Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

SU-E-T-211: Comparison of Seven New TrueBeam Linacs with Enhanced Beam Data Conformance Using a Beam Comparison Software Tool

Purpose: To develop an independent software tool to assist in commissioning linacs with enhanced beam conformance, as well as perform ongoing QA for dosimetrically equivalent linacs. Methods: Linac manufacturers offer enhanced beam conformance as an option to allow for clinics to complete commissioning efficiently, as well as implement dosimetrically equivalent linacs. The specification for enhanced conformance includes PDD as well as profiles within 80% FWHM. Recently, we commissioned seven Varian TrueBeam linacs with enhanced beam conformance. We developed a software tool in Visual Basic to allow us to load the reference beam data and compare our beam data during commissioning to evaluate enhanced beam conformance. This tool also allowed us to upload our beam data used for commissioning our dosimetrically equivalent beam models to compare and tweak each of our linac beams to match our modelled data in Varian’s Eclipse TPS. This tool will also be used during annual QA of the linacs to compare our beam data to our baseline data, as required by TG-142. Results: Our software tool was used to check beam conformance for seven TrueBeam linacs that we commissioned in the past six months. Using our tool we found that the factory conformed linacs showed up to 3.82% difference in their beam profile data upon installation. Using our beam comparison tool, we were able to adjust the energy and profiles of our beams to accomplish a better than 1.00% point by point data conformance. Conclusion: The availability of quantitative comparison tools is essential to accept and commission linacs with enhanced beam conformance, as well as to beam match multiple linacs. We further intend to use the same tool to ensure our beam data conforms to the commissioning beam data during our annual QA in keeping with the requirements of TG-142.

43 PARTICLE ACCELERATORS↗

SU-F-T-399: Migration of Treatment Planning Systems Without Beam Data Measurement

Purpose: Data acquisition for commissioning is steered by Treatment Planning System (TPS) requirements which can be cumbersome and time consuming involving significant clinic downtime. The purpose of this abstract is to answer if we could circumvent this by extracting data from existing TPS and speed up the process. Methods: Commissioning beam data was obtained from a clinically commissioned TPS (Pinnacle™) using Matlab™ generated Pinnacle™ executable scripts to commission a secondary 3D dose verification TPS (Eclipse™). Profiles and output factors for commissioning as required by Eclipse™ were computed on a 50 cm{sup 3} water phantom at a dose grid resolution of 2mm3. Verification doses were computed and compared to clinical TPS dose profiles as per TG-106 guidelines. Standard patient plans from Pinnacle™ including IMRT and VMAT plans were re-computed keeping the same monitor units (in order to perform true comparison) using Eclipse™. Computed dose was exported back to Pinnacle for comparison to original plans. This methodology enables us to alleviate all ambiguities that arise in such studies. Results: Profile analysis using in-house software for 6x, showed that for all field sizes including small MLC generated fields, 100% of infield and penumbra data points of Eclipse™ match Pinnacle™ generated and measured profiles with 2%/2 mm gamma criteria. Excellent agreement was observed in the penumbra regions, with all data points passing DTA criteria for complex C-shaped and S-shaped profiles. Patient plan dose volume histograms (DVHs) and isodose lines agreed well to within a 1.5% for target coverage. Conclusion: Secondary 3D dose checking is of utmost importance with advanced techniques such as IMRT and VMAT. Migration of TPS is possible without compromising accuracy or enduring the cumbersome measurement of commissioning data. Economizing time for commissioning such a verification system or for migration of TPS can add great QA value and minimize downtime.

60 APPLIED LIFE SCIENCES↗

Status Update - Installation and Operation of GeoMelt{sup R} ICV{sup TM} Process in the NNL's Central Laboratory on the Sellafield Site - 16410

Thermal treatment of nuclear waste in the UK has seen much renewed interest recently, owing to the advantages that can be gained in terms of reduced waste volumes, compatibility with reactive metals and organics and its ability to treat mixed generic wastes. Vitrification is a treatment option which destroys organics and some hazardous inorganics such as asbestos, reduces wasteform volume, and produces a robust leach resistant wasteform. Kurion's GeoMelt{sup R} In-Container Vitrification (ICV){sup TM} is a vitrification process where the treatment vessel can serve as an interim-storage, transport, and final long-term storage vessel - thus negating the need to pour glass into a separate container, effectively leading to a much simpler system than traditional waste melters. The UK's National Nuclear Laboratory (NNL) and Kurion have entered into a joint project to deploy an active waste ICV{sup TM} plant based on Kurion's GeoMelt{sup R} technology, at NNL's flagship Central Laboratory on the Sellafield site. NNL is the UK's national laboratory for civil nuclear science and technology, providing advice to government, protecting key skills, supporting industry and delivering national nuclear programs. NNL is bringing the Kurion GeoMelt{sup R} process alongside its existing capabilities in thermal waste treatment. Kurion provides technology solutions to minimize and stabilize nuclear and hazardous waste through its families of technologies: access, separation and stabilization processes. The GeoMelt{sup R} plant being installed at the NNL's Central Laboratory creates a platform to evaluate the vitrification technology for the variety of wastes from the NDA estate and creates a treatment path for problematic waste streams that currently have no disposition pathway. With the diverse facilities under NNL management coupled with the NNL's ability to import wastes from within the UK and Europe, this arrangement with Kurion provides waste owners with treatment disposition pathways for problematic wastes. The Kurion / NNL team completed non-radioactive commissioning of a GeoMelt{sup R} ICV{sup TM} treatment system in 2015. Commissioning consisted of performing two tests at NNL's Workington Laboratory. Commissioning Test 1 involved vitrification of 367 kg of glass frit over the course of approximately 18 hours. Commissioning Test 2 consisted of processing 470 kg of soil and additives in approximately 27 hours. The soil processed in the second test was non-radioactive soil from Sellafield and was used as an analog for radioactive soil to be processed during radioactive commissioning at the Central Laboratory at Sellafield. All commissioning test goals were easily achieved and all subsystems operated as designed. Radioactive commissioning will be carried out in early 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dosimetry tools and techniques for IMRT

Intensity modulated radiation therapy (IMRT) poses a number of challenges for properly measuring commissioning data and quality assurance (QA) radiation dose distributions. This report provides a comprehensive overview of how dosimeters, phantoms, and dose distribution analysis techniques should be used to support the commissioning and quality assurance requirements of an IMRT program. The proper applications of each dosimeter are described along with the limitations of each system. Point detectors, arrays, film, and electronic portal imagers are discussed with respect to their proper use, along with potential applications of 3D dosimetry. Regardless of the IMRT technique utilized, some situations require the use of multiple detectors for the acquisition of accurate commissioning data. The overall goal of this task group report is to provide a document that aids the physicist in the proper selection and use of the dosimetry tools available for IMRT QA and to provide a resource for physicists that describes dosimetry measurement techniques for purposes of IMRT commissioning and measurement-based characterization or verification of IMRT treatment plans. This report is not intended to provide a comprehensive review of commissioning and QA procedures for IMRT. Instead, this report focuses on the aspects of metrology, particularly the practical aspects of measurements that are unique to IMRT. The metrology of IMRT concerns the application of measurement instruments and their suitability, calibration, and quality control of measurements. Each of the dosimetry measurement tools has limitations that need to be considered when incorporating them into a commissioning process or a comprehensive QA program. For example, routine quality assurance procedures require the use of robust field dosimetry systems. These often exhibit limitations with respect to spatial resolution or energy response and need to themselves be commissioned against more established dosimeters. A chain of dosimeters, from secondary standards to field instruments, is established to assure the quantitative nature of the tests. This report is intended to describe the characteristics of the components of these systems; dosimeters, phantoms, and dose evaluation algorithms. This work is the report of AAPM Task Group 120.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

RADIOACTIVE ELEMENTS IN THE STANDARD ATOMIC WEIGHTS TABLE

In the 1949 Report of the Atomic Weights Commission, a series of new elements were added to the Atomic Weights Table. Since these elements had been produced in the laboratory and were not discovered in nature, the atomic weight value of these artificial products would depend upon the production method. Since atomic weight is a property of an element as it occurs in nature, it would be incorrect to assign an atomic weight value to that element. As a result of that discussion, the Commission decided to provide only the mass number of the most stable (or longest-lived) known isotope as the number to be associated with these entries in the Atomic Weights Table. As a function of time, the mass number associated with various elements has changed as longer-lived isotopes of a particular element has been found in nature, or as improved half-life values of an element's isotopes might cause a shift in the longest-lived isotope from one mass to another. In the 1957 Report of the Atomic Weights Commission, it was decided to discontinue the listing of the mass number in the Atomic Weights Table on the grounds that the kind of information supplied by the mass number is inconsistent with the primary purpose of the Table, i.e., to provide accurate values of 'these constants' for use in various chemical calculations. In addition to the Table of Atomic Weights, the Commission included an auxiliary Table of Radioactive Elements for the first time, where the entry would be the isotope of that element which was the most stable, i.e., the one with the longest known half-life. In their 1973 Report, the Commission noted that the users of the main Table of Atomic Weights were dissatisfied with the omission of values for some elements in that Table and it was decided to reintroduce the mass number for the radioactive elements into the main Table. In their 1983 Report, the Commission decided that radioactive elements were considered to lack a characteristic terrestrial isotopic composition, from which an atomic weight value could be calculated to five or more figure accuracy, without prior knowledge of the sample involved. These elements were again listed in the Atomic Weights Table with no further information, i.e., with no mass number or atomic weight value. For the elements, which have no stable characteristic terrestrial isotopic composition, the data on the half-lives and the relative atomic masses for the nuclides of interest for those elements have been evaluated. The values of the half-lives with their uncertainties are listed in the table. The uncertainties are given for the last digit quoted of the half-life and are given in parentheses. A half-life entry for the Table having a value and an uncertainty of 7 {+-} 3 is listed in the half-life column as 7 (3). The criteria to include data in this Table, is to be the same as it has been for over sixty years. It is the same criteria, which are used for all data that are evaluated for inclusion in the Standard Table of Atomic Weights. If a report of data is published in a peer-reviewed journal, that data is evaluated and considered for inclusion in the appropriate table of the biennial report of the Atomic Weights Commission. As better data becomes available in the future, the information that is contained in either of the Tables of Standard Atomic Weights or in the Table of Radioactive Elements may be modified. It should be noted that the appearance of any datum in the Table of the Radioactive Elements is merely for the purposes of calculating an atomic mass value for any sample of a radioactive material, which might have a variety of isotopic compositions and it has no implication as to the priority for claiming discovery of a given element and is not intended to. The atomic mass values have been taken primarily from the 2003 Atomic Mass Table. Mass values for those radioisotopes that do not appear in the 2003 Atomic mass Table have been taken from preliminary data of the Atomic Mass Data Center. Most of the quoted half-lives.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Distribution System Planning - State Examples by Topic

The U.S. Department of Energy (DOE) recently completed a study on how regulators in 16 states have dealt with questions related to distribution system planning (DSP) and distributed energy resource (DER) utilization. During the study, DOE and three of its national laboratories developed a significant amount of information on state-level activities including grid modernization planning; distribution planning; tools for integrating distributed energy resources (DERs) (e.g., hosting capacity analysis and tools for maximizing the value of DERs to the distribution system such as locational value analyses); and linkages between distribution planning and related processes such as cost recovery through general rate cases or rate surcharges. The Oregon Public Utility Commission (Commission) requested assistance from DOE on a list of specific questions related to DSP. The Commission was specifically interested in identifying guidance on the creation of comprehensive and transparent utility distribution system plans; on the linkages between such plans and other utility planning processes such as integrated resource planning; improved forecasting and representation of DERs in distribution system plans and other plans such as integrated resource planning; valuation of DERs; and a roadmap for optimized locational planning for DERs. In response to their interests, we have identified 1) specific topics from the original study that would be of assistance to the Commission and 2) states that could provide potential examples or templates to draw from. In this report, we have summarized and reorganized the pertinent original material by subject. We also developed a matrix that points to specific examples for each topic and provide one or two paragraph summaries of each possible template for each topic area with web links directly to the source documents. For some cases in which states have taken significant steps since the publication of the original DOE study, the original source information has been supplemented to ensure the information provided to the Commission remains current. Finally, we called out a small number of especially pertinent or immediately useful documents and have highlighted these in the introductory section. This report documents the material developed for the Oregon Commission by DOE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NSLS-II Transport Line Progress

The National Synchrotron Light Source II (NSLS-II) is a state-of-the-art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The first part of the Linac to Booster Transport (LBT) line has been installed for linac commissioning. This part includes all components necessary to commission the NSLS-II linac. The second part of this transport line is undergoing installation. Initial results of hardware commissioning will be discussed. The Booster to Storage Ring (BSR) transport line underwent a design review. The first part of the BSR transport line, consisting of all components necessary to commission the booster will be installed in 2012 for booster commissioning. We report on the final design of the BSR line along with the plan to commission the booster.

3-GeV↗

Transitioning from Construction to Startup for the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility - 17284

The original design of the Waste Treatment and Immobilization Plant (WTP) required all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has developed a sequenced approach to completing the WTP Project, beginning with delivering some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. This operating configuration is referred to as direct-feed LAW (DFLAW). The primary driver for the DFLAW approach is to enable startup and commissioning of the LAW Facility for low-activity waste processing prior to the completion and availability of the PT and High-Level Waste facilities. In March 2016, a federal judge amended the Consent Decree between DOE and the State of Washington to require completion of hot commissioning for the LAW Facility no later than December 31, 2023. During the next few years ORP and the WTP contractor will transition the project from completion of construction to the startup and commissioning phase for the LAW Facility and the associated support facilities. The WTP contractor has developed an integrated management process to successfully conduct facility startup testing for the WTP facilities required to support DFLAW. The WTP contractor will also develop a commissioning plan and facility transition plan. These plans will describe the strategy; schedule; and requirements for safe, efficient, and sequential startup, commissioning, and transfer of the WTP facilities to an operations contractor. The WTP contractor has also established a strategy to achieve operational readiness for the facilities required to support DFLAW consistent with DOE O 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities and DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. ORP has established a strategy for oversight of the WTP contractor's startup, commissioning, and readiness activities. The strategy also encompasses ORP's own activities to achieve readiness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

5ω Optical Thomson Scattering Report

The 5ω Optical Thomson Scattering system on the National Ignition Facility (NIF) is a diagnostic designed to measure temporally and spatially resolved plasma conditions in Inertial Confinement Fusion (ICF) Hohlraums. The system was proposed in 2014 and a phased approach to implementation was developed. In phase one the collection system was designed, built, and fielded on the NIF to be used for 3ω Thomson scattering measurements and background measurements near 211 nm (5ω. The initial commissioning experiment for the collection system was completed in Oct. 2016. Commissioning of the collection system continued through 2017 and the system is now fielded for a range of user experiments and regularly produces publication quality data. A dedicated 5ω probe laser was designed and built to allow Thomson scattering measurements in the presence of 2 MJ of 3ω drive energy. Due to scattered light (spectral reflections, laser-plasma instabilities, and unconverted drive energy) from the 3w drive lasers typical wavelengths (2ω and 4ω) fielded at other laser facilities like the Nova Laser Facility and the Omega Laser Facility were unable to meeting the signal to background requirements in design studies. A 10 Joule 5ω probe was proposed as a solution that met requirements. This 10 Joule laser was more energetic than previously fielded 5w lasers by 2-3 orders of magnitude. As part of a risk reduction plan, phase two of the project was to develop a 1 Joule, 5ω laser to demonstrate conversion efficiency >20% from 1ω to 5ω and make initial Thomson scattering measurements in the first few nanoseconds of an ICF laser pulse. Initial tests of the 5w conversion were completed at the Laboratory for Laser Energetics (LLE) and produced record 5ω energies. Based on these results from LLE, a 1 Joule, 5w laser system was designed for the NIF in 2018 and commissioning began in 2019. Commissioning of the 5ω laser system continued through 2023 and was eventually paused in Q1 of FY24 due to completing resource constraints. Commissioning of the 5w laser system proved incredibly challenging. Multiple issues were identified during commissioning and resolved, but issues remain. Currently there is not a clear understanding of why 5ω scattered has not been detected on the OTS collection system. Based on offline measurements, calculations, and preshot measurements the system appears to meet all requirements. Potential target physics issues have been investigated and do not appear to be an issue. The current hypothesis is that there is an error in one or more aspects of the offline testing not translating to expected performance when the system is fielded on the NIF. Additional full system testing in-situ utilizing the complete OTS system and NIF target chamber center time is needed to further test potential failure modes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Recent Developments in Radioactive Waste Management in the Federal Republic of Germany - 17450

In 2013 the Federal Parliament and the Federal Council passed the Act Concerning the Search and Selection of a Site for a Repository for Heat-Generating Radioactive Waste and the Amendment of Other Acts (Site Selection Act). It was a restart for the search for a repository for especially heat-generating waste in Germany. As a first step in May 2014 the Commission 'Storage of High-Level Radioactive Waste' started their work. Their aim was to debate and clarify the principle questions concerning the management of heat-generating radioactive waste. As well as to evaluate and determine the fundamentals for the Site Selection Process e.g. safety requirements, exclusion criteria, minimum requirements and consideration criteria for the site selection. They also evaluated the organizational and procedural arrangements in the scope of waste management. As a first act to implement the suggestions of this Commission the organizational structures in waste management were greatly altered. This reorganization not only had a significant influence on the waste management of high-active, but also on the management of low- and intermediate-active waste management in the Federal Republic of Germany. In 2015 a second Commission started its work focusing on the funding of waste management in Germany. The results of this Commission were presented in April 2016. At the moment the suggestions of this Commission are being implemented, changing the financial responsibilities for waste management in the Federal Republic of Germany. The presentation will focus on changes and the developments of radioactive waste management in Germany and talk about the ongoing process in implementing the suggestions of the two Commissions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-E-T-226: Correction of a Standard Model-Based Dose Calculator Using Measurement Data

Purpose: To propose a hybrid method that combines advantages of the model-based and measurement-based method for independent dose calculation. Modeled-based dose calculation, such as collapsed-cone-convolution/superposition (CCCS) or the Monte-Carlo method, models dose deposition in the patient body accurately; however, due to lack of detail knowledge about the linear accelerator (LINAC) head, commissioning for an arbitrary machine is tedious and challenging in case of hardware changes. On the contrary, the measurement-based method characterizes the beam property accurately but lacks the capability of dose disposition modeling in heterogeneous media. Methods: We used a standard CCCS calculator, which is commissioned by published data, as the standard model calculator. For a given machine, water phantom measurements were acquired. A set of dose distributions were also calculated using the CCCS for the same setup. The difference between the measurements and the CCCS results were tabulated and used as the commissioning data for a measurement based calculator. Here we used a direct-ray-tracing calculator (ΔDRT). The proposed independent dose calculation consists of the following steps: 1. calculate D-model using CCCS. 2. calculate D-ΔDRT using ΔDRT. 3. combine Results: D=D-model+D-ΔDRT. Results: The hybrid dose calculation was tested on digital phantoms and patient CT data for standard fields and IMRT plan. The results were compared to dose calculated by the treatment planning system (TPS). The agreement of the hybrid and the TPS was within 3%, 3 mm for over 98% of the volume for phantom studies and lung patients. Conclusion: The proposed hybrid method uses the same commissioning data as those for the measurement-based method and can be easily extended to any non-standard LINAC. The results met the accuracy, independence, and simple commissioning criteria for an independent dose calculator.

60 APPLIED LIFE SCIENCES↗

SU-E-T-253: Development of a GDPM Monte Carlo Based Quality Assurance Tool for Cyberknife

Purpose: To develop a 3D quality assurance (QA) tool for Cyberknife plans using a GPU-based Monte Carlo dose calculation package, gDPM. The developed QA tool will be used as a secondary check for Cyberknife treatment planning software (TPS) reported dose distributions. Methods: Phase space files of the 5, 7.5, 10, 15, and 60 mm iris cones were downloaded from IAEA phase-space database. From the 60mm iris cone phase space file, we were able to generate raw phase space files for all other cones using a particle rejection method. The particles in the raw phase space files were binned with respect to the radial position and energy for commissioning. During the commissioning process, gDPM calculated percent depth dose and off-center ratios which were compared to those measured in the Blue Phantom. The off-axis data was measured with an SAD setup at depths of 15, 50, 100, 200, and 300 mm. At the commissioning stage, an optimization problem was solved to adjust the binned particles weights to minimize the difference between the calculated and measured ones. Commissioning validations will be performed by measuring point dose data of patient specific plans delivered to water phantoms. With commissioned phase space files, 3D patient-specific dose distributions will be calculated and compared against TPS reported dose. Results: Beyond the initial buildup region, the root mean square difference between the calculated and measured percent depth dose differences was less than 0.5%. The full-width half-max data from the off-axis ratio calculations was found to be within 0.1 mm of the measured data. Conclusion: Our current work showed excellent agreement between the gDPM calculated dose and the measured data for all cone sizes and types for the Cyberknife system. Implementation of a fast and accurate QA tool for patient specific plans will be feasible with this tool.

60 APPLIED LIFE SCIENCES↗

SU-F-T-285: Evaluation of a Patient DVH-Based IMRT QA System

Purpose: To evaluate the clinical performance of a patient DVH-based QA system for prostate VMAT QA. Methods: Mobius3D(M3D) is a QA software with an independent beam model and dose engine. The MobiusFX(MFX) add-on predicts patient dose using treatment machine log files. We commissioned the Mobius beam model in two steps. First, the stock beam model was customized using machine commissioning data, then verified against the TPS with 12 simple phantom plans and 7 clinical 3D plans. Secondly, the Dosimetric Leaf Gap(DLG) in the Mobius model was fine-tuned for VMAT treatment based on ion chamber measurements for 6 clinical VMAT plans. Upon successful commissioning, we retrospectively performed IMRT QA for 12 VMAT plans with the Mobius system as well as the ArcCHECK-3DVH system. Selected patient DVH values (PTV D95, D50; Bladder D2cc, Dmean; Rectum D2cc) were compared between TPS, M3D, MFX, and 3DVH. Results: During the first commissioning step, TPS and M3D calculated target Dmean for 3D plans agree within 0.7%±0.7%, with 3D gamma passing rates of 98%±2%. In the second commissioning step, the Mobius DLG was adjusted by 1.2mm from the stock value, reducing the average difference between MFX calculation and ion chamber measurement from 3.2% to 0.1%. In retrospective prostate VMAT QA, 5 of 60 MFX calculated DVH values have a deviation greater than 5% compared to TPS. One large deviation at high dose level was identified as a potential QA failure. This echoes the 3DVH QA result, which identified 2 instances of large DVH deviation on the same structure. For all DVH’s evaluated, M3D and MFX show high level of agreement (0.1%±0.2%), indicating that the observed deviation is likely from beam modelling differences rather than delivery errors. Conclusion: Mobius system provides a viable solution for DVH based VMAT QA, with the capability of separating TPS and delivery errors.

60 APPLIED LIFE SCIENCES↗

Photon Beamlines and Diagnostics at LCLS

The Linac Coherent Light Source (LCLS) is the first hard-x-ray free electron laser in operation. The turn-on of LCLS was rapid and operation has been reliable. Performance has exceeded the design parameters in several areas. The photon energy output covers a range from 480 eV to over 9 keV; the pulse energy is typically 2-3 mJ, with a maximum of 4 mJ at 2 keV. Electron pulse lengths can be varied from 500 fs to shorter than 10 fs. A low-charge option at 20 pC is being explored, which delivers pulses shorter than 10 fs with a reduced pulse energy, typically around 0.2 mJ. On-demand, single-shot and multi-shot modes up to 60 Hz (planned is 120 Hz) can be made available. The photon diagnostics built for LCLS have been commissioned and provide measurements of various properties of the FEL beam, such as pulse energy, beam size and position, wavelength, and allows for intensity attenuation over the entire wavelength range. The two soft x-ray instruments, the Atomic Molecular and Optics (AMO) and Soft X-ray Material Science (SXR) stations, are fully operational and completed their second user run in mid September 2010. The third user run is scheduled from October to December 2010, and will include the first hard x-ray instrument X-ray Pump-and-Probe (XPP). Three additional hard x-ray stations will follow: CXI (Coherent X-ray Imaging) is planned to start commissioning in December 2010, the XCS (X-ray correlation spectroscopy) instrument will start in June 2011, and the station for Matter in Extreme Conditions (MEC) in 2012. A list of past and future milestones for LCLS commission and operations is shown in table 1. The LCLS hard x-ray Free Electron Laser at SLAC reported first lasing in April of 2009. Since then two successful user runs have been completed at the two soft x-ray stations. The first hard x-ray station has started commissioning in July of 2010. Beam diagnostics play an essential role for tuning the machine and delivering the requested beam properties to the users. An overview of the LCLS photon diagnostics will be presented including some selected commissioning results. Plans for future improvements and upgrades will be briefly discussed.

43 PARTICLE ACCELERATORS↗

Hanford WTP LAW Melter Startup and Tuning Feed Material Development - 17065

The U.S. Department of Energy's (DOE) Hanford Site in southeast Washington state is home to 56 million gallons of chemical and radioactive waste stored in underground tanks, the result of more than four decades of plutonium production. To address this challenge, the U.S. Department of Energy contracted Bechtel National, Inc., to design and build the world's largest radioactive waste treatment plant. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) will use vitrification to immobilize most of Hanford's waste. Vitrification involves blending the waste with glass-forming materials, and heating it to high temperature to form molten glass, then pouring it into stainless steel containers. In this glass form, its radioactivity will decay over hundreds to thousands of years. In advance of full operation of WTP, a sequential process of commissioning will be undertaken to ensure the plant operates safely and within design requirements. The first phase of WTP operations will focus on the Low-Activity Waste (LAW) Vitrification Facility and its supporting facilities and systems. Commissioning of the LAW Facility will employ a progressive approach to address the complexity of system operation and introduction of hazards. This approach starts with introduction of low hazard and simple testing configurations, and incrementally increasing the complexity and hazardous makeup of testing feed materials, culminating in fully integrated treatment of radioactive tank waste during hot commissioning. Testing with simulants that are chemically similar to radioactive tank waste introduces significant chemical hazards into treatment systems in the form of nitrogen oxides (NOx) and anhydrous ammonia. A method of testing to allow tuning and demonstration of equipment and to develop operator proficiency prior to introducing these chemical hazards was deemed necessary. To that end, the development and testing of a new 'tuning feed' material is in progress. The tuning feed is important because its use will enable the first-time integration of all LAW Facility process systems. The tuning feed must include key physical and chemical characteristics that correspond to the commissioning simulant and low activity tank waste, without the inherently hazardous materials or toxic off-gas constituents that result from tank waste treatment. Tuning feed is being developed to provide representative melter feed rheology, glass chemistry, cold cap formation, and off-gas generation rate in order to predict system response to actual tank waste to the extent practical. The tuning feed must also be compatible with process equipment and other process streams that will be encountered during the cold commissioning testing program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 18327

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever, built for radioactive waste processing. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) (collectively referred to as LBL); - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the Pretreatment (PT) Facility; - Resolving the technical issues associated with primarily the PT Facility; - Completing the design and construction of the High-Level Waste (HLW) and PT facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree 1 completion milestones for the Hanford WTP, which generally aligns with DOE's plans for completing the WTP facilities in sequence: - Complete LAW Facility hot commissioning: December 31, 2023; - Complete HLW Facility hot commissioning: December 31, 2033; - Complete PT Facility hot commissioning: December 31, 2033; - Achieve initial plant operations for the WTP: December 31, 2036. Having established milestones for completing the WTP facilities has enabled DOE to formally implement its plans for completing the WTP facilities in sequence, starting with the LAW Facility. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. Significant progress has been made toward completing the design, construction, and planning for commissioning of the facilities needed to enable the DFLAW operations to commence as early as January 2022. In 2012, DOE partially suspended production work on the WTP's PT Facility and to a lesser degree the HLW Facility because of unresolved technical issues associated with those facilities. In September 2017, DOE acknowledged the WTP contractor had met all the criteria for full resumption of engineering, procurement, and construction (EPC) activities for the HLW Facility. By December 2017, DOE had completed the actions needed to resolve the six of the eight primary technical issues associated with the PT Facility, with the remaining two issues expected to be resolved in the first quarter of 2018. Although significant progress has been made to prepare for resuming production activities for the HLW and PT facilities, DOE has made the decision to constrain EPC work on those facilities in the near term based on DOE's higher priority of completing the WTP facilities needed to begin DFLAW operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study the sensitivity of dose calculation in prism treatment planning system using Monte Carlo simulation of 6 MeV electron beam

Prism is a non-commercial Radiotherapy Treatment Planning System (RTPS) develop by Ira J. Kalet from Washington University. Inhomogeneity factor is included in Prism TPS dose calculation. The aim of this study is to investigate the sensitivity of dose calculation on Prism using Monte Carlo simulation. Phase space source from head linear accelerator (LINAC) for Monte Carlo simulation is implemented. To achieve this aim, Prism dose calculation is compared with EGSnrc Monte Carlo simulation. Percentage depth dose (PDD) and R50 from both calculations are observed. BEAMnrc is simulated electron transport in LINAC head and produced phase space file. This file is used as DOSXYZnrc input to simulated electron transport in phantom. This study is started with commissioning process in water phantom. Commissioning process is adjusted Monte Carlo simulation with Prism RTPS. Commissioning result is used for study of inhomogeneity phantom. Physical parameters of inhomogeneity phantom that varied in this study are: density, location and thickness of tissue. Commissioning result is shown that optimum energy of Monte Carlo simulation for 6 MeV electron beam is 6.8 MeV. This commissioning is used R50 and PDD with Practical length (R{sub p}) as references. From inhomogeneity study, the average deviation for all case on interest region is below 5 %. Based on ICRU recommendations, Prism has good ability to calculate the radiation dose in inhomogeneity tissue.

61 RADIATION PROTECTION AND DOSIMETRY↗

Target Diagnostics Supports NIF's Path to Ignition

The physics requirements derived from the National Ignition Facility (NIF) experimental campaigns are leading to a wide variety of target diagnostics. Software development for the control and analysis of these diagnostics is included in the NIF Integrated Computer Control System, Diagnostic Control System and Data Visualization. These projects implement the configuration, controls, data analysis and visual representation of most of these diagnostics. To date, over 40 target diagnostics have been developed to support NIF experiments. In 2011 diagnostics were developed or enhanced to measure Ignition performance in a high neutron yield environment. Performance is optimized around four key variables: Adiabat (a) which is the strength and timing of four shocks delivered to the target, Velocity (V) of the imploding target, Mix (M) is the uniformity of the burn, and the Shape (S) of the imploding Deuterium Tritium (DT) hot spot. The diagnostics used to measure each of these parameters is shown in figure 1. Adiabat is measured using the Velocity Interferometer System for Any Reflector (VISAR) diagnostic consisting of three streak cameras. To provide for more accurate adiabat measurements the VISAR streak cameras were enhanced in FY11 with a ten comb fiducial signal controller to allow for post shot correction of the streak camera sweep non-linearity. Mix is measured by the Neutron Time of Flight (NTOF) and Radiochemical Analysis of Gaseous Samples (RAGS) diagnostics. To accommodate high neutron yield shots, NTOF diagnostic controls are being modified to use Mach Zehnder interferometer signals to allow the digitizers to be moved from near the target chamber to the neutron shielded diagnostic mezzanine. In December 2011 the first phase of RAGS diagnostic commissioning will be completed. This diagnostic will analyze the tracers that are added to NIF target capsules that undergo nuclear reactions during the shot. These gases are collected and purified for nuclear counting by the RAGS system. Three new instrument controllers were developed and commissioned to support this diagnostic. A residual-gas analyzer (RGA) instrument measures the gas content at various points in the system. The Digital Gamma Spectrometer instrument measures the radiological spectrum of the decaying gas isotopes. A final instrument controller was developed to interface to a PLC based Gas collection system. In order to support the implosion velocity measurements an additional Gated X-ray Detector (GXD) diagnostic was tested and commissioned. This third GXD views the target through a slit contained in its snout and allows the other GXD diagnostics to be used for measuring the shape on the same shot. In order to measure the implosion shape in a high neutron environment, Actide Readout In A Neutron Environment (ARIANE) and Neutron Imaging (NI) diagnostics were commissioned. The controls for ARIANE, a fixed port gated x-ray imager, contain a neutron shielded camera and micro channel plate pulser with its neutron sensitive electronics located in the diagnostic mezzanine. The NI diagnostic is composed of two Spectral Instruments SI-1000 cameras located 20M from the target and provides neutron images of the DT hot spot for high yield shots. The development and commissioning of these new or enhanced diagnostics in FY11 have provided meaningful insight that facilitates the optimization of the four key Ignition variables. In FY12 they will be adding three new diagnostics and enhancing four existing diagnostics in support of the continuing optimization series of campaigns.

42 ENGINEERING↗