Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BEAM PRODUCTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Measurement of T-Dependence of the Beam Asymmetry (S) for the Reaction yp --> n'p AT GLUEX

We report on a measurement of the four-momentum transfer (-t) dependence of the Beam Asymmetry (Sigma) for the reaction yp --> n'p with the linearly polarized photon beam at GlueX. The observable is sensitive to the n' production mechanism. The Beam Asymmetry (Sigma) was extracted from azimuthal angular distributions (phi) combined to obtain yield asymmetries. This technique removes most contributions from instrumental asymmetries. These data are based on a data set that is five times more extensive than previous measurements. This allowed us to double the kinematic reach in the four-momentum transfer squared (-t) and reduce the statistical uncertainties. Up to a four-momentum transfer squared (-t) of 1.7 GeV2, the beam asymmetry is positive, close to unity, and shows little dependence on the four-momentum transfer -t. This indicates that the production process continues to be dominated by exchanges of the rho (p) and the omega (w) mesons. Further systematic cross-check was done by analyzing the decay mode nr^0r^0. This analysis also revealed positive asymmetries closer to unity providing an important systematic cross-check for the results obtained using n'-->nr+r-.

Paudel, Churamani↗

RIB in-flight production and the facility EXOTIC at LNL

The production of Radioactive Ion Beams (RIBs) via the In-Flight technique is reviewed. This separation method typically employs four main production mechanisms: (i) Projectile Fragmentation; (ii) Projectile Fission; (iii) Nuclear Fusion and (iv) Direct Processes in Inverse Kinematics. We will concentrate particularly on the last mechanism, the one used by the facility EXOTIC at the INFN-Laboratori Nazionali di Legnaro (LNL) for the production of light RIBs. An extensive description of the facility and a brief overview of the most recent scientific achievements with {sup 7}Be and {sup 17}F are given.

43 PARTICLE ACCELERATORS↗

Charmonium production in fixed-target experiments with SPS and LHC beams at CERN

The possibility of measuring cross sections for the production of J/{psi} mesons in fixed-target experiments with the proton and ion beams of the Large Hadron Collider (LHC) at CERN (Switzerland) is considered. At the present time, measurements of charmonium production in proton-proton collisions at an energy of 7 TeV have begun at LHC. Previously, the production of J/{psi} and {psi} Prime mesons was studied in the NA38, NA50, and NA60 fixed-target experiments with beams of the CERN synchrotron (SPS) and in the PHENIX experiment at the Relativistic Heavy Ion Collider (RHIC, Brookhaven National Laboratory, USA). A normal nuclear absorption of J/{psi} mesons in proton-nucleus collisions and an enhanced, anomalous, suppression of the production of charmonium states in central collisions of relativistic nuclei were observed. At the present time, there are no theoretical models that could describe the entire body of experimental data. Measurements over a broad interval of proton and ion energies are required. Measurements of charmonium production using LHC beams with fixed targets in the energy range between the SPS and RHIC energies-a beam of 7-TeV protons ({radical}s = 114.6 GeV) and a beam of 2.75-TeV/nucleon lead ions ({radical}s = 71.8 GeV)-will provide an additional possibility for studying the charmonium-production mechanism. Estimates of the geometric acceptance, luminosity, and counting rate for the production of J/{psi} mesons are presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Measurement of coherent production of π ± in neutrino and antineutrino beams on carbon from E ν of 1.5 to 20 GeV

Neutrino-induced coherent charged pion production on nuclei ν(–) μ A → μ ± π ∓ A is a rare, inelastic interaction in which a small squared four-momentum |t| is transferred to the recoil nucleus, leaving it intact in the reaction. In the scintillator tracker of MINERvA, we remove events with evidence of particles from nuclear breakup and reconstruct |t| from the final-state pion and muon. In addition, we select low |t| events to isolate a sample rich in coherent candidates. By selecting low |t| events, we produce a model-independent measurement of the differential cross section for coherent scattering of neutrinos and antineutrinos on carbon. We find poor agreement with the predicted kinematics in neutrino generators used by current oscillation experiments.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Controllable X-ray Pulse Trains from Enhanced Self-Amplified Spontaneous Emission

We report the demonstration of optical compression of an electron beam and the production of controllable trains of femtosecond, soft x-ray pulses with the Linac Coherent Light Source (LCLS) freeelectron laser (FEL). This is achieved by enhanced self-amplified spontaneous emission with a 2 μm laser and a dechirper device. Optical compression was achieved by modulating the energy of an electron beam with the laser and then compressing with a chicane, resulting in high current spikes on the beam which we observe to lase. A dechirper was then used to selectively control the lasing region of the electron beam. Field autocorrelation measurements indicate a train of pulses, and we find that the number of pulses within the train can be controlled (from 1 to 5 pulses) by varying the dechirper position and undulator taper. These results are a step toward attosecond spectroscopy with x-ray FELs as well as future FEL schemes relying on optical compression of an electron beam.

Duris, Joseph P↗

Measurement of parity-violating asymmetry in electron-deuteron inelastic scattering

The parity-violating asymmetries between a longitudinally polarized electron beam and an unpolarized deuterium target have been measured recently. The measurement covered two kinematic points in the deep-inelastic scattering region and five in the nucleon resonance region. We provide here details of the experimental setup, data analysis, and results on all asymmetry measurements including parity-violating electron asymmetries and those of inclusive pion production and beam-normal asymmetries. The parity-violating deep-inelastic asymmetries were used to extract the electron-quark weak effective couplings, and the resonance asymmetries provided the first evidence for quark-hadron duality in electroweak observables. These electron asymmetries and their interpretation were published earlier, but are presented here in more detail.

Wang, D.↗

Molecular dynamics simulations of Si etching in Cl- and Br-based plasmas: Cl{sup +} and Br{sup +} ion incidence in the presence of Cl and Br neutrals

Classical molecular dynamics (MD) simulations have been performed for Cl{sup +} and Br{sup +} ions incident on Si(100) surfaces with Cl and Br neutrals, respectively, to gain a better understanding of the ion-enhanced surface reaction kinetics during Si etching in Cl- and Br-based plasmas. The ions were incident normally on surfaces with translational energies in the range E{sub i} = 20–500 eV, and low-energy neutrals of E{sub n} = 0.01 eV were also incident normally thereon with the neutral-to-ion flux ratio in the range Γ{sub n}{sup 0}/Γ{sub i}{sup 0} = 0–100, where an improved Stillinger--Weber potential form was employed for the interatomic potential concerned. The etch yields and thresholds presently simulated were in agreement with the experimental results previously reported for Si etching in Cl{sub 2} and Br{sub 2} plasmas as well as in Cl{sup +}, Cl{sub 2}{sup +}, and Br{sup +} beams, and the product stoichiometry simulated was consistent with that observed during Ar{sup +} beam incidence on Si in Cl{sub 2}. Moreover, the surface coverage of halogen atoms, halogenated layer thickness, surface stoichiometry, and depth profile of surface products simulated for Γ{sub n}{sup 0}/Γ{sub i}{sup 0} = 100 were in excellent agreement with the observations depending on E{sub i} reported for Si etching in Cl{sub 2} plasmas. The MD also indicated that the yield, coverage, and surface layer thickness are smaller in Si/Br than in Si/Cl system, while the percentage of higher halogenated species in product and surface stoichiometries is larger in Si/Br. The MD further indicated that in both systems, the translational energy distributions of products and halogen adsorbates desorbed from surfaces are approximated by two Maxwellians of temperature T{sub 1} ≈ 2500 K and T{sub 2} ≈ 7000–40 000 K. These energy distributions are discussed in terms of the desorption or evaporation from hot spots formed through chemically enhanced physical sputtering and physically enhanced chemical sputtering, which have so far been speculated to both occur in the ion-enhanced surface reaction kinetics of plasma etching.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Oak Ridge 25URC Tandem Accelerator 2008 SNEAP Lab Report

During FY 2008, the 25URC operated for slightly over 3,000 research hours. The radioactive species {sup 80}Ge and {sup 17,18}F accounted for 763 of these hours. This included an experiment using {sup 17}F which was only possible due to an improvement of a factor of 50 in beam intensity over our previous facility record. Twenty stable beam species were provided this year. Operation for the experimental program was at terminal potentials from 2.02 to 23.8 MV. Approximately 200 hours of conditioning were done to return the machine to operation after tank openings. There were six tank openings during the year: three scheduled for general maintenance and three unscheduled. Two of the unscheduled openings were required to correct shorting rod issues and the other was to reestablish communication with one of the major dead sections. On July 28, an event happened that caused all accelerators at the Holifield Radioactive Ion Beam Facility (HRIBF) to suspend operation. At approximately 8 AM on that Monday, during operations with approximately 12 {micro}A of 50-MeV protons on a uranium carbide target, delivering neutron-rich {sup 81}Zn beam to the new Low-energy Radioactive Ion Beam Spectroscopy Station (LeRIBSS), a radiological control technician (RCT) reported higher than normal radiation levels just outside the shield door to the IRIS1 vault (the room in which RIBs are produced at HRIBF). The measured dose rate equivalent was 4 mrem/hr. The presence of radiological contamination on the floor just outside the shield door was subsequently noted, as was the possible presence of airborne radioactivity. These observations were reported to facility management. Accelerators were put in standby immediately and the building evacuated. The event was subsequently declared a laboratory operational emergency. Parts of the building were cleared for reentry to collect belongings on Monday afternoon. The entire building was cleared for reoccupation on Tuesday morning after a detailed radiological survey found no contamination outside the shielded vaults. No decontamination was required. No individual received any detectable radiological dose as a result of this event. The 25URC tandem accelerator was given permission to resume operation with stable beams in early September, but radioactive ion production is still not allowed. Subsequent analysis indicated a release that consisted entirely of noble gasses (Xe and Kr isotopes). We believe we have identified two unrelated failures, one associated with the HVAC system and the other with the roughing system exhaust which accounts for both the escape of noble gasses into the IRIS1 vault and their migration outside the vault. An investigation team report is expected by October 24. At that time, corrective actions will be determined and the path to future radioactive ion beam production will be known. The break from operations allowed a few upgrades to be implemented. The most notable was the installation and commissioning of a SNICS ion source purchased from National Electrostatics Corporation (NEC). The SNICS replaced the old Alton/Aarhus source that we have used for many years. An ANU style gas cathode holder was purchased also but has not yet been implemented. The first beams have been produced by the source and the biggest problem encountered was reducing the beam for very low current experiments. A new power supply for the injection magnet was installed during this period also. Radioactive ion beam (RIB) development at the High Power Target Laboratory (HPTL) has been delayed this year while installing the platforms, conduits and equipment for the second Injector for Radioactive Ion Species (IRIS2) which is co-located with the HPTL facility. Therefore, the majority of development activities have been performed at the two off-line ion source test facilities (ISTF1 and ISTF2) and the On-Line Test Facility (OLTF). Both test facilities have been developing systems which will eventually be used with IRIS2. Two new tunable Ti:Sapphire lasers have been ordered for continuing development of an ion source based on laser ionization using all solid-state lasers. When these are delivered, we will have a complete laser system. The other ion source test facility is continuing development of a negative-ion cooler for beam purification using photodetachment. This process has been demonstrated to work well in three systems so far (removing Co from Ni, removing S from Cl, and removing O from F). The original ion cooler has been modified to allow for use on the IRIS2 platform. Testing of this modified device is starting now. The OLTF has been used to test new types of uranium carbide targets for the electron beam plasma source (which are used for neutron-rich RIB campaigns) and to test a novel ion source which may result in purified beams of radioactive strontium isotopes.

43 PARTICLE ACCELERATORS↗

Beam-Based Target Alignment for Mu2e

The Mu2e Experiment is a precision experiment at Fermi National Accelerator Laboratory, searching for charged lepton flavor violation (CLFV) in the conversion of a muon to an electron in the presence of an atomic nucleus. In order to achieve the expected single-event sensitivity of $3\times 10^{-17}$ , Mu2e will require an intense muon beam, generated via pion decay. These pions are the product of a proton beam striking a radiatively-cooled tungsten target. In order to maximize pion production and prevent target failure, the beam will have to be aligned with the target center to within 0.5 mm. The production target monitor (PTM) will ensure this alignment. The PTM consists of a series of proportional wire chambers (PWC’s) upstream and downstream of the production target. In this dissertation, I explain the requirements of this detector system and derive the decisions about which detector model to use and how they should be arranged from these requirements. After this, I describe my e xperience building the detectors and show an early use for them in the Mu2e proton beam. I also performed a study of the sensitivity and time resolution of this model of PWC and its electronics, and give the results here. I then describe a series of simulation campaigns which shed light on the interactions between the beam and the target, and how these interactions manifest on the downstream detectors. Finally, I give the target scanning procedure to be used to align the beam and target during experiment start up.

43 PARTICLE ACCELERATORS↗

Search for Charged Current Coherent Pion Production on Carbon in a Few-GeV Neutrino Beam

The SciBooNE Collaboration has performed a search for charged current coherent pion production from muon neutrinos scattering on carbon, nu{sub {mu}}{sup 12}C- {yields} {mu}{sup 12}Cpi{sup +}, with two distinct data samples. No evidence for coherent pion production is observed. We set 90% confidence level upper limits on the cross section ratio of charged current coherent pion production to the total charged current cross section at 0.67 x 10{sup -2} at mean neutrino energy 1.1 GeV and 1.36 x 10{sup -2} at mean neutrino energy 2.2 GeV.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Meniscus and beam halo formation in a tandem-type negative ion source with surface production

A meniscus of plasma-beam boundary in H{sup -} ion sources largely affects the extracted H{sup -} ion beam optics. Although it is hypothesized that the shape of the meniscus is one of the main reasons for the beam halo observed in experiments, a physical mechanism of the beam halo formation is not yet fully understood. In this letter, it is first shown by the 2D particle in cell simulation that the H{sup -} ions extracted from the periphery of the meniscus cause a beam halo since the surface produced H{sup -} ions penetrate into the bulk plasma, and, thus, the resultant meniscus has a relatively large curvature.

43 PARTICLE ACCELERATORS↗

A spectral method for halo particle definition in intense mismatched beams

An advanced spectral analysis of a mismatched charged particle beam propagating through a periodic focusing transport lattice is utilized in particle-in-cell (PIC) simulations. It is found that the betatron frequency distribution function of a mismatched space-charge-dominated beam has a bump-on-tail structure attributed to the beam halo particles. Based on this observation, a new spectral method for halo particle definition is proposed that provides the opportunity to carry out a quantitative analysis of halo particle production by a beam mismatch. In addition, it is shown that the spectral analysis of the mismatch relaxation process provides important insights into the emittance growth attributed to the halo formation and the core relaxation processes. Finally, the spectral method is applied to the problem of space-charge transport limits.

43 PARTICLE ACCELERATORS↗

Measurement of spin-density matrix elements in ρ ( 770 ) production with a linearly polarized photon beam at E γ = 8.2 – 8.8 GeV

The GlueX experiment at Jefferson Lab studies photoproduction of mesons using linearly polarized 8.5GeV photons impinging on a hydrogen target which is contained within a detector with near-complete coverage for charged and neutral particles. We present measurements of spin-density matrix elements for the photoproduction of the vector meson rho(770). The statistical precision achieved exceeds that of previous experiments for polarized photoproduction in this energy range by orders of magnitude. Here we confirm a high degree of s-channel helicity conservation at small squared four-momentum transfer t and are able to extract the t-dependence of natural and unnatural-parity exchange contributions to the production process in detail. We confirm the dominance of natural-parity exchange over the full t range. We also find that helicity amplitudes in which the helicity of the incident photon and the photoproduced rho(770) differ by two units are negligible for -t<0.5GeV 2 /c 2 .

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Oak Ridge 25URC Tandem Accelerator 2007 SNEAP Lab Report

During FY 2008, the 25URC operated for slightly over 3,000 research hours. The radioactive species 80Ge and 17,18F accounted for 763 of these hours. This included an experiment using 17F which was only possible due to an improvement of a factor of 50 in beam intensity over our previous facility record. Twenty stable beam species were provided this year. Operation for the experimental program was at terminal potentials from 2.02 to 23.8 MV. Approximately 200 hours of conditioning were done to return the machine to operation after tank openings. There were six tank openings during the year: three scheduled for general maintenance and three unscheduled. Two of the unscheduled openings were required to correct shorting rod issues and the other was to reestablish communication with one of the major dead sections. On July 28, an event happened that caused all accelerators at the Holifield Radioactive Ion Beam Facility (HRIBF) to suspend operation. At approximately 8 AM on that Monday, during operations with approximately 12 {micro}A of 50-MeV protons on a uranium carbide target, delivering neutron-rich 81Zn beam to the new Low-energy Radioactive Ion Beam Spectroscopy Station (LeRIBSS), a radiological control technician (RCT) reported higher than normal radiation levels just outside the shield door to the IRIS1 vault (the room in which RIBs are produced at HRIBF). The measured dose rate equivalent was 4 mrem/hr. The presence of radiological contamination on the floor just outside the shield door was subsequently noted, as was the possible presence of airborne radioactivity. These observations were reported to facility management. Accelerators were put in standby immediately and the building evacuated. The event was declared a laboratory operational emergency. Parts of the building were cleared for reentry to collect belongings on Monday afternoon. The entire building was cleared for reoccupation on Tuesday morning after a detailed radiological survey found no contamination outside the shielded vaults. No decontamination was required. No individual received any detectable radiological dose as a result of this event. The 25URC tandem accelerator was given permission to resume operation with stable beams in early September, but radioactive ion production is still not allowed. Subsequent analysis indicated a release that consisted entirely of noble gasses (Xe and Kr isotopes). We believe we have identified two unrelated failures, one associated with the HVAC system and the other with the roughing system exhaust which accounts for both the escape of noble gasses into the IRIS1 vault and their migration outside the vault. An investigation team report is expected by October 24. At that time, corrective actions will be determined and the path to future radioactive ion beam production will be known. The break from operations allowed a few upgrades to be implemented. The most notable was the installation and commissioning of a SNICS ion source purchased from National Electrostatics Corporation (NEC). The SNICS replaced the old Alton/Aarhus source that we have used for many years. An ANU style gas cathode holder was purchased also but has not yet been implemented. The first beams have been produced by the source and the biggest problem encountered was reducing the beam for very low current experiments. A new power supply for the injection magnet was installed during this period also. Radioactive ion beam (RIB) development at the High Power Target Laboratory (HPTL) has been delayed this year while installing the platforms, conduits and equipment for the second Injector for Radioactive Ion Species (IRIS2) which is co-located with the HPTL facility. The majority of development activities have been performed at the two off-line ion source test facilities (ISTF1 and ISTF2) and the On-Line Test Facility (OLTF). Both test facilities have been developing systems which will eventually be used with IRIS2. Two new tunable Ti:Sapphire lasers have been ordered for continuing development of an ion source based on laser ionization using all solid-state lasers. When these are delivered, we will have a complete laser system. The other ion source test facility is continuing development of a negative-ion cooler for beam purification using photodetachment. This process has been demonstrated to work well in three systems so far (removing Co from Ni, removing S from Cl, and removing O from F). The original ion cooler has been modified to allow for use on the IRIS2 platform. Testing of this modified device is starting now. The OLTF has been used to test new types of uranium carbide targets for the electron beam plasma source (which are used for neutron-rich RIB campaigns) and to test a novel ion source which may result in purified beams of radioactive strontium isotopes. This ion source uses a quartz tube in the transfer line between the production target and the ion source to selectively slow down some elements such as rubidium and cesium.

43 PARTICLE ACCELERATORS↗

High intensity proton injector for facility of antiproton and ion research

The high current ion source with the low energy beam transport (LEBT) will serve as injector into the proton LINAC to provide primary proton beam for the production of antiprotons. The pulsed ion source developed and built in CEA/Saclay operates with a frequency of 2.45 GHz based on ECR plasma production with two coils with 87.5 mT magnetic field necessary for the electron cyclotron resonance. The compact LEBT consists of two solenoids with a maximum magnetic field of 500 mT including two integrated magnetic steerers to adjust the horizontal and vertical beam positions. The total length of the compact LEBT is 2.3 m and was made as short as possible to reduced emittance growth along the beam line. To measure ion beam intensity behind the pentode extraction system, between solenoids and at the end of the beam line, two current transformers and a Faraday cup are installed. To get information about the beam quality and position, the diagnostic chamber with different equipment will be installed between the two solenoids. This article reports the current status of the proton injector for the facility of antiproton and ion research.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Towards Understanding the Cesium Cycle of the Persistent H- Beams at SNS

This paper describes the accomplishments of the SNS H- ion source, which delivers routinely ~50 mA at a 5.4% duty factor with ~99% availability, enabling 1 MW beams for neutron production with ~90 % availability. It discusses the need for increasing reliability and beam current. But mostly it focuses on its unexpected feature: H- beams that are apparently persistent for up to 5 weeks without adding Cs after an initial dose of less than ~5 mg. Thermal emission and sputtering are qualitatively evaluated, and appear consistent with a negligible Cs sputter rate after the initial dose disappears from the Cs plasma. It concludes with a list of future experiments that can shed more light on this apparently unique Cs cycle.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Experimental results of beryllium exposed to intense high energy proton beam pulses

Beryllium is extensively used in various accelerator beam lines and target facilities as a material for beam windows, and to a lesser extent, as secondary particle production targets. With increasing beam intensities of future accelerator facilities, it is critical to understand the response of beryllium under extreme conditions to reliably operate these components as well as avoid compromising particle production efficiency by limiting beam parameters. As a result, an exploratory experiment at CERN’s HiRadMat facility was carried out to take advantage of the test facility’s tunable high intensity proton beam to probe and investigate the damage mechanisms of several beryllium grades. The test matrix consisted of multiple arrays of thin discs of varying thicknesses as well as cylinders, each exposed to increasing beam intensities. This paper outlines the experimental measurements, as well as findings from Post-Irradiation-Examination (PIE) work where different imaging techniques were used to analyze and compare surface evolution and microstructural response of the test matrix specimens.

43 PARTICLE ACCELERATORS↗

The Eagle ALDRIS (Agile Low-Does Radiographic Imaging System)

The overall project was to design a mobile (truck-based) cargo scanning system that can be deployed at different stations according to need. In addition, the project would optimize the use of the electron beam thereby reducing the overall radiation produced and to help make the radiation shielding lighter. The SLAC work for this project done through this CRADA was to design the beam-line from the output of the alpha-magnet at the end of the Varian linac to the photon production target. The beam is required to hit the photon production target at the same point but with a range of vertical angles from +/- 25°. In addition, the scope of work by SLAC was to provide an alternate design for the linac based on new linac and RF source technology developed at SLAC.

43 PARTICLE ACCELERATORS↗