Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONTRACTORS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Heat Capacity Mapping Radiometer (HCMR) data processing algorithm, calibration, and flight performance evaluation

The rationale and procedures used in the radiometric calibration and correction of Heat Capacity Mapping Mission (HCMM) data are presented. Instrument-level testing and calibration of the Heat Capacity Mapping Radiometer (HCMR) were performed by the sensor contractor ITT Aerospace/Optical Division. The principal results are included. From the instrumental characteristics and calibration data obtained during ITT acceptance tests, an algorithm for post-launch processing was developed. Integrated spacecraft-level sensor calibration was performed at Goddard Space Flight Center (GSFC) approximately two months before launch. This calibration provided an opportunity to validate the data calibration algorithm. Instrumental parameters and results of the validation are presented and the performances of the instrument and the data system after launch are examined with respect to the radiometric results. Anomalies and their consequences are discussed. Flight data indicates a loss in sensor sensitivity with time. The loss was shown to be recoverable by an outgassing procedure performed approximately 65 days after the infrared channel was turned on. It is planned to repeat this procedure periodically.

Bohse, J. R.↗

Space station: Cost and benefits

Costs for developing, producing, operating, and supporting the initial space station, a 4 to 8 man space station, and a 4 to 24 man space station are estimated and compared. These costs include contractor hardware; space station assembly and logistics flight costs; and payload support elements. Transportation system options examined include orbiter modules; standard and extended duration STS fights; reusable spacebased perigee kick motor OTV; and upper stages. Space station service charges assessed include crew hours; energy requirements; payload support module storage; pressurized port usage; and OTV service facility. Graphs show costs for science missions, space processing research, small communication satellites; large GEO transportation; OVT launch costs; DOD payload costs, and user costs.

Source record↗

Test results for 27.5- to 30-GHz communications satellite receivers

Five proof of concept receivers are tested. The receivers operate in the 27.5 to 30 GHz uplink band for communications satellites and produce an output at C band. Receiver requirements and test results are given. Test methods are discussed and results are compared with the contractor's test results.

Conroy, M. J.↗

Development of standardized specifications for screening space level integrated circuits and semiconductors

Standardized methods are established for screening of JAN B microcircuits and JANTXV semiconductor components for space mission or other critical applications when JAN S devices are not available. General specifications are provided which outline the DPA (destructive physical analysis), environmental, electrical, and data requirements for screening of various component technologies. This standard was developed for Air Force Space Division, and is available for use by other DOD agencies, NASA, and space systems contractors for establishing common screening methods for electronic components.

Source record↗

The NASA welding assessment program

The potential cost and performance advantages of welding was understood but ignored by solar panel manufacturers in the U.S. Although NASA, DOD and COMSAT have supported welding development efforts, soldering remains the only U.S. space qualified method for interconnecting solar cells. The reason is that no U.S. satellite prime contractor found it necessary, due to mission requirements, to abandon the space proven soldering process. It appears that the proposed NASA space station program will provide an array requirement, a 10 year operation in a low Earth orbital environment, that mandates welding. The status of welding technology in the U.S. is assessed.

Scott-Monck, J.↗

AC propulsion system for an electric vehicle, phase 2

A second-generation prototype ac propulsion system for a passenger electric vehicle was designed, fabricated, tested, installed in a modified Mercury Lynx vehicle and track tested at the Contractor's site. The system consisted of a Phase 2, 18.7 kw rated ac induction traction motor, a 192-volt, battery powered, pulse-width-modulated, transistorized inverter packaged for under rear seat installation, a 2-axis, 2-speed, automatically-shifted mechanical transaxle and a microprocessor-based powertrain/vehicle controller. A diagnostics computer to assist tuning and fault finding was fabricated. Dc-to-mechanical-system efficiency varied from 78% to 82% as axle speed/torque ranged from 159 rpm/788 nm to 65 rpm/328 nm. Track test efficiency results suggest that the ac system will be equal or superior to dc systems when driving urban cycles. Additional short-term work is being performed under a third contract phase (AC-3) to raise transaxle efficiency to predicted levels, and to improve starting and shifting characteristics. However, the long-term challenge to the system's viability remains inverter cost. A final report on the Phase 2 system, describing Phase 3 modifications, will be issued at the conclusion of AC-3.

Slicker, J. M.↗

Microgravity science and applications bibliography, 1984 revision

A compilation of Government reports, contractor reports, conference proceedings, and journal articles dealing is presented that deal with flight experiments utilizing a low gravity environment to elucidate and control various processes or with ground based activities that provide supporting research. Subdivisions include six major categories: (1) Electronic Materials; (2) Metals, Alloys, and Composites; (3) Fluid Dynamics and Transports; (4) Biotechnology; (5) Glasses and Ceramics; and (6) Combustion. Also included are publications from the European, Soviet, and Japanese MSA programs. In addition, there is a list of patents and appendices providing a compilation of anonymously authored reports and a cross reference index.

Pentecost, E.↗

The Design and Usage of the New Data Management Features in NASTRAN

Two new data management features are installed in the April 1984 release of NASTRAN. These two features are the Rigid Format Data Base and the READFILE capability. The Rigid Format Data Base is stored on external files in card image format and can be easily maintained and expanded by the use of standard text editors. This data base provides the user and the NASTRAN maintenance contractor with an easy means for making changes to a Rigid Format or for generating new Rigid Formats without unnecessary compilations and link editing of NASTRAN. Each Rigid Format entry in the data base contains the Direct Matrix Abstraction Program (DMAP), along with the associated restart, DMAP sequence subset and substructure control flags. The READFILE capability allows an user to reference an external secondary file from the NASTRAN primary input file and to read data from this secondary file. There is no limit to the number of external secondary files that may be referenced and read.

Pamidi, P. R.↗

Viking lander: Creating the science teams

The teams of scientists and the contractors involved in designing and fabricating the Viking lander spacecraft for Mars exploration are discussed. The requirements established for each member of the research teams are enumerated and the personnel selection process is described. Two instruments for the lander, a gas chromatograph-mass spectrometer and a biology life detection instrument, are addressed in terms of costs, design, planning, and subcontractors. The challenges and ultimate success of the research management efforts are related in detail.

Source record↗

Design, installation and operating experience of 20 photovoltaic medical refrigerator systems on four continents

The NASA Lewis Research Center in cooperation with the World Health Organization, U.S.A. I.D., the Pan American Health Organization and national government agencies in some developing countries sponsored the installation of twenty photovoltaic powered medical vaccine storage refrigerator-freezer (R/F) systems. The Solar Power Corporation was selected as the contractor to perform the design, development and installation of these twenty units. Solar Power's experiences are described herein.

Hein, G. F.↗

Space station - The next logical step

NASA has been charged with the development, over the next decade, of a permanently manned space station in low earth orbit. The space station system will comprise a manned base and associated unmanned platforms; while one of the platforms will be in polar orbit, another (or several) platforms will, like the manned base, have an orbital inclination of 28.5 deg. Because it is permanent, the space station will have to be semiautonomous from its mission control center. NASA will take a number of steps to foster the commercial utilization of the space station, and one of the design goals of the project is the definition of astronaut facilities that are very 'customer friendly'. Reliance on a single, program-wide contractor has been deemed undesirable; several major aerospace manufacturers will instead distribute responsibility among themselves for the various modules constituting the craft.

Beggs, J. M.↗

The 3-D inelastic analysis methods for hot section components: Brief description

Advanced 3-D inelastic structural/stress analysis methods and solution strategies for more accurate yet more cost-effective analysis of components subjected to severe thermal gradients and loads in the presence of mechanical loads, with steep stress and strain gradients are being developed. Anisotropy, time and temperature dependent plasticity and creep effects are also addressed. The approach is to develop four different theories, one linear and three higher order theories (polynomial function, special function, general function). The theories are progressively more complex from linear to general function in order to provide streamlined analysis capability with increasing accuracy for each hot section component and for different parts of the same component according to the severity of the local stress, strain and temperature gradients associated with hot spots, cooling holes and surface coating cracks. To further enhance the computational effectiveness, the higher order theories will have embedded singularities (cooling passages, for example) in the generic modeling region. Each of the four theories consists of three formulation models derivable from independent theoretical formulations. These formulation models are based on: (1) mechanics of materials; (2) special finite elements; and (3) an advanced formulation to be recommended by the contractor.

Chamis, C. C.↗

Commercializing the transfer orbit stage

Key milestones necessary to establish the transfer orbit stage are examined. The selection of the project concept and synthesis of the company are described followed by an analysis venture capability support and the selection of a major aerospace company as prime contractor. A landmark agreement with NASA sanctioned the commercial TOS concept and provided the critical support necessary to raise the next round of venture capital. Project management and customer commitments are also discussed.

Miller, M. W.↗

Space Shuttle wind tunnel testing program

A major phase of the Space Shuttle Vehicle (SSV) Development Program was the acquisition of data through the space shuttle wind tunnel testing program. It became obvious that the large number of configuration/environment combinations would necessitate an extremely large wind tunnel testing program. To make the most efficient use of available test facilities and to assist the prime contractor for orbiter design and space shuttle vehicle integration, a unique management plan was devised for the design and development phase. The space shuttle program is reviewed together with the evolutional development of the shuttle configuration. The wind tunnel testing rationale and the associated test program management plan and its overall results is reviewed. Information is given for the various facilities and models used within this program. A unique posttest documentation procedure and a summary of the types of test per disciplines, per facility, and per model are presented with detailed listing of the posttest documentation.

Whitnah, A. M.↗

Project resources planning and control

This report contains instructional guidelines for the resources planning and control of research and development (R&D) projects managed by NASA's Langley Research Center (LaRC). Although written to serve primarily as a practical guide and reference for those LaRC personnel who perform resources planning, analysis, control, and reporting functions, it should also be meaningful to other NASA personnel who are directly or indirectly involved in or affected by these functions, especially project technical managers whose responsibilities include resources management. Certain sections should help Contractor personnel to better understand what resources information must usually be submitted on LaRC projects and what use is made of such information. The Project Manager of a large R&D project typicaly receives support from an Analyst in the area of resources management. The Analyst provides assistance in four functional areas: Planning, Analysis/Control, Administration, and Reporting. Each of these functions are discussed in detail. Examples of techniques used effectively on LaRC projects have been included where applicable. A considerable amount of information has been included on the use of Performance Measurement (Earned Value) Systems for contract cost control and reporting as little information is currently available on this subject in NASA publications.

Sibbers, C. W.↗

FY 1984 scientific and technical reports, articles, papers and presentations

This bibliography lists formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel. Abstracts are presented for 56 technical memorandum, and 13 technical papers. Six publications, over 260 contractor reports, and more than 300 papers cleared for publication are cited.

Turner, J. E.↗

Demand for satellite-provided domestic communications services up to the year 2000

Three fixed service telecommunications demand assessment studies were completed for NASA by The Western Union Telegraph Company and the U.S. Telephone and Telegraph Corporation. They provided forecasts of the total U.S. domestic demand, from 1980 to the year 2000, for voice, data, and video services. That portion that is technically and economically suitable for transmission by satellite systems, both large trunking systems and customer premises services (CPS) systems was also estimated. In order to provide a single set of forecasts a NASA synthesis of the above studies was conducted. The services, associated forecast techniques, and data bases employed by both contractors were examined, those elements of each judged to be the most appropriate were selected, and new forecasts were made. The demand for voice, data, and video services was first forecast in fundamental units of call-seconds, bits/year, and channels, respectively. Transmission technology characteristics and capabilities were then forecast, and the fundamental demand converted to an equivalent transmission capacity. The potential demand for satellite-provided services was found to grow by a factor of 6, from 400 to 2400 equivalent 36 MHz satellite transponders over the 20-year period. About 80 percent of this was found to be more appropriate for trunking systems and 20 percent CPS.

Stevenson, S.↗