space policy to retire the Space Shuttle fleet, complete the International Space Station, and return to the Moon as the first step in resuming this nation s exploration of deep space. The Constellation Program is developing the launch vehicles, spacecraft, surface systems, and ground systems to support those plans. Two launch vehicles will support those ambitious plans the Ares I and Ares V. (Figure 1) The J-2X Upper Stage Engine is a critical element of both of these new launchers. This paper will provide an overview of the J-2X design background, progress to date in design, testing, and manufacturing. The Ares I crew launch vehicle will lift the Orion crew exploration vehicle and up to four astronauts into low Earth orbit (LEO) to rendezvous with the space station or the first leg of mission to the Moon. The Ares V cargo launch vehicle is designed to lift a lunar lander into Earth orbit where it will be docked with the Orion spacecraft, and provide the thrust for the trans-lunar journey. While these vehicles bear some visual resemblance to the 1960s-era Saturn vehicles that carried astronauts to the Moon, the Ares vehicles are designed to carry more crew and more cargo to more places to carry out more ambitious tasks than the vehicles they succeed. The government/industry team designing the Ares rockets is mining a rich history of technology and expertise from the Shuttle, Saturn and other programs and seeking commonality where feasible between the Ares crew and cargo rockets as a way to minimize risk, shorten development times, and live within the budget constraints of its original guidance.

Byrd, Thomas↗

Conceptual Drivers for an Exploration Medical System

Interplanetary spaceflight, such as NASA's proposed three-year mission to Mars, provides unique and novel challenges when compared with human spaceflight to date. Extended distance and multi-year missions introduce new elements of operational complexity and additional risk. These elements include: inability to resupply medications and consumables, inability to evacuate injured or ill crew, uncharted psychosocial conditions, and communication delays that create a requirement for some level of autonomous medical capability. Because of these unique challenges, the approaches used in prior programs have limited application to a Mars mission. On a Mars mission, resource limitations will significantly constrain available medical capabilities, and require a paradigm shift in the approach to medical system design and risk mitigation for crew health. To respond to this need for a new paradigm, the Exploration Medical Capability (ExMC) Element is assessing each Mars mission phase-transit, surface stay, rendezvous, extravehicular activity, and return-to identify and prioritize medical needs for the journey beyond low Earth orbit (LEO). ExMC is addressing both planned medical operations, and unplanned contingency medical operations that meld clinical needs and research needs into a single system. This assessment is being used to derive a gap analysis and studies to support meaningful medical capabilities trades. These trades, in turn, allow the exploration medical system design to proceed from both a mission centric and ethics-based approach, and to manage the risks associated with the medical limitations inherent in an exploration class mission. This paper outlines the conceptual drivers used to derive medical system and vehicle needs from an integrated vision of how medical care will be provided within this paradigm. Keywords: (Max 6 keywords: exploration, medicine, spaceflight, Mars, research, NASA)

Antonsen, Erik↗

Atmospheric Mining in the Outer Solar System: Aerospacecraft Analysis, Propulsion, and Resource Capturing Implications

Atmospheric mining in the outer solar system has been investigated as a means of fuel production for high energy propulsion and power. Fusion fuels such as Helium 3 (3He) and deuterium can be wrested from the atmospheres of Uranus and Neptune and either returned to Earth or used in-situ for energy production. Helium 3 and deuterium were the primary gases of interest with hydrogen being the primary propellant for nuclear thermal solid core and gas core rocket-based atmospheric flight. A series of analyses were undertaken to investigate resource capturing aspects of atmospheric mining in the outer solar system. This included the gas capturing rate, storage options, and different methods of direct use of the captured gases. While capturing 3He, large amounts of hydrogen and 4He are produced. With these two additional gases, the potential for fueling small and large fleets of additional exploration and exploitation vehicles exists. Analyses of orbital transfer vehicles (OTVs), landers, and in-situ resource utilization (ISRU) mining factories are included. Preliminary observations are presented on near-optimal selections of moon base orbital locations, OTV power levels, and OTV and lander rendezvous points. Aerospacecraft with closed cycle gas core propulsion are used to capture the 3He and deuterium from the outer planet atmospheres. Additional analyses of aerospacecraft sizing led to important results, reducing the overall mining system mass by many thousands of metric tons. Earlier analyses had focused on small aerospacecraft payloads. Important influences on mining time in the atmosphere were also analyzed and will be presented.

In Situ Resource Utilization↗

Atmospheric Mining in the Outer Solar System: Outer Planet Moon Bases, Propulsion, In-Situ Resource Utilization, and Mining Implications

Atmospheric mining in the outer solar system has been investigated as a means of fuel production for high energy propulsion and power. Fusion fuels such as Helium 3 (3He) and deuterium can be wrested from the atmospheres of Uranus and Neptune and either returned to Earth or used in-situ for energy production. Helium 3 and deuterium were the primary gases of interest with hydrogen being the primary propellant for nuclear thermal solid core and gas core rocket-based atmospheric flight. A series of analyses were undertaken to investigate resource capturing aspects of atmospheric mining in the outer solar system. This included the gas capturing rate, storage options, and different methods of direct use of the captured gases. While capturing 3He, large amounts of hydrogen and 4He are produced. With these two additional gases, the potential for fueling small and large fleets of additional exploration and exploitation vehicles exists. Analyses of orbital transfer vehicles (OTVs), landers, and in-situ resource utilization (ISRU) mining factories are included. Preliminary observations are presented on near-optimal selections of moon base orbital locations, OTV power levels, and OTV and lander rendezvous points. Aerospacecraft with closed cycle gas core propulsion are used to capture the 3He and deuterium from the outer planet atmospheres. Water ice on the outer planet moons has been identified as critical resources for refueling the moon landers and the nuclear electric OTVs. Outer planet moon mining issues are addressed. The issues include the mass fraction of water ice on the moon’s surface, the volume of the mined regolith-water ice matter, and the time to capture the water ice.

In-situ resource utilization↗

SeaWinds on QuikSCAT Mission and Early Science Results

SeaWinds on QuikSCAT (QSCAT) is a dedicated satellite remote sensing mission for measuring ocean surface wind speed and direction, using a spinning, pencil-beam Ku-band scatterometer. It is a replacement mission for NASA Scatterometer (NSCAT), which was launched on board of the Japan's Advanced Earth Observation System (ADEOS-1) in August 1996 and returned 10 months of high quality data before the mission was terminated in June, 1997 due to the failure of the ADEOS-1 spacecraft. Since the next NASA scatterometer mission, SeaWinds on ADEOS-2 (SeaWinds), will not be launched until November 2000, NASA decided to fill the data gap by launching the QSCAT mission. Furthermore, after year 2000. the potential exists for using both the QSCAT and SeaWinds to provide approximately 6 hours global coverage of the marine winds. QSCAT is currently scheduled for launch in April, 1999 from Vandenberg Air Force Base, using Titan-II launch vehicle. The purpose of this paper is to first present the mission objectives, the spacecraft and instrument design, ground receiving systems, the science data processing system, and the data products. We will then present the post-launch calibration and verification results of the QSCAT end-to-end sensor system. Finally, we present some of the key results obtained from the first two months of the mission, which include ocean surface wind measurements, ice detection and classification, global snow cover detection, and flood detection.

Tsai, Wu-Yang↗

A Space Based Internet Protocol System for Sub-Orbital Tracking and Control

Personnel from the Goddard Space Flight Center Wallops Flight Facility (GSFC/WFF) in Virginia are responsible for the overall management of the NASA Sounding Rocket Program. Payloads are generally in support of NASA's Space Science Enterprise's missions and return a variety of scientific data as well as providing a reasonably economical means of conducting engineering tests for instruments and devices used on satellites and other spacecraft. The fifteen types of sounding rockets used by NASA can carry payloads of various weights to altitudes from 50 km to more than 1,300 km. Launch activities are conducted not only from established missile ranges, but also from remote locations worldwide requiring mobile tracking and command equipment to be transported and set up at considerable expense. The advent of low earth orbit (LEO) commercial communications satellites provides an opportunity to dramatically reduce tracking and control costs of launch vehicles and Unpiloted Aerial Vehicles (UAVs) by reducing or eliminating this ground infrastructure. Additionally, since data transmission is by packetized Internet Protocol (IP), data can be received and commands initiated from practically any location. A low cost Commercial Off The Shelf (COTS) system is currently under development for sounding rockets which also has application to UAVs and scientific balloons. Due to relatively low data rate (9600 baud) currently available, the system will first be used to provide GPS data for tracking and vehicle recovery. Range safety requirements for launch vehicles usually stipulate at least two independent tracking sources. Most sounding rockets flown by NASA now carry GPS receivers that output position data via the payload telemetry system to the ground station. The Flight Modem can be configured as a completely separate link thereby eliminating requirement for tracking radar. The system architecture which integrates antennas, GPS receiver, commercial satellite packet data modem, and a single board computer with custom software is described along with the technical challenges and the plan for their resolution. These include antenna development, high Doppler rates, reliability, environmental ruggedness, hand over between satellites and data security. An aggressive test plan is included which in addition to environmental testing measures bit error rate, latency and antenna patterns. Actual flight tests are planned for the near future on aircraft, long duration balloons and sounding rockets and these results as well as the current status of the project are reported.

Bull, Barton↗

(abstract) Saturn Mini-Probes Mission

The original Cassini mission concept for intensive Saturn exploration included dual atmospheric probes - to Titan and Saturn. The Saturn probe was lost in Cassini Project cost reduction, but the Saturn atmospheric goals are still important to the planetary science community - especially it measurements can be acquired during synoptic coverage by the Cassini Orbiter. New advanced technology and design heritage from the Pluto Fast Flyby mission permit a low cost mission concept for launch early in the first decade of the 21st century, in time to take advantage of the Cassini spacecraft being in orbit around Saturn. This paper will describe such a concept. The mini-probe carrier can be a relatively simple design, depending on a solar array/battery power system design instead of Radioactive Thermoelectric Generators (RTGs) with their attendant programmatic complexities, costs, and constraints. The Atlas IIAS/Star 48B, Proton, and STS with upper stage are launch vehicle options which permit modest payload deliveries to Saturn with relatively short flight times (3 to 4 years) such that the mini-probes arrive in the time period when the Cassini Orbiter is operating at Saturn. The Cassini time-line with a compatible SMP mission sequence is described. An example mission concept includes a carrier spacecraft with three 10 to 20 kg mini-probes, launched in the late summer of 2001 by an Atlas IIAS/Star 48B on a 3.8 year trip to Saturn. Preliminary evaluation of the Cassini time-line suggests compatibility of the probe entries with collecting the data for Earth-return.

Saturn Cassini miniprobes cost Pluto Fast Flyby↗

Pressure Effects on the Self-Extinguishment Limits of Aerospace Materials

The Orion Crew Exploration Vehicle Module (CM) is being designed to operate in an atmosphere of up to 30% oxygen at a pressure of 10.2 psia for lunar missions. Spacecraft materials selection is based on an upward flammability test conducted in a closed chamber under the worst expected conditions of pressure and oxygen concentration. Material flammability depends on both oxygen concentration and pressure but, since oxygen concentration is the primary driver, all materials are certified in the 30% oxygen, 10.2 psia environment. Extensive data exist from the Shuttle Program at this condition which used relatively the same test methodology as currently used in the Constellation Program. When the CM returns to Earth, a snorkel device will be activated after splashdown to provide outside air to the crew; however, for operational reasons, it is desirable to maximize the time the crew is able to breathe cabin air before the snorkel device is activated. To maximize this time, it has been proposed to raise the partial pressure of oxygen in the CM immediately before reentry while maintaining the total cabin pressure at 14.7 psia. In addition, it has been proposed to leak-test the Orion CM with ambient air at a maximum pressure of 17.3 psia. No data exist to assess how high the cabin oxygen concentration can be at 14.7 psia or 17.3 psia. One is to re-test a large number of materials at these pressures at a significant cost. However, since the maximum oxygen concentration (MOC) at which a material will self-extinguish has been determined for a variety of spacecraft materials as a function of pressure, a second alternative is to use existing data to estimate the MOC at 14.7 psia and 17.3 psia. This data will be examined in this paper and an analysis presented to determine the oxygen concentrations at the increased pressures that will result in self-extinguishment of a material. This analysis showed that the oxygen concentration for the Orion CM at 14.7 psia cannot be set higher than 25.6% without potentially invalidating the materials flammability certification in 30% oxygen at 10.2 psia for some materials. Materials certified under these conditions would still be self-extinguishing in ambient air at 17.3 psia. alternative

Hirsch, David B.↗

The Skylab Medical Operations Project: Recommendations to Improve Crew Health and Performance for Future Exploration Missions

From May 1973 to February 1974, NASA conducted a series of three human missions to the Skylab space station, which was a voluminous vehicle largely descendant of Apollo hardware and the first U.S. space station. Crew members of these missions spent record-breaking durations of time in microgravity (28, 59, and 84 days, respectively) and gave the U.S. space program its first experiences with long-duration space flight. The program overcame a number of obstacles to conduct a lauded scientific program that encompassed life sciences, astronomy, solar physics, materials sciences, and Earth observation. Yet Skylab has more to offer than the results of these scientific efforts. The operations that were conducted by the crews and ground personnel represent a rich legacy of operational experience. As we plan a return to the moon and subsequent human exploration of Mars, it is essential to use the experiences and insights of those who were involved in previous programs. Skylab and Skylab Medical Experiments Altitude Test personnel possess unique insight into operations that are being planned for the Constellation Program, such as umbilical extravehicular activity and water landing/recovery of long-duration crew members. The Skylab Program was also well known for its habitability and extensive medical suite.

Scheuring, Richard A.↗

Cost Breakeven Analysis of Lunar ISRU for Human Lunar Surface Architectures

The return of humans to the lunar surface encompasses a range of possible architectures from brief Apollo-like sorties to long-term sustainment of human presence. Any architecture in this span requires propellant for the crew’s ascent from the lunar surface, as well as consumables to support their presence on the Moon. Oxygen and hydrogen are candidates for the propellant for the ascent vehicle due to their high specific impulse and potential for production from lunar resources and also constitute important consumables for the crew. Thus, the production of oxygen and/or hydrogen from lunar resources could significantly reduce the mass that must be sent from Earth to enable future human lunar missions. To assess the merits of using lunar resources, the costs associated with developing, producing, launching, operating, and maintaining those systems must be considered relative to the costs of delivering the needed resources from Earth. The demand for those resources depends upon the nature of the lunar mission, while the costs of both Earth-derived and lunar-derived resources depend on the performance requirements and technology capabilities associated with each approach. Thus, determining which approach is more cost efficient requires modeling the performance and cost of the associated systems as well as the range of possible architectures over which such a determination might apply. This research proposes a model that parametrically captures the factors influencing the relevant costs of providing propellant and crew consumables on the lunar surface from Earth and from the Moon. Two ISRU system models are assessed relative to propellant delivery from Earth. In this model, lunar ISRU breaks even with propellant delivery from Earth at high propellant demands and mission durations with multi-year ISRU system lifetimes; however, the costs of developing the necessary technologies to support a highly reliable and autonomous lunar ISRU system were not included.

ISRU↗

Orbital mechanics and mission design; Proceedings of the AAS/NASA International Symposium, Greenbelt, MD, Apr. 24-27, 1989

The present conference discusses topics in LEO mechanics, the earth-sun-moon orbital regime, space navigation, and lunar and planetary missions. Attention is given to an improved technique for passive eccentricity control, H-I launch vehicle mission planning, glideslope approaches, the control of Space Station-based tethered systems, rendezvous operations in GEO, launch-window expansion and trajectory correction for the First Lunar Swingby, the nature of lunar gravity assists, and the numerical determination of libration-point trajectories with solar exclusion zone-avoiding out-of-plane maneuvers. Also discussed are the interferometric tracking of multiple spacecraft, an improved determination of Martian satellite orbits, the Magellan Venus Mapping Mission, the Mars Rover Sample Return Mission, round-trip trajectories for manned Mars exploration, advanced missions using fusion propulsion, Vesta trajectories and navigation, and Voyager interstellar mission design.

Teles, Jerome↗

Advanced Crew Rescue Vehicle/Personnel Launch System

The Advanced Crew Rescue Vehicle (ACRV) will be an essential element of the Space Station to respond to three specific missions, all of which have occurred during the history space exploration by the U.S. and the Soviets: (1) Mission DRM-1: Return of disabled crew members during medical emergencies; (2) Mission DRM-2: Return of crew members from accidents or as a result of failures of Space Station systems; and (3) Mission DRM-3: Return of crew members during interruption of Space Shuttle launches. The ACRV will have the ability to transport up to eight astronauts during a 24-hour mission. Not only would the ACRV serve as a lifeboat to provide transportation back to Earth, but it would also be available as a immediately available safe refuge in case the Space Station were severely damaged by space debris or other catastrophe. Upon return to Earth, existing world-wide search and rescue assets operated by the Coast Guard and Department of Defense would be able to retrieve personnel returned to Earth via the ACRV. The operational approach proposed for the ACRV is tailored to satisfying mission requirements for simplicity of operation (no piloting skills or specially trained personnel are required), continuous availability, high reliability and affordability. By using proven systems as the basis for many critical ACRV systems, the ACRV program is more likely to achieve each of these mission requirements. Nonetheless, the need for the ACRV to operate reliably with little preflight preparation after, perhaps, 5 to 10 years in orbit imposes challenges not faced by any previous space system of this complexity. Specific concerns exist regarding micrometeoroid impacts, battery life, and degradation of recovery parachutes while in storage.

Craig, Jerry W.↗

Atmospheric Mining in the Outer Solar System: Outer Planet In-Space Bases and Moon Bases for Resource Processing

Atmospheric mining in the outer solar system has been investigated as a means of fuel production for high energy propulsion and power. Fusion fuels such as Helium 3 (3He) and deuterium can be wrested from the atmospheres of Uranus and Neptune and either returned to Earth or used in-situ for energy production. Helium 3 and deuterium were the primary gases of interest with hydrogen being the primary propellant for nuclear thermal solid core and gas core rocket-based atmospheric flight. A series of analyses were undertaken to investigate resource capturing aspects of atmospheric mining in the outer solar system. This included the gas capturing rate, storage options, and different methods of direct use of the captured gases. While capturing 3He, large amounts of hydrogen and 4He are produced. The propulsion and transportation requirements for all of the major moons of Uranus and Neptune are presented. Analyses of orbital transfer vehicles (OTVs), landers, factories, and the issues with in-situ resource utilization (ISRU) low gravity processing factories are included. Preliminary observations are presented on near-optimal selections of moon base orbital locations, OTV power levels, and OTV and lander rendezvous points. Several artificial gravity in-space base designs and orbital sites at Uranus and Neptune and the OTV requirements to support them are also addressed.

Palaszewski, Bryan↗

Mars Opposition Piloted Nuclear Electric Propulsion (NEP)-Chem Vehicle

Many previous studies have examined sending crews to and from Mars. The most economical involved a ‘conjunction’ class whereby the crew spends around 500 days on Mars surface waiting for a ‘cheap’ return. The total mission time results in a mission duration around 3 years. Given the current demonstrated crew maximum of a 1 year stint on ISS, it is interesting to look at reducing that time to only two years, thus reducing risk and minimizing time in the Martian System. In order to meet such a short mission an ‘opposition’ class Mars mission (which includes a Venus flyby) was chosen. The energy required to perform such a mission in only two years (for the 2036 opportunity at least) is about three times that of the 3 year conjunction mission. The rocket equation clearly shows that this mission would then require several times the propellant of the three-year mission unless the Isp of the propulsion system can be increased. Electric propulsion can provide the 3-10x improvement in Isp but even with a nuclear reactor power levels could approach 10 MWe. As an alternative, a smaller reactor (1.5 MWe class) joined together with a chemical stage was found to allow for using each propulsion system to its best advantage: low thrust in interplanetary space and chemical in the gravity wells of Earth and Mars. Indeed, the use of high Isp, low thrust during the interplanetary leg of the journey’s reduced the required capture/departure ∆Vs by 5-10X. Lowering the NEP power also allowed fitting the power system into a single SLS launch – which limited the radiator area to ~ 2500m^2. For the first look a reactor using fuels created by the SP-100 program with a limit of ~1200K was assumed. Starting in the ‘Lunar Gateway’ also allowed for use of commercial tankers to fuel the vehicle in a relative benign place. A top level summary of the mission design, concept of operations, as well as a conceptual point design of the vehicle is described.

Nuclear Electric Propulsion↗