Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BASIN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Computed Tomography Scanning and Geophysical Measurements of the CarbonSAFE Seal Integrity Wells in the Illinois Basin

The U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) researchers in Morgantown, West Virginia, utilized computed tomography (CT) facilities and the Multi-Sensor Core Logger (MSCL) to evaluate the integrity of three cores (Geophysical Monitor #2 (GM2), Verification Well #1 (VW #1), and Wabash #1 for the Illinois Basin Carbon Storage Assurance Facility Enterprise (CarbonSAFE) efforts. This work was carried out in collaboration with the Illinois State Geological Survey (ISGS) as part of their efforts to analyze cores from two field locations, including the Illinois Basin-Decatur Project (IBDP) and second stage Illinois Industrial Carbon Capture and Storage (IL-ICCS) sites at Decatur, Illinois, and the Wabash CarbonSAFE project at the Wabash Valley Resources Integrated Gasification Combined Cycle plant in Terre Haut, Indiana. The results of this study are presented in several formats and are available online on the Energy Data eXchange (EDX). The rock characterization was conducted using non-destructive techniques, allowing for future analysis of the cores. While the equipment used did not provide direct visualization of shale pore space, it allowed for detection of fractures and discontinuities. Low resolution CT imagery with the NETL medical CT scanner was performed on the entire core. Qualitative analysis of the medical CT images, coupled with x-ray fluorescence (XRF), P-wave, and magnetic susceptibility measurements from the MSCL were utilized to identify areas of interest for further study as well as fractured zones. The ability to quickly identify key areas for more detailed study with higher resolution will save time and resources in future studies. The combination of methods used provided a multi-scale analysis of this core and provided both a macro and micro description of the core that is relevant for many subsurface energy-related examinations traditionally performed at NETL.

58 GEOSCIENCES↗

Accelerated Basin De-Inventory Maximum Fissile Estimate

The Accelerated Basin De-inventory (ABD) program increases processing of Spent Nuclear Fuel (SNF) in H-Canyon to accelerate the closure of L Basin. The dissolved SNF will be dispositioned to Sludge Batches that will be processing in the Defense Waste Processing Facility and converted to glass. The fissile glass loading directly impacts the amount of glass canisters made. This memorandum provides an estimated maximum quantity of total fissile expected to be transferred to a Sludge Batch to support increasing the fissile glass loading and thus reducing the number of canisters created across the lifetime of the ABD mission.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11 (Rev. 1)

The Accelerated Basin De-inventory (ABD) program involves discarding spent nuclear fuel that is currently stored in L-Basin to the Defense Waste Processing Facility (DWPF) for vitrification. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. Savannah River Mission Completion has requested that the Savannah River National Laboratory assess the technical gaps related to the increased gadolinium poisoning requirement and the impacts of performing the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51 with H-Canyon discards present. The following summarizes the evaluation of the impacts of increasing the quantity of gadolinium (and related topics) from what was previously evaluated in the SRNL studies of gadolinium-poisoned ABD material solubility, the overall ABD flowsheet review, and increasing the fissile mass loading in glass: 1) Based on literature surveys, there is no indication that organic interactions with gadolinium will be significant at the high pH (typically >13) conditions of the Concentration, Storage, and Transfer Facilities. Any interactions of gadolinium with organics in DWPF are not expected to adversely impact DWPF or downstream facilities. Thus, there is little-to-no residual risk from organic interactions with gadolinium [Gap closed]; 2) Adding depleted uranium to ABD material, targeting 235 U enrichment of 4.90% within each transfer window, will mitigate potential impacts from an increase in soluble 235 U enrichment during sludge washing and LTAD. The plan to take advantage of previous transfers and allow 235 U enrichment of >5% during the final transfer window carries a risk that Tank 51 supernate will have a 235 U enrichment of >5%, which should be evaluated for acceptance; 3) Increasing the gadolinium mass ratio to 3.0:1 Gd: 235 U(eq SLU ) should lead to the same or higher partitioning of gadolinium into the solid phase within the DWPF Chemical Process Cell, resulting in both liquid and solid phases with expected partitioning of Gd consistent with the prior solubility study [Gap closed for SB11]; 4) There are no expected impacts on DWPF melt temperature and melter operations due to the minimal ~0.2 weight percent (wt%) increase in Gd concentration relative to previous sludge batches [Gap closed for SB11]; 5) As observed previously, Gd is expected to enter the off-gas system via physical entrainment, but at a slightly higher concentration than what was observed for SB9 melter off-gas pluggage deposits (0.07 wt%) [Gap closed for SB11] ; 6) There are no expected impacts on DWPF recycle or the Recycle Collection Tank glycolate destruction process. [Gap closed for SB11]; 7) Gd is projected to be a trace component in the SB11 glass (<0.5 wt%) and can be ignored for process control. Trace components do not significantly impact glass durability, thus the conclusions of the previous Product Consistency Test evaluation at a fissile mass loading of 2,500 g fissile/m3 glass still applies to SB11. The ~0.1 wt% increase in Gd2O3 concentration relative to the previous study will not impact the predictability of SB11 glass with the DWPF Product Composition Control System (PCCS) models for durability or the acceptability of glass according to the Waste Acceptance Product Specifications (WAPS) criterion for product consistency [Gap closed for SB11]; 8) No additional Toxicity Characteristic Leaching Procedure testing is necessary for SB11 and the hazardous waste specification of the SB11 DWPF waste form is unchanged after the addition of the ABD stream [Gap closed for SB11]. The following summarizes the evaluation of the impacts of adding two-thirds of the ABD material to Tank 51 prior to LTAD: 1) The addition of two-thirds of the ABD increases overall aluminum mass from 1.39×10 4 kg to 1.64×10 4 kg (15.5% ABD Al). The form of the insoluble portion of the Al resulting from ABD addition should be the more readily dissolved Al(OH) 3 and amorphous forms. The portion of the ABD aluminum that is processed by LTAD is expected to be completely soluble, thus requiring that less of the boehmite in the sludge be dissolved to reach the same Al target in the SB. [Gap closed for SB11]; The expected LTAD impact on other components, as related primarily to the components in ABD, are discussed. Gd is expected to remain insoluble during LTAD and not impact the solubility of other components. [Gap closed for SB11]; The addition of two-thirds of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 13,100 kg (63% ABD U) and the projected plutonium mass from 86.0 kg to 89.5 kg (3.9% ABD Pu). The addition of all of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 16,100 kg (70% ABD U) and the projected plutonium mass from 86.0 kg to 90.4 kg (5.3% ABD Pu). The 235 U enrichment will be ≤5%. The fissile uranium will be adequately poisoned by Gd and the fissile Pu will be adequately poisoned by Fe from the sludge. [Gap closed for SB11]; There is a low risk that ABD addition will impact the rheology or pumpability of the slurry. There is a low but higher risk of ABD addition prior to LTAD impacting the settling rate; Based on the evaluation of adding two-thirds of the ABD material and all of the ABD material prior to the LTAD process, there is no volume or mass limit that would need to be imposed on ABD additions prior to LTAD. [Gap closed for SB11]. Revision 1 of this report addresses a variation on the ABD additions and LTAD strategy where sodium hydroxide additions for LTAD may be performed intermittently or concurrently with an ABD addition window. The proposed change does not alter the conclusions of this evaluation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computed Tomography Scanning and Geophysical Measurements of Appalachian Basin Core from the Jones and Laughlin #1 Well, Beaver County, PA

The computed tomography (CT) facilities and the Multi-Sensor Core Logger (MSCL) at the National Energy Technology Laboratory (NETL) in Morgantown, West Virginia, were used to characterize Appalachian Basin core from Beaver County, Pennsylvania. The primary impetus of this work is a collaboration between the U.S. Department of Energy (DOE) and the Pennsylvania Geological Survey to characterize and make publicly available core information from the Onondaga-Huntersville formations of the Appalachian Basin. This stratigraphic well and the core data produced in this report will aid in understanding the structural complexities of the Onondaga-Huntersville formations. The resultant datasets are presented in this report and can be accessed from NETL's Energy Data eXchange (EDX) online system using the following link: https://edx.netl.doe.gov/dataset/jonesandlaughlin1well. All equipment and techniques used were non-destructive, enabling future examinations and analyses to be performed on these cores. Fractures, discontinuities, and millimeter-scale features were readily detectable with imaging performed with the NETL medical CT scanner over the entire core. Qualitative analysis of the medical CT images, coupled with X-ray fluorescence (XRF), and magnetic susceptibility measurements from the MSCL were useful in identifying zones of interest for further study. Targeted higher resolution CT scanning of select sections was performed with NETL’s micro-CT scanner. The combination of methods used provides a multiscale analysis of the core; the resulting macro and micro descriptions are relevant to many subsurface energy related examinations traditionally performed at NETL.

58 GEOSCIENCES↗

Williston Basin CORE-CM Initiative Presentation to ND Building and Trades Unions

The Energy & Environmental Research Center (EERC) is leading the Williston Basin Carbon Ore, Rare Earth, and Critical Minerals (CORE-CM) Initiative, an initiative to drive the expansion and transformation of coal and coal-based resource usage within the Williston Basin to produce rare-earth elements (REEs), critical minerals (CMs), and nonfuel carbon-based products (NFCBPs). This presentation describes the program, initial results, and potential benefits.

Kay, John P.↗

Computational Analysis of Hydraulic Capacity of Ohio DOT Catch Basin No. 6 in On-Grade and Sag Locations

Stormwater runoff from streets and highways is typically captured by drainage structures strategically placed when roadways use curb or curb and gutter systems. These structures include catch basins with grates, inlets, or combination grates/inlets that collect and discharge storm water runoff to buried pipe conveyance systems. The performance of these drainage structures is measured in terms of hydraulic efficiency, which is defined as the percentage of flow captured by the basin as compared to the total flow draining to the structure. Understanding the performance of these drainage structures allows for a safe and economical design which prevents flooding along Ohio roadways.

42 ENGINEERING↗

Prospecting for Critical Minerals and Rare Earth Elements from Marcellus Shale in the Western Portion of the Appalachian Basin with Non-Destructive Core Characterization

Identification of sources for domestic critical minerals and rare earth elements (CM/REE) has been deemed essential for the energy transition by the United States Department of Energy (DOE). The U.S. DOE’s National Energy Technology Laboratory’s (NETL) Geomaterials Characterization Laboratory has performed non-destructive core characterizations on energy-relevant rock cores for the past decade. During this time, NETL has published over 36 technical reports and made the associated data publicly available. Much of this work focuses on unconventional shale gas, subsurface carbon storage systems, and carbon-ore. These efforts provide cm-scale petrophysical and elemental data, photographic documentation, detailed core descriptions, and computed tomography (CT) data for each well. This provides a first phase prospecting resource for CM/REE resources and can provide a map for pin-pointing intervals and lithologies for further development. Using historical core characterization data from 12 Marcellus wells from the western portion of the Appalachian Basin, this study builds an improved understanding of the chemostratigraphy of the basin. X-ray fluorescence (XRF) and CT images were used to determine lithologic intervals and potential ore bodies for further analysis, including benchtop digestion and inductively coupled plasma mass spectrometry (ICP-MS) to better understand the CM/REE enrichments.

Paronish, Thomas J.↗

Illinois Basin Carbon Ore, Rare Earth, and Critical Minerals (IB-CORE-CM) Initiative (Final Report (Redacted)(Public))

Final Report; Illinois Basin - Carbon Ore, Rare Earth and Critical Mineral (IB-CORE-CM) project team has conducted a comprehensive basin-wide assessment of CORE-CM presence in coal, coal-based, and waste stream resources, as well as a thorough examination of mining practices, separation technologies, and the local infrastructure necessary for producing and providing the needed CORE-CM resources for U.S. industry. This final report details the research, methods, and results of the project.

01 COAL, LIGNITE, AND PEAT↗

Findings on subtask 1.6 – basin electric carbon storage research project: novel monitoring techniques

The Energy & Environmental Research Center (EERC) led a study to validate novel and emerging technologies as commercial monitoring techniques for application in carbon dioxide (CO 2 ) injection operations. This applied research was conducted at Basin Electric Power Cooperative’s (Basin Electric’s) active CO 2 -injection operations in Beulah, North Dakota, in two phases. The EERC previously completed a set of baseline (preinjection) activities in Phase 1, which included 1) design of an automated, integrated, modular (AIM) monitoring station; 2) time-lapse electromagnetic (EM) field surveys; 3) drone-based surveillance studies; 4) time-lapse monitoring with seismic methods; and 5) advanced wellbore-monitoring methods.

54 ENVIRONMENTAL SCIENCES↗

CMCSCFCB—Critical Minerals in Coaly Strata of the Cherokee-Forest City Basin

This report summarizes results of CMCSCFCB—Critical Minerals in Coaly Strata of the Cherokee-Forest City Basin, a multiyear and multidisciplinary study funded through DE-FOA-0002364 as part of the Department of Energy Office of Fossil Energy and Carbon Management (FECM) Carbon Ore, Rare Earth and Critical Minerals (CORE-CM) Initiative for U.S. Basins. Our working group of state and tribal agencies collected data and made interpretations included herein. It also surveyed the regional potential for critical mineral/material production.

01 COAL, LIGNITE, AND PEAT↗

RESULTS OF GROUNDWATER MONITORING FOR THE 183-H SOLAR EVAPORATION BASINS AND 300 AREA PROCESS TRENCHES JANUARY THRU JUNE 2008

This is one of a series of reports on Resource Conservation and Recovery Act of 1976 (RCRA) monitoring at the 183-H solar evaporation basins and the 300 Area process trenches. It fulfills the requirement of Washington Administrative Code (WAC) 173-303-645(11)(g), 'Release from Regulated Units', to report twice each year on the effectiveness of the corrective action program. This report covers the period from January through June 2008. The current objective of corrective action monitoring the 183-H basins is simply to track trends. Although there is short-term variability in contaminant concentrations, trends over the past 10 years are downward. The current Hanford Facility RCRA Permit (Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste [Permit No. WA 7890008967]) and monitoring plan remain adequate for the objective of tracking trends. The objective of groundwater monitoring at the 300 Area process trenches is to demonstrate the effectiveness of the corrective action program by examining the trend of the constituents of interest to confirm that they are attenuating naturally. The overall concentration of uranium in network wells remained above the 30 {micro}g/L drinking water standard in the three downgradient wells screened at the water table. Fluctuations of uranium concentration are caused by changes in river stage. The concentration of cis-1,2-dichloroethene remained above the 70 {micro}g/L drinking water standard in one well (399-1-16B). Concentrations are relatively steady at this well and are not affected by river stage. Trichloroethene and tetrachloroethene concentrations were below detection limits in all wells during the reporting period.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

3D Geologic Modeling of the Southern San Joaquin Basin for the Westcarb Kimberlina Demonstration Project- A Status Report

The objective of the Westcarb Kimberlina pilot project is to safely inject 250,000 t CO{sub 2}/yr for four years into the deep subsurface at the Clean Energy Systems (CES) Kimberlina power plant in southern San Joaquin Valley, California. In support of this effort, we have constructed a regional 3D geologic model of the southern San Joaquin basin. The model is centered on the Kimberlina power plant and spans the UTM range E 260000-343829 m and N 3887700-4000309 m; the depth of the model ranges from the topographic surface to >9000 m below sea level. The mapped geologic units are Quaternary basin fill, Tertiary marine and continental deposits, and pre-Tertiary basement rocks. Detailed geologic data, including surface maps, borehole data, and geophysical surveys, were used to define the geologic framework. Fifteen time-stratigraphic formations were mapped, as well as >140 faults. The free surface is based on a 10 m lateral resolution DEM. We use Earthvision (Dynamic Graphics, Inc.) to integrate the geologic and geophysical information into a 3D model of x,y,z,p nodes, where p is a unique integer index value representing the geologic unit. This grid represents a realistic model of the subsurface geology and provides input into subsequent flow simulations.

58 GEOSCIENCES↗

3D Geologic Modeling of the Southern San Joaquin Basin for the Westcarb Kimberlina Demonstration Project- A Status Report

The objective of the Westcarb Kimberlina pilot project is to safely inject 250,000 t CO{sub 2}/yr for four years into the deep subsurface at the Clean Energy Systems (CES) Kimberlina power plant in southern San Joaquin Valley, California. In support of this effort, we have constructed a regional 3D geologic model of the southern San Joaquin basin. The model is centered on the Kimberlina power plant and spans the UTM range E 260000-343829 m and N 3887700-4000309 m; the depth of the model ranges from the topographic surface to >9000 m below sea level. The mapped geologic units are Quaternary basin fill, Tertiary marine and continental deposits, and pre-Tertiary basement rocks. Detailed geologic data, including surface maps, borehole data, and geophysical surveys, were used to define the geologic framework. Fifteen time-stratigraphic formations were mapped, as well as >140 faults. The free surface is based on a 10 m lateral resolution DEM. We use Earthvision (Dynamic Graphics, Inc.) to integrate the geologic and geophysical information into a 3D model of x,y,z,p nodes, where p is a unique integer index value representing the geologic unit. This grid represents a realistic model of the subsurface geology and provides input into subsequent flow simulations.

58 GEOSCIENCES↗

Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.

Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the Feed Canal Diversion Dam site (Umatilla River mile 28.7) was implemented with local U.S. Bureau of Reclamation field office personnel coordinating project activities. Operation and Maintenance Project personnel assisted with labor, materials, and equipment to ensure the project was completed as planned. Discussions are under way to determine feasible alternatives for longer term solutions to passage issues at the site. (2) Three Mile Right (east bank) Facilities - The pump for supplying water to the fish handling facility holding pond was reconstructed successfully to achieve the desired increase in flow output necessary when increased quantities of fish are present. (3) Fish Screen Rehab at Stanfield Canal Diversion - Working with the Washington Department of Fish and Wildlife screen shop personnel, three rotating drum screens at the Stanfield Canal diversion site (Umatilla River mile 33.3) were serviced and overhauled with new bearings, seals, paint, and reinforcing bars. Work was completed, and screens reinstalled prior to water diversions beginning in the spring. (4) O & M personnel performed daily, weekly, and monthly operations and maintenance duties at the screen and ladder sites including, but not limited to, desilting of mud and debris, lubrication of mechanical parts, replacement of screen seals and screen motor components, adjustment of ladder gates, removal of large trees and woody debris deposited during high river flow conditions, servicing of pumps and screens for fish handling operations and sampling studies, in addition to general site clean-up, vegetative control, and security. Crew members responded as needed during evenings and after-hours according to weather conditions, river flows, and fish passage facility needs.

13 HYDRO ENERGY↗

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, 2007 Annual Report.

Redd counts are routinely used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2007; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches counted upstream of Lower Granite Dam into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2007 was funded by the Bonneville Power Administration and Idaho Power Company.

13 HYDRO ENERGY↗

Assessment of Jet Erosion for Potential Post-Retrieval K-Basin Settled Sludge

Packaged K-Basin sludge will be transported to the T Plant on the Hanford Site where it will be interim stored. The sludge will be retrieved from the storage containers and processed for disposal. A sample of high uranium content canister sludge, designated 96-13, "self-cemented" during laboratory storage. This sample was uncharacteristically strong compared to expected K-Basin material. The purpose for this work is to evaluate the potential retrieval of such sludge after storage at the T Plant via jet erosion. The specific objectives of this report are to determine the modes of erosion and the methods used to measure/assess the erodibility parameters of sludge and identify those parameters applicable to jet erosion. The erodibility parameters of sample 96-13 are characterized to the extent possible. These objectives have been met based on literature review, past experience at Pacific Northwest National Laboratory, and observation of sample 96-13 video during hot-cell activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HydroSource: A Platform for US Hydropower Data for Basin-Scale Applications

HydroSource: A Platform for US Hydropower Data for Basin-Scale Applications presents a high-level overview of ORNL’s HydroSource data products that can be used in various basin-scale applications across the United States to realistically conceptualize and quantitatively analyze the complex dynamics, effects, and implications of energy-water systems. This product is an ArcGIS Story Map that contains an array of interactive and static maps.

13 HYDRO ENERGY↗

Permian Basin: in-situ tower greenhouse gas data

The Permian Basin in-situ greenhouse gas network was designed to measure atmospheric mole fractions of methane to be used in conjunction with transport modeling to determine methane emissions from the Permian Basin oil and natural gas extraction area in Texas/New Mexico. The current network includes 5 measurement sites with continuous measurements of CH4, 4 sites with measurements of CO2, 2 sites with measurements of the isotopic ratio of methane, and 1 site with measurements of H2S.

Monteiro, V.↗