Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

A Systems Engineering Approach to Accident Response Planning

This paper explores the Systems Engineering structure, strategies and tools for real world scenarios involving work with accident response groups. A systems engineering approach must be taken by the technical teams to prepare for a successful response and design the technical systems in support of the operations. The scope of this project is focused on laying out the foundation of the systems engineering approach taken to help the teams develop an accident response strategy and identify new engineering designs in support of these operations for the black box systems. This Master’s project involves several interdisciplinary teams & stakeholders across different areas. Identifying the proper tools to use is key to addressing the big picture needs of the multiple stakeholders. This project explores some of the key tools used by the integrated team. The integrated project work will primarily take place over the course of 8 weeks via integrated team meetings. Other work in support of this project will take place off-line as needed by the project lead. Details on the prospective timeline, milestones, key dates and work scope can be referenced in other sections of this paper. Key systems engineering methodologies and tools used thus far in support of this project includes: 1) Market Surveys and Interviews, 2) Project Charter, 3) Feasibility Study, 4) Swim Lane Diagram, and 5) Knowledge Management Plan.

42 ENGINEERING↗

Robotic Assembly of Truss Structures for Space Systems and Future Research Plans

Many initiatives under study by both the space science and earth science communities require large space systems, i.e. with apertures greater than 15 m or dimensions greater than 20 m. This paper reviews the effort in NASA Langley Research Center's Automated Structural Assembly Laboratory which laid the foundations for robotic construction of these systems. In the Automated Structural Assembly Laboratory reliable autonomous assembly and disassembly of an 8 meter planar structure composed of 102 truss elements covered by 12 panels was demonstrated. The paper reviews the hardware and software design philosophy which led to reliable operation during weeks of near continuous testing. Special attention is given to highlight the features enhancing assembly reliability.

Doggett, William↗

An expansion plan for the 60 Hz power distribution system at KSC: LC-39 substations load allocation plan

The increasing load density in the LC-39 area of Kennedy Space Center (KSC) can be met by either modifying the existing substation and increasing its capacity or by planning an additional new substation. Evidence that the later approach is more economical, enhances the system reliability, and would produce more satisfactory performance indices is provided. Network theory is the basis for the optimal location determination of the proposed substation. A load reallocation plan which minimizes investment cost and power losses and meets other desirable system features is drafted. The report should be useful to the system designer and can be a useful guideline for future facility planners.

Kalu, Alex↗

Effectively Considering the Distribution System in Integrated Resource Plans

While electricity planning practices vary by state and utility based on utility type and market structure, integrated resource planning (IRP) remains a prominent vehicle — even in states with centrally-organized wholesale electricity markets. IRP focuses on meeting forecasted long-term electricity needs. Typically, utilities have not considered impacts of design and operation of the low-voltage distribution network in IRP. With advanced capabilities of grid-edge technologies to generate and store electricity and provide load flexibility, and large utility investments in distribution systems, it's increasingly important to consider at least some distribution planning elements in IRP. This report considers the value proposition for doing so, such as reducing utility costs through resource co-optimization and strategic siting of grid-edge resources, and idenfities the most important touchpoints between planning for bulk power and distribution systems and provide a range of tactics for integrating these two processes.

Relf, Grace [Lawrence Berkeley National Laboratory↗

An information adaptive system study report and development plan

The purpose of the information adaptive system (IAS) study was to determine how some selected Earth resource applications may be processed onboard a spacecraft and to provide a detailed preliminary IAS design for these applications. Detailed investigations of a number of applications were conducted with regard to IAS and three were selected for further analysis. Areas of future research and development include algorithmic specifications, system design specifications, and IAS recommended time lines.

Ataras, W. S.↗

The plan for the economic evaluation of the Public Service Communication Satellite system

A total plan for the economic evaluation of the PSCS public service communication satellite program within domestic markets is presented. It extends from the present through the planning, performance and evaluation of economic experiments following the launch of the PSCS, and includes the consideration of how the results of these experiments impact the transfer from demonstration to operations. The implementation of this plan will provide NASA with information needed to understand and manage the economic and social impacts of the PSCS program.

Source record↗

PC-based Multiple Information System Interface (PC/MISI) design plan

The general design plan for the implementation of a common user interface to multiple remote information systems within a microcomputer-based environment is presented. The intent is to provide a framework for the development of detailed specifications which will be used as guidelines for the actual development of the system.

Dominick, Wayne D.↗

SURE (Science User Resource Expert): A science planning and scheduling assistant for a resource based environment

SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.

Thalman, Nancy E.↗

Definition of propulsion system for V/STOL research and technology aircraft

Wind tunnel test support, aircraft contractor support, a propulsion system computer card deck, preliminary design studies, and propulsion system development plan are reported. The Propulsion system consists of two lift/cruise turbofan engines, one turboshaft engine and one lift fan connected together with shafting into a combiner gearbox. Distortion parameter levels from 40 x 80 test data were within the established XT701-AD-700 limits. The three engine-three fan system card deck calculates either vertical or conventional flight performance, installed or uninstalled. Design study results for XT701 engine modifications, bevel gear cross shaft location, fixed and tilt fan frames and propulsion system controls are described. Optional water-alcohol injection increased total net thrust 10.3% on a 90 F day. Engines have sufficient turbine life for 500 hours of the RTA duty cycle.

Source record↗

SAR image data compression for an on-line archive system

This paper summarizes the investigation of SAR image data compression for an on-line archive data distribution system. This system is planned for the ground processing system of Alaska SAR Facility (ASF) and Shuttle Imaging Radar (SIR-C). The objective of the SAR image data compression is to enable the data archive system to provide the remote users a large data base with good image quality, short response time, low transfer cost, and minimal decoding complexity. The requirements and limitations of the on-line archive data distribution system are presented. The effects of SAR image data characteristics on data compression are addressed. The users' survey results suggest that compression ratios between 10:1 and 20:1 appear suitable. Based on the algorithm evaluation results, the two-level tree-searched vector quantization technique has been recommended as the SAR image data compression algorithm for the on-line archive data distribution system.

Chang, C. Y.↗

Autonomy technology at JPL

This paper and exhibit describes the on-going research activities, plans and products of the Autonomy Technology program at NASA Jet Propulsion Laboratory. In this paper, we briefly describe the areas of Mission Planning and Execution, Distributed Autonomous Systems, Science Data Understanding, and Autonomous Guidance and Control.

autonomous rovers distributed systems planning con↗

Overview and Status of the Laser Communication Relay Demonstration

NASA is presently developing first all optical high data rate satellite relay system, LCRD. To be flown on commercial geosynchronous satellite, it will communicate at DPSK and PPM modulation formats up to 1.244 Gbps. LCRD flight payload is being developed by NASA's Goddard Space Flight Center. The two ground stations, one on Table Mountain in CA, developed by NASA's Jet Propulsion Laboratory and another on Hawaiian island will enable bi-directional relay operation and ground sites diversity experiments. In this paper we will report on the current state of LCRD system development, planned operational scenarios and expected system performance.

free space optical communication↗

Using Time Series Data Products to Support ASHRAE’s Historic and Future Climate Data Needs through NASA’s POWER Web Services

To address the data needs for resilience and sustainability of building systems within ASHRAE, the NASA Prediction of Worldwide Energy Resource (POWER) project facilitates the use of NASA Earth Science data on a long-term, global scale. Solar data from several NASA projects and meteorological data from NASA assimilation models have been reformatted and disseminated to the public via a user friendly web GIS-enabled based data portal (https://power.larc.nasa.gov) in selectable data formats, immediately amenable to key industry wide decision support tools such as EnergyPlus. Time series of potential climate conditions from downscaled climate simulations are being made available for similar statistics and formats. An emphasis is placed upon obtaining and utilizing time series data to conduct analysis of building system performance for current and planning building systems for energy savings and greenhouse gas emissions. This presentation has the learning following learning objectives for the ASHRAE community: 1) Learn how NASA POWER’s web service suite can provide supplementary solar and surface meteorological data parameters, including a discussion of uncertainty. 2) Learn how downscaled climate scenario information can be provided to evaluate potential future requirements. The presentation is part of a forum entitled, "Weather Data for Large-Scale Building Energy Modeling".

time series↗

Factors Influencing the Selection of the Systems Integration Organizational Model Type for Planning and Implementing Government High-Technology Programs

While there has been extensive research in defining project organizational structures for traditional projects, little research exists to support high technology government project s organizational structure definition. High-Technology Government projects differ from traditional projects in that they are non-profit, span across Government-Industry organizations, typically require significant integration effort, and are strongly susceptible to a volatile external environment. Systems Integration implementation has been identified as a major contributor to both project success and failure. The literature research bridges program management organizational planning, systems integration, organizational theory, and independent project reports, in order to assess Systems Integration (SI) organizational structure selection for improving the high-technology government project s probability of success. This paper will describe the methodology used to 1) Identify and assess SI organizational structures and their success rate, and 2) Identify key factors to be used in the selection of these SI organizational structures during the acquisition strategy process.

Thomas, Leann↗

Using ASPEN to Automate EO-1 Activity Planning

This paper describes the application of an automated planning and scheduling system to the NASA Earth Orbiting 1 (EO-1) mission. The planning system, ASPEN, is used to autonomously schedule the daily activites of the satellite. The satellite and operations constraints are encoded within a software model used by the planner.

Automated↗

Commercial Building Planning and Retrofitting Strategy for Grid Services

The increasing integration of distributed energy resources (DERs) plays an important role in improving energy consumption efficiency. In September 2020, the Federal Energy Regulatory Commission (FERC) approved Order 2222 which opens wholesale electricity markets to small capacity DERs. The benefit of this new FERC Order 2222 is that DERs, such as rooftop solar panels and batteries, will be able to participate in regional electricity markets and provide grid services. Meanwhile, the planning and operation strategies of DERs are facing new challenges to account for the impact of the wholesale market with numerous uncertainty factors. Therefore, in this paper, we propose a new planning and retrofitting model for long-term commercial buildings that considers both DER investment and market participation. Specifically, we explore the capability of implementing DERs for grid services. The effectiveness of the proposed model is validated using real-world data. Simulation results also validate that participating in grid services can significantly increase revenues through appropriate building energy management and shorten the payback period of DER investments.

building energy management↗