D and D (System Closure) Mockup Testing Demonstration. Remediation of Legacy Radioactive Piping and Tank Systems at the Reactor Technology Complex (RTC) (2007)
This paper presents the results of an integrated mockup demonstration of technologies and equipment designed to remove radioactively contaminated piping systems from underground vaults and pipe trenches at the Idaho National Laboratory. The integrated mockup demonstration included performing a bench scale wax fixative study and field demonstrations of the remotely operated equipment that will be used to remove radioactively contaminated pipe systems. The bench-scale wax fixative study involved defining optimum temperature and moisture conditions for effectively filling pipe sections containing residual wastes with a wax based fixative. The field demonstrations involved dismantling underground vault and trench piping systems, including pipe sections filled with the wax fixative. The purpose of the demonstration was to ensure the selected technologies and equipment would be effective prior to field deployment. The demonstration was conducted as a joint effort by MSE Technology Applications, Inc., and CWI on behalf of the U.S. Department of Energy at the Mike Mansfield Advanced Technology Center in Butte Montana. In summary: The mockup included two main tests at the MSE facility: 1) a vault mockup that included stainless and carbon steel pipe cutting and removal; and 2) a trench mockup that included cutting and removing buried Duriron and ductile iron piping. Both mockups included cutting and removing a pipe filled with the WAXFIX stabilizing material. Based on the MSE moisture tests, project personnel concluded that the WAXFIX product would be effective when used on wastes with different moisture contents that may be encountered in piping systems during the closure of the TRA-630 Catch Tank System at INL. A section of stainless steel pipe was also used to test a number of leak stop alternatives for wax leaks that may be encountered in a degraded piping system. Both the vault and the trench mockup demonstration proved successful for ICP, DOE, and MSE. The ICP operators received valuable hands-on training using the selected equipment and tooling in situations very similar to what they will encounter at INL. Proper tool selection and tool change procedures were defined as situations requiring these operations were encountered. Methodologies for approaching similar trench and vault situations (including safety concerns) were identified and experienced, and wax filled pipes were successfully cut and removed without spilling the surrogate materials within the pipes. All of the tools performed well except the band saw tool. The band saw was specifically designed to cut pipe; however, it was not robust enough and generally the shear was used in its place. Mockups are essential in gaining actual hands on training before going to the field. Mockups improve efficiency and safety that results in cost effective remediation. The MSE facility provides a valuable resource for demonstration of mockups. The facility has several acres of available space and a highly qualified support staff. The integrated mockup demonstration was considered a great success by all involved parties. ICP operators received valuable experience using the equipment selected for catch tank system closure before field deployment in a radiological contaminated environment. The selected equipment proved to be applicable to the safe and effective closure of the catch tank systems, and MSE demonstrated the ability to provide facility and services necessary to support closure mockup demonstrations. (authors)