Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pilot”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

PILOT SCALE TESTING OF MONOSODIUM TITANATE MIXING FOR THE SRS SMALL COLUMN ION EXCHANGE PROCESS - 11224

The Small Column Ion Exchange (SCIX) process is being developed to remove cesium, strontium, and select actinides from Savannah River Site (SRS) Liquid Waste using an existing waste tank (i.e., Tank 41H) to house the process. Savannah River National Laboratory (SRNL) is conducting pilot-scale mixing tests to determine the pump requirements for suspending monosodium titanate (MST), crystalline silicotitanate (CST), and simulated sludge. The purpose of this pilot scale testing is to determine the requirements for the pumps to suspend the MST particles so that they can contact the strontium and actinides in the liquid and be removed from the tank. The pilot-scale tank is a 1/10.85 linear scaled model of SRS Tank 41H. The tank diameter, tank liquid level, pump nozzle diameter, pump elevation, and cooling coil diameter are all 1/10.85 of their dimensions in Tank 41H. The pump locations correspond to the proposed locations in Tank 41H by the SCIX program (Risers B5 and B2 for two pump configurations and Risers B5, B3, and B1 for three pump configurations). The conclusions from this work follow: (i) Neither two standard slurry pumps nor two quad volute slurry pumps will provide sufficient power to initially suspend MST in an SRS waste tank. (ii) Two Submersible Mixer Pumps (SMPs) will provide sufficient power to initially suspend MST in an SRS waste tank. However, the testing shows the required pump discharge velocity is close to the maximum discharge velocity of the pump (within 12%). (iii) Three SMPs will provide sufficient power to initially suspend MST in an SRS waste tank. The testing shows the required pump discharge velocity is 66% of the maximum discharge velocity of the pump. (iv) Three SMPs are needed to resuspend MST that has settled in a waste tank at nominal 45 C for four weeks. The testing shows the required pump discharge velocity is 77% of the maximum discharge velocity of the pump. Two SMPs are not sufficient to resuspend MST that settled under these conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TF Inner Leg Space Allocation for Pilot Plant Design Studies

A critical design feature of any tokamak is the space taken up by the inner leg of the toroidal field (TF) coil. The radial build needed for the TF inner leg, along with shield thickness , size of the central solenoid and plasma minor radius set the major radius of the machine. The cost of the tokamak core roughly scales with the cube of the major radius. Small reductions in the TF build can have a big impact on the overall cost of the reactor. The cross section of the TF inner leg must structurally support the centering force and that portion of the vertical separating force that is not supported by the outer structures. In this paper, the TF inner leg equatorial plane cross sections are considered. Out-of- Plane (OOP) forces must also be supported, but these are largest away from the equatorial plane, in the inner upper and lower corners and outboard sections of the TF coil. OOP forces are taken by structures that are not closely coupled with the radial build of the central column at the equatorial plane. The "Vertical Access AT Pilot Plant" currently under consideration at PPPL is used as a starting point for the structural, field and current requirements. Other TF structural concepts are considered. Most are drawn from existing designs such as ITER's circular conduits in radial plates bearing on a heavy nose section, and TPX's square conduits in a case, Each of these concepts can rely on full wedging, or partial wedging. Vaulted TF coils are considered as are those with some component of bucking against a central solenoid or bucking post. With the expectation that the pilot plant will be a steady state machine, a static stress criteria is used for all the concepts. The coils are assumed to be superconducting, with the superconductor not contributing to the structural strength. Limit analysis is employed to assess the degree of conservatism in the static criteria as it is applied to a linear elastic stress analysis. TF concepts, and in particular the PPPL AT PILOT plate concept are evaluated based on amount of space needed for structure and the amount of space left for superconductor.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Comparison of Options for a Pilot Plant Fusion Nuclear Mission

A fusion pilot plant study was initiated to clarify the development needs in moving from ITER to a first of a kind fusion power plant, following a path similar to the approach adopted for the commercialization of fission. The pilot plant mission encompassed component test and fusion nuclear science missions plus the requirement to produce net electricity with high availability in a device designed to be prototypical of the commercial device. Three magnetic configuration options were developed around this mission: the advanced tokamak (AT), spherical tokamak (ST) and compact stellarator (CS). With the completion of the study and separate documentation of each design option a question can now be posed; how do the different designs compare with each other as candidates for meeting the pilot plant mission? In a pro/con format this paper will examine the key arguments for and against the AT, ST and CS magnetic configurations. Key topics addressed include: plasma parameters, device configurations, size and weight comparisons, diagnostic issues, maintenance schemes, availability influences and possible test cell arrangement schemes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Understanding Building Infrastructure and Building Operation through DOE Asset Score Model: Lessons Learned from a Pilot Project

The U.S. Department of Energy (DOE) is developing a national voluntary energy asset score system to help building owners to evaluate the as-built physical characteristics (including building envelope, the mechanical and electrical systems) and overall building energy efficiency, independent of occupancy and operational choices. The energy asset score breaks down building energy use information by simulating building performance under typical operating and occupancy conditions for a given use type. A web-based modeling tool, the energy asset score tool facilitates the implementation of the asset score system. The tool consists of a simplified user interface built on a centralized simulation engine (EnergyPlus). It is intended to reduce both the implementation cost for the users and increase modeling standardization compared with an approach that requires users to build their own energy models. A pilot project with forty-two buildings (consisting mostly offices and schools) was conducted in 2012. This paper reports the findings. Participants were asked to collect a minimum set of building data and enter it into the asset score tool. Participants also provided their utility bills, existing ENERGY STAR scores, and previous energy audit/modeling results if available. The results from the asset score tool were compared with the building energy use data provided by the pilot participants. Three comparisons were performed. First, the actual building energy use, either from the utility bills or via ENERGY STAR Portfolio Manager, was compared with the modeled energy use. It was intended to examine how well the energy asset score represents a building’s system efficiencies, and how well it is correlated to a building’s actual energy consumption. Second, calibrated building energy models (where they exist) were used to examine any discrepancies between the asset score model and the pilot participant buildings’ [known] energy use pattern. This comparison examined the end use breakdowns and more detailed time series data. Third, ASHRAE 90.1 prototype buildings were also used as an industry standard modeling approach to test the accuracy level of the asset score tool. Our analysis showed that the asset score tool, which uses simplified building simulation, could provide results comparable to a more detailed energy model. The buildings’ as-built efficiency can be reflected in the energy asset score. An analysis between the modeled energy use through the asset score tool and the actual energy use from the utility bills can further inform building owners about the effectiveness of their building’s operation and maintenance.

Wang, Na↗

Sequential Design of Experiments to Maximize Learning from Carbon Capture Pilot Plant Testing

Pilot plant test campaigns can be expensive and time-consuming. Therefore, it is of interest to maximize the amount of learning and the efficiency of the test campaign given the limited number of experiments that can be conducted. This work investigates the use of sequential design of experiments (SDOE) to overcome these challenges by demonstrating its usefulness for a recent solvent-based CO2 capture plant test campaign. Unlike traditional design of experiments methods, SDOE regularly uses information from ongoing experiments to determine the optimum locations in the design space for subsequent runs within the same experiment. However, there are challenges that need to be addressed, including reducing the high computational burden to efficiently update the model, and the need to incorporate the methodology into a computational tool. We address these challenges by applying SDOE in combination with a software tool, the Framework for Optimization, Quantification of Uncertainty and Surrogates (FOQUS) (Miller et al., 2014a, 2016, 2017). The results of applying SDOE on a pilot plant test campaign for CO2 capture suggests that relative to traditional design of experiments methods, SDOE can more effectively reduce the uncertainty of the model, thus decreasing technical risk. Future work includes integrating SDOE into FOQUS and using SDOE to support additional large-scale pilot plant test campaigns.

20 FOSSIL-FUELED POWER PLANTS↗

NREL's Biochemical Conversion Pilot Plant Capabilities

NREL's biochemical conversion plant is a flexible pilot plant for testing a wide range of bio-based technologies for producing renewable fuels and byproducts. The biochemical conversion pilot plant is housed in the Integrated Biorefinery Research Facility located on the National Renewable Energy Laboratory's (NREL's) main campus. The facility provides industry partners the opportunity to test and develop their own biorefining technology using NREL equipment or rental equipment that can be brought into the plant. The pilot plant can process materials up to one dry ton per day in an integrated fashion using a variety of operating modes including batch, fed-batch, and continuous processing.

biochemical↗

Delivering Effective Virtual Energy-Focused Trainings: Successful Strategies and Lessons Learned from the Virtual Cohort In-Plant Training Pilot

While there are always barriers to energy efficiency efforts, few challenges have been as severe as the global COVID-19 pandemic. Many manufacturers throughout the United States and the world have been trying to determine how to safely open and operate their plants. To minimize the number of people working within facilities and maximize the physical distance between workers, only essential facility engineers are allowed into plants to ensure proper operations. The Department of Energy’s Better Plants Program created In-Plant Trainings (INPLTs) to help partners develop in-house expertise in energy efficiency. Delivering INPLTs in the traditional in-person fashion is infeasible under these circumstances. To continue providing INPLTs during this difficult time, the Better Plants Program piloted Virtual Cohort In-Plant Trainings (VINPLTs) on wastewater treatment and ammonia industrial refrigeration systems from October 27 to November 19, 2020. This paper provides an overview of the pilot, then discusses successful strategies and lessons learned from this pilot for delivering effective virtual energy-focused trainings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

History Matching and Prediction of a Polymer Flood Pilot in Heavy Oil Reservoir on Alaska North Slope

The first-ever polymer flood pilot to enhance heavy oil recovery on Alaska North Slope is ongoing. After more than 3 years of polymer injection, significant benefit has been observed from the decrease in water cut from 65% to less than 15% in the project producers. The primary objective of this study is to develop a robust history-matched reservoir simulation model capable of predicting future polymer flood performance. In this work, the reservoir simulation model has been developed based on the geological model and available reservoir and fluid data. In particular, four high transmissibility strips were introduced to connect the injector-producer well pairs, simulating short-circuiting flow behavior that can be explained by viscous fingering and reproducing the water cut history. The strip transmissibilities were manually tuned to improve the history matching results during the waterflooding and polymer flooding periods, respectively. It has been found that higher strip transmissibilities match the sharp water cut increase very well in the waterflooding period. Then the strip transmissibilities need to be reduced with time to match the significant water cut reduction. The viscous fingering effect in the reservoir during waterflooding and the restoration of injection conformance during polymer flooding have been effectively represented. Based on the validated simulation model, numerical simulation tests have been conducted to investigate the oil recovery performance under different development strategies, with consideration for sensitivity to polymer parameter uncertainties. The oil recovery factor with polymer flooding can reach about 39% in 30 years, twice as much as forecasted with continued waterflooding. Besides, the updated reservoir model has been successfully employed to forecast polymer utilization, a valuable parameter to evaluate the pilot test’s economic efficiency. All the investigated development strategies indicate polymer utilization lower than 3.5 lbs/bbl in 30 years, which is less than that of the same polymer used in a polymer pilot in Argentina.

Wang, Xindan↗

sCO2 Primary Power Large-Scale Pilot Plant FEED Summary

Echogen Power Systems and its project partners the Electric Power Research Institute, CDM Smith, Riley Power Inc. (a Babcock Power Inc. company), and the University of Missouri completed the Front-End Engineering Design (FEED) study of a nominal 10 MWe supercritical carbon dioxide (sCO2) large-scale pilot plant based on Recompression Brayton Cycle (RCBC) architecture. The FEED study was completed under Phase II of the U.S. Department of Energy Fossil Fuel Large-Scale Pilots program. The FEED study scope included the preliminary design of the combustion and environmental control systems, the primary heater, the sCO2 power cycle and its associated turbomachinery, and the balance of plant equipment to determine accurate cost and schedule requirements for fabrication and installation of the system at the University of Missouri’s Combined Cooling, Heat, and Power Plant, located in Columbia, Missouri. The RCBC sCO2 cycle presents superior thermodynamic efficiency compared to steam-Rankine cycles and is adaptable to a broad range of heat sources. The risk aversion of the power generation industry requires a successful large-scale pilot plant demonstration to enable financing and deployment of commercial-scale plants. Therefore, successful construction and demonstration of a 10 MWe RCBC sCO2 power plant would empower a transformational step forward for the efficiency of the next generation of utility power plants. This paper provides details on the primary heater, environmental control systems, and sCO2 power cycle design and performance.

01 COAL, LIGNITE, AND PEAT↗

PILOT PLANT EVALUATIONS OF RARE EARTH ELEMENT RECOVERY AND CONCENTRATION FROM PRE-COMBUSTION BITUMINOUS COAL SOURCES

Rare earths and other critical elements are commonly associated with coal-based sources and sometimes at concentrations that may be attractive for recovery as a byproduct of coal production. The results obtained from laboratory research performed during the past five years have led to the design, construction and testing of a pilot plant that recovered rare earth elements from several bituminous coal-based materials including coarse refuse as well as solutions from a small heap leach and acid mine drainage. From this initial design, rare earth oxide (REO) concentrates having a purity greater than 90% have been produced using solvent extraction as the primary means of concentration. Following cost reduction and process intensification efforts, the circuit was revised to include feed calcination and several selective precipitation stages as a substitute for the original direct leach-solvent extraction circuit. Pilot test results revealed that the modified circuit was ideal for treating the relatively low-grade feedstocks and provided similar final REO purities at a significantly lower cost. This communication will present the flowsheets evaluated in the pilot plant along with technical and economic analyses for each circuit.

Coal↗

Radiological Soil Sorting Pilot Study Results - Middlesex Municipal Landfill - 19394

The U.S. Army Corps of Engineers (USACE) conducted a pilot scale study of radiological sorting technology at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Middlesex Municipal Landfill (MML) site in Middlesex, New Jersey. Residual uranium ore pieces or 'nuggets' and associated soil contamination are present at the MML site as a result of the nation's early atomic energy program. Study questions and objectives of the MML Pilot Study project were to 1) evaluate the accuracy with which contaminated soils can be separated from uncontaminated soils using a radiologic soil sorting system, 2) determine the optimal full-scale operational process throughput rate that might reasonably be achieved, 3) determine the waste volume reduction that might be expected when operating at full scale, and 4) help establish the feasibility of implementing soil sorting as a potential remedy to other areas of the site. To accomplish the objectives soils were processed through the sorting system in a series of 30 different sorting experimental (test) runs utilizing approximately 917 cubic meters [1200 cubic yards (CY)] of material. The test runs included varying parameters such as belt speeds, soil layer thicknesses, and alarm criteria, all in varying combinations. Test runs also included engineered tests to evaluate point source segregation issues. This paper presents the challenges, results, lessons learned, and recommendations of the radiological soil sorting pilot study. The technical aspects and evaluation of the results of the test runs will also be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reactive transport modeling to study changes in water chemistry induced by CO2 injection at the Frio-I brine pilot

To demonstrate the potential for geologic storage of CO{sub 2} in saline aquifers, the Frio-I Brine Pilot was conducted, during which 1600 tons of CO{sub 2} were injected into a high-permeability sandstone and the resulting subsurface plume of CO{sub 2} was monitored using a variety of hydrogeological, geophysical, and geochemical techniques. Fluid samples were obtained before CO{sub 2} injection for baseline geochemical characterization, during the CO{sub 2} injection to track its breakthrough at a nearby observation well, and after injection to investigate changes in fluid composition and potential leakage into an overlying zone. Following CO{sub 2} breakthrough at the observation well, brine samples showed sharp drops in pH, pronounced increases in HCO{sub 3}{sup -} and aqueous Fe, and significant shifts in the isotopic compositions of H{sub 2}O and dissolved inorganic carbon. Based on a calibrated 1-D radial flow model, reactive transport modeling was performed for the Frio-I Brine Pilot. A simple kinetic model of Fe release from the solid to aqueous phase was developed, which can reproduce the observed increases in aqueous Fe concentration. Brine samples collected after half a year had lower Fe concentrations due to carbonate precipitation, and this trend can be also captured by our modeling. The paper provides a method for estimating potential mobile Fe inventory, and its bounding concentration in the storage formation from limited observation data. Long-term simulations show that the CO{sub 2} plume gradually spreads outward due to capillary forces, and the gas saturation gradually decreases due to its dissolution and precipitation of carbonates. The gas phase is predicted to disappear after 500 years. Elevated aqueous CO{sub 2} concentrations remain for a longer time, but eventually decrease due to carbonate precipitation. For the Frio-I Brine Pilot, all injected CO{sub 2} could ultimately be sequestered as carbonate minerals.

54 ENVIRONMENTAL SCIENCES↗

National Grid Deep Energy Retrofit Pilot

Through discussion of five case studies (test homes), this project evaluates strategies to elevate the performance of existing homes to a level commensurate with best-in-class implementation of high-performance new construction homes. The test homes featured in this research activity participated in Deep Energy Retrofit (DER) Pilot Program sponsored by the electric and gas utility National Gridin Massachusetts and Rhode Island. Building enclosure retrofit strategies are evaluated for impact on durability and indoor air quality in addition to energy performance. Evaluation of strategies is structured around the critical control functions of water, airflow, vapor flow, and thermal control. The aim of the research project is to develop guidance that could serve as a foundation for wideradoption of high performance, 'deep' retrofit work. The project will identify risk factors endemic to advanced retrofit in the context of the general building type, configuration and vintage encountered in the National Grid DER Pilot. Results for the test homes are based on observation and performance testing of recently completed projects. Additional observation would be needed to fully gaugelong-term energy performance, durability, and occupant comfort.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Leveraging a Southern California Energy Innovation Cluster to Pilot and Validate Emerging Energy Technologies

The EPIC Pilot Program, led by the Los Angeles Cleantech Incubator (LACI), was designed to help early-stage clean technology startups accelerate technical validation, investment readiness, and market entry. The project focused on supporting startups in designing and deploying small-scale pilots with the guidance of EPIC Partners, a network of regional stakeholders in the Southern California energy ecosystem, including but not limited to: the Los Angeles Department of Water and Power (LADWP), the California Energy Commission (CEC), Los Angeles County Metropolitan Transportation Authority (LA Metro), and Edison International, among others. Through mentorship, funding, and site access for technology deployments, the program provided a structured pathway for startups to test and refine their technologies in real-world settings.

14 SOLAR ENERGY↗

Pilot Scale Testing of Lignite Adsorption Capability and the Benefits for the Recovery of Rare Earth Elements from Dilute Leach Solutions

Naturally occurring organic materials containing humic acids show a strong affinity towards rare earth elements (REE) and other critical elements. Leaching experiments on lignite coal waste produced from construction sand production revealed that the contained REEs were associated with the organic matter. Furthermore, adsorption studies revealed that the lignite waste was capable of extracting REEs from a model solution and increased the REE content of the lignite waste by more than 100%. As such, this study aimed to utilize the lignite waste to adsorb REEs from pregnant leach solutions and acid mine drainage sources having low REE concentrations and subsequently leach the lignite material to produce pregnant leach solutions containing relatively high amounts of REEs, which benefits the performance and economic viability of downstream separation and purification processes. An integrated flowsheet was developed based on this concept and tested at a pilot scale. The pregnant leachate solution (PLS) was generated from a heap leach pad containing 2000 tons of Baker seam coarse refuse. The pilot scale circuit was comprised of aluminum precipitation, adsorption using the waste lignite, and rare earth-critical metal (RE-CM) precipitation stages in succession. The results indicated that the aluminum precipitation stage removed over 88% and 99% of the Al and Fe, respectively. The adsorption stage increased the REE content associated with the waste lignite from 457 ppm to 1065 ppm on a whole mass basis. Furthermore, the heavy REE (HREE) content in the feedstock increased by approximately 250%, which raised the percentage of HREE in the REE distribution by 19 absolute percentage points. In addition to the REEs, concentrations of other critical elements such as Mn, Ni, and Zn also improved by 75%, 37%, and 250%, respectively. Bench-scale tests revealed that increasing the solids concentration in the waste lignite and PLS mix from 1% to 20% by weight enhanced the adsorption efficiency from 32.0% to 99.5%, respectively. As such, a new flowsheet was proposed which provides significantly higher REE concentrations in the PLS that can be fed directly to solvent extraction and/or oxalic acid precipitation and, thereby, enhancing process efficiency and economics.

58 GEOSCIENCES↗

Launch Vehicle Manual Steering with Adaptive Augmenting Control In-flight Evaluations Using a Piloted Aircraft

An adaptive augmenting control algorithm for the Space Launch System has been developed at the Marshall Space Flight Center as part of the launch vehicles baseline flight control system. A prototype version of the SLS flight control software was hosted on a piloted aircraft at the Armstrong Flight Research Center to demonstrate the adaptive controller on a full-scale realistic application in a relevant flight environment. Concerns regarding adverse interactions between the adaptive controller and a proposed manual steering mode were investigated by giving the pilot trajectory deviation cues and pitch rate command authority.

pilot ratings↗

NESC GN&C TDT Best Practices: Design Requirements for Satisfactory Handling Qualities of a Piloted Spacecraft

This document describes work to determine a proposed set of concise design requirements for manned spacecraft to yield satisfactory handling qualities when the pilot is performing manual control. This is done primary via the analysis of various historic spacecraft. Partial requirements verification is performed via the creation of a simulated pilot used to determine limits of satisfactory vehicle performance. Partial requirements validation is per-formed via example conceptual design of a spacecraft that is compliant with all relevant proposed requirements.

Cooper-Harper↗

High-moisture pelleting of corn stover using pilot- and commercial-scale systems: Impact of moisture content, L / D ratio and hammer mill screen size on pellet quality and energy consumption

Here, high-moisture pelleting of corn stover was tested in pilot- and commercial-scale systems. For the pilot-scale study, a 6.35 mm screen size hammer mill ground corn stover was reconditioned to moisture between 14 and 29.6% (w.b.), and 5, 7 and 9 L/D ratio pellet die were used. At 29% corn stover moisture content and L/D ratios of 5 and 9, the bulk density and durability of the pellets were ≤450 kg/m 3 and <90% and >540 kg/m 3 and >90%, respectively. Increasing the feedstock moisture and L/D ratio increased the pelleting energy. Increasing the hammer mill screen size to 11.11 mm reduced the bulk density but not the durability. The response surface models adequately described the pelleting process (R 2 ≥ 0.88), and analysis of variance showed a strong interaction between the process variables and pellet properties. Commercial-scale testing of high-moisture pelleting using 6.35 mm ground corn stover bales in the moisture range 24–26% (w.b.) produced pellets with a density of >675 kg/m 3 and durability of >98%, whereas increasing the hammer mill screen size to 11.11 mm reduced the bulk density by about 100 kg/m 3 but not the durability. The energy consumption of the commercial-scale unit operations for the high-moisture pelleting process was in the range 98–124 kW h/ton, which is 64–72% less energy than conventional pelleting that requires energy about 350 kW h/ton for biomass drying from 30% (w.b.) to 10% (w.b.) moisture content before pelleting. Pellets produced using high-moisture pelleting met International Organization for Standardization and Pellets Fuel Institute international standards. Published 2023. This article is a U.S. Government work and is in the public domain in the USA.

09 BIOMASS FUELS↗