Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EVA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Carbon dioxide adsorbent study

A study was initiated on the feasibility of using the alkali metal carbonate - bi-carbonate solid-gas reaction to remove carbon dioxide from the atmosphere of an EVA life support system. The program successfully demonstrates that carbon dioxide concentrations could be maintained below 0.1 mole per cent using this chemistry. Further a practical method for distributing the carbonates in a coherent sheet form capable of repeated regeneration (50 cycles) at modest temperatures (423 K), without loss in activity was also demonstrated. Sufficiently high reaction rates were shown to be possible with the carbonate - bi-carbonate system such that EVA hardware could be readily designed. Experimental and design data were presented on the basis of which two practical units were designed. In addition to conventional thermally regenerative systems very compact units using ambient temperature cyclic vacuum regeneration may also be feasible. For a one man - 8 hour EVA unit regenerated thermally at the base ship a system volume of 14 liters is estimated.

Onischak, M.↗

Construction in space - Toward a fresh definition of the man/machine relation

The EVA (extravehicular activity) project forming part of the space construction process is reviewed. The manual EVA constuction, demonstrated by the crew of Skylab 3 by assembling a modest space structure in the form of the twin-pole sunshade, is considered, indicating that the experiment dispelled many doubts about man's ability to execute routine and contingency EVA operations. Tests demonstrating the feasibility of remote teleoperator rendezvous, station keeping, and docking operations, using hand controllers for direct input and television for feedback, are noted. Future plans for designing space construction machines are mentioned.

Watters, H. H.↗

Centerline latch tool for contingency orbiter door closure

The centerline latch tool was designed and developed as an EVA manual backup device for latching the Space Shuttle Orbiter's payload bay doors for reentry in case of a failure of the existing centerline latches to operate properly. The tool was designed to satisfy a wide variety of structural, mechanical, and EVA requirements. It provides a load path for forces on the payload bay doors during reentry. Since the tool would be used by an EVA crewmember, control, handgrips, operating forces, and procedures must be within the capabilities of a partially restrained, suited crewmember in a zero-gravity environment. The centerline latch tool described was designed, developed, and tested to meet these requirements.

Trevino, R. C.↗

The assembly of large structures in space - An evaluation of hardware configurations and assembly techniques through neutral buoyancy simulation

The implementation of NASA's Space Transportation System (STS) presents the opportunity for the on-orbit assembly of structures which, before the advent of multi-launch missions, were not possible because of their physical size. This report presents the results of an eight-month effort in the investigation of assembly techniques and hardware configurations used in assembly of the basic tetrahedral cell by A7LB pressure-suited subjects in Marshall Space Flight Center's Neutral Buoyancy Simulator. Eleven subjects participated in assembly procedures which investigated two types of structural members and two configurations of attachment hardware. The assembly was accomplished through extra-vehicular activity (EVA) only, EVA with simulated manned maneuvering unit (MMU), and EVA with simulated MMU and simulated remote manipulator system (RMS). Assembly times as low as 10.20 minutes per tetrahedron were achieved.

Loughead, T. E.↗

Photovoltaic encapsulation materials

Candidate materials for the construction of cost-effective solar cell flat array modules are reviewed. Fabrication goals include electricity production at $.70/W with a lifetime of 20 yr. Research is currently directed toward low cost encapsulants and substrates for the cells, and outer covers which resist weathering. Ethylene/vinyl acetate copolymer (EVA) at $.09/sq ft has displayed the most promising results as the encapsulant laminate when subjected to peroxide cross-linking to prevent melting. EVA accepts the addition of antioxidants, quenchers, absorbers, and stabilizers. Wood is favored as the rigid substrate due to cost, while top covers in substrate modules comprise candidate acrylic and polyvinyl fluoride films and a copolymer. Finally, fiberglass mat is placed between the substrate and the EVA pottant as a mechanical support and for electrical insulation.

Baum, B.↗

Polymer-water interaction studies

Polymer water interactions were investigated. The following interactions were studied: (1) water absorption and desorption kinetics in EVA and PVB; (2) humidity dependence of electrical properties of EVA and PVB; (3) plasticizer effects in PVB; and (4) radiation effects in PVB and EVA.

Orehotsky, J.↗

Control of a free-flying robot manipulator system

The development of and test control strategies for self-contained, autonomous free flying space robots are discussed. Such a robot would perform operations in space similar to those currently handled by astronauts during extravehicular activity (EVA). Use of robots should reduce the expense and danger attending EVA both by providing assistance to astronauts and in many cases by eliminating altogether the need for human EVA, thus greatly enhancing the scope and flexibility of space assembly and repair activities. The focus of the work is to develop and carry out a program of research with a series of physical Satellite Robot Simulator Vehicles (SRSV's), two-dimensionally freely mobile laboratory models of autonomous free-flying space robots such as might perform extravehicular functions associated with operation of a space station or repair of orbiting satellites. It is planned, in a later phase, to extend the research to three dimensions by carrying out experiments in the Space Shuttle cargo bay.

Alexander, H.↗

Development of a Pre-Prototype Power Assisted Glove End Effector for Extravehicular Activity

The purpose of this program was to develop an EVA power tool which is capable of performing a variety of functions while at the same time increasing the EVA crewmember's effectiveness by reducing hand fatigue associated with gripping tools through a pressurized EMU glove. The Power Assisted Glove End Effector (PAGE) preprototype hardware met or exceeded all of its technical requirements and has incorporated acoustic feedback to allow the EVA crewmember to monitor motor loading and speed. If this tool is to be developed for flight use, several issues need to be addressed. These issues are listed.

Source record↗

Empirical models for use in designing decompression procedures for space operations

Empirical models for predicting the incidence of Type 1 altitude decompression sickness (DCS) and venous gas emboli (VGE) during space extravehicular activity (EVA), and for use in designing safe denitrogenation decompression procedures are developed. The models are parameterized using DCS and VGE incidence data from NASA and USAF manned altitude chamber decompression tests using 607 male and female subject tests. These models, and procedures for their use, consist of: (1) an exponential relaxation model and procedure for computing tissue nitrogen partial pressure resulting from a specified prebreathing and stepped decompression sequence; (2) a formula for calculating Tissue Ratio (TR), a tissue decompression stress index; (3) linear and Hill equation models for predicting the total incidence of VGE and DCS attendant with a particular TR; (4) graphs of cumulative DCS and VGE incidence (risk) versus EVA exposure time at any specified TR; and (5) two equations for calculating the average delay period for the initial detection of VGE or indication of Type 1 DCS in a group after a specific denitrogenation decompression procedure. Several examples of realistic EVA preparations are provided.

Conkin, Johnny↗

Regenerable non-venting thermal control subsystem for extravehicular activity

Routine and complex EVAs call for more effective heat rejection systems in order to maximize mission productivity; an optimum EVA mobility unit (EMU) thermal control subsystem must require no expendables and introduce no contaminants into the environment, while conforming to minimum size limits and allowing easy regeneration. Attention is presently given to two thermal control subsystems, one of which can be integrated with the existing Space Shuttle Orbiter EMU to provide a 3-hour nonventing heat rejection capability, while the other can furnish the entire heat rejection capability requirement for an 8-hour Space Station EVA.

Roebelen, George J.↗

Building validation tools for knowledge-based systems

The Expert Systems Validation Associate (EVA), a validation system under development at the Lockheed Artificial Intelligence Center for more than a year, provides a wide range of validation tools to check the correctness, consistency and completeness of a knowledge-based system. A declarative meta-language (higher-order language), is used to create a generic version of EVA to validate applications written in arbitrary expert system shells. The architecture and functionality of EVA are presented. The functionality includes Structure Check, Logic Check, Extended Structure Check (using semantic information), Extended Logic Check, Semantic Check, Omission Check, Rule Refinement, Control Check, Test Case Generation, Error Localization, and Behavior Verification.

Stachowitz, R. A.↗

NASA Office of Space Flight (OSF) in-orbit servicing program

Tools, fixtures and systems being developed to improve the efficiency of extravehicular activity (EVA) servicing operations; and tools developed for EVA use being adapted for use in robot-assisted EVA, local robotic servicing, and remote robotic servicing, are presented. The basic types of satellite servicing operations, the various modes by which they can be accomplished, and the hardware which supports these modes are outlined. The program and hardware elements of the program infrastructure are reviewed.

Levin, George C.↗

The space station assembly phase: Flight telerobotic servicer feasibility. Volume 2: Methodology and case study

A methodology is described for examining the feasibility of a Flight Telerobotic Servicer (FTS) using two assembly scenarios, defined at the EVA task level, for the 30 shuttle flights (beginning with MB-1) over a four-year period. Performing all EVA tasks by crew only is compared to a scenario in which crew EVA is augmented by FTS. A reference FTS concept is used as a technology baseline and life-cycle cost analysis is performed to highlight cost tradeoffs. The methodology, procedure, and data used to complete the analysis are documented in detail.

Smith, Jeffrey H.↗

A 60-meter erectable assembly concept for a control of flexible structures flight experiment

A flight experiment which proposes to use a 60-m deployable/retractable truss beam attached to the Space Shuttle to study dynamic characterization and control of flexible structures is being studied by NASA. The concept requires a relatively complex mechanism for deploying and retracting the truss on-orbit. Development of such a mechanism having a high degree of reliability will be expensive. An alternative method for constructing the truss is discussed requiring no new technology development or complex mechanisms and has already been demonstrated on-orbit. The alternative method proposes an erectable truss beam which can be assembled by two astronauts in EVA. The EVA crew would have to manually assemble the beam from 468 struts and 165 nodes, and install 7 instrumentation platforms with signal and power cabling. The predicted assembly time is 3 hr and 23 min. The structure would also have to be disassembled and restowed following testing, thus 2 EVA days would be required. To allow 25 hr for data collection (probably a bare minimum to accomplish meaningful tests), current Shuttle operations policy dictates a 9-day mission. The design, assembly procedure and issues associated with the alternative concept are discussed.

Watson, Judith J.↗

Electrochemically regenerable carbon dioxide/moisture control technology for an Advanced Extravehicular Mobility Unit

Regenerable CO2/moisture removal techniques that reduce the expendables and logistics requirements are needed to sustain people undertaking EVAs for the Space Station. Here, the development of electrochemically regenerable CO2 absorption (ERCA) technology to replace the nonregenerable LiOH absorber for the advanced Portable Life Support System (PLSS) is reported. During EVA the ERCA uses a mechanism involving gas absorption into a liquid absorbent for the removal and storage of the metabolically produced CO2 and moisture. Following the EVA, the expended absorbent is regenerated onboard the Space Station by an electrochemical CO2 concentrator. The ERCA concept has the ability to effectively satisfy the high metabolic CO2 and moisture removal requirements of PLSS applications. This paper defines the ERCA concept and its advantages for the PLSS application, reviews breadboard test data, and presents physical characteristics of the breadboard and projected flight hardware.

Lee, M. C.↗

Astronaut/EVA construction of Space Station

Four early space construction tests performed in neutral buoyancy and/or on-orbit to evaluate EVA for assembly of truss structures are reviewed and astronaut observations are presented. In addition, two ongoing ground test programs that address EVA assembly of full scale Space Station truss structure using a mobile transporter equipped with astronaut positioning arms are described. A truss joint design that enables EVA assembly while meeting structural design goals is also discussed.

Heard, Walter L., Jr.↗

Results of EVA/mobile transporter space station truss assembly tests

Underwater neutral buoyance tests were conducted to evaluate the use of a Mobile Transporter concept in conjunction with EVA astronauts to construct the Space Station Freedom truss structure. A three-bay orthogonal tetrahedral truss configuration with a 15 foot square cross section was repeatedly assembled by a single pair of pressure suited test subjects working from the Mobile Transporter astronaut positioning devices (mobile foot restraints). The average unit assembly time (which included integrated installation of utility trays) was 27.6 s/strut, or 6 min/bay. The results of these tests indicate that EVA assembly of space station size structures can be significantly enhanced when using a Mobile Transporter equipped with astronaut positioning devices. Rapid assembly time can be expected and are dependent primarily on the rate of translation permissible for on-orbit operations. The concept used to demonstate integrated installation of utility trays requires minimal EVA handling and consequentially, as the results show, has little impact on overall assembly time.

Watson, Judith J.↗