Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Space Shuttle Main Engine: Advanced Health Monitoring System

The main gola of the Space Shuttle Main Engine (SSME) Advanced Health Management system is to improve flight safety. To this end the new SSME has robust new components to improve the operating margen and operability. The features of the current SSME health monitoring system, include automated checkouts, closed loop redundant control system, catastropic failure mitigation, fail operational/ fail-safe algorithms, and post flight data and inspection trend analysis. The features of the advanced health monitoring system include: a real time vibration monitor system, a linear engine model, and an optical plume anomaly detection system. Since vibration is a fundamental measure of SSME turbopump health, it stands to reason that monitoring the vibration, will give some idea of the health of the turbopumps. However, how is it possible to avoid shutdown, when it is not necessary. A sensor algorithm has been developed which has been exposed to over 400 test cases in order to evaluate the logic. The optical plume anomaly detection (OPAD) has been developed to be a sensitive monitor of engine wear, erosion, and breakage.

Singer, Chirs↗

Simultaneous Observation of Jovian Radio Emissions by Cassini and Wind

During the Cassini instrument checkout interval in January 1999 as the spacecraft was making a distant (0.6 AU) swing by Earth, the radio and plasma wave receiver (RPWS) detected radio emission from the sun, Earth, and Jupiter, the latter including both the hectometric (HOM) and decametric (DAM) components. The WAVES experiment on the Wind spacecraft in orbit near Earth was also making observations of Jupiter at this same time. By combining the RPWS and WAVES data sets, we are able to provide some insight into the instantaneous beaming of Jovian radio emissions. As seen by Jupiter, Cassini and Wind were a few degrees apart during this period, yet the correlation between Jovian DAM arcs observed by the two spacecraft suggests that the beam width is even narrower and does not simultaneously illuminate both. The only earlier spacecraft capable, in principle, of making these observations were Voyager-1 and 2, but their sensitivity to DAM emissions was too limited to reliably measure the instantaneous beaming. The beam width implied by the RPWS-WAVES measurements is approximately the same as the angle through which Jupiter rotates while an arc (at a fixed frequency) is visible. The HOM Jovian emissions, on the other hand, seem similar as observed by RPWS and WAVES, consistent with earlier Wind-Ulysses measurements indicating a somewhat broader beam width.

Kaiser, M. L.↗

Automated Testing Experience of the Linear Aerospike SR-71 Experiment (LASRE) Controller

System controllers must be fail-safe, low cost, flexible to software changes, able to output health and status words, and permit rapid retest qualification. The system controller designed and tested for the aerospike engine program was an attempt to meet these requirements. This paper describes (1) the aerospike controller design, (2) the automated simulation testing techniques, and (3) the real time monitoring data visualization structure. Controller cost was minimized by design of a single-string system that used an off-the-shelf 486 central processing unit (CPU). A linked-list architecture, with states (nodes) defined in a user-friendly state table, accomplished software changes to the controller. Proven to be fail-safe, this system reported the abort cause and automatically reverted to a safe condition for any first failure. A real time simulation and test system automated the software checkout and retest requirements. A program requirement to decode all abort causes in real time during all ground and flight tests assured the safety of flight decisions and the proper execution of mission rules. The design also included health and status words, and provided a real time analysis interpretation for all health and status data.

Larson, Richard R.↗

Human Mars Mission: SEP Architecture Crew Taxi Propulsion Stage Study and Design and Technology for Reaction and Control System

The Mars exploration is a candidate pathway to expand human presence and useful activities in the solar system. There are several propulsion system options being considered to place the Mars payload on its inter-planetary transfer trajectory. One propulsion option is the use of Solar Electric Propulsion (SEP) to spiral out with the Mars payload from an initial Low Earth Orbit (LEO) to an elliptical High Earth Orbit (HEO). This report, presented in annotated facing page format, describes the work completed on the design of a crew taxi propulsion stage used in conjunction with the SEP. Transportation system/mission analysis topics covered in this report include sub-system analysis, trajectory profile description, mass performance and crew taxi stage sizing, stage configuration, stage cost, and Trans-Mars Injection (TMI) launch window. The high efficiency of SEP is used to provide the major part of the TMI propulsion maneuver. Orbital energy is continuously added over a period of approximately twelve months. The SEP and Mars payload follow a spiral trajectory from an initial LEO to a final elliptical HEO. A small chemical stage is then used to provide the final part of the TMI. The now unloaded SEP returns to LEO to repeat another spiral trajectory with payload to HEO. The spiral phase of the SEP's trajectory takes several months to reach HEO, thus significantly increasing the exposure time of the crew to zero-gravity. In order to minimize the long zero-gravity effects, a high thrust chemical stage delivers the crew to the SEP's HEO. The crew rendezvous with the Mars payload in HEO. After a checkout period the Mars payload with the crew is injected onto a Trans-Mars Trajectory by a small chemical stage.

Young, Archie↗

A Status of the Advanced Space Transportation Program from Planning to Action

A Technology Plan for Enabling Commercial Space Business was presented at the 48th International Astronautical Congress in Turin, Italy. This paper presents a status of the program's accomplishments. Technology demonstrations have progressed in each of the four elements of the program; (1) Low Cost Technology, (2) Advanced Reusable Technology, (3) Space Transfer Technology and (4) Space Transportation Research. The Low Cost Technology program element is primarily focused at reducing development and acquisition costs of aerospace hardware using a "design to cost" philosophy with robust margins, adapting commercial manufacturing processes and commercial off-the-shelf hardware. The attributes of this philosophy for small payload launch are being demonstrated at the component, sub-system, and system level. The X-34 "Fastrac" engine has progressed through major component and subsystem demonstrations. A propulsion system test bed has been implemented for system-level demonstration of component and subsystem technologies; including propellant tankage and feedlines, controls, pressurization, and engine systems. Low cost turbopump designs, commercial valves and a controller are demonstrating the potential for a ten-fold reduction in engine and propulsion system costs. The Advanced Reusable Technology program element is focused on increasing life through high strength-to-weight structures and propulsion components, highly integrated propellant tanks, automated checkout and health management and increased propulsion system performance. The validation of rocket based combined cycle (RBCC) propulsion is pro,-,ressing through component and subsystem testing. RBCC propulsion has the potential to provide performance margin over an all rocket system that could result in lower gross liftoff weight, a lower propellant mass fraction or a higher payload mass fraction. The Space Transfer Technology element of the program is pursuing technology that can improve performance and dramatically reduce the propellant and structural mass of orbit transfer and deep space systems. Flight demonstration of ion propulsion is progressing towards launch. Ion propulsion is the primary propulsion for Deep Space 1; a flyby of comet West-kohoutek-lkemura and asteroid 3352 McAuliffe. Testing of critical solar-thermal propulsion subsystems have been accomplished and planning is continuing for the flight demonstration of an electrodynamic tether orbit transfer system. The forth and final element of the program, Space Transportation Research, has progressed in several areas of propulsion research. This element of the program is focused at long-term (25 years) breakthrough concepts that could bring launch costs to a factor of one hundred below today's cost or dramatically expand planetary travel and enable interstellar travel.

Lyles, Garry↗

STS-103 Crew Activities Report: Flight Day 7 Highlights

Today Discovery's astronauts begin preparing the spacecraft for it's scheduled return to Earth by checking out the flight control system and reaction control jets that support re-entry. Later in the day the astronauts begin stowing equipment used during the past week and start buttoning up on-orbit systems. The Ku-band antenna which provides most of the capacity for data and television relay was stowed around 8:45 p.m. The recently refurbished Hubble Space Telescope moves slowly through it's checkout sequence before resuming science operations. Both the flight control system (FCS) and the reaction control jets (RCS) were without issue, with all systems ready to support Discovery's return to Earth.

Source record↗

STS-103 Crew at Breakfast, Suiting, Departing O&C

The Hubble Space Telescope (HST) team is preparing for NASA's third scheduled service call to Hubble. This mission, STS-103, will launch from Kennedy Space Center aboard the Space Shuttle Discovery. The seven flight crew members for STS-103 are: Commander Curtis L. Brown (his sixth flight), Pilot Scott J. Kelly and European Space Agency (ESA) astronaut Jean-Francois Clervoy (his third flight) will join space walkers Steven L. Smith (his third flight), C. Michael Foale (his fifth flight), John M. Grunsfeld (his third flight) and ESA astronaut Claude Nicollier (his fourth flight). This current video presents a live footage of the seven STS-103 crewmembers eating breakfast, suiting, and departing the O&C (Operations and Checkout) before the 6:50 p.m. lift-off.

Source record↗

STS-93: Chandra Flight Crew During Breakfast, Suiting and Departing the O&C Building

Live footage shows the crewmembers, Commander Eileen M. Collins, Pilot Jeffrey S. Ashby, and Mission Specialists Steven A. Hawley, Catherine G. Coleman and Michel Tognini, sitting around the traditional breakfast table with the traditional cake, talking and having their photographs taken. Footage also includes the crew suiting up and walking out to the Astro-Van from the Operations and Checkout (O&C) Building.

Source record↗

STS-93: Columbia / Chandra Mission Overview (from JSC)

A press briefing held on July 7, 1999 reviews the progress of the Chandra X ray Observatory project. The tape begins with an animated view of the launch of the Chandra X ray Observatory from the shuttle, as it was planned. Next is a press briefing. Bryan Austin, the Lead Flight Director, discusses the five day mission, and the reason for the shortened length, due to the added weight from the Chandra Observatory. He also reviews the other payloads, and activities that will take place during the mission. Kenneth Ledbetter, Science Director Mission Development, discusses the 4 great observatories and the role of each. They are the Hubble, which observed visible light; Compton Gamma Ray Observatory, the Chandra, and the Space Infrared Telescope Facility. A time line of the expected operational lifetime of each of the 4 great observatories is shown. Specific information about the Chandra Telescope is reviewed. The last press briefing presenter is Fred Wojtalik, who is the Chandra Program Manager. He reviews the Chandra's components, and acknowledges a few of the many companies that contributed to its building. He also reviews the orbital activation and checkout sequences. Question that follows, center around contingency plans if some part of the planned sequence is not successful. The costs are reviewed, and concerns about the Initial Upper Stage, the propulsion unit required to take the Chandra to its high orbit are addressed. The Chandra is planned to take an eliptical orbit, which is higher than the other space telescopes, thus far launched due to the requirement to avoid Earth generated X rays.

Source record↗

The Life Cycle Application of Intelligent Software Modeling for the First Materials Science Research Rack

Marshall Space Flight Center (MSFC) has been funding development of intelligent software models to benefit payload ground operations for nearly a decade. Experience gained from simulator development and real-time monitoring and control is being applied to engineering design, testing, and operation of the First Material Science Research Rack (MSRR-1). MSRR-1 is the first rack in a suite of three racks comprising the Materials Science Research Facility (MSRF) which will operate on the International Space Station (ISS). The MSRF will accommodate advanced microgravity investigations in areas such as the fields of solidification of metals and alloys, thermo-physical properties of polymers, crystal growth studies of semiconductor materials, and research in ceramics and glasses. The MSRR-1 is a joint venture between NASA and the European Space Agency (ESA) to study the behavior of different materials during high temperature processing in a low gravity environment. The planned MSRR-1 mission duration is five (5) years on-orbit and the total design life is ten (IO) years. The MSRR-1 launch is scheduled on the third Utilization Flight (UF-3) to ISS, currently in February of 2003). The objective of MSRR-1 is to provide an early capability on the ISS to conduct material science, materials technology, and space product research investigations in microgravity. It will provide a modular, multi-user facility for microgravity research in materials crystal growth and solidification. An intelligent software model of MSRR-1 is under development and will serve multiple purposes to support the engineering analysis, testing, training, and operational phases of the MSRR-1 life cycle development. The G2 real-time expert system software environment developed by Gensym Corporation was selected as the intelligent system shell for this development work based on past experience gained and the effectiveness of the programming environment. Our approach of multi- uses of the simulation model and its intuitive graphics capabilities is providing a concurrent engineering environment for rapid prototyping and development. Operational schematics of the MSRR-1 electrical, thermal control, vacuum access, and gas supply systems, and furnace inserts are represented graphically in the environment. Logic to represent first order engineering calculations is coded into the knowledge base to simulate the operational behavior of the MSRR-1 systems. An example of engineering data provided includes electrical currents, voltages, operational power, temperatures, thermal fluid flow rates. pressures, and component status indications. These type of data are calculated and displayed at appropriate instrumentation points, and the schematics are animated to reflect the simulated operational status of the MSRR-1. The software control functions are also simulated to represent appropriate operational behavior based on automated control and response to commands received by the crew or ground controllers. The first benefit of this simulation environment is being realized in the high fidelity engineering analysis results from the electrical power system G2 model. Secondly, the MSRR-1 simulation model will be embedded with a hardware mock-up of the MSRR-1 to provide crew training on MSRR-1 integrated payload operations. G2 gateway code will output the simulated instrumentation values, termed as telemetry, in a flight-like data stream so that the crew has realistic and accurate simulated MSRR-1 data on the flight displays which will be designed for crew use. The simulation will also respond appropriately to crew or ground initiated commands, which will be part of normal facility operations. A third use of the G2 model is being planned; the MSRR-1 simulation will be integrated with additional software code as part of the test configuration of the primary onboard computer, or Master Controller, for MSRR-1. We will take advantage of the G2 capability to simulate the flight like data stream to test flight software responses and behavior. A fourth use of the G2 model will be to train the Ground Support Personnel that will monitor the MSRR-1 systems and payloads while they are operating aboard the ISS. The intuitive, schematic based environment will provide an excellent foundation for personnel to understand the integrated configuration and operation of the MSRR-1, and the anticipated telemetry feedback based on operational modes of the equipment. Expert monitoring features will be enhanced to provide a smart monitoring environment for the operators. These features include: (1) Animated, intuitive schematic-based displays which reflect telemetry values, (1) Real-time plotting of simulated or incoming sensor values, (3) High/Low exception monitoring for analog data, (4) Expected state monitoring for discrete data, (5) Data trending, (6) Automated malfunction procedure execution to diagnose problems, (7) Look ahead capability to planned MSRR-1 activities in the onboard timeline. And finally, the logic to calculate telemetry values will be deactivated, and the same environment will interface to the incoming data for the real-time telemetry stream to schematically represent the onboard hardware configuration. G2 will be the foundation for the real-time monitoring and control environment. In summary, our MSRR-1 simulation model spans many elements of the life cycle development of this project: Engineering Analysis, Test and Checkout, Training of Crew and Ground Personnel, and Real-time monitoring and control. By utilizing the unique features afforded by an expert system development environment, we have been able to synergize a powerful tool capable of addressing our project needs at every phase of project development.

Rice, Amanda↗

Human Mars Mission: SEP Architecture, Crew Taxi Propulsion Stage Study and Design and Technology for Reaction and Control System

The Mars exploration is a candidate pathway to expand human presence and useful activities in the solar system. There are several propulsion system options being considered to place the Mars payload on its interplanetary transfer trajectory. One propulsion option is the use of Solar Electric Propulsion (SEP) to spiral out with the Mars payload from an initial Low Earth Orbit (LEO) to an elliptical High Earth Orbit (HEO). This report, presented in annotated facing page format, describes the work completed on the design of a crew taxi propulsion stage used in conjunction with the SEP. Transportation system/mission analysis topics covered in this report include sub-system analysis, trajectory profile description, mass performance and crew taxi stage sizing, stage configuration, stage cost, and Trans-Mars Injection (TMI) launch window. The high efficiency of SEP is used to provide the major part of the TMI propulsion maneuver. Orbital energy is continuously added over a period of approximately twelve months. The SEP and Mars payload follow a spiral trajectory from an initial LEO to a final elliptical HEO. A small chemical stage is then used to provide the final part of the TMI. The now unloaded SEP returns to LEO to repeat another spiral trajectory with payload to HEO. The spiral phase of the SEP's trajectory takes several months to reach HEO, thus significantly increasing the exposure time of the crew to zero-gravity. In order to minimize the long zero-gravity effects, a high thrust chemical stage delivers the crew to the SEP's HEO. The crew rendezvous with the Mars payload in HEO. After a checkout period the Mars payload with the crew is injected onto a Trans-Mars Trajectory by a small chemical stage.

Young, Archie↗

Design of an Aircraft Vortex Spacing System for Airport Capacity Improvement

The National Aeronautics and Space Administration (NASA) is addressing airport capacity enhancements through the Terminal Area Productivity (TAP) program. Within TAP, the Reduced Spacing Operations element at the NASA Langley Research Center is developing an Aircraft VOrtex Spacing System (AVOSS). AVOSS will integrate the output of several systems to produce weather dependent, dynamic wake vortex spacing criteria. These systems provide current and predicted weather conditions, models of wake vortex transport and decay in these weather conditions, and real-time feedback of wake vortex behavior from sensors. The goal of the NASA program is to provide the research and development to demonstrate an engineering model AVOSS, in real-time operation, at a major airport. A wake vortex system test facility was established at the Dallas-Fort Worth International Airport (DFW) in 1997 and tested in 1998. Results from operation of the initial AVOSS system, plus advances in wake vortex prediction and near-term weather forecast models, "nowcast", have been integrated into a second-generation system. This AVOSS version is undergoing final checkout in preparation for a system demonstration in 2000. This paper describes the revised AVOSS system architecture, subsystem enhancements, and initial results with AVOSS version 2 from a deployment at DFW in the fall of 1999.

Hinton, David A.↗

STS-99 Countdown Status Briefing

The primary objective of the STS-99 mission was to complete high resolution mapping of large sections of the Earth's surface using the Shuttle Radar Topography Mission (SRTM), a specially modified radar system. This radar system produced unrivaled 3-D images of the Earth's Surface. The mission was launched at 12:31 on February 11, 2000 onboard the space shuttle Endeavour. This tape presents a pre-launch briefing for the press held on Jan. 28, 2000. Statements were given by Doug Lyons, Shuttle Test Director; Scott Higginbotham, STS-99 Payload Director and Ed Priselac, Shuttle Weather Officer. Doug Lyons reported on the checkout of the equipment. Scott Higgenbotham reviewed the steps required to assemble and test the SRTM instrumentation and equipment. Ed Priselac gave the weather forecast for the expected launch day. The questions concerned a possible problem with a part onboard the shuttle and the likely impact this might have on the launch.

Source record↗

STS-99 Countdown Status Press Conference

Live footage shows the participants in the Press Conference disclosing the status of the STS-99 flight. The panelists consists of NASA's test Director Jeff Spaulding, the STS-99 Payload Manager Scott Higginbotham, and the Shuttle Weather Officer Ed Priselac. Bruce Buckingham NASA's Public Affairs introduces each panelist as they discuss the servicing of fuel tanks, checkout, closeouts, payload status, and favorable weather conditions. The panelists also answer questions from the audience. Also shown are various shots of the Shuttle on the launch pad.

Source record↗

In-Flight Technique for Acquiring Mid- And Far-Field Sonic Boom Signatures

Flight test experiments have been conducted to establish the feasibility of obtaining sonic boom signature measurements below a supersonic aircraft using the NASA Portable Automatic Triggering System (PATS) mounted in the USMC Pioneer Unmanned Aerial Vehicle (UAV). This study forms a part of the NASA sonic boom minimization activities, specifically the demonstration of persistence of modified boom signatures to very large distances in a real atmosphere. The basic objective of the measurement effort was to obtain a qualitative view of the sonic boom signature in terms of its shape, number of shocks, their locations, and their relative strength. Results suggest that the technique may very well provide quantitative information relative to mid-field and far-field boom signatures. The purpose of this presentation is to describe the arrangement and operation of this in-flight system and to present the resulting sonic boom measurements. Adaption and modification of two PATS to the UAV payload section are described and include transducer location, mounting arrangement and recording system isolation. Ground static runup, takeoff and landing, and cruise flight checkouts regarding UAV propeller and flow noise on the PATS automated triggering system and recording mode are discussed. For the proof-of-concept tests, the PATS instrumented UAV was flown under radar control in steady-level flight at the altitude of 8700 feet MSL and at a cruise speed of about 60 knots. The USN F-4N sonic boom generating aircraft was vectored over the UAV on reciprocal headings at altitudes of about 1 1,000 feet MSL and 13,000 feet MSL at about Mach 1. 15. Sonic boom signatures were acquired on both PATS for all six supersonic passes. Although the UAV propeller noise is clearly evident in all the measurements, the F-4 boom signature is clearly distinguishable and is typically N-wave in character with sharply rising shock fronts and with a mid-shock associated with the inlet-wing juncture. Consideration is being given to adapting the PATS/TJAV measurements technique to the NASA Learjet to determine feasibility of acquiring in-flight boom signatures in the altitude range of 10,000 feet to 40,000 feet.

Stansbery, Eugene G.↗

Chandra X-Ray Observatory Pointing Control System Performance During Transfer Orbit and Initial On-Orbit Operations

The Chandra X-ray Observatory (CXO, formerly AXAF) is the third of the four NASA great observatories. It was launched from Kennedy Space Flight Center on 23 July 1999 aboard the Space Shuttle Columbia and was successfully inserted in a 330 x 72,000 km orbit by the Inertial Upper Stage (IUS). Through a series of five Integral Propulsion System burns, CXO was placed in a 10,000 x 139,000 km orbit. After initial on-orbit checkout, Chandra's first light images were unveiled to the public on 26 August, 1999. The CXO Pointing Control and Aspect Determination (PCAD) subsystem is designed to perform attitude control and determination functions in support of transfer orbit operations and on-orbit science mission. After a brief description of the PCAD subsystem, the paper highlights the PCAD activities during the transfer orbit and initial on-orbit operations. These activities include: CXO/IUS separation, attitude and gyro bias estimation with earth sensor and sun sensor, attitude control and disturbance torque estimation for delta-v burns, momentum build-up due to gravity gradient and solar pressure, momentum unloading with thrusters, attitude initialization with star measurements, gyro alignment calibration, maneuvering and transition to normal pointing, and PCAD pointing and stability performance.

Quast, Peter↗

STS-35: ASTRO-1 Assembly at O&C

Live footage shows the assembly of the ASTRO-1 payload for STS-35. The assembly occurred in the Operations and Checkout Building.

Source record↗

Advances in Space Transportation Technology Toward the NASA Goals

NASA has set goals to increase safety by one hundred times while reducing cost tenfold over the next decade. This dramatic increase in safety will come by departing from a past emphasis on cost and performance to a new paradigm of safety and reliability, which, in turn, will drive down cost. To accomplish this, vehicle systems must be inherently reliable, functionally redundant wherever practical and designed to minimize or eliminate catastrophic failure modes. Over the next twenty-five years, NASA has set goals to increase safety ten thousand times while reducing cost one hundred fold. Safety will increase towards today's airline safety and the low price per flight has the potential to enable a 15-fold increase in the size of the current projected space launch market. This level of improvement is comparable to the developments in the 1970s in the computer microprocessor when microchips went from hundreds of thousands to tens of thousands of dollars - hailing the era of the personal computer. In order to achieve such ambitious cost goals, today's partial and fully expendable rockets must be replaced by fully reusable systems. A RLV can eliminate assembly and checkout of the large number of complex interfaces on today's Space Shuttle. Full reusability will eliminate the necessity to throw away expensive hardware and the need for on-going production. Systems in ten years will have to accommodate 50 to 100 missions per year and could be commercially certified for hundreds of flights. In twenty-five years, the number of flights per year could jump to over 1,000, which will require certification for thousands of flights. The large increase in flights per year will demand that current operations and maintenance procedures be revolutionized. Unlike the current shuttle, which requires several thousand personnel over five months to process, the next generation system must be turned around in one week with less than one hundred personnel. In contrast to the rigorous disassembly and inspections required for the Space Shuttle's subsystems, the next generation vehicle's on-board health monitoring systems will could tell the ground crews which systems need replacement before landing. In twenty-five years, vehicles will be re-flown within one with crews numbering less than one hundred. Fully automated ground processing systems must require only a handful of personnel to launch the vehicle. Due to the increased intelligence of on-board systems, only cursory walk-around inspections would be required between flights An assessment of the progress in breakthrough technologies toward these goals by the NASA Advanced Space Transportation Program is presented. These breakthrough technologies include combined rocket and air breathing propulsion, high strength lightweight structures, high temperature materials, vehicle health management, and flight operations.

Lyles, Garry M.↗