Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Neutrino Program at Fermilab -- Enhancing proton beam power and accelerator infrastructure

The upcoming long baseline neutrino experiments aim to enhance proton beam power to multi-MW scale and utilize large-scale detectors to address the challenge of limited event statistics. The DUNE experiment at LBNF will test the three neutrino flavor paradigm and directly search for CP violation by studying oscillation signatures in the high intensity $\nu_{\mu}$ (anti-$\nu_{\mu}$) beam to $\nu_{e}$ (anti-$\nu_{e}$) measured over a long baseline. Higher beam power and improved accelerator up-time will enhance neutrino flux for the neutrino program by increasing the number of protons on target. LBNF/DUNE, as well as PIP-II upgrade and Accelerator Complex Evolution (ACE) plan, play a vital role in this effort. The scientific potential of ACE plan extends beyond neutrino physics, encompassing endeavors such as the Muon Collider, Charged Lepton Flavor Violation (CLFV), Dark Sectors, and exploration of neutrinos beyond DUNE.\par In the era of higher-power accelerator operation , research in target materials and beam instrumentation is crucial for optimizing design modifications. This abstract discusses Fermilab ACE, the science opportunities it provides, and how Fermilab is pushing the limits of proton beam power and accelerator infrastructure. By tackling neutrino beam challenges and exploring research and development ideas, we are advancing our understanding of fundamental particles and their interactions.

43 PARTICLE ACCELERATORS↗

From Today to Tomorrow: Envisioning an Emergency Operations Center of the Future

This article explores the "Emergency Operations Center of the Future", including outcomes from an in-depth landscape assessment, stakeholder outreach, and tabletop exercises that explored how the rapid pace of advancements in science and technology can both accelerate and be highly disruptive to emergency services.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Practical Guide to E-waste Education and Events in Schools

The Practical Guide to E-waste Education and Events in Schools is a comprehensive resource that equips educators and outreach professionals to deliver impactful lessons on electronic waste (e-waste), critical materials, and battery recycling, while launching effective school-based e-waste recycling programs. It offers step-by-step guidance for starting and managing outreach efforts, including tips on student engagement, selecting recycling partners, planning collection logistics, creating promotional materials, and overcoming common challenges. The guide also supports curriculum development and scaling initiatives across schools to foster lasting recycling habits.

school outreach↗

Enabling Dynamic Probabilistic Risk Assessment of Physical Security Using EMRALD and MAAP

The optimization of physical security in nuclear power plants requires sophisticated methodologies that integrate operator actions and plant behavior through advanced simulation tools. To address this, Idaho National Laboratory [JL2.1]has developed the Modeling and Analysis for Safety and Security using the Dynamic EMRALD Framework (MASS-DEF) methodology, an approach that integrates force-on-force simulations, dynamic probabilistic risk assessment, and thermal-hydraulics modeling [JL3.1]to enhance security planning while reducing costs. We developed a tool that produces reduced order models using thermal hydraulic simulations from the Modular Accident Analysis Program (MAAP) [1]. These models can quickly evaluate reactor core behavior during attack simulations, and in so doing, address two barriers of traditional methods: (1) MAAP simulations are computationally intensive, and (2) attack scenarios must be run in a secure environment, which complicates analysis and validation. By precomputing scenario outcomes for a small number of modified parameters, the reduced order model significantly decreases the computational cost and enables offsite review of the results.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

Advanced Fuels Campaign Execution Plan

The Advanced Fuels Campaign (AFC) Execution Plan details the strategy, mission, scope, and goals—both near-term and long-term—along with the structure and organization of nuclear fuels and materials research, development, and demonstration (RD&D) activities within the Fuel Cycle Technologies (FCT) program. The FCT program, tasked by the U.S. Department of Energy (DOE), employs a science-based approach to advance fuel technologies. This approach integrates theory, experiments, and multi-scale modeling and simulation (M&S) to develop a predictive understanding of fuel fabrication processes and fuel/cladding performance under irradiation, moving beyond traditional empirical methods. The long-term goals of the AFC are guided by the AFC Strategic Plan and align with the DOE Office of Nuclear Energy (NE) Roadmap [1], which outlines a multi-decade vision for demonstrating and qualifying advanced fuel forms to support diverse fuel cycle options. Near-term goals focus on enhancing accident tolerant fuels (ATF) for Light Water Reactors (LWR), a significant challenge that demands balancing immediate objectives with ongoing progress toward advanced reactor missions. Accelerating the traditional fuel qualification process to meet ATF objectives is another critical challenge. A detailed set of 5-year goals, summarized below, has been developed in line with the overarching science-based fuel development approach: • Advanced LWR Fuel Technologies: By 2027, support the development of advanced LWR fuel technologies with improved performance and enhanced accident tolerance. This includes high burnup (HBu), low enriched uranium (LEU)+, coated cladding, and doped fuel, aimed at complementing industry-led significant LWR uprates and plant refurbishments. • Tristructural Isotropic (TRISO) Fuel: Achieve qualification by 2028 and develop improved designs for emerging markets. • Metal Fuel: Achieve qualification by 2028 and develop improved designs for emerging markets. • Molten Salt Fuel: By 2027, deploy a robust program that enables fuel salt qualification technologies needed to support fuel salt research and development (R&D), focusing on emergent needs to derisk fuel salt production and utilization in advanced reactors. • Long-Term ATF: Develop fuel technologies that enable significant power uprates (~50%) in refurbished or new LWRs while optimizing fissile material utilization and waste disposal. The 5-year milestones in the AFC Execution Plan are contingent on an assumed budget. This Execution Plan will be updated annually to reflect actual funding profiles as budget guidance becomes available, ensuring milestones are adjusted accordingly. In summary, the AFC Execution Plan presents a comprehensive strategy to advance nuclear fuel technologies through a science-based approach, addressing both near-term and long-term goals while adapting to funding realities.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Zero-Emission Vehicle Adoption Resource Guide for Government Fleets in Jackson County, Illinois

As part of Communities LEAP (Local Energy Action Program), the National Renewable Energy Laboratory (NREL) provided technical assistance to Jackson County, Illinois to help develop their clean energy transition roadmap. Fleet electrification was identified as a potential pathway that could address the environmental injustices, high energy burden, and local pollution experienced by this former coal community. NREL worked with Jackson County, Illinois to develop a resource guide that can assist fleet managers considering a transition to electric light-duty fleet vehicles. To further understand the unique challenges of fleet electrification in Jackson County, NREL met with three leaders within the county who either managed current fleets or were responsible for fleet purchases. This resource guide includes best practices and resources that address many of the frequently asked questions that arose during these discussions. Interested fleets can then use this resource guide to help identify the initial steps needed to plan for vehicle electrification. The resource guide summarizes the basics of electric vehicle (EV) adoption for fleets, funding and incentive pathways, total cost of ownership in comparison to conventional internal combustion engine (ICE) vehicles, charging infrastructure, and pilot programs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nevada National Security Site Radiological Control Manual

Please have this STIP assigned, documented, and recorded in OSTI as Report Number DOE/NV/03624--0257 Revision 1 and Author as Radiological Control Managers' Council. This manual contains the radiological control requirements to be used for all radiological activities conducted by programs under the purview of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO). (Activities conducted under the purview of the U.S. Department of Energy, Office of Environmental Management Nevada[(EM Nevada] may require additional approval authorities as described in the EM Nevada Prime Contractor’s implementation plan.) Compliance with these requirements will ensure compliance with Title 10 Code of Federal Regulations (CFR) Part 835, “Occupational Radiation Protection.” This manual represents policies, guidelines, and best practices for implementing the DOE/NV/03624--0082, “Nevada National Security Site Radiation Protection Program,” (NNSS RPP) according to the requirements of 10 CFR 835.

61 RADIATION PROTECTION AND DOSIMETRY↗

I-80 Mid-America Clean Fuels Corridor: Deployment Plan Report

The I-80 Mid-America Clean Fuels Corridor, which spans I-80 from Fort Lee, New Jersey, to Council Bluffs, Iowa, was designated an Alternative Fuels Corridor (AFC) in Round 1 of the Alternative Fuels Corridor program administered by the U.S. Department of Transportation’s (DOT’s) Federal Highway Administration (FHWA). Originally called the “I-80 Mid-America Alternative Fuels Corridor,” it is now named the “I-80 Mid-America Clean Fuels Corridor.” As of Round 6 AFC designation, parts of the corridor have sufficient direct current fast charging (DCFC) stations to be designated Electric Vehicle (EV)-Ready and sufficient compressed natural gas (CNG) fueling stations to be designated CNG-Ready. However, much of the corridor’s approximately 1,240 miles (mi) are not yet EV- or CNG-Ready. This includes about 1,130 mi that are designated EV-Pending and 700 mi that are designated CNG-Pending. This report presents a plan to develop EV charging and CNG fueling infrastructure sufficient to convert the entire length of the corridor to EV-Ready and CNG-Ready. Specific sites are not identified for future infrastructure. Rather, priority exits are identified, and information, analysis, and additional steps are recommended to support further refinement of these locations, as well as additional outreach and deployment efforts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2021-2026 Weapons Research Services Strategic Plan

The Weapons Research Services (WRS) Division provides Los Alamos National Laboratory with services, resources, and staff that are critical to fulfilling its national security mission. WRS serves the entire LANL Weapons Program and is housed within the Weapons Physics Directorate (ALDX), which is at the core of the design, certification, and assessment of the nation’s nuclear weapons. More specifically, WRS is a research and development organization that provides unique tools designed to meet the specific needs of the Lab’s weapons mission rather than administrative or Information & Technology (IT) tools used broadly by the Lab. WRS partners with other LANL organizations, including Global Security to conduct mission research and I&T organizations to meet basic IT infrastructure needs.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

California Energy Systems for the 21st Century (CES-21) Program, CRADA TC02200 (Final Report)

The following report representsthe culmination of a five-year Cybersecurity Research and Development (R&D) program performed by California’s Investor-Owned Utilities (IOUs) and Lawrence Livermore National Laboratory (LLNL) and funded by the IOUs’ electricity ratepayers as authorized by California Legislation and the California Public Utilities Commission (CPUC). The cybersecurity R&D, which was intensely technical in nature, was broken into three major workstreams: 1. The development of a modeling & simulation platform, to explore the potential effects of various threat and response scenarios at grid scale; 2. The establishment of a physical testbed with separate substation instances from each of the IOUs, to evaluate threats and responses on actual substation equipment; 3. The development of a research package consisting of several capabilities to support the industry’s evolution towards automated threat response and other next-generation cybersecurity techniques Throughout the program, there was extensive collaboration between the program team and national laboratories, federal departments, academic institutions and industry organizations. Several of the tools developed through the program have been made available to the open source community, to enable faster adoption and continued development of important cybersecurity capabilities. While this program began to develop much of the foundation for automated threat response, much work remains to be done, and this report recommends a series of next steps. While the Executive Summary below has been simplified as much as possible, the very technical nature of the subject matter would make further reduction difficult without causing meaning to be lost. Due to the sensitive nature of the research, some topics are intentionally covered at a high level to protect the research and therefore the electric grid and customers of California and the Nation. For further detail, clarification or questions we suggest discussion with the program team.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2.4.2.405 - Water Power STEM Workforce Development (Marine Energy)

As interest in renewable energy grows, marine energy (ME) technologies will continue to play a growing role in reaching our nation's clean energy objectives. As it is still a nascent industry, developing a ME workforce will require a wide range of expertise and tight competition with other energy sectors. The industry needs to attract and train talent to help develop the workforce pipeline. WPTO efforts to address these needs include more programs, improved program accessibility, and an increased awareness of ME as a renewable energy career (secondary school, vocational and apprenticeship programs, and undergraduate curricula). There is much more work to be done.

ENERGY PLANNING, POLICY, AND ECONOMY,ENGINEERING,H↗

Energy Transitions Initiative Partnership Project

An overview of the Energy Transitions Initiative Partnership Project (ETIPP), a U.S. Department of Energy program that provides technical assistance and cash awards to coastal, island, and remote communities. This fact sheet includes updated information about ETIPP eligibility requirements for communities; new program offerings, including cash awards; and the locations of communities in the program's first three cohorts.

cash award↗

Resources for E-Mobility Program Implementation [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series.This presentation overviews the basics of developing electric mobility projects with emphasis on leveraging the right tools to advance technical scoping and program design.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Enhanced Atmospheric Research at the Multidisciplinary drifting Observatory for the Study of Arctic Climate (MOSAiC) (Final Report)

The Multidisciplinary drifting Observatory for the Study of Arctic Climate (MOSAiC) was an international scientific expedition into the central Arctic sea ice to study the changing atmosphere-ice-ocean system and its key physical, chemical, and biological processes in a way that will support improved understanding and modeling of Arctic climate. The US Department of Energy’s Atmospheric Research Measurement (ARM) Program operated its second ARM Mobile Facility (AMF2) as a major contribution to the expedition, and the Atmospheric System Research (ASR) program supported this project to maximize the success of DOE’s involvement in MOSAiC. This project has enabled the successful collection of data through support of field operations plans, in-field operational implementation, oversight of real-time data quality, and representing DOE’s interests within the broader international MOSAiC endeavor. The project has promoted scientific research by facilitating and leading a number of efforts to develop value-added products that will support research, including products related to aerosol properties, trace gases, cloud properties, snowfall, the surface energy budget, and a merged product designed for model assessment. These products and related analyses have also contributed to numerous scientific publications on related themes as well as direct model evaluation. Lastly, the project has engaged in a great deal of communication and outreach activities that help to publicize and promote both MOSAiC and DOE’s specific contribution to a broad audience that includes the scientific community, program management, policy makers, and the general public.

54 ENVIRONMENTAL SCIENCES↗

Time- and Energy-Resolved Coupled Saturn Radiation Environments Simulations Using the Integrated Tiger Series (ITS) Code

Using a newly developed coupling of the ElectroMagnetic Plasma In Realistic Environments (EMPIRE) code with the Integrated Tiger Series (ITS) code, radiation environment calculations have been performed. The effort was completed as part of the Saturn Recapitalization (Recap) program that represents activities to upgrade and modernize the Saturn accelerator facility. The radiation environment calculations performed provide baseline results with current or planned hardware in the facility. As facility design changes are proposed and implemented as part of Saturn Recap, calculations of the radiation environment will be performed to understand how the changes impact the output of the Saturn accelerator.

43 PARTICLE ACCELERATORS↗

Williston Basin CORE-CM Initiative Final Report

The University of North Dakota Energy & Environmental Research Center (EERC) is leading the Williston Basin Carbon Ore, Rare Earth, and Critical Minerals (CORE-CM) Initiative to drive the expansion and transformation of coal and coal-based resource usage within the Williston Basin to produce rare-earth elements (REEs), CMs, and nonfuel carbon-based products (CBPs). This project is the first phase in a long-term program and set the stage for future work by assessing resource, market, technology, and infrastructure knowledge; identifying knowledge gaps; developing a series of plans to be carried out in future work; and initiating stakeholder engagement. Composed of several tasks, the project sought to identify, characterize, and assess several necessary aspects vital to make this future work a reality. The project’s fundamental task was to characterize the Williston Basin CORE-CM resources. Over 2500 samples from multiple sources were utilized to begin the assessment. Several locations were identified in western North Dakota where sample analysis identified the total REE (TREE) concentration as being over 500 parts per million (ppm), which is at a concentration level that would be suitable to consider for mining and extraction. Current operating coal mines have sufficient concentrations of TREEs for consideration. However, the current data across the basin are still not adequate to fully characterize REE and CM content nor give reliable estimates of the total resource potential. Waste stream reuse was also considered, and several streams were identified which ranged from potential energy sources to chemicals to material wastes. This includes streams that result from oil and gas production. These streams are not fully characterized, and further data are needed before they can be accurately assessed. Infrastructure within the Williston Basin is suitable for expansion of a new industry to mine, extract, and concentrate REEs and CMs. The development of this industry will not only preserve many existing jobs in the coal-mining industry but produce many new jobs. The supply chain for REEs and CMs is currently controlled outside of the United States in nations such as China, but the potential to develop the supply chain within the basin is considered possible. Processing of the mined materials for REEs and CMs needs further research. The technology and knowhow exist outside of the United States, and within the country much of the knowledge has been lost and must be regained. To develop the supply chain and regain lost processing technology, the creation of technology innovation centers (TICs) is crucial. The Williston Basin contains several similar centers and entrepreneurial assistance for other industries that can be applied in the development of REE and CM innovation centers. Education to develop the new skill sets required is also needed. Outreach is important for the development of the REE and CM industry within the basin. Understanding throughout federal and state governments, state agencies, industry, and resource end users is vital for the industry to form and grow. Through this project these groups have been contacted through bulletins, presentations, webinars, and annual symposiums. The report is a summary of the work conducted and throughout refers to a series of appendixes which contain more thorough and specific information about each section.

01 COAL, LIGNITE, AND PEAT↗