Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Designs that Work”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Exascale workflow applications and middleware: An ExaWorks retrospective

Exascale computers offer transformative capabilities to combine data-driven and learning-based approaches with traditional simulation applications to accelerate scientific discovery and insight. However, these software combinations and integrations are difficult to achieve due to the challenges of coordinating and deploying heterogeneous software components on diverse and massive platforms. Here, we present the ExaWorks project, which addresses many of these challenges. We developed a workflow Software Development Toolkit (SDK), a curated collection of workflow technologies that can be composed and interoperated through a common interface, engineered following current best practices, and specifically designed to work on HPC platforms. ExaWorks also developed PSI/J, a job management abstraction API, to simplify the construction of portable software components and applications that can be used over various HPC schedulers. The PSI/J API is a minimal interface for submitting and monitoring jobs and their execution state across multiple and commonly used HPC schedulers. We also describe several leading and innovative workflow examples of ExaWorks tools used on DOE leadership platforms. Furthermore, we discuss how our project is working with the workflow community, large computing facilities, and HPC platform vendors to address the requirements of workflows sustainably at the exascale.

97 MATHEMATICS AND COMPUTING↗

Data for Metabolic Engineering of β-Oxidation to Leverage Thioesterases for Production of 2-Heptanone, 2-Nonanone, and 2-Undecanone

Medium-chain length methyl ketones are potential blending fuels due to their cetane numbers and low melting temperatures. Biomanufacturing offers the potential to produce these molecules from renewable resources such as lignocellulosic biomass. In this work, we designed and tested metabolic pathways in Escherichia coli to specifically produce 2-heptanone, 2-nonanone and 2-undecanone. We achieved substantial production of each ketone by introducing chain-length specific acyl-ACP thioesterases, blocking the β-oxidation cycle at an advantageous reaction, and introducing active β-ketoacyl-CoA thioesterases. Using a bioprospecting approach, we identified 15 homologs of E. coli β-ketoacyl-CoA thioesterase (FadM) and evaluated the in vivo activity of each against various chain length substrates. The FadM variant from Providencia sneebia produced the most 2-heptanone, 2-nonanone, and 2-undecanone, suggesting it has the highest activity on the corresponding β-ketoacyl-CoA substrates. We tested enzyme variants, including acyl-CoA oxidases, thiolases, and bi-functional 3-hydroxyacyl-CoA dehydratases to maximize conversion of fatty acids to β-keto acyl-CoAs for 2-heptanone, 2-nonanone, and 2-undecanone production. In order to address the issue of product loss during fermentation, we applied a 20% (v/v) dodecane layer in the bioreactor and built an external water cooling condenser connecting to the bioreactor heat-transferring condenser coupling to the condenser. Using these modifications, we were able to generate up to 4.4 g/L total medium-chain length methyl ketones.

Metabolic Engineering↗

Machine-assisted discovery of integrable symplectic mappings

Integrable systems possess a hidden symmetry associated with the existence of conserved quantities known as integrals of motion. These systems play an important role in understanding general dynamics in accelerators and have potential for future designs. This work will cover two automated methods for finding integrable symplectic maps of the plane. The first algorithm is based on the observation that the evolution of an integrable system in phase space is confined to a lower-dimensional submanifold of a specific type. The second algorithm relies on an analysis of dynamical variables. Both methods rediscover some of the famous McMillan-Suris integrable mappings and ultra-discrete Painlev\'e equations. Over 100 new integrable families are presented and analyzed, some of which are isolated in the space of parameters, while others are families with one parameter (or the ratio of parameters) being either continuous or discrete. In addition, the newly discovered maps are related to a general 2D symplectic map through the use of discrete perturbation theory. A method is proposed for constructing smooth near-integrable dynamical systems based on mappings with polygon invariants.

43 PARTICLE ACCELERATORS↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University's aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Automatic Transformation of MPI Programs to Asynchronous, Graph-Driven Form

The goals of this project are to develop new, scalable, high-fidelity algorithms for atomic-level simulations and program transformations that automatically restructure existing applications, enabling them to scale forward to Petascale systems and beyond. The techniques enable legacy MPI application code to exploit greater parallelism though increased latency hiding and improved workload assignment. The techniques were successfully demonstrated on high-end scalable systems located at DOE laboratories. Besides the automatic MPI program transformations efforts, the project also developed several new scalable algorithms for ab-initio molecular dynamics, including new massively parallel algorithms for hybrid DFT and new parallel in time algorithms for molecular dynamics and ab-initio molecular dynamics. These algorithms were shown to scale to very large number of cores, and they were designed to work in the latency hiding framework developed in this project. The effectiveness of the developments was enhanced by the direct application to real grand challenge simulation problems covering a wide range of technologically important applications, time scales and accuracies. These included the simulation of the electronic structure of mineral/fluid interfaces, the very accurate simulation of chemical reactions in microsolvated environments, and the simulation of chemical behavior in very large enzyme reactions.

97 MATHEMATICS AND COMPUTING↗

Application of Robust Design and Advanced Computer Aided Engineering Technologies: Cooperative Research and Development (Final Report)

Oshkosh Corporation (OSK) is taking an aggressive approach to implementing advanced technologies, including hybrid electric vehicle (HEV) technology, throughout their commercial and military product lines. These technologies have important implications for OSK's commercial and military customers, including fleet fuel efficiency, quiet operational modes, additional on-board electric capabilities, and lower thermal signature operation. However, technical challenges exist with selecting the optimal HEV components and design to work within the performance and packaging constraints of specific vehicle applications. SK desires to use unique expertise developed at the Department of Energy?s (DOE) National Renewable Energy Laboratory (NREL), including HEV modeling and simulation. These tools will be used to overcome technical hurdles to implementing advanced heavy vehicle technology that meet performance requirements while improving fuel efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Comparison of Fast Neutron Detector Technologies

This report documents the work performed for the Department of Homeland Security Domestic Nuclear Detection O ce as the project Fast Neutron Detection Evaluation under contract HSHQDC-14-X-00022. This study was performed as a follow-on to the project Study of Fast Neutron Signatures and Measurement Techniques for SNM Detection - DNDO CFP11-100 STA-01. That work compared various detector technologies in a portal monitor con guration, focusing on a comparison between a number of fast neutron detection techniques and two standard thermal neutron detection technologies. The conclusions of the earlier work are contained in the report Comparison of Fast Neutron Detector Technologies. This work is designed to address questions raised about assumptions underlying the models built for the earlier project. To that end, liquid scintillators of two di erent sizes{ one a commercial, o -the-shelf (COTS) model of standard dimensions and the other a large, planer module{were characterized at Los Alamos National Laboratory. The results of those measurements were combined with the results of the earlier models to gain a more complete picture of the performance of liquid scintillator as a portal monitor technology.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Elko County School District (ECSD) Geothermal Evaluation: Basin College Direct Use Geothermal Demonstration Project

The system has been in continuous operation since October 1986 and serves various customers with approximately 180°F geothermal heating water for use at each facility as shown in Exhibit B. The system which is maintained by the school district consists of two main water loops. The system was designed for a large temperature difference instead of the normal 20°ΔT heating system. Using the design 80°ΔT, we yield 4+ times more energy with the same water flow. Loop 1 is the main geothermal water loop which flows from the production well through two main system heat exchangers and, after heat is extracted, to the disposal area. Loop 2, the customer heating loop, is heated in the main heat exchangers and then runs through approximately 5500 feet of buried supply piping and approximately 5500 feet of buried return piping to each customer facility where a facility heat exchanger is provided for each customers use. All piping on the customers’ side of each facility heat exchanger is the responsibility of the individual customer. Although originally designed to work with an 80ºΔT, this has deteriorated over the years and cannot achieve this at the present time. The system has operated over the last 29 years with minimal maintenance but is now starting to show its age with various corrosion issues, control problems, and several leaks. Some parts of the system are also located in areas where proposed building expansions will require piping relocations.This is the final technical report for the Great Basin College Direct Use Geothermal Demonstrationn Project, outlining the technical aspects of the User Group System.

15 GEOTHERMAL ENERGY↗

Development of an improved MATLAB GUI for the prediction of coefficients of restitution, and integration into LMS.

In 2012, a Matlab GUI for the prediction of the coefficient of restitution was developed in order to enable the formulation of more accurate Finite Element Analysis (FEA) models of components. This report details the development of a new Rebound Dynamics GUI, and how it differs from the previously developed program. The new GUI includes several new features, such as source and citation documentation for the material database, as well as a multiple materials impact modeler for use with LMS Virtual.Lab Motion (LMS VLM), and a rigid body dynamics modeling software. The Rebound Dynamics GUI has been designed to work with LMS VLM to enable straightforward incorporation of velocity-dependent coefficients of restitution in rigid body dynamics simulations.

97 MATHEMATICS AND COMPUTING↗

Long Island Smart Energy Corridor

The Long Island Power Authority (LIPA) has teamed with Stony Brook University (Stony Brook or SBU) and Farmingdale State College (Farmingdale or FSC), two branches of the State University of New York (SUNY), to create a “Smart Energy Corridor.” The project, located along the Route 110 business corridor on Long Island, New York, demonstrated the integration of a suite of Smart Grid technologies from substations to end-use loads. The Smart Energy Corridor Project included the following key features: -TECHNOLOGY: Demonstrated a full range of smart energy technologies, including substations and distribution feeder automation, fiber and radio communications backbone, advanced metering infrastructure (AM”), meter data management (MDM) system (which LIPA implemented outside of this project), field tools automation, customer-level energy management including automated energy management systems, and integration with distributed generation and plug-in hybrid electric vehicles. -MARKETING: A rigorous market test that identified customer response to an alternative time-of-use pricing plan and varying levels of information and analytical support. -CYBER SECURITY: Tested cyber security vulnerabilities in Smart Grid hardware, network, and application layers. Developed recommendations for policies, procedures, and technical controls to prevent or foil cyber-attacks and to harden the Smart Grid infrastructure. -RELIABILITY: Leveraged new Smart Grid-enabled data to increase system efficiency and reliability. Developed enhanced load forecasting, phase balancing, and voltage control techniques designed to work hand-in-hand with the Smart Grid technologies. -OUTREACH: Implemented public outreach and educational initiatives that were linked directly to the demonstration of Smart Grid technologies, tools, techniques, and system configurations. This included creation of full-scale operating models demonstrating application of Smart Grid technologies in business and residential settings. Farmingdale State College held three international conferences on energy and sustainability and Smart Grid related technologies and policies. These conferences, in addition to public seminars increased understanding and acceptance of Smart Grid transformation by the general public, business, industry, and municipalities in the Long Island and greater New York region. - JOB CREATION: Provided training for the Smart Grid and clean energy jobs of the future at both Farmingdale and Stony Brook. Stony Brook focused its “Cradle to Fortune 500” suite of economic development resources on the opportunities emerging from the project, helping to create new technologies, new businesses, and new jobs. To achieve these features, LIPA and its sub-recipients, FSC and SBU, each have separate but complementary objectives. At LIPA, the Smart Energy Corridor (1) meant validating Smart Grid technologies; (2) quantifying Smart Grid costs and benefits; and (3) providing insights into how Smart Grid applications can be better implemented, readily adapted, and replicated in individual homes and businesses. LIPA installed 2,550 AMI meters (exceeding the 500 AMI meters in the original plan), created three “smart” substations serving the Corridor, and installed additional distribution automation elements including two-way communications and digital controls over various feeders and capacitor banks. It gathered and analyzed customer behavior information on how they responded to a new “smart” TOU rate and to various levels of information and analytical tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Influence of local capillary trapping on containment system effectiveness

Immobilization of CO 2 injected into deep subsurface storage reservoirs is a critical component of risk assessment for geologic CO 2 storage (GCS). Local capillary trapping (LCT) is a recently established mode of immobilization that arises when CO 2 migrates due to buoyancy through heterogeneous storage reservoirs. This project sought to assess the amount and extent of LCT expected in storage formations under a range of injection conditions, and to confirm the persistence of LCT if the seal overlying the reservoir were to lose its integrity. Numerical simulation using commercial reservoir simulation software was conducted to assess the influence of injection. Laboratory experiments, modeling and numerical simulation were conducted to assess the effect of compromised seal integrity. Bench-scale (0.6 m by 0.6 m by 0.03 m) experiments with surrogate fluids provided the first empirical confirmation of the key concepts underlying LCT: accumulation of buoyant nonwetting phase at above residual saturations beneath capillary barriers in a variety of structures, which remains immobile under normal capillary pressure gradients. Immobilization of above-residual saturations is a critical distinction between LCT and the more familiar “residual saturation trapping.” To estimate the possible extent of LCT in a storage reservoir an algorithm was developed to identify all potential local traps, given the spatial distribution of capillary entry pressure in the reservoir. The algorithm assumes that the driving force for CO 2 migration can be represented as a single value of “critical capillary entry pressure” P c,entry crit , such that cells with capillary entry pressure greater/less than P c,entry crit act as barriers/potential traps during CO 2 migration. At intermediate values of P c,entry crit , the barrier regions become more laterally extensive in the reservoir, approaching a percolation threshold while non-barrier regions remain numerous. The maximum possible extent of LCT thus occurs at P c,entry crit near this threshold. Testing predictions of this simple algorithm against full-physics simulations of buoyancy-driven CO 2 migration support the concept of critical capillary entry pressure. However, further research is needed to determine whether a single value of critical capillary entry pressure always applies and how that value can be determined a priori. Simulations of injection into high-resolution (cells 0.3 m on a side) 2D and 3D heterogeneous domains show two characteristic behaviors. At small gravity numbers (vertical flow velocity much less than horizontal flow velocity) the CO 2 fills local traps as well as regions that would act as local barriers if CO 2 were moving only due to buoyancy. When injection ceases, the CO 2 migrates vertically to establish large saturations within local traps and residual saturation elsewhere. At large gravity numbers, the CO 2 invades a smaller portion of the perforated interval. Within this smaller swept zone the local barriers are not invaded, but local traps are filled to large saturation during injection and remain during post-injection gravity-driven migration. The small gravity number behavior is expected in the region within 100 m of a vertical injection well at anticipated rates of injection for commercial GCS. Simulations of leakage scenarios (through-going region of large permeability imposed in overlying seal) indicate that LCT persists (i.e. CO 2 remains held in a large fraction of the local iv traps) and the persistence is independent of injection rate during storage. Simulations of leakage for the limiting case of CO 2 migrating vertically from an areally extensive emplacement in the lower portion of a reservoir showed similar strong persistence of LCT. This research has two broad implications for GCS. The first is that LCT can retain a significant fraction of the CO 2 stored in a reservoir – above and beyond the residual saturation -- if the overlying seal were to fail. Thus frameworks for risk assessment should be extended to account for LCT. The second implication is that compared to pressure driven flow in reservoirs, CO 2 migration and trapping behave in a qualitatively different manner in heterogeneous reservoirs when buoyancy is the dominant driving force for flow. Thus simulations of GCS that neglect capillary heterogeneity will fail to capture important features of the CO 2 plume. While commercial reservoir simulation software can account for fine scale capillary heterogeneity, it has not been designed to work efficiently with such domains, and no simulators can handle fine-scale resolution throughout the reservoir. A possible way to upscale the migration and trapping is to apply an “effective residual saturation” to coarse-scale grids. While the extent of overall immobilization can be correlated in this way, all coarser grids failed to capture the distance traveled by the migrating CO 2 for large gravity number. Thus it remains unclear how best to account for LCT in the routine simulation work-flow that will be needed for large-scale GCS. Alternatives meriting investigation include streamline methods, reduced-physics proxies (e.g. particle tracking), and biased invasion percolation algorithms, which are based on precisely the capillary heterogeneity essential for LCT.

58 GEOSCIENCES↗