Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning and operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Evolving Competitive Markets in SAPP: Leveraging Competitive Wholesale Electricity Markets to Drive Renewable Generation Capacity in the Southern African Power Pool (SAPP)

The SADC region has significant natural resource potential to increase renewable energy generation, improve electricity reliability, and support economic development. This research finds an apparent lack of confidence from electricity infrastructure investors in SAPP wholesale electricity markets, which increases risk perception and lowers the likelihood of capital deployment. With respect to free market fundamentals, competitive market obstacles and renewable energy development obstacles are characterized. Stakeholders identified the top obstacles to well-functioning competitive markets as insufficient transmission infrastructure for interconnection and regional movement of electricity, dominance of national single-buyer markets, and lack of or weak nation-state regulatory frameworks. Stakeholders prioritized the top three obstacles for renewable energy development as a lack of viable commercial arrangements for variable renewable energy (VRE) balancing, lack of functional and consistent nation-level regulations, and higher project costs related to reliance on imported equipment. With respect to potential solution options, stakeholders prioritized the development of new cost allocation and finance methods to facilitate new transmission expansion, training to educate new or potential new market entrants on SAPP processes, as well as modeling and analysis of regional SAPP participation benefits disaggregated to the nation-state level. From these perspectives, this research identified strategy options for consideration including transitioning SAPP to a regional transmission operator (RTO) for operation and planning of cross-border transmission facilities and market administration, shifting operations of SAPP member transmission systems to Independent System Operators (ISOs), establishing a regional regulatory authority and enhancing market data transparency. Implementing these reforms is expected to be challenging, but not insurmountable, given the domestic political, legal, and jurisdictional complexities of the SADC region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Computational Math Problems for a Clean Energy Future

Cutting edge computational mathematics are ubiquitous in renewable energy research. Problems in resilient and reliable electric grid operations, infrastructure planning, wind farm yaw control, and more demand sophisticated and scalable computational tools that enable the transition of renewable energy technologies from proof of concept to deployment into our energy system. The mission of the Computational Science Center at NREL is to lead the lab's efforts to solve energy challenges using high-performance computing (HPC), computational science, applied mathematics, scientific data management, visualization, and informatics. In this poster, we provide a short overview of three areas of computational mathematics research at NREL: wind power scenario generation for stochastic grid operations and infrastructure planning, improved rational function approximations for electromagnetic transients codes, and wind farm yaw control using a combination of the Alternating Direction Method of Multipliers (ADMM) and reinforcement learning (RL). Increasing penetrations of renewable energy into power grids motivate the investigation of new approaches to characterizing uncertainty for five-minute economic dispatch problems. Similarly, as the penetration of distributed energy resources on power grids increases, it becomes important to revisit our methods of modelling transient phenomena, i.e. electromagnetic transients programs. Finally, the combination of ADMM and RL for wind farm yaw control presented here can potentially increase the efficiency of the deployed distributed controllers by orders of magnitude.

ADMM↗

Potential of Data Center Controls in Grid Services

The rapid proliferation of large data centers brings both challenges and opportunities for grid reliability. The data center resources and their potential flexibility have the potential to contribute resources to grid operations. Through capabilities like energy shifting and resource coordination, data centers can help reduce their net demand on the transmission network, as well as provide additional grid services to support reliable operation on the grid. While transient and long-term grid planning and operations are the scenarios that draw most attention, the quasi-steady state timeseries (QSTS) operation of data centers and grid bring interesting scenarios that can help evaluate the data center controls to aid grid services. This work is focused on modeling data centers for QSTS applications – incorporating the AI data center load profiles and building on the PNNL digital twin model for the thermal management loads to enable simulation studies to reveal the impact of data center controls on grid performance. This includes the integration of a QSTS battery and natural gas generator model to incorporate local resource impacts to the system. The simulation study is performed with a modified IEEE 24-Bus transmission system. Scenarios are focused on evaluating the data center load impacts on the transmission system and leveraging both data center and local generation controls to mitigate those impacts and provide additional grid services. The data center controls revealed the ability to contribute to two main kinds of grid services: preventing congestion on a weak grid by coordinating the data center resources with the collocated BESS and onsite generation; and the ability to help the grid operations during stressed times of operation like during a contingency. Leveraging these and other capabilities has the potential to help data centers become grid responsive assets, aiding in both their integration into the power system and grid reliability.

power grid simulation↗

Robot path planning for space-truss assembly

Construction, repair, and maintenance of space-based structures will require extensive planning of operations in order to effectively carry out these tasks. The path planning algorithm described here is a general approach to generating paths that guarantee collision avoidance for a single chain nonredundant or redundant robot. The algorithm uses a graph search of feasible points in position space, followed by a local potential field method that guarantees collision avoidance among objects, structures, and the robot arm as well as conformance to joint limit constraints. This algorithm is novel in its computation of goal attractive potential fields in Cartesian space, and computation of obstacle repulsive fields in robot joint space. These effects are combined to generate robot motion. Computation is efficiently implemented through the computation of the robot arm Jacobian and not the full inverse arm kinematics. These planning algorithms have been implemented and evaluated using existing space-truss designs, and are being integrated into the RPI-CIRSSE Testbed environment.

Muenger, Rolf↗

The Ceres S'COOL Project: Two Years After First Launch

The idea for the Students' Cloud Observations OnLine (S'COOL) project as an outreach and education element of NASA's Clouds and the Earth's Radiant Energy System (CERES) research program was conceived in late 1996 during a conversation with a middle school science teacher. S'COOL was implemented in a series of increasingly developed test phases during 1997, as the launch of the first CERES instrument approached. Even before launch, the reception of the project in schools far exceeded expectations. After several delays the first instrument, on the Tropical Rainfall Measuring Mission (TRMM) spacecraft, was launched on Thanksgiving Day, 1997. Since the first launch, development and expansion of the project has continued with expectations for launch of Terra carrying two CERES instruments into a polar orbit in mid-1998. That launch is now expected in fall 1999, and will finally provide overflight of all participating schools. In two years, the project has grown from three initial test participants to over 300 schools now participating in 23 countries on five continents. Students from first grade through university level are involved (most participants are ages 10-15). S'COOL is also being used by a few education professors to teach about Internet use in the classroom. The project continues to grow through word of mouth, presentations at teacher workshops, and now increasingly through teachers who find it during web searches. Participants in the S'COOL project are part of the CERES validation team. They provide ground truth measurements at the time the CERES instrument flies over their location, to be compared with the retrieval of cloud properties by remote sensing from CERES. Quantities reported include cloud type, height, fraction and opacity; information on contrails; surface temperature, pressure and relative humidity; and ground cover (snow/ice, wet, dry; leaves on trees or not). in addition, a comment field on the report form serves as a catch-all for all kinds of interesting observations, including similes written by some classes to describe more exactly the clouds they see. Several not totally unexpected complications with the CERES instrument and processing software mean that the CERES team has not yet reached the point of computing the cloud properties, a high level product at the end of the processing stream. However, progress is being made and we anticipate that we will soon be populating the S'COOL database with a large number of satellite retrievals for comparison with the students' observations. Some satellite retrievals from the initial test phases are already available in the database, The CERES instruments are planned to operate at least through 2006, and the S'COOL Project is planned to continue at least that long, providing motivational learning to as many students as possible. This paper reports on the first several years of the S'CCOL project. It further reports on some of the noteworthy observations and comparisons made possible by this project. Schools are often located in interesting places, in terms of the clouds found there and the satellite's ability to observe these clouds. The paper also reports on the learning opportunities delivered by this project, and on new questions about the planet and its climate which arise in the students' minds as a result of their active participation.

Chambers, Lin H.↗

Effective Crew Operations: An Analysis of Technologies for Improving Crew Activities and Medical Procedures

NASA's vision for space exploration (February 2004) calls for development of a new crew exploration vehicle, sustained lunar operations, and human exploration of Mars. To meet the challenges of planned sustained operations as well as the limited communications between Earth and the crew (e.g., Mars exploration), many systems will require crews to operate in an autonomous environment. It has been estimated that once every 2.4 years a major medical issue will occur while in space. NASA's future travels, especially to Mars, will begin to push this timeframe. Therefore, now is the time for investigating technologies and systems that will support crews in these environments. Therefore, this summer two studies were conducted to evaluate the technology and systems that may be used by crews in future missions. The first study evaluated three commercial Indoor Positioning Systems (IPS) (Versus, Ekahau, and Radianse) that can track equipment and people within a facility. While similar to Global Positioning Systems (GPS), the specific technology used is different. Several conclusions can be drawn from the evaluation conducted, but in summary it is clear that none of the systems provides a complete solution in meeting the tracking and technology integration requirements of NASA. From a functional performance (e.g., system meets user needs) evaluation perspective, Versus performed fairly well on all performance measures as compared to Ekahau and Radianse. However, the system only provides tracking at the room level. Thus, Versus does not provide the level of fidelity required for tracking assets or people for NASA requirements. From an engineering implementation perspective, Ekahau is far simpler to implement that the other two systems because of its wi-fi design (e.g., no required runs of cable). By looking at these two perspectives, one finds there was no clear system that met NASA requirements. Thus it would be premature to suggest that any of these systems are ready for implementation and further study is required.

Harvey, Craig↗

The Development and Evaluation of an Operational Aerobraking Strategy for the Mars 2001 Odyssey Orbiter

The Mars 2001 Odyssey Orbiter successfully completed the aerobraking phase of its mission on January 11, 2002. This paper discusses the support provided by NASA's Langley Research Center to the navigation team at the Jet Propulsion Laboratory in the planning and operational support of Mars Odyssey Aerobraking. Specifically, the development of a three-degree-of-freedom aerobraking trajectory simulation and its application to pre-flight planning activities as well as operations is described. The importance of running the simulation in a Monte Carlo fashion to capture the effects of mission and atmospheric uncertainties is demonstrated, and the utility of including predictive logic within the simulation that could mimic operational maneuver decision-making is shown. A description is also provided of how the simulation was adapted to support flight operations as both a validation and risk reduction tool and as a means of obtaining a statistical basis for maneuver strategy decisions. This latter application was the first use of Monte Carlo trajectory analysis in an aerobraking mission.

Tartabini, Paul V.↗

Mars Exploration Rover Mission

Two rovers with a sophisticated geological payload have been operating on the surface of Mars since January of 2004. Future missions and their related technology developments will benefit from the lessons learned during these surface operations. The planning cycle was dictated by the communications opportunities and the times of day that the rovers could operate, and the team and tools were tuned to optimize the mission return for that cycle time. The ability to traverse and to approach and perform in situ investigations on targets was limited in speed by the same cycle time, due to required human involvement in the related planning and risk decisions. In addition traverse was limited by the speed of the on-board terrain and hazard assessment, and in situ operations were limited by a lack of autonomy. Different planning cycles and levels of autonomy should be considered for future surface missions, which will result in different approaches to science decision making.

Adler, M.↗

A Human-in-the-Loop Evaluation of Multi-Sector Planning in Mixed Equipage Airspace (MSP III)

A human-in-the-loop (HITL) simulation was conducted in May 2010 to determine the feasibility and value 01 conducting multi-sector planning (MSP) operations in a mixed equipage environment. Aircraft were categorized as equipped or unequipped based on the presence or absence of an air-ground data communications (Data Comm) capability for receiving auto-loadable clearances and transfer of communication messages from the air navigation service provider (ANSP). The purpose of the study was to determine the feasibility and possible benefits of introducing multi-sector planning in a mixed equipage context, or whether Data Comm equipage was required for MSP operations. Each test scenario presented one of three different equipage levels to the controllers (10%, 50% or 90% equipped aircraft), so that the operational impact of different equipage levels could be observed. Operational feasibility assessment addressed two related questions: (1) are MSP operations feasible for unequipped aircraft, and (2) are they feasible in a mixed equipage context. Similarly, two categories of potential benefits were explored: (1) system performance improvements (e.g., throughput, workload) associated with MSP at different equipage levels, and (2) the possibility of providing differential service for equipage through MSP operations. Tool requirements (for both planning and controller stations), as well as planning and coordination procedures - within facility (traffic management unit/operational area) and within sector (R-Side/D-Side) - were two other topics addressed in the study. Overall, results suggested that MSP operations were feasible in a mixed equipage environment and that the tools were effective with both equipped and unequipped aircraft. Using the MSP tools, traffic management coordinators were able to manage controller task load, effectively balancing throughput with complexity and controller task load at each of the three equipage levels tested.

Smith, Nancy↗

Lessons learned from the Hubble Space Telescope planning and scheduling system implementation and operation

The major challenge of the NASA Hubble Space Telescope (HST) Ground System has been the implementation of the planning and scheduling system. This paper describes the operational flow of HST from science proposals to the actual execution of science observations on board the HST. The paper provides a collection of lessons learned over the 10 years that have covered the definition, development, test, and initial operation of HST's planning and scheduling system.

Ruitberg, Edward O.↗

Automatic vehicle monitoring systems study. Report of phase O. Volume 1: Executive summary

A set of planning guidelines is presented to help law enforcement agencies and vehicle fleet operators decide which automatic vehicle monitoring (AVM) system could best meet their performance requirements. Improvements in emergency response times and resultant cost benefits obtainable with various operational and planned AVM systems may be synthesized and simulated by means of special computer programs for model city parameters applicable to small, medium, and large urban areas. Design characteristics of various AVM systems and the implementation requirements are illustrated and cost estimated for the vehicles, the fixed sites, and the base equipments. Vehicle location accuracies for different RF links and polling intervals are analyzed.

Source record↗

Automatic vehicle monitoring systems study. Report of phase O. Volume 2: Problem definition and derivation of AVM system selection techniques

A set of planning guidelines is presented to help law enforcement agencies and vehicle fleet operators decide which automatic vehicle monitoring (AVM) system could best meet their performance requirements. Improvements in emergency response times and resultant cost benefits obtainable with various operational and planned AVM systems may be synthesized and simulated by means of special computer programs for model city parameters applicable to small, medium and large urban areas. Design characteristics of various AVM systems and the implementation requirements are illustrated and cost estimated for the vehicles, the fixed sites and the base equipments. Vehicle location accuracies for different RF links and polling intervals are analyzed. Actual applications and coverage data are tabulated for seven cities whose police departments actively cooperated in the study.

Source record↗

Enabling and Enhancing Space Mission Success and Reduction of Risk through the Application of an Integrated Data Architecture

The engineering phases of design, development, test, and evaluation (DDT and E) and subsequent planning, preparation, and operation (Ops) of space vehicles in a complex and distributed environment requires massive and continuous flows of information across the enterprise and across temporal stages of the vehicle lifecycle. The resulting capabilities at each subsequent stage depend in part on the capture, preparation, storage, and subsequent provision of information from prior stages. The United States National Aeronautics and Space Administration (NASA) is currently designing a fleet of new vehicles that will replace the Space Shuttle and expand space operations and exploration capabilities. This includes the 2 stage human rated lift vehicle Ares 1 and its associated crew vehicle the Orion, and a service module; the heavy lift cargo vehicle, Ares 5, and an associated cargo stage known as the Earth Departure Stage; and a Lunar Lander vehicle that contains a descent stage, and ascent stage, and a habitation module. A variety of concurrent assorted ground operations infrastructure including software and facilities are also being developed, assorted technology and assembly designs and development for equipment such as EVA suits, life support systems, command and control technologies are also in the pipeline. The development is occurring in a distributed manner, with project deliverables being contributed by a large and diverse assortment of vendors and most space faring nations. Critical information about all of the components, software, and procedures must be shared during the DDT and E phases and then made readily available to the mission operations staff for access during the planning, preparation, and operations phases, and also need to be readily available for system to system interactions. The Constellation Data Systems Project (CxDS) is identifying the needs, and designing and deploying systems and processes to support these needs. This paper details the steps and processes that NASA is applying within the Constellation Program to manage this data and information, and to insure that the correct information is available, correctly annotated, and can be provisioned digitally to enhance response times, and support engineering analysis and anomaly resolution.

Brummett, Robert C.↗

Mission Performance of the GLAS Thermal Control System - 7 Years In Orbit

ICESat (Ice, Cloud and land Elevation Satellite) was launched in 2003 carrying a single science instrument - the Geoscience Laser Altimeter System (GLAS). Its primary mission was to measure polar ice thickness. The GLAS thermal control architecture utilized propylene Loop Heat Pipe (LHP) technology to provide selectable and stable temperature control for the lasers and other electronics over a widely varying mission thermal environment. To minimize expected degradation of the radiators, Optical Solar Reflectors (OSRs) were used for both LHP radiators to minimize degradation caused by UV exposure in the various spacecraft attitudes necessary throughout the mission. Developed as a Class C mission, with selective redundancy, the thermal architecture was single st ring, except for temperature sensors used for heater control during normal operations. Although originally planned for continuous laser operations over the nominal three year science mission, laser anomalies limited operations to discrete measurement campaigns repeated throughout the year. For trending of the science data, these periods were selected to occur at approximately the same time each year, which resulted in operations during similar attitudes and beta angles. Despite the laser life issues, the LHPs have operated nearly continuously over this time, being non-operational for only brief periods. Using mission telemetry, this paper looks at the performance of the thermal subsystem during these periods and provides an assessment of radiator degradation over the mission lifetime.

Grob, Eric W.↗

Conceptual Drivers for an Exploration Medical System

Interplanetary spaceflight provides unique challenges that have not been encountered in prior spaceflight experience. Extended distance and timeframes introduce new challenges such as an inability to resupply medications and consumables, inability to evacuate injured or ill crew, and communication delays that introduce a requirement for some level of autonomous medical capability. Because of these challenges the approaches used in prior programs have limited application to a proposed three year Mars mission. This paper proposes a paradigm shift in the approach to medical risk mitigation for crew health and mission objectives threatened by inadequate medical capabilities in the setting of severely limited resources. A conceptual approach is outlined to derive medical system and vehicle needs from an integrated vision of how medical care will be provided within this new paradigm. Using NASA Design Reference Missions this process assesses each mission phase to deconstruct medical needs at any point during a mission. Two operational categories are proposed, nominal operations (pre-planned activities) and contingency operations (medical conditions requiring evaluation) that meld clinical needs and research needs into a single system. These definitions are used to derive a task level analysis to support quantifiable studies into a medical capabilities trade. This trade allows system design to proceed from both a mission centric and ethics-based approach to medical limitations in an exploration class mission.

Antonsen, E.↗

Establishing and Monitoring an Aseptic Workspace

When are aseptic operations necessary? In order to meet certain bioburden requirements, some components must undergo dry heat microbial reduction (DHMR) or other sterilizing procedures. If sensitive surfaces must be re-exposed after DHMR, this could compromise the bioburden levels. Recontaminating sterilized surfaces could be costly both in time by requiring repeated DHMR and risk to the hardware, which may not be compatible with repeated high temperature bakes. In order to prevent recontamination of the sensitive surfaces, an aseptic environment and sterile technique must be employed. Aseptic environments mean working in a space with almost no detectable bioburden in the air or on surfaces. Ideally, DHMR happens as late as possible to avoid requiring aseptic operations, as it can be considered a high-risk operations. Preparing the cleanroom for aseptic operations Establishing an ISO (International Organization for Standardization) class 5 space to minimize airborne particles. Maintain low bioburden in the cleanroom by using biocidal cleaners. Using multiple biocidal techniques decreases the likelihood of selecting for resistant microorganisms. 70% Isopropyl Alcohol (IPA) denatures the proteins in a microorganism (note: 70% IPA is better at killing microorganisms than 100% IPA) 7% hydrogen peroxide: damages DNA and proteins through oxygen radical damage. Ultraviolet-C (UV-C) lamps: causes crosslinking in DNA which prevents replication. Monitor cleanroom regularly for bioburden trending: Standard bioassay: Swab or wipe samples of cleanroom surfaces processed for colony forming unity (viable or spore selected); Rapid bioassay: Adenosine triphosphate (ATP) or Limulus amebocyte lysate (LAL) for a bioburden snapshot. High levels can signal an immediate re-cleaning before standard bioassay samples are taken. Airborne monitoring: Active (pulling air through a filter) or passive (particle fallout) for bioburden. Verify bioburden levels just before aseptic operation. Test hardware and cleanroom surfaces and air 3 days before the planned aseptic operation. Rapid bioburden just before aseptic operation to ensure room was not re-contaminated. Preparing personnel and tools: Personnel training. Everyone in the cleanroom: Standard cleanroom certification Everyone on the team: 1 day Planetary Protection overview. Aseptic operators only: Half-day aseptic operations training. Covers sterile garmenting/gloves, Sterile handling with a focus on contact transfer risk, tool/GSE preparation, and two-operator system for opening sterilized tools/components. Tool sterilization: All tools to be used during an aseptic operation need to be identified. Compatible tools are sterilized by DHMR or Autoclave. Double wrapped so that the exterior bag can be handled by a non-sterile operator, and the sterile. Tools that are not compatible with high heat do not come in contact with sensitive surfaces: either substitutes are found, or tools are isolated by wrapping in sterile foil. During an aseptic operation. Pre-task to make sure everyone understands the operations, who is handling what, and when the most critical surfaces will be exposed. Monitoring during the operation. Bioburden: active and passive airborne bioburden sampling, glove-tip dabs onto a plate after completion of operation (3 days for results). Particles: real time particle counter constantly running, with alarm for exceeding ISO 5 conditions.

aseptic processing↗