Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “plant operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Gaseous By-Product of Thermal Vacuum Processing of Lunar Highland Simulant

Scientists at Kennedy Space Center are advancing technologies to achieve oxygen extraction on the Lunar surface. One such technology is Molten Regolith Electrolysis (MRE) in which regolith simulant is melted under high temperatures to perform oxygen extraction through electrolysis of the melt pool. A study was conducted to understand the molten formation and proper-ties of Lunar Highlands Simulants (LHS-1) under high vacuum environments ranging between 10-6 Torr. These studies include investigating the regolith melt behavior and by-product gas analysis systems to prepare for pilot plant development and operations. The off-gassing rates and pressure build-up, gaseous compounds, and material compatibility may be a risk to MRE systems. The KSC findings are reported here for inclusion into future mis-sion architecture and operational planning. The four stages of the experiment were vacuum, resistive heating, regolith melt and gas detection. The regolith mass of 70 g was melted in a 40 cm tall x 50 cm diameter vacuum chamber at temperature increase rate 47 ℃ /min and ramp rate of 1 ampere/3 min up to an 18-amp maximum. The test is conducted for about 60 minutes and the constituent gases produced during heating of regolith is monitored with a re-sidual gas analyzer. During the molten formation, primary off-gassing volatiles included water vapor (18 amu), a peak at 44 amu (FeO2 – expected), and atomic oxygen (16 amu), among a series of other compounds that could create compatibility issues such as magnesium, chlorine, and silicon oxide. These results add to the knowledge required for successful oxygen extraction on the moon.

Molten Regolith Electrolysis↗

Eagle Behavior and Risk Modeling for Wind Energy Webinar

NREL presents recent progress in the development and validation of new eagle behavioral models, highlighting applications for wind-plant siting and operations. This webinar features talks focused on three areas: atmospheric modeling across the spatiotemporal scales of interest, facility-scale behavioral modeling, and turbine-scale data-driven behavioral modeling. A final presentation demonstrates micrositing as an application of our completely open-source analysis framework.

agent-based movement model↗

Historical Pattern Analysis of Global Geothermal Power Capacity Development: Preprint

Between 1913 and 1958, Italy was the only country with an operational geothermal power plant until New Zealand installed its first plant in 1958. At present, 24 countries are involved in the geothermal power market, and they have a combined installed capacity of 16,127 GW. This study analyzes the historical patterns of geothermal power capacity in the world and in individual countries to investigate the ideal global geothermal development pattern by examining the annual cumulative capacity (ACC) and the annual capacity addition (ACA) graphs of the historical development of geothermal power capacity in 24 countries. First, the global patterns are analyzed using these graphs in five periods (1945-1957, 1958-1976, 1977-1991, 1992-2002, and 2003-2020) that are marked by a series of characteristics of ACA peaks separated by two major troughs. Then, five characteristic patterns are developed in five periods globally. These patterns correspond to the early-stage linear, the first acceleration, the first steady-state linear, the second acceleration, and the second steady-state linear developments. A positive relationship exists between global patterns and the 5-year shifted oil-price curve: two major factors influenced global development: 1) increasing oil prices and increasing awareness of global climate change, and 2) global development of geothermal power. Last, we investigate these patterns in each country. The top ten countries, which comprise 93.3% of the world's total installed capacity are separated into five groups based on the availability and characteristics of patterns globally developed in five periods. Group-1 (the United States) has an installed capacity of 3,794 MW, Group-2 (Mexico and Philippines) 963-1935 MW, Group-3 (New Zealand, Italy, Iceland, and Japan) 601-1,037 MW, and Group-4 (Indonesia, Kenya, and Turkiye) 944-2,356 MW. The remaining 14 countries (6.7%), which are called Group 5, are still in an immature stage and have installed capacities of 7-262 MW and are not involved in pattern analysis. Overall, geothermal power in the world is in its third stage of development, which had its peak development after 1977. A fourth development peak may be expected to occur after this through business-as-usual cases. The biggest barrier to the development of the global geothermal power market is the risk associated with exploration and drilling. If risk mitigation systems and funds are employed, the growth of geothermal power production projects could accelerate.

GEOTHERMAL ENERGY↗

Historical Pattern Analysis of Global Geothermal Power Capacity Development

Between 1913 and 1958, Italy was the only country with an operational geothermal power plant until New Zealand installed its first plant in 1958. At present, 24 countries are involved in the geothermal power market, and they have a combined installed capacity of 16,127 GW. This study analyzes the historical patterns of geothermal power capacity in the world and in individual countries to investigate the ideal global geothermal development pattern by examining the annual cumulative capacity (ACC) and the annual capacity addition (ACA) graphs of the historical development of geothermal power capacity in 24 countries. First, the global patterns are analyzed using these graphs in five periods (1945-1957, 1958-1976, 1977-1991, 1992-2002, and 2003-2020) that are marked by a series of characteristics of ACA peaks separated by two major troughs. Then, five characteristic patterns are developed in five periods globally. These patterns correspond to the early-stage linear, the first acceleration, the first steady-state linear, the second acceleration, and the second steady-state linear developments. A positive relationship exists between global patterns and the 5-year shifted oil-price curve: two major factors influenced global development: 1) increasing oil prices and increasing awareness of global climate change, and 2) global development of geothermal power. Last, we investigate these patterns in each country. The top ten countries, which comprise 93.3% of the world's total installed capacity are separated into five groups based on the availability and characteristics of patterns globally developed in five periods. Group-1 (the United States) has an installed capacity of 3,794 MW, Group-2 (Mexico and Philippines) 963-1935 MW, Group-3 (New Zealand, Italy, Iceland, and Japan) 601-1,037 MW, and Group-4 (Indonesia, Kenya, and Turkiye) 944-2,356 MW. The remaining 14 countries (6.7%), which are called Group 5, are still in an immature stage and have installed capacities of 7-262 MW and are not involved in pattern analysis. Overall, geothermal power in the world is in its third stage of development, which had its peak development after 1977. A fourth development peak may be expected to occur after this through business-as-usual cases. The biggest barrier to the development of the global geothermal power market is the risk associated with exploration and drilling. If risk mitigation systems and funds are employed, the growth of geothermal power production projects could accelerate.

GEOTHERMAL ENERGY↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of UTP A 2133 Mn as a Matching Filler Metal for Alloy 800H in Section III, Division 5 Applications

Six alloys are qualified in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC) for elevated-temperature nuclear components. Due to reactor design alloy restrictions and motivation to improve operational efficiency and plant lifetimes, it is necessary to maximize the usefulness of qualified alloys. One of these alloys is Alloy 800H, which is qualified for a maximum temperature of 760°C and a maximum 300,000-hour service life. However, the welding filler metals qualified to join Alloy 800H have stress rupture factors that reduce the allowable weldment strength by factors as low as 0.59 times the Alloy 800H base metal. In an effort to improve the weldment creep-rupture performance, or to increase the stress reduction factor, non-code qualified filler metals are under investigation by the Department of Energy?s Advanced Reactor Technologies program. For this investigation, UTP A 2133 Mn filler metal (Fe-Cr-Ni-Mn-Nb) was used to join 0.5 in. thick Alloy 800H plate to demonstrate passing an ASME BPVC Section IX weld qualification. The multi-pass, pulsed GTAW process showed successful weld qualification results, and additional property measurements were conducted to compare previous analyses of Alloy 82 and Alloy 617 filler metals. Future work will evaluate the cross-weld creep-rupture performance of the UTP A 2133 Mn in comparison to Alloy 82 and Alloy 617 filler metals.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

PSA 2025 DPRA for Cyber Optimization

Cyberattacks can have many different attack paths, durations, and goals. There are also many different mitigation options involving hardware, software, and/or humans. Evaluating defense options should include quantitative evaluation of overall effectiveness to make cost and risk-informed decisions. Typical cyberattack modeling methods only provide a qualitative evaluation and have difficulty with time dependent scenarios. The main areas of cybersecurity are confidentiality, integrity, and availability. For companies with cyber-physical systems such as advanced nuclear reactors, cyber-related integrity is a requirement set by the U.S. Nuclear Regulatory Commission. But companies are also concerned about availability or reliability as a business case. As cyber threats are evolving to a business-for-hire structure, more attacks focus on disrupting business success and reliability, causing financial and economic stability risk. Companies want reliability analysis while optimizing cost, which requires more than safety modeling methods. Dynamic-state-based and Markov-based modeling provides a method for better cyber scenario modeling with timing and conditional features not found in other numerical evaluation methods. EMRALD (Event Modeling Risk Assessment using Lined Diagrams) is a dynamic risk analysis modeling and simulation tool and has features that reduce modeling issues such as state-base explosion found in Markov-based tools. It has been used to model different time-dependent events including plant behavior and operator procedures. As a general modeling tool, EMRALD can also be used to model cyberattack scenarios with varying mitigation options and quantify effectiveness, producing numerical data for risk-informed decisions. This paper uses EMRALD to demonstrate that dynamic risk analysis can be used for cyber threat modeling to provide insights for design decision-making and optimize defense strategies.

97 - MATHEMATICS AND COMPUTING↗

Techno-Economic and Deployment Analysis of Fossil Fuel-Based Power Generation with Integrated Energy Storage

Most existing coal-fired power plants were designed for sustained operation at full load to maximize efficiency, reliability, and revenues. Depending on plant type and design, these plants can adjust output within a fixed range in response to plant or market conditions. The need for flexibility driven by increased penetration of variable and non-dispatchable power generation such as wind and solar is shifting traditional mission profile of thermoelectric power plants in three ways: more frequent shutdowns when market or grid conditions warrant, more aggressive load ramp rates (rate of output change), and lower minimum sustainable load, which provides a wider operating range and helps avoid costly plant shutdowns. The recent studies have shown that flexibility of a coal-fired power plant can be improved by the energy storage. The objective of this project was to analyze a set of energy storage options (technologies) and determine their impact on flexibility and economics of a representative coal-fired power plant. The effect of five Energy Storage Systems (ESSs) integrated with a coal power plant on plant flexibility and economics was investigated in this study. The results obtained in this project and presented in this report showed that ESS integrated with a thermal power plant improves plant flexibility and participation in the Energy and Ancillary Services markets and also improves plant financial performance.

20 FOSSIL-FUELED POWER PLANTS↗

Diagnosing an IFE Power Plant

This white paper for the Basic Research Needs for Plasma Diagnostics workshop lists a selected set of measurements required for normal and off-normal operation of an Inertial Fusion Energy power plant. An Inertial Fusion Energy (IFE) power plant will require instruments that record how well it is performing and, more importantly, sufficient instruments to diagnose failures during routine operation. It is assumed in this white paper that operating specifications and tolerances have been established before the plant begins operation so that only a minimal set of instruments is required. A pilot plant (a DEMO) would require more instrumentation in order to set those requirements and tolerances. This white paper assumes a laser-based IFE plant that operates at up to 20 Hz. Two scenarios are considered below. One is for routine, nominal operation and the other is when an implosion fails to produce energy.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Dynamic Simulation of a Sub-Critical Coal Fired Power Plant

In order to address the demanding operating conditions for remaining coal-fired power plants, a dynamic model and a suite of tools have been developed for studying load cycling and to find optimization opportunities. A sub-critical steam cycle power plant was modeled in a flow-sheet modeling tool, APROS™. The model represented the firing system, economizer, evaporator, superheat, and reheat systems. Four loads from 100% TMCR to 25% TMCR were calibrated and tested such that low-to-high cycling could be studied. The model was run through various load cycles; one of which is presented here. This modeling is a prototype for general use in developing cutting edge controls products and for maximizing economic, low-emissions, and efficient operation of the existing coal power fleet.

Braun, Timothy↗

Integrated Operations for Nuclear: Work Reduction Opportunity Demonstration

Integrated Operations for Nuclear: Work Reduction Opportunity Demonstration The DI BCA document also identifies specific, digitally enabled WRO categories for further study. These were selected as most relevant by Reference Plant personnel from a larger list of WRO areas identified across the nuclear industry as captured INL/RPT-21-64134, “Process for Significant Nuclear Work Function Innovation Based on Integrated Operations Concepts.” This ION WRO demonstration report was developed to provide illustrative, specific, and actionable direction for intertwined PTPG changes associated with digital modernization efforts. The coordinated changes in these areas are intended to maximize safe plant operational and economic performance. This includes enabling WROs associated with detailed configuration, implementation, and use of digital systems and how they are supported over their lifecycle. Illustrating this direction through a minimum set of advanced technology examples establishes a model PTPG framework that can be leveraged across the spectrum of nuclear plant digital modernization efforts going forward. This document addresses many related concepts. To promote an integrated understanding of the topics that make up this work, this document contains an extensive set of internal hyperlinks. This set includes hyperlinks to page numbers in the table of contents, section numbers, items in lists, figures, tables, and references to other documents within the report. When hovering the cursor above hyperlinked text in Adobe, the cursor will change from “ ” to “ .” When the “ ” appears, a left mouse click will take the reader to the referenced location in the document. To return to the original location in the document, the reader need only press and hold the “alt” button on the keyboard and then simultaneously press the “<” directional key on the keyboard.

42 ENGINEERING↗

Approach to startup inventory for viable commercial fusion power plant

With the increasing efforts to commercialize fusion power, private and government organizations are investing heavily in the development of technology to support a viable fusion power plant. Deuterium-Tritium (DT) fueled reactors are more prevalent than other proposed designs, requiring tritium processing and handling technology for safe operations and self-sufficiency. Further, each fusion power plant will need a specific-to-design startup inventory of tritium to begin operations. This startup inventory is required prior to breeding and is the minimum tritium inventory required to fill each processing component in the fuel cycle, to offset radioactive decay losses, and to avoid a zero-fuel situation for continuous operation. We present an approach to calculate the startup tritium inventory for a 500 MW th reactor, with considerations for reserve inventory for maintenance and commissioning. A baseline startup inventory was calculated to be approximately 327 gs. This value was obtained using modest assumptions about the technology and operating parameters of a fusion power plant. The required operating reserve inventory or the inventory necessary to keep a fusion power plant operational using only direct internal recycling for 24 h for the same plant design is approximately 642 gs. The approach and findings of this paper will enable fusion energy stakeholders to better utilize the existing scarce global tritium supply.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Hybrid Natural Gas Geothermal Combined Cycle Power Plant Analysis

Low temperature geothermal resources, including those associated with oil and gas production, are an underutilized source of low carbon energy. The present work investigates coupling of low-temperature geothermal resources with concentrating solar and/or natural gas energy sources to increase the number of locations at which power generation from low temperature geothermal resources would be technically and economically viable. Stand-alone and hybrid geothermal power cycles are simulated using SimTech IPSEpro process modeling software. Design point strategies for a hybrid power cycle that may operate with either a single heat source or two simultaneous heat input sources are considered. Additionally, off-design power plant operation is investigated to consider the impacts of the heat source availability and ambient temperature variations. The off-design analysis utilizes a modeling tool that predicts power plant performance at each time step as a function of topping cycle heat input (from gas or solar), bottoming cycle heat input (from geothermal), and ambient temperature. Addition of a steam topping cycle to an organic Rankine cycle geothermal power plant provides opportunities to increase the efficiency and power output relative to a stand-alone geothermal power plant. Additionally, use of the waste heat from gas turbine power generation in a geothermal bottoming cycle provides opportunities to increase the amount of power generation associated with each unit of carbon dioxide emitted. This paper will describe the hybrid plant configuration evaluated, discuss the predicted power cycle performance, and compare with stand-alone natural gas and geothermal power generation cases. The power cycle investigated is expected to be applicable for use with conventional hydrothermal resources as well as with geologic thermal energy storage applications and/or enhanced geothermal systems. The steam topping cycle could use a concentrated solar heat source for fully renewable hybrid plant configuration. A plant initially constructed with a natural gas topping cycle heat source could be converted to a solar heat source part way though the power cycle operational life to achieve life cycle carbon emission reductions.

concentrating solar power↗

Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation and Lessons Learned

In May 2016, the U.S. Nuclear Regulatory Commission (NRC) staff provided a digital instrumentation and control (I&C) regulatory infrastructure integrated action plan to the NRC for approval. One of the objectives of that plan was to establish a clear regulatory structure with reduced regulatory uncertainty to enable the expanded safe use of digital I&C in commercial nuclear reactors while continuing to ensure safety and security. To achieve this end, the NRC, with collaboration from industry, developed a streamlined License Amendment Request Alternate Review (AR) process for safety-related (SR) digital I&C upgrades. In spite of this effort, the industry has remained reluctant to perform such I&C upgrades because of perceived regulatory and financial risks associated with being the first or an early adopter of the AR process for SR I&C upgrades. The U.S. Department of Energy Light Water Reactor Sustainability Program at the Idaho National Laboratory performed Initial Scoping Phase research to help break this impasse by supporting a SR I&C Pilot Upgrade, working with MPR Associates, ScottMadden Inc., and Exelon Generation. Exelon’s Limerick Generating Station (LGS) was selected as the target for this research. This paper summarizes the Initial Scoping Phase engineering and operations, licensing, and project management activities necessary to bound the scope, schedule, and estimated cost of the project sufficiently to enable utility management authorization of Conceptual Design Phase activities. These efforts and associated products are intended to provide a template to support larger industry efforts to perform similar upgrades as a foundation stone for a digital transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership. As a result of the combined effort of Exelon Generation and research participants, Conceptual Design Phase activities for the subject upgrade at LGS were approved by Exelon. Further, the U.S. Department of Energy also awarded a $50 million cost share award to Exelon in order to pave the way for SR I&C modernization and associated control room upgrades across the U.S. nuclear fleet. Additional research reports are planned for the Conceptual Design Phase, Detailed Design Phase, and the Implementation Phase of the LGS project to document the process followed and promulgate lessons learned to industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimizing Heat Recovery with Storage: Control Validation and Sensitivity Analysis of the Time-Independent Energy Recovery Plant Using Modelica

Heat recovery in large building central plants saves energy but traditionally requires simultaneous heating and cooling. The Time-Independent Energy Recovery (TIER) plant shifts this paradigm by integrating thermal energy storage (TES) to enable heat recovery regardless of concurrent demand, offering a highly efficient, space-saving solution to achieve California’s energy goals. However, its integration of heat recovery chillers, cooling-only chillers, cooling towers, and trim air-source heat pumps (ASHPs) creates growing control and sizing complexity. To overcome this, this study employs high-fidelity Modelica dynamic simulation to validate TIER control sequences and optimize equipment sizing. We translated the written Sequences of Operation into executable Control Description Language (CDL) to test logic against sub-hourly loads. This verification workflow successfully identified and resolved critical vulnerabilities, such as thermal storage freezing and equipment short-cycling, in a virtual environment prior to physical deployment. Then, the study analyzes TIER plant performance across three simulated building types in three locations, and a real building load profile, ensuring variety in heating and cooling loads, and simultaneity factors and explores sizing rules for the TES and ASHP capacity. The analysis shows that the TIER plant operates equipment efficiently leading to a plant SCOP of around 7.5 across all scenarios, higher than a traditional ASHP plant, and a viable pathway to de-risk complex system design and control through simulation to identify optimal designs that maximize energy efficiency, minimize operational costs, and ensure robust operation in varied environmental conditions, thereby facilitating the broader adoption of such a solution for large buildings.

Zanetti, Ettore↗

Light Water Reactor Sustainability Program: Materials Research Pathway: FY 23 Technical Program Plan

Components in operating commercial nuclear power plants must withstand very harsh environments that include extended time at neutron and gamma irradiation, stress, and temperature, as well as possible exposure to corrosive media. The many modes of materials degradation are complex and often include synergies between multiple environmental variables and conditions that vary depending on locations and materials. Understanding and managing materials degradation is a requirement for the continued safe and reliable operation of nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of Hybrid FPOG Applications in Regulated and Deregulated Markets Using HERON

Recent changes in the U.S. energy market, such as low natural gas prices and increased electricity production for variable renewable energy (VRE) sources, have led to an economic crisis for existing light-water reactor (LWR) nuclear power plants (NPP). Many owners and operators of LWRs have elected to decommission these plants rather than continue using them as consistent sources of clean baseload power. This has led to exploration of various possibilities to increase the economic viability of these units, including market restructuring to monetize benefits LWRs already provide to the grid through ancillary markets, load following and economic dispatch, and possible integration of secondary systems directly to the NPP for production of additional products through technologies such as hydrogen electrolysis or water desalination. Previous studies have considered the technologies associated with these Integrated Energy Systems (IES) activities, and the analysis of markets for these secondary products. To analyze the economic viability of various system configurations including IES, especially given the uncertainty surrounding load demand, electricity prices, and the availability of VRE resources, the stochastic technoeconomic analysis package HERON (Heuristic Energy Resource Optimization Network) was released earlier this year as an extension of the risk analysis framework RAVEN (Risk Analysis Virtual Environment). HERON focuses foremost on making the complex uncertainty quantification analysis tools approachable for energy systems analysts, also providing general dispatch optimization algorithms for those workflows. HERON continues to be improved and tested as a significant part of the IES viability analyses performed in this work. HERON is not a capacity expansion model. To consider market and grid energy system development in a variety of scenarios, HERON is best used in coupling with modelling tools such as US-REGEN, which sacrifice some of the uncertainty analysis and resolution of HERON's modelling for the ability to efficiently predict the change in the grid energy system's profile due to economic drivers over decades. HERON can then use this information to explore the economic viability of introducing changes to the predicted outcomes, such as the introduction of an IES. In this work, experts at EPRI using US-REGEN provide six projection scenarios for use in HERON stochastic technoeconomic analysis (STEA) in considering the options available for increasing LWR economic viability through introduction of a hydrogen-centric IES using a high-temperature steam electrolysis plant (HTSE), hydrogen storage, and a constant-rate contracted hydrogen consumer. The results obtained are differential in nature; they do not report expected profits for any configuration, but rather report on the possible increase in the NPV of a configuration with respect to a baseline no-IES configuration. Due to the uncertainty captured in the variable net load of the systems, there is likewise uncertainty in the mean values reported. We consider this viability both in terms of a regulated market, where the energy producers and IES are owned and operated by single entity, as well as a deregulated market, where the IES chooses its bid for electricity generation and is then dispatched by the grid system operator. Results indicate that for deregulated markets, the inclusion of the IES is often statistically beneficial. This is especially true in policies that are not favorable towards nuclear, as nuclear is less often dispatched and is forced to deal with frequent idle capacity. In the nominal case as well as the case of carbon tax policies, inclusion of the IES clearly benefited the economic performance of the NPP. In the regulated case, however, there was a trend towards minimizing the IES, likely due to the optimal sizing performed by US-REGEN of the NPP within the system as well as the lack of penalty for idle capacity at the NPP in the regulated market analyses.

99 GENERAL AND MISCELLANEOUS↗

Activation of lead coolant in Westinghouse lead fast reactor

The Westinghouse Lead-cooled Fast Reactor (LFR) is a medium-sized, passively safe, scalable reactor being developed by Westinghouse in collaboration with domestic and international organizations with the primary goals of reducing front-end capital cost and generating flexible and cost-competitive electricity while satisfying the highest standards in terms of safety and sustainability. An important aspect of new plant design is an assessment of activation level of its components so that an appropriate nuclear waste management plan can be established. As lead coolant is a distinguishing design feature of the LFR, its activation due to irradiation and the implications on establishing an appropriate waste disposal approach are important for engagement of project stakeholders, customers and nuclear safety regulators. This paper provides a brief description of the Westinghouse LFR design, a background on lead activation phenomenology, and then describes the methodology used for lead activation analysis performed with the computer code Serpent 2. It was determined that impurities naturally occurring in lead have the biggest contribution to lead activation. Corrosion and erosion products from the components immersed in lead can also be important contributors to lead activity and their impact can be limited by appropriate selection of materials and operating conditions. Polonium isotopes, resulting from bismuth generated from lead irradiation and its impurities, bring a notable contribution to the inhalation and ingestion doses during the plant operation and in the first years after the plant shutdown. However, it is not by far as important as for lead-bismuth coolant.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗