Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Disassembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Towards a Benchmark Experiment with the Compact Nuclear Power Source

The Compact Nuclear Power Source (CNPS) was a high-assay low enriched uranium (HALEU) tristructural isotropic (TRISO)-fueled, graphite-moderated microreactor constructed in 1987 at Los Alamos National Laboratory. The reactor, conceived as a power source for short-range radar stations, was designed to be "walk-away safe," and was cooled by heat pipes and ambient air. Though the project was formally cancelled after the fuel and moderator material had been received, its potential to meaningfully advance the body of critical and integral data was evident, and critical experiments with a mock-up of the reactor proceeded at TA-18 until its disassembly in 1991. The reflector and some components of the core would later go on to see service as part of the New Production Reactor Modular High-Temperature Gas-Cooled Reactor (NP-MHTGR) critical experiments. In light of the progress made by groups like Westinghouse and X-Energy towards contemporary graphite-moderated microreactors, the system remains an attractive candidate for the basis of a benchmark experiment even today. Uncertainties remain, however, in some features of the system–inconsistencies in the dimensions and composition of the reactor’s components as described in literature and implemented in current computational models. The identification, quantification, and to the extent possible, the minimization of these uncertainties is a crucial task on the path towards creating a benchmark based on the CNPS system. The present work seeks to initiate this process with a survey of available documentation and improvements to the accuracy of CNPS neutronics models.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Report on Post-Irradiation Dimensional Change of AGC-1 Samples

This report documents the measured post irradiation dimensional change in the AGC-1 samples. The AGC-1 capsule is the first in six planned irradiation capsules comprising the Advanced Graphite Creep (AGC) test series. AGC-1 irradiation began September 5, 2009 in the Advanced Test Reactor (ATR) and was completed on January 8, 2011. The capsule was cooled for 3 months in the ATR Canal, and then shipped to MFC in April 2011 for disassembly and sample extraction. After extraction the samples were shipped to the INL Research Center (IRC) for initial post-irradiation examination (PIE) and storage in the irradiated graphite vault. The AGC-1 capsule design contained “matched pair” samples to ascertain the irradiation-induced dimensional changes and levels of creep experienced in different graphite types. The irradiation-induced dimensional changes and creep levels are determined by comparing the total dimensional change for stressed and unstressed samples of the same type of graphite exposed to the same dose levels and at similar temperatures. Under irradiation creep (i.e. permanent strain due to irradiation, stress, and temperature) the stressed samples should demonstrate more dimensional change than the unstressed samples. This additional dimensional change in the stressed samples is designated as “irradiation-induced creep” in graphite. The data are further presented using the parameters influencing dimensional change in graphite; levels of induced stress, temperature, graphite type, and dose. However, the AGC-1 post-irradiation examination is a significant endeavor and this data report serves to provide irradiation-induced dimensional change data for AGC capsule design refinement as well as a status on the progress of the PIE activities. The dimensional changes of both the samples and graphite body are very important to the design of the future AGC capsules (AGC-3 through AGC-6) and are provided as soon as the data are available in order to determine whether design changes to the next capsule are required. A complete evaluation of the irradiation-induced dimensional change data will be performed for a final AGC-1 PIE report that will include full analysis of pre- and post-irradiation data, with verified AGC-1 irradiation conditions of temperature and dose.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lubricant impacts on piston deposit formation in the Enterprise marine diesel research engine

The impact of lubricant formulation on piston deposits was studied using the Enterprise, a reduced-scale, single-cylinder, two-stroke crosshead marine diesel research engine. The Enterprise engine was specially designed for marine diesel lubricant research, with a custom reduced-scale cylinder lubricant injection system and extensive instrumentation of thermal boundary conditions on both the liner and piston. Lubricant conditions typical of full-scale marine diesel engines are obtained by matching mean piston speed, liner temperature profile, and combustion metrics to realistic values.Piston deposit thicknesses were measured after a set period of operation, with a focus on lubricant-based deposits on the lands and ring grooves, using both optical and contact-based measurement techniques. Engine operation for each lubricant was conducted according to a standardized protocol, with precise control of engine speed and load, cylinder lubricant injection rate, coolant temperatures, and system oil temperature; the liner and piston temperatures are continuously monitored during operation. After operation with each lubricant was completed, the engine was disassembled, and the piston and ring deposits were characterized. The piston was then thoroughly cleaned, and the lubricant system flushed, between each lubricant formulation being evaluated. The impacts on piston deposits of the lubricants being evaluated can thus be accurately quantified and are described herein.

Kaul, Brian↗

Vendor Irradiation Capsule A quick summary and update

Vendor Irradiation Capsule (VIC) update and summary. Includes what the VIC is, why it is needed, options, how data will be used, and what is concluded from using VIC. Also discusses realistic irradiation timelines, available MTRs and realisitic irradiation positions, disassembly and PIE timelines, processes and conclusions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Particle Management Strategies for Ultra-high Vacuum Assemblies

The intent of this project is to compare the particle generation and gall prevention characteristics of stainless steel, silver coated, and TiN coated fasteners. To achieve this goal, the following steps were taken: • A testing stand was designed to be compatible with cleanroom requirements. • Data acquisition programs and equipment were obtained and implemented. • Particle count data was collected during the assembly and disassembly of conflat vacuum flanges. • Observations of galling and particle generation phenomena were made. • A Student T-test was applied to the collected particle data to determine the statistical significance of the collected data. • Samples were placed under a Scanning Electron Microscope to examine particle generation phenomena.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Progress and status of the IAEA coordinated research project: production of Mo-99 using LEU fission or neutron activation

Since late 2004, the IAEA has developed and implemented a Coordinated Research Project (CRP) to assist countries interested in initiating indigenous, small-scale production of Mo-99 to meet local nuclear medicine requirements. The objective of the CRP is to provide interested countries with access to non-proprietary technologies and methods to produce Mo-99 using LEU foil or LEU mini-plate targets, or for the utilization of n,gamma neutron activation, e.g. through the use of gel generators. The project has made further progress since the RERTR 2006 meeting, with a Technical Workshop on Operational Aspects of Mo99 Production held 28-30 November 2006 in Vienna and the Second Research Coordination Meeting held in Bucharest, Romania 16-20 April 2007. The paper describes activities carried out as noted above, and as well as the provision of LEU foils to a number of participants, and the progress by a number of groups in preparing for LEU target assembly and disassembly, irradiation, chemical processing, and waste management. The participants' progress in particular on thermal hydraulics computations required for using LEU targets is notable, as also the progress in gel generator plant operations in India and Kazakhstan. Poland has joined as a new research agreement holder and an application by Egypt to be a contract holder is undergoing internal review in the IAEA and is expected to be approved. The IAEA has also participated in several open meetings of the U.S. National Academy of Sciences Study on Producing Medical Radioisotopes without HEU, which will also be discussed in the paper. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Experience of Hot Cell Renovation Work in CPF (Chemical Processing Facility)

Renovation work for operation room A of the Chemical Processing Facility (CPF) was carried out. Cell renovation work involved disassembly, removal and installation of new equipment for the CA-3 cell of operation room A and the crane renovation work involved the repair of the in-cell crane for the CA-5 cell of operation room A. There were not many examples of renovation work performed on cells under high radiation environment and alpha contamination in Japan. Lessons learnt: With respect to the cell renovation work and crane repair work, a method that gave full consideration to safety was employed and the work was performed without accidents or disaster. Moreover, through improvement of the method, reduction of radioactive exposure of the workers was achieved and a melt reduction device was designed to deal with the radioactive waste material that was generated in the renovation work to achieve significant melt reduction of waste material.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Closure of the Fast Flux Test Facility: Current Status and Future Plans

The Fast Flux Test Facility (FFTF) was a 400 MWt sodium cooled fast reactor designed and constructed in the 1970's. The original purpose of the facility was to develop and test advanced fuels and materials for the liquid metal fast breeder reactor program. The facility operated very successfully from 1982 through 1992, fulfilling its original mission as well as other identified missions. However, in 1993 the Department of Energy concluded that there was no longer a need for the FFTF and thus ordered that it be shut down. Following eight years of additional study of potential new missions, the final decision to shut down the facility was made in 2001. (During this eight year period the plant was maintained in a condition to allow safe and efficient shut down or restart). The complete closure of the FFTF consists of the following phases: - Deactivation - removal/stabilization of hazards to allow long-term storage (2001-2009); - Surveillance and maintenance - minimum cost compliant storage (2010-2015); - Decontamination and decommissioning (2016-2024). All of the FFTF fuel has been removed from the site except the sodium-bonded fuel that is destined for transportation to Idaho National Laboratory for final disposition. The sodium-bonded fuel had metallic sodium inside of the fuel pin to increase the heat transfer from the fuel pellet to the clad in order to reduce pellet centerline temperature. Three hundred and seventy-six (376) fuel assemblies have been washed (sodium removed) and transferred to storage at other Hanford locations. The majority of the spent fuel is stored in interim storage casks designed for a 50 year storage life, holding seven assemblies each. All sodium systems have been drained and the sodium stored under an inert gas blanket at ambient temperature in a Sodium Storage Facility at the FFTF site. This facility consists of four large tanks and associated piping. The main contaminants are sodium-22, cesium-137 and tritium. The sodium-potassium (NaK) that was used as an intermediate cooling fluid in several FFTF systems has been drained and removed or flushed to sodium systems where it became mixed with the sodium. The in-containment hot cell has minimal sodium contamination, is currently inerted with argon and is being used for loading of the T-3 transportation cask with the sodium-bonded fuel for transportation to Idaho National Laboratory. The majority of the fuel handling machines are still operational and being used for loading the sodium-bonded fuel into the T-3 casks. This equipment will be shut down immediately following completion of shipment of the sodium-bonded fuel. The majority of hotel systems are still operating. Four of the eight 400-ton chillers have been shut down and four of the cooling towers have been shut down. The argon system is operational and supplying gas for sodium systems cover gas, in-containment hot cell atmosphere and fuel handling systems. The nitrogen system remains in service supplying cover gas to the demineralized water system and fire suppression systems. Eleven of the facilities nineteen transformers containing polychlorinated biphenyls (PCBs) have been removed and significant re-routing of power has been performed to support the long term minimum cost surveillance mode. Future plans include the complete deactivation, the long-term surveillance and maintenance, the sodium disposition and the decontamination and decommissioning The most complex and costly activity during the decontamination and decommissioning phase will be the removal of the 'residual sodium' in the sodium systems. It was impractical to remove the residual sodium during the systems draining evolution. It is estimated that approximately 24,000 liters (6,400 gallons) remain within the systems. The complexity of design of the FFTF exceeds any sodium facility in the United States in which sodium removal has occurred. There are a total of 21 miles of sodium piping in the FFTF as well as three large vessels (the reactor vessel and two spent fuel pool vessels) that will require partial disassembly and drilling in order react/remove remaining sodium.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of a Rotary Micro-filter for Radioactive Waste Applications

The processing rates of Savannah River Site (SRS) high-level waste decontamination processes are limited by the flow rate of the solid-liquid separation. The baseline process, using a 0.1 micron cross-flow filter, produces {approx}1.36 x 10{sup -5} m/s ({approx}0.02 gpm/ft{sup 2}) of filtrate under expected operating conditions. Savannah River National Laboratory (SRNL) demonstrated significantly higher filter flux for actual waste samples using a small-scale rotary filter. With funding from the U. S. Department of Energy Office of Cleanup Technology, SRNL personnel are evaluating and developing the rotary micro-filter for radioactive service at SRS. The authors improved the design for the disks and filter unit to make them suitable for high-level radioactive service. They procured two units using the new design, tested them with simulated SRS wastes, and evaluated the operation of the units. Work to date provides the following conclusions and program status. - The authors modified the design of the filter disks to remove epoxy and Ryton{sup R}. The new design includes welding both stainless steel and ceramic coated stainless steel filter media to a stainless steel support plate. The welded disks were tested in the full-scale unit. They showed good reliability and met filtrate quality requirements. - The authors modified the design of the unit, making installation and removal easier. The new design uses a modular, one-piece filter stack that is removed simply by disassembly of a flange on the upper (inlet) side of the filter housing. All seals and rotary unions are contained within the removable stack. - While it is extremely difficult to predict the life of the seal, the vendor representative indicates a minimum of one year in present service conditions is reasonable. Changing the seal face material from silicon-carbide to a graphite-impregnated silicon-carbide is expected to double the life of the seal. Replacement of the current seal with an air seal could increase the lifetime to 5 years and is undergoing testing in the current work. - The bottom bushing showed wear due to a misalignment during the manufacture of the filter tank. Replacing the graphite bushing with a more wear resistant material such as a carbide material will increase the lifetime of the bushing. This replacement requires a more wear resistant part or coating to prevent excessive wear of the shaft. The authors are currently conducting testing with the more wear resistant bushing. - The project team plans to use the rotary micro-filter as a filter in advance of an ion exchange process under development for potential deployment in SRS waste tank risers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application and development of technologies for engine-condition-based maintenance of emergency diesel generators

The emergency diesel generator (EDG) of a nuclear power plant has the role of supplying emergency electric power to protect the reactor core system in the event of the loss of offsite power supply. Therefore, EDGs should be subject to periodic surveillance testing to verify their ability to supply specified frequencies and voltages at design power levels within a limited time. To maintain optimal reliability of EDGs, condition monitoring/diagnosis technologies must be developed. Changing from periodic disassemble maintenance to condition-based maintenance (CBM) according to predictions of equipment condition is recommended. In this paper, the development of diagnosis technology for CBM and the application of a diesel engine condition-analysis system are described. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Packaging, Transportation and Recycling of NPP Condenser Modules - 12262

Perma-Fix was awarded contract from Energy Northwest for the packaging, transportation and disposition of the condenser modules, water boxes and miscellaneous metal, combustibles and water generated during the 2011 condenser replacement outage at the Columbia Generating Station. The work scope was to package the water boxes and condenser modules as they were removed from the facility and transfer them to the Perma-Fix Northwest facility for processing, recycle of metals and disposition. The condenser components were oversized and overweight (the condenser modules weighed ∼102,058 kg [225,000 lb]) which required special equipment for loading and transport. Additional debris waste was packaged in inter-modals and IP-1 boxes for transport. A waste management plan was developed to minimize the generation of virtually any waste requiring landfill disposal. The Perma-Fix Northwest facility was modified to accommodate the ∼15 m [50-ft] long condenser modules and equipment was designed and manufactured to complete the disassembly, decontamination and release survey. The condenser modules are currently undergoing processing for free release to a local metal recycler. Over three millions pounds of metal will be recycled and over 95% of the waste generated during this outage will not require land disposal. There were several elements of this project that needed to be addressed during the preparation for this outage and the subsequent packaging, transportation and processing. - Staffing the project to support 24/7 generation of large components and other wastes. - The design and manufacture of the soft-sided shipping containers for the condenser modules that measured ∼15 m X 4 m X 3 m [50 ft X 13 ft X 10 ft] and weighed ∼102,058 kg [225,000 lbs] - Developing a methodology for loading the modules into the shipping containers. - Obtaining a transport vehicle for the modules. - Designing and modifying the processing facility. - Movement of the modules at the processing facility. If any of these issues were not adequately resolved prior to the start of the outage, costly delays would result and the re-start of the power plant could be impacted. The main focus of this project was to find successful methods for keeping this material out of the landfills and preserving the natural resources. In addition, this operation provided a significant cost savings to the public utility by minimizing landfill disposal. The onsite portion of the project has been completed without impact to the overall outage schedule. By the date of presentation, the majority of the waste from the condenser replacement project will have been processed and recycled. The goals for this project included helping Energy Northwest maintain the outage schedule, package and characterize waste compliantly, perform transportation activities in compliance with 49CFR (Ref-1), and minimize the waste disposal volume. During this condenser replacement project, over three millions pounds of waste was generated, packaged, characterized and transported without injury or incident. It is anticipated that 95% of the waste generated during this project will not require landfill disposal. All of the waste is scheduled to be processed, decontaminated and recycled by June of 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Emergency response and solutions for damaged fuel assembly handling events - Lessons learned from a 2013 fuel positioning issue

In 2013, during the refueling of a French 1300 MWe reactor, a fuel assembly (FX3599) was damaged by a fuel assembly positioning tool in the reactor vessel. The upper part of a corner rod of the fuel assembly was twisted and the top end grid was torn off. Because of the protruding fuel rod, the assembly could not be easily transferred for repair to the fuel storage pool via the transfer tube. This unexpected and rarely encountered situation was assessed jointly by EDF and AREVA NP. The chosen option was to directly perform the field service inside the reactor building in cells generally used for intermediate storage during refueling. This operation, performed by EDF and AREVA, involved removing the twisted rod and positioning it in a special-purpose canister by means of a gripper-type tool for removal (KIPCI gripper) and a gripper for holding the rod in place. The special-purpose canister was designed, ordered and supplied by a sub-supplier within one week. The operation went through 3 phases. First a preparation step in the fuel building: The stripper was disassembled and technical checks carried out to ensure correct operation. The gripper tightening force was checked in real-life conditions with the gripper suspended from auxiliary crane. The fuel rod removal was simulated several times by trained operators. Second, the equipment was installed in the reactor building. And third, the operation took place in the reactor cavity: the special-purpose canister was opened, the radioactive waste canister placed in the special-purpose canister, the twisted fuel rod was then grasped by the KIPCI gripper and removed from the fuel assembly. The twisted fuel rod was positioned above the canister and dropped into it. Once the fuel rod had been removed, the canister and fuel assembly FX3599 were transferred to the fuel building and refueling resumed. The canister containing the fuel rod is currently in interim storage in the reactor pool until appropriate action is taken for it to be shipped and eventually reprocessed. EDF has performed improvement in its handling procedures and in its handling tools to avoid a similar new event.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Improving Decommissioning Success using the Tool of Virtual Reality; Increasing Worker Safety and Project Schedule Stability - 17193

operations, especially underwater, is essential. Equally essential is a precise game plan for disassembly which focuses attention on the skilled remote handling operators who must produce the results. Project success is based on clean, efficient cuts and take-aways, prepared paths for waste placement and containment, programmed return paths; and practice, practice, practice on the part of the operators. Recently, our Partner, WAK Ruackbau- und Entsorgungs- GmbH (Decommissioning and Waste Management Company) was tasked with dismantling and decommissioning the Karlsruhe Reprocessing Plant. The most difficult task in this project is the dismantling of the vitrification plant. Waelischmiller was selected to address this high-consequence project. Together, WAK and Waelischmiller determined that development of a virtual reality suite, where management and operators could create a virtual vitrification layout and subsequently map and rehearse their dismantling plan was essential. This approach, using Virtual Reality (VR) as a tool in streamlining operations and rehearsing difficult moves and cuts, will be a game changer for this and future projects. It will be a first-of-a-kind in Germany. The VR suite is contained in a room at the Karlsruhe facility with a large screen, control cabinet, simulation computer, a Waelischmiller Joyarm and Masterarm. To support the dismantling of the vitrification plant, WAK/HWM will conduct interactive feasibility studies for each dismantling step. All movements; cuts, take-aways and vessel segment insertion into transportation and disposal casks will be established, programed and practiced within virtual test suite. This allows savings in cost-intensive and complex construction of test rigs. Operating personnel can be trained in the VR suite, without taking the risk of damaging expensive remote handling equipment.While the operators are working on the operating element, they stand in front of a wide screen. Instead of a real TELBOT{sup R}, a virtual TELBOT{sup R} is moving on the screen in virtual reality. While practicing, the operators cannot damage the arm and the equipment, which is a big advantage. Moreover an interactive feasibility study can be realized without building a real test rig (mock-up). Consequently significant cost-expenses can be reduced. This paper will describe the virtual suite used by the WAK in Karlsruhe and the advantages of this new and innovative approach, which is unique in decommissioning of nuclear facilities. The viewpoint of each (WAK and HWM), and the decisions and benefits realized along the project path will be detailed in the paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Nuclear Divers in Decommissioning of Spent Fuel Pools/Ponds in the United Kingdom - 17431

Magnox Ltd. (Operated by the Cavendish Fluor Partnership) has initiated decommissioning of spent fuel pools/ponds utilizing divers. This decommissioning technique is being employed to disassemble and size reduce underwater equipment and furniture, as well as the collection of sludge and debris prior to draining of the pool. This technique has proven to be highly effective at reducing the radiological exposure to the workforce over previously implemented methods and is expected to significantly reduce overall decommissioning durations and costs. The decommissioning of the UK Nuclear Decommissioning Authority's (NDA) Dungeness A power station spent fuel ponds was initiated in 2015 to eliminate the mobile hazards and prepare the facilities for entry into a Care and Maintenance period. This dual reactor site has two spent fuel ponds each containing 1000 m{sup 3} of water, with the fuel removed since April 2012, which will utilize divers to remove solid wastes from the ponds prior to drain down. This technique has overcome many challenges to implementation including regulatory approval and high airborne contamination. The use of divers for decommissioning was a new technique for the Magnox Sites and required early engagement with the UK Office for Nuclear Regulation (ONR) and the Health and Safety Executive (HSE). The use of plasma arc cutting underwater required the pond area to be classified as an airborne contamination area. The implementation of local ventilation has controlled this hazard. The initial demonstration dives at Dungeness A were completed in April 2016 and the decommissioning dives are expected to be completed in March 2017. This is a substantial improvement to the project schedule and will allow the project completion 5 1/2 years ahead of the Licence Condition milestone. This technique is planned to be implemented at two further NDA Magnox power stations over the next three years. This paper provides the accomplishments and lessons learned to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of a facility in a historical reactor at SRS: achieving both historical significance preservation and effective in-situ decommissioning - 15275

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, where Management and Operations are performed by Savannah River Nuclear Solutions, LLC (SRNS). In 2004, US DOE recognized SRS as a structure within the Cold War Historic District of national, state and local significance because it is composed of the first generation of facilities constructed and operated from 1950 through 1989 to produce plutonium and tritium for our nation's defense. US DOE agreed to manage the SRS 105-C Reactor Facility as a potentially historic property due to its significance in supporting the U.S. Cold War Mission and for potential for future interpretation. The Disassembly Basin (DB) in C Reactor was evaluated for action under CERCLA. Data indicated there were over 830 curies of radioactivity associated with the basin sediments and approximately 9.1 million (M) liters (L) of contaminated water, not including a large quantity of activated reactor equipment, scrap metal, and debris on the basin floor. The release of DB water could potentially migrate to the aquifer and contaminate groundwater. The need for an action was identified to reduce risks to personnel in the facility and to eliminate the possible release of contaminants into the environment. In-situ decommissioning was selected as the remedy. The remedial action proceeded in stages: -Above-grade modifications to the interior of DB building -Relocation of irradiated scrap and reactor components to the deepest segments of the DB - Construction of a metal building to house evaporators - Forced evaporation of the DB's radiologically contaminated water - Grouting with special hybrid grouts - Removal of the evaporators and temporary building. Since the building itself was not demolished and will remain unchanged in appearance with the exception of filling the DB with grout, this ISD removal action/methodology did not adversely impact the historical significance of the 105-C Reactor Building, in accordance with the National Historic Preservation Act, nor did it adversely affect the ability to determine the full extent and details of preservation at some later date. Both special hybrid grout materials met all requirements. Overall average 7-day compressive strength for the dry area mix was 1.54 MPa (223 psi) and for the underwater mix 2.94 MPa (427 psi).Overall 28-day compressive strength for the dry area mix was 2.88 MPa (417 psi) and for the underwater mix 4.99 MPa (724 psi). A limited amount of testing was also performed at 91 days, where the overall compressive strength for the dry area mix was found to be 9.40 MPa (1363 psi) and for the underwater mix 13.98 MPa (2028 psi). All compressive strength values far exceeded the 0.34 MPa (50 psi) minimum requirements. The special, flowable-fill grouts designed and used for P- and R-Reactor ISD and used again for this 105-C ISD removal action resulted in considerable labor, cost, and schedule savings versus conventional materials. As an added bonus/benefit, the CO{sub 2} footprint of the SRS C-Reactor DB ISD was minimized by using a small amount of cement and byproduct material to produce the structural fill materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Macro-encapsulation as Manufactured Components for Disposal at the Nevada National Security Site (NNSS) - 16213

Macro-encapsulation as Manufactured is a relatively new terminology that supports the disposal of classified legacy weapon components at the Area 5 Disposal Cell at the Nevada National Security Site (NNSS). These components are composed of hundreds and sometimes thousands of parts. Examples of this type of item include firing sets, trainers, radar assemblies, neutron generators and other similar components. Sometimes there are hazardous Resource Conservation and Recovery Act-regulated (RCRA) metals involved in the parts that make up the components. The typical regulated metals in the components can be lead and silver from circuit boards and wiring, cadmium or chromium from plating operations of the parts. To perform the Toxicity Characteristic Leaching Procedure (TCLP) components have to be completely disassembled and sanitized prior to being sent to laboratories for analysis. The results vary but the majority of times there are regulated metals present in these samples. The levels are relatively low and since analysis has been performed then a disposal process needs to be followed. A process needed to be developed and approved by governing boards to allow disposal of these items as long as this material meets the Waste Acceptance Criteria (WAC) (No liquids, compressed gases, explosives, SNM, etc.) before being sent to the Nevada desert for disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adsorptive Removal of Cs-137 and Sr-90 from Water in the Spent Fuel Pool of Taiwan Research Reactor - 18169

The cleanup of spent fuel pool in Taiwan Research Reactor (TRR) is a significant milestone in the decommissioning project of TRR. Due to the water was polluted by the ruptured spent nuclear fuel rods, the fission products and actinides were required to be removed from the water prior to transporting the water to the radioactive liquid wastes treatment plant. A granular aluminosilicate adsorbent (namely GWC) was loaded into a special designed water submersion adsorber to remove radionuclides from water in consideration of the subsequent retrieving after used. The unit is able to be placed underwater without heavy shield shroud, and easily to be assembled and disassembled. More than 95% of β-emitters had been removed from the 980 m{sup 3} of contaminated water in the SFP and generated about 1.5 m{sup 3} of spent GWC which adsorbed with 4*10{sup 12} Bq of radionuclides. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling of Lead-210 Data Documents Benefits in Proactively Understanding TENORM Deposition - 18515

Radioactive decay of naturally occurring Radon-222 present in just-produced natural gas can lead to deposition of its radiogenic daughter, Lead-210, and subsequent radiogenic progeny within natural gas handling, treatment, and distribution facilities. Worker safety issues and disposal challenges arise when these accumulate to radiologically problematic activity levels. This is due to the 22.3-year half-life of Lead-210, allowing for multi-decade period of accumulation to occur and to persist, even after facility operations have ceased. Due to the far shorter half-lives of Lead-210 radiogenic progeny, especially that of Polonium-210, secular equilibrium within the Lead-210-Bismuth-210-Polonium-210 decay chain is quickly approached during facility operations and achieved after facility operations end. Lead-210 that accumulates in pipe scale can complicate any subsequent intrusive facility modifications, such as disassembly and dismantlement, potentially exposing workers to adverse radioactivity and impeding recycling and/or disposal of radiologically impacted equipment or other material. Experience has shown it is not strictly the presence of Lead-210 that is problematic but rather its 'unexpected' presence when this Technologically Enhanced Naturally Occurring Radioactive Material (TENORM) is discovered during intrusive work not incorporating radiological health and safety and material handling plans. Conversely, when implementing a program that proactively considers the potential for Lead-210, this form of TENORM simply becomes another 'special waste' that can be safely, efficiently, and effectively addressed during a decommissioning effort, without associated adverse worker exposures, project cost over-runs, and schedule delays. This paper will discuss how proactive radioactive scanning quickly and safely identified Lead-210 and its radiogenic progeny within a natural gas sweetening and compressor station located in northern Montana, a portion of which was undergoing decommissioning, aiding in safe and compliant material handling and recycling. The location of this operation necessitated that the decommissioning program be completed on schedule to prevent weather-related impacts due to the onset of adverse winter conditions. Further, the radioactive data acquired during this project will be shown to provide important insight into historic behavior of Lead-210 in terms of its disposition and its more recent decay. From these data, it became possible to back-model the average activity of Radon-222 within the natural gas being processed during the life of the operation, how the estimated Radon-222 activity within the processed natural gas conformed to measured Radon-222 at various other natural gas fields, and how this information can be leveraged in developing safe and successful plans for future intrusive work at this and companion site operations. This presentation will also note the apparent preferential accumulation of Lead-210 within both rubber-based materials, such as gaskets and seals, and grease-based products found within natural gas flow lines. Thoughts regarding processes that may lead to this finding will be explored. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗