Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “regulatory”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Integrated Off-Gas System Tests on the DM1200 Melter with RPP-WTP LAW Sub-Envelope C1 Simulants (Final Report)

The report documents melter and off-gas performance results obtained on the DM1200 during processing of LAW Sub-Envelope Cl feed. The principal objectives of the DM1200 melter testing were to demonstrate suitable processing and production rates for LAW Cl feed; characterize the glass product for elemental composition, the presence of organic compounds, and TCLP response for metals; and measure destruction and removal efficiencies (DREs) for organic compounds across the melter and off-gas treatment components. The feed was spiked with organic compounds for part of the testing duration. Data were collected for both process engineering needs and to support regulatory activities. The data needed for regulatory support were collected using EPA methods and independent data analyses and data checking were performed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evolving Competitive Markets in SAPP: Leveraging Competitive Wholesale Electricity Markets to Drive Renewable Generation Capacity in the Southern African Power Pool (SAPP)

The SADC region has significant natural resource potential to increase renewable energy generation, improve electricity reliability, and support economic development. This research finds an apparent lack of confidence from electricity infrastructure investors in SAPP wholesale electricity markets, which increases risk perception and lowers the likelihood of capital deployment. With respect to free market fundamentals, competitive market obstacles and renewable energy development obstacles are characterized. Stakeholders identified the top obstacles to well-functioning competitive markets as insufficient transmission infrastructure for interconnection and regional movement of electricity, dominance of national single-buyer markets, and lack of or weak nation-state regulatory frameworks. Stakeholders prioritized the top three obstacles for renewable energy development as a lack of viable commercial arrangements for variable renewable energy (VRE) balancing, lack of functional and consistent nation-level regulations, and higher project costs related to reliance on imported equipment. With respect to potential solution options, stakeholders prioritized the development of new cost allocation and finance methods to facilitate new transmission expansion, training to educate new or potential new market entrants on SAPP processes, as well as modeling and analysis of regional SAPP participation benefits disaggregated to the nation-state level. From these perspectives, this research identified strategy options for consideration including transitioning SAPP to a regional transmission operator (RTO) for operation and planning of cross-border transmission facilities and market administration, shifting operations of SAPP member transmission systems to Independent System Operators (ISOs), establishing a regional regulatory authority and enhancing market data transparency. Implementing these reforms is expected to be challenging, but not insurmountable, given the domestic political, legal, and jurisdictional complexities of the SADC region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

Guidance for Monitoring Passive Groundwater Remedies Over Extended Time Scales

Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. However, long-term passive remedies are usually selected in combination with at least one active remedy, such as source removal, in situ treatment, or pump-and-treat, functioning as a complementary method for achieving remediation objectives and meeting the applicable statutory and regulatory requirements. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When time scales for passive remediation extend to many decades (50 years or more), a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that downstream receptors will not be impacted within the remediation timeframe. ESM applies to slow-moving groundwater contaminant plumes and emphasizes monitoring primarily for potential exposure pathways. For this approach, the primary monitoring objective is to demonstrate that the plume diminishes before reaching the receptor zone or point of compliance and/or a receptor does not receive concentrations above the compliance limit. While the overall objectives of protecting human health and the environment are the same as for plumes where remediation can occur over a shorter time period, the time scales between decisions are longer and the dynamics of plume evolution are slower. To this end, a scenario-based strategy is described for different plume and source conditions, defining a containment and receptor zones. The containment zone is the area where the risk of exposure to groundwater contamination can be mitigated (e.g., through institutional controls) during the remediation time period. The receptor zone is defined as the area where exposure to groundwater contamination cannot be mitigated and compliance concentration standards must be met. Within the containment zone, slow plume migration may occur, leading to concentrations that exceed compliance standards. However, where distance to the receptor zone is large relative to plume migration and attenuation rate, this approach can be protective of the receptor zone. Selection of a long-duration passive remedy needs to be based on sufficient understanding of contaminant sources, hydrogeology, and contaminant plumes. A strong technical basis, supported by predictive analysis, is recommended to substantiate that contamination is expected to stay within the containment zone during the active remediation and attainment phase of the remedy, and diminish to meet compliance standards within the extended timeframe prior to reaching the receptor zone (e.g., many decades or even centuries). The ESM approach is based on verification of plume behavior and not on detailed plume dynamics. Monitoring is conducted to confirm expected behavior with an emphasis on exposure pathways to verify that plumes remain contained in areas where the protectiveness objectives can be met. ESM should not be adopted if there is significant risk of the plume extending beyond the containment zone. Given the slow movement within the containment zone, less frequent sampling is required relative to approaches used for conventional-scale remediation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulator Data Analysis to Inform Digitalized Environment Impacts on Human Reliability

The U.S. Nuclear Regulatory Commission (NRC) has developed a human reliability analysis (HRA) method, termed the Integrated Human Event Analysis System for Event and Condition Assessment (IDHEAS-ECA), in order to estimate human error probabilities (HEPs) in risk-informed regulatory applications. To update the quantification part of IDHEAS-ECA, the NRC required human performance and error data from fully digitalized main control rooms (MCRs); therefore, it requested that Idaho National Laboratory (INL) revisit previous data collection studies and investigate how the following three factors impact human reliability: self-checking, peer-checking, and automation. The HRA data collection studies revisited were the Human Reliability Data Extraction (HuREX) project, developed by the Korea Atomic Energy Research Institute (KAERI), and the Simplified Human Error Experimental Program (SHEEP), developed by INL. HuREX is a representative HRA data collection study that collects human reliability data from full-scope simulators staffed by licensed operators. SHEEP, on the other hand, has been proposed to complement such full-scope studies by collecting data via simplified simulators staffed by non-licensed student operators. In the HuREX study, KAERI collected HRA data from fully digitalized MCRs for the Advanced Power Reactor (APR)–1400. The SHEEP data were obtained from simplified simulators that partially mimicked the features of digitalized MCRs. The present report mainly discusses how the impacts of the aforementioned three factors on human errors were derived from these two data collection studies.

99 GENERAL AND MISCELLANEOUS↗

Development and Demonstration of a Risk Assessment Approach for Approval of a Transportation Package of a Transportable Nuclear Power Plant for Domestic Highway Shipment

The U.S. Department of Defense (DoD) Strategic Capabilities Office (SCO) has tasked PNNL to address the regulatory challenges associated with confirming the safe transport of Transportable Nuclear Power Plants (TNPPs) containing irradiated nuclear fuel. A previous report—Proposed Risk-Informed Regulatory Framework for Approval of Microreactor Transportation Packages (PNNL-31867)—determined that the expected radioactive inventory in the irradiated fuel of a TNPP would likely require shipment in an NRC-approved Type B package (or spent nuclear fuel cask) but that a TNPP “package” is unlikely to meet the entire suite of NRC requirements set forth in Part 71 of Title 10 of the Code of Federal Regulations (CFR) for a Type B package. It was therefore concluded that shipment of this initial TNPP transportation package, as well as possibly others, under existing regulations would likely require NRC approval using the 10 CFR 71.12 (“Specific exemptions”) process that relies on risk-informed decision making supported by quantitative risk assessment (i.e., Probabilistic Risk Assessment).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RANGERS: Modeling Report on Integrity and Performance Assessment of Engineered Barrier Systems in a Salt Repository for HLW/SNF

The Engineered Barrier System (EBS) plays an important role in ensuring the long-term safety and containment of high-level waste (HLW) and spent nuclear fuel (SNF) in deep geological repositories in salt formation. As part of a multi-barrier system, the EBS works alongside the natural barrier, which is the salt formation itself and the technical barrier comprising the disposal casks. The primary function of the EBS is to maintain containment during a defined period until the backfill used in the repository made of crushed salt, develops its sealing capacity through compaction. Over the time, the backfill eventually compacts to a state of low porosity and permeability, acting as a long-term seal. However, until this process is complete, the EBS must retain its structural and functional integrity. Regulatory guidelines in Germany currently require the EBS to remain effective for up to next ice age, that is expected in 50,000 years. The significant hydro-geological and topographic changes expected during an ice age could make it impossible to accurately predict the hydro-chemical conditions within the repository system at that time. In response to these challenges, BGE TECHNOLOGY GmbH (BGE TEC) and Sandia National Laboratories (SNL) have jointly developed a comprehensive methodology for the design and safety assessment of engineered barrier systems within the scope of the RANGERS project. This methodology is tailored for repositories in salt formations. The developed methodology provides a structured approach for designing and assessing the performance of the EBS in salt-based repositories. It begins with defining a sealing concept based on the geological characteristics of the selected site and the overall repository design. The entire repository system, comprising the geological site, repository infrastructure, and EBS, is then subjected to a Features, Events, and Processes (FEP) analysis, focusing solely on those FEPs that affect the EBS. The derived FEPs help identify the loads and stresses acting on the EBS, which serve as the foundation for conducting an integrity assessment. This analysis helps predict the EBS’s evolution and performance over the regulatory time frame, feeding into integrated performance assessment simulations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nitrate and Nitrite at Hanford – From Tanks to Natural Attenuation

Washington River Protection Solutions, LLC (WRPS) contracted Pacific Northwest National Laboratory (PNNL) in support of their maturation testing and analysis to develop and deploy an ambient temperature solidification/stabilization process for low-activity waste (LAW) (referred to as “grout” in this report). The intent of this effort is to support a sample-and-send regulatory and processing strategy in the Hanford 200 West Area, specifically considering grout waste forms disposal at Hanford in the Integrated Disposal Facility (IDF). Currently the disposal of grouted LAW is not an option because the IDF is not permitted to receive this waste form. The material presented in this report is intended to help inform the U.S. Department of Energy (DOE), the site operating contractors, regulatory agencies, and stakeholders of the future implications of IDF disposal of a grouted LAW waste form, specifically for the behavior of nitrate (NO 3 - ) and nitrite (NO 2 - ) at the Hanford. The only calculation of nitrate release from a hypothetical grouted LAW inventory in the IDF showed that the overall release was slightly above the compliance limit of 45 mg/L nitrate and 3.32 mg/L nitrate after 1000 years (Asmussen et al. 2019). As such, uncertainty around the impact of nitrate and nitrite release from the IDF was identified in the recent National Academies of Sciences study of Hanford supplemental LAW by both the national laboratory team and Hanford stakeholders (Bates et al. 2023). However, these calculations (and others for the IDF involving secondary waste grout) may be conservative as no nitrate and nitrite retention in the grout waste form was assumed, nor any attenuation in the subsurface. There is evidence from the literature of processes that can attenuate nitrate migration both in the waste form and in the Hanford subsurface. If found to be technically defensible and likely to occur in the IDF and associated subsurface, then these processes should be included in modeling of the IDF to represent the behavior of nitrate and nitrite more accurately. Doing so would remove unnecessary conservatism in the modeling projections and reduce the uncertainty in assessments of facility compliance of a grouted LAW waste form in the IDF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing the Current State of U.S. Energy Equity Regulation and Legislation (2024 Update) [Slides]

Lawrence Berkeley National Laboratory (LBNL) partnered with E9 Insight (E9) to update the 2022 database of executive, legislative, and regulatory actions focusing on energy equity and directed at electricity and natural gas utilities. The resulting database contains 307 energy equity actions, which consist of documents (e.g., bills, dockets, and executive orders) identified through keyword searches associated with energy equity. Based on our review, almost half of states (32 + DC) were taking some sort of action on energy equity (i.e., executive order, PUC activity, agency plan, or executive bill). In the report, we explored temporal trends to track state actions over time across regions, outcomes, equity tenets, and objectives. We also explored what drivers led to what outcomes. Drivers were organized into legislative, regulatory, executive, and stakeholder-driven.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advancing Development of Emissions Detection (Final Report)

This document is the final report to the U.S. Department of Energy (DOE for contract DE-FE0031873) awarded to Colorado State University (CSU). CSU and partners at Harrisburg University of Science and Technology, University of Texas Arlington, and University of Texas at Austin organized several testing rounds to provide knowledge focused on advancing the detection capabilities of emissions monitoring devices. With this funding opportunity the research group began by establishing the Advancing the Development of Emission Detection (ADED) program, with the goal focused on enhancing the accuracy, reliability, and field applicability of methane detection technologies. This effort aimed to address the critical challenges of identifying and quantifying methane emissions while enabling industry stakeholders to meet regulatory compliance and environmental sustainability goals. The program engaged with industry, government, and technology stakeholders to promote adoption and consensus on testing techniques for methane detection solutions. Methane, a potent greenhouse gas, contributes significantly to global warming, and the oil and natural gas (O&G) sector is a primary source of methane emissions. Regulatory measures such as leak detection and repair (LDAR) programs have been implemented to address emissions. However, traditional LDAR approaches, reliant on handheld and component-level measurements, are resource-intensive. To address these limitations and move with evolving regulations, advanced methane technologies are emerging. These solutions include ground-based sensors, mobile systems (e.g., drones, vehicles, and aircraft), and satellite-based platforms. They offer innovative capabilities for autonomous monitoring, larger spatial coverage, and emission quantification using methods such as tracer gas techniques and inverse modeling with Gaussian plume analysis. The ADED program began with creating protocols for methane controlled release (CR) testing these continuous monitoring (CM) and survey technologies that detect and monitor methane emissions at O&G facilities. The protocols were then implemented throughout testing of CM and survey devices at CSU’s Methane Emissions Technology Evaluation Center (METEC) facility from 2021 through 2024. As apart of the protocol, solutions that tested under the ADED program installed their solutions at METEC, documented their system under test, and provided detection reports to the METEC team for analysis. The METEC team would provide the solutions with analyzed reports of their emissions and ground truth data of the releases conducted during their testing session. Under the ADED program, CMs were also tested at O&G facilities for a six week test run of challenge release (ChR) releases. The findings from the ADED program underscore the critical role of collaborative research and innovation in tackling methane emissions, offering a pathway for the oil and gas sector to achieve significant environmental and economic benefits. Results from METEC testing saw improvement of performance and accuracy across all solutions over the extent of the ADED experiments. The results also showed a variance in CM solution performance between CRs and ChRs. That variance pushed the team to further analyze the differences between CR testing environments and field conditions. With the drive from regulations and that variance in field conditions, the ADED team began designing a new CR testing protocol and additions to the METEC testing facility. The METEC team is furthering the progress made through the ADED program with awarded funding from DE-FE0032276. This funding pushes the development of METEC’s addition with new equipment, allowing for an updated facility layout. METEC still facilitates for traditional facilities, with a legacy pad, while expanding an new design based on how O&G infrastructure has Final Report - Contract Number: DE-FE0031873 been changed over the last decade. Throughout the ADED program the team has also been working with international partners to ensure staying in the trend globally. International partners have been essential in moving the new protocol forward to implement into CR testing at the METEC facility in Spring 2025.

42 ENGINEERING↗

Unlocking load growth at the grid edge: Practices for managing, recovering, and allocating distribution system investments

Utilities and utility regulators are preparing to make significant investments in the electricity distribution system driven by expected load growth in coming years and decades. Regulators will be tasked with vetting investment proposals and implementing cost recovery and allocation mechanisms. In particular, state regulators are anticipating the need to make proactive distribution system investments, building the capability to serve new load in advance of demand. This report focuses on load growth from homes and businesses that adopt electric vehicles and heat pump heating technologies. Through a review of legislation and regulatory dockets in a subset of states, we provide insights into emerging utility and regulatory practices to recover and allocate costs of electrification-driven distribution system investments necessary to accommodate these technologies. Our review focused on utility electrification programs, line extension policies, and proactive investments. Our report is largely descriptive, offering detailed information about approaches different state commissions and utilities have implemented to inform future decision-making.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Architecting the Grid Edge: Ensuring Reliability and Resilience

Changes in technology, customer expectations, and business and regulatory environments are rapidly evolving causing fundamental changes in the nation’s electrical infrastructure. Nowhere is this more apparent that at the “grid edge”, where there is an increasing number of new devices and systems, as well as complex new interactions between them. This is leading to the traditional relationship between the end-use customers and their utilities being expanded by an increasing number of stakeholders, each with their own operational and financial objectives, governed by regulatory policy. While there are concerns about the rapidly increasing complexity negatively impacting reliable and resilience of the electrical infrastructure, these changes are also bringing new resources and opportunities that hold great potential if they can be properly coordinated. This white paper outlines the considerations for the coordination of multi-stakeholder objectives with electric utility requirements using the concept of grid services. Describing a framework that enables new stakeholders to achieve their local technical and economic objectives, while simultaneously delivering operational benefits to the electrical infrastructure. The concepts of grid architecture are presented as a tool to evaluate how stakeholders might participate in, and benefit from, services, and how utilities can make decision on the reliance on services to ensure reliability and resilience, translating abstract concepts into actionable information for utilities and grid edge stakeholders. The end result of proper coordination, informed by grid architecture, will be a range of new devices and systems, operated by new stakeholders, achieving their local objectives while also increasing the reliability, resilience, security, and affordability of the nation’s critical electrical infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Architecting the Grid Edge: Ensuring Reliability and Resilience

Changes in technology, customer expectations, and business and regulatory environments are rapidly evolving causing fundamental changes in the nation’s electrical infrastructure. Nowhere is this more apparent that at the “grid edge”, where there is an increasing number of new devices and systems, as well as complex new interactions between them. This is leading to the traditional relationship between the end-use customers and their utilities being expanded by an increasing number of stakeholders, each with their own operational and financial objectives, governed by regulatory policy. While there are concerns about the rapidly increasing complexity negatively impacting reliable and resilience of the electrical infrastructure, these changes are also bringing new resources and opportunities that hold great potential if they can be properly coordinated. This white paper outlines the considerations for the coordination of multi-stakeholder objectives with electric utility requirements using the concept of grid services. Describing a framework that enables new stakeholders to achieve their local technical and economic objectives, while simultaneously delivering operational benefits to the electrical infrastructure. The concepts of grid architecture are presented as a tool to evaluate how stakeholders might participate in, and benefit from, services, and how utilities can make decision on the reliance on services to ensure reliability and resilience, translating abstract concepts into actionable information for utilities and grid edge stakeholders. The end result of proper coordination, informed by grid architecture, will be a range of new devices and systems, operated by new stakeholders, achieving their local objectives while also increasing the reliability, resilience, security, and affordability of the nation’s critical electrical infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pacific Northwest National Laboratory Facility Radionuclide Emission Points and Sampling Systems

Battelle–Pacific Northwest Division operates numerous research and development laboratories in Washington State. The U.S. Department of Energy (DOE) contracts to Battelle at Richland facilities on both the DOE Hanford Site and the Pacific Northwest National Laboratory (PNNL) Richland campus. These facilities have the potential for radionuclide air emissions. The PNNL contract with DOE also includes operations at the PNNL-Sequim campus in Sequim, where there is also the potential for radionuclide air emissions. This document is a periodic update that describes current PNNL facility emission units and sampling systems. The National Emission Standard for Hazardous Air Pollutants (NESHAP [40 Code of Federal Regulations 61, Subpart H]) requires an assessment of all emission units that have the potential for radionuclide air emissions. Emission units are registered with the State of Washington. Potential emissions from emission units are assessed annually by PNNL staff. Sampling, monitoring, and other regulatory compliance requirements are designated based on the potential to-emit dose criteria, a graded approach to facility-identified potential impact categories, and regulatory requirements. The purpose of this document is to describe the facility radionuclide air emission sampling program and provide current and historical facility emission unit system performance, operation, and design information. For sampled emission units, the building, exhaust unit, control technologies, and sample extraction details are provided. Additionally, applicable configuration drawings, figures, and photographs are included. For non-sampled emission units, emission estimation and radionuclide source details are provided. Site-wide permits for the lowest potential impact category are described. Deregistered/transitioned emission unit details are also provided as necessary for at least 5 years post-closure/transition. Currently, five emission units are sampled continuously for particulate radionuclides at PNNL managed facilities on the PNNL-Richland campus (3 of the 5) and on the Hanford Site (2 of the 5). Four of these units have sampling systems that comply with the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1–2011 standard for sampling from stacks and ducts of nuclear facilities, and the fifth is grandfathered and compliant with the older ANSI N13.1–1969 standard. In addition, the PNNL-managed Hanford Site 325 Building EP 325-01-S stack is sampled continuously for emissions of tritium. No emissions sampling is required for the single licensed emission unit on the PNNL-Sequim campus.

54 ENVIRONMENTAL SCIENCES↗

Critical Literature Review of Low Global Warming Potential (GWP) Refrigerants and their Environmental Impact

Refrigeration and air conditioning currently account for ~20% of the total electricity consumption in buildings around the world. Over the next three decades as global temperatures are projected to increase, urbanization and economic growth will lead to an increased demand for refrigeration and cooling. Most commonly used refrigerants belong to the five following classes: (i) chlorofluorocarbons, (ii) hydrochlorofluorocarbons, (iii) hydrofluorocarbons (HFCs), (iv) hydrofluoroolefins (HFOs), and (v) natural refrigerants. Over the past century, there have been shifts in which compounds were used for refrigeration to improve safety and durability, allow for ozone protection, and, most recently, to reduce global warming potential (GWP). Although technological advances have led to increased cooling capacity and safer refrigerants, emissions from refrigeration systems can affect the environment by contributing to greenhouse gas emissions or by depleting the ozone layer, depending on the gas emitted. The focus is increasingly on adopting compounds that are both efficient at cooling and effective for reducing emissions and other adverse environmental impacts. Because of policy and regulatory changes to avert ozone depletion and global climate change, much discussion has centered on the environmental impacts of next-generation refrigerants. Of particular interest are the fluorinated refrigerants, HFCs and HFOs, most of which are defined as per- and polyfluoroalkyl substances (PFAS) and their breakdown products (especially trifluoroacetic acid). The US Environmental Protection Agency in 2021 drafted a Strategic Roadmap for PFAS, which has already resulted in an increase in investment in research on these compounds and has restricted the release of PFAS into the environment through the implementation of monitoring and reporting requirements. A critical evaluation of fluorinated refrigerants and their breakdown products with respect to persistence, biodegradation and toxicity, and global warming potential is needed to guide environmental regulations. This document aims to perform a critical review of the relevant scientific data on the most common refrigerants currently used, their degradation products, and their alternatives. Where available, estimates of precursor production quantities and existing environmental regulatory information are reviewed. Key data of interest for the evaluation include physicochemical properties, environmental fate parameters, ecological or human health toxicity/risk information, and GWP for compounds of interest.

54 ENVIRONMENTAL SCIENCES↗

Southwest Regional Partnership on Carbon Sequestration: Phase III (Final Scientific/Technical Report)

The Southwest Regional Partnership on Carbon Sequestration (SWP) is one of 7 regional partnerships formed in 2003 under the U.S. Department of Energy’s (DOE) Regional Carbon Sequestration Partnerships (RCSPs) initiative. The overall purpose of the initiative was to help determine and implement the technology, infrastructure, and regulations most appropriate to promote carbon storage in different regions of the country. Covering Arizona, Colorado, New Mexico, Oklahoma, Utah, and parts of Texas, Wyoming, and Kansas, the SWP evaluated regional carbon storage and utilization potential and focused on technologies and sites that could complement the region’s strong position in energy production. The project progressed through three phases: • Phase I (2003–2005): Characterized regional geologic formations and CO 2 sources, assessed sequestration potential, and identified pilot test sites. • Phase II (2005–2013): Conducted small-scale field tests to validate sequestration methods, including geologic and terrestrial projects. • Phase III (2008–2022): Demonstrated large-scale CO 2 injection at a commercial oil field to test monitoring, verification, and long-term storage strategies. This report covers Phase III. The final project site, the Farnsworth Unit (FWU) in Texas, provided real-world testing of reservoir characterization, monitoring, and risk evaluation tools and processes that could be used in any commercial scale carbon capture, utilization, and storage (CCUS) project. Extensive data collection and analysis helped refine best practices for reservoir characterization, injection monitoring, and storage verification. The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Key lessons learned include the importance of robust data management, strategic site selection, regulatory navigation, and effective industry collaboration. The project’s findings will inform ongoing and future carbon storage initiatives. Task 1 (Regional Characterization) • The SWP continued to participate in national outreach efforts and NATCARB. • The SWP evaluated multiple potential sites before selecting the FWU as the primary field test location. Task 2 (Public Outreach and Education) • The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Task 3 (Permitting and Regulatory Compliance) • The SWP ensured compliance with federal and state regulations, including National Environmental Policy Act (NEPA) requirements. • The SWP obtained all necessary permits for drilling, injection, and monitoring activities. Task 4 (Site Characterization and Planning) • The SWP developed work plans for four key activities: characterization, simulation, monitoring and verification, and risk evaluation. • The SWP collected and synthesized legacy data from multiple sources to build initial static geological models and dynamic reservoir models demonstrating project feasibility. • The SWP conducted an initial risk evaluation and developed mitigation plans. Task 5 (Field Operations and Data Collection) • The SWP drilled, logged, and cored three characterization wells to gather critical subsurface data. • The SWP conducted multiple geophysical surveys, including 3D seismic, crosswell seismic, and vertical seismic profiling, to improve reservoir characterization. Task 6 (Monitoring and Verification) • The SWP performed extensive geological characterization using data from characterization wells and seismic surveys. • The SWP established a surface monitoring network to track CO 2 flux in soil gas, groundwater chemistry, and near-surface atmospheric CO 2 levels. • The SWP built and refined reservoir models to study the effects of relative permeability on simulation behavior and improve calibration with experimental data. Task 7 (Risk Assessment and Model Refinement) • The SWP conducted multiple studies to evaluate reservoir integrity, predict CO 2 plume behavior and improve predictive modeling capabilities. • The SWP refined geological models and used them to enhance the accuracy of simulation models. • The SWP continued quantitative risk assessment of top-ranked risks and strengthened the link between qualitative and quantitative risk methodologies.

02 PETROLEUM↗

Bioremediation of Chlorinated Volatile Organic Compounds: DOE Experiences and Lessons Learned

From the mid-1980s to the present, the Department of Energy (DOE) has developed, tested, and deployed diverse bioremediation strategies for chlorinated volatile organic compounds (cVOCs). A systematic review of these projects after decades of activity provides an opportunity to identify crosscutting themes and lessons learned. The knowledge provided by a DOE bioremediation retrospective represents a resource to support current and future bioremediation operations, and future decisions related to cVOC bioremediation. This systematic review examined the design, objectives, performance and outcomes for remediation projects at DOE sites including Savannah River, Hanford, Idaho, Mound and Pinellas. The results were used to identify emergent themes to provide actionable insights. The bioremediation retrospective technical team first developed standardized criteria to support the systematic review. Then, the evaluation was performed using a sequential process that was informed by local technical experts who identified and provided the structured information that served as the basis for the evaluation. The participation of these experts was invaluable to the effort. Importantly, DOE cVOC bioremediation efforts were implemented based on the foundational knowledge developed by U.S. Department of Defense (DoD) strategic and applied environmental technology development and certification programs, as well as technical, policy and regulatory guidance from the U.S. Environmental Protection Agency (EPA), Interstate Technology and Regulatory Council (ITRC), U.S. Geological Survey (USGS), industry, and universities. To maximize the value of the DOE cVOC bioremediation retrospective, the systematic review strategy focused on identifying important DOE-specific experiences, trends and lessons learned that would extend the knowledge available from these other key entities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Status Report (FY 2024): Performance Assessment for the Integrated Disposal Facility

The purpose of this Annual Summary Report (ASR) for Fiscal Year (FY) 2024 is to evaluate the continued adequacy of the Integrated Disposal Facility (IDF) Performance Assessment (PA) and Disposal Authorization Statement (DAS). This report consolidates relevant monitoring data, modeling analyses, and regulatory reviews to demonstrate a reasonable expectation that the PA objectives and performance measures will be met, as required under DOE O 435.1. The ASR follows the guidance in DOE-STD-5002-2017, which provides a framework for maintaining the validity of the DAS through periodic assessment of facility performance and compliance with waste disposal requirements. The IDF is a near-surface disposal facility designed to receive and permanently dispose of low-level waste (LLW) and mixed low-level waste (MLLW) generated from Hanford Site operations. The facility consists of two double-lined disposal cells equipped with leak detection and leachates recovery systems to ensure environmental protection. Waste planned for disposal includes vitrified low-activity waste (LAW) and solid secondary waste (SSW) from the Hanford Waste Treatment and Immobilization Plant (WTP). At the end of FY 2024, the IDF had not yet received any waste, as it remains in a pre-operational state. Disposal activities will begin with the hot commissioning of the WTP LAW Vitrification Facility using the Direct-Feed Low-Activity Waste (DFLAW) approach in Calendar Year (CY) 2025. This ASR justifies the continued adequacy of the PA and DAS by reviewing key documents and data sources. these sources are listed in Table A-2 in Appendix A.4): The Operating Disposal Authorization Statement (ODAS) for the IDF (DOE-EM, 2021) remains in effect, with no outstanding conditions or key issues affecting its implementation. Based on the comprehensive review of PA analyses, monitoring data, and regulatory compliance activities, this ASR concludes that the IDF remains in compliance with DOE O 435.1, and there is reasonable assurance that the PA performance objectives will be met once disposal operations commence in CY 2025.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗