Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “optimisation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Presentation of the MERC work-flow for the computation of a 2D radial reflector in a PWR

This paper presents a work-flow for computing an equivalent 2D radial reflector in a pressurized water reactor (PWR) core, in adequacy with a reference power distribution, computed with the method of characteristics (MOC) of the lattice code APOLLO2. The Multi-modelling Equivalent Reflector Computation (MERC) work-flow is a coherent association of the lattice code APOLLO2 and the core code COCAGNE, structured around the ADAO (Assimilation de Donnees et Aide a l'Optimisation) module of the SALOME platform, based on the data assimilation theory. This study leads to the computation of equivalent few-groups reflectors, that can be spatially heterogeneous, which have been compared to those obtained with the OPTEX similar methodology developed with the core code DONJON, as a first validation step. Subsequently, the MERC work-flow is used to compute the most accurate reflector in consistency with all the R and D choices made at Electricite de France (EDF) for the core modelling, in terms of number of energy groups and simplified transport solvers. We observe important reductions of the power discrepancies distribution over the core when using equivalent reflectors obtained with the MERC work-flow. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

EC MoDeRn Project: In-situ Demonstration of Innovative Monitoring Technologies for Geological Disposal - 12053

Monitoring to provide information on the evolution of geological disposal presents several challenges. The 4-year, euros M 5, EC MoDeRn Project (http://www.modern-fp7.eu/), which commenced in 2009, addresses monitoring processes, state-of-the-art technology and innovative research and development of monitoring techniques. This paper discusses some of the key drivers for the development of innovative monitoring techniques and provides outlines of the demonstration programmes being conducted within MoDeRn. The aim is to develop these innovative monitoring techniques and to demonstrate them under realistic conditions present in underground laboratories. These demonstration projects, applying a range of different monitoring techniques, are being carried out at underground research facilities in different geological environments at HADES URL in Belgium (plastic clay), Bure in France (indurated clay) and at Grimsel Test Site (granite) in Switzerland. These are either built upon existing infrastructure (EC ESDRED Low pH shotcrete and TEM experiments at Grimsel; and PRACLAY experiment and underground galleries in HADES) or will be attached to infrastructure that is being developed and financed by resources outside of this project (mock-up disposal cell in Bure). At Grimsel Test Site, cross-hole and hole-to-tunnel seismic methods are being employed as a means to monitor induced changes in an artificially saturated bentonite wall confined behind a shotcrete plug. Recognising the limitations for travel-time tomography for monitoring a disposal cell, full waveform inversion techniques are being employed to enhance the capacity to monitor remote from the excavation. At the same Grimsel location, an investigation will be conducted of the potential for using a high frequency wireless (HFW) sensor network embedded within the barrier system; this will include the possibility of providing energy remotely to isolated sensors. At the HADES URL, the monitoring programme will utilise the PRACLAY gallery equipped to simulate a disposal gallery for heat-generating high-level waste evaluating fibre-optic based sensing techniques, including distributed sensing for thermal distribution and long-term reliability in harsh conditions. It also includes the potential to improve the treatment of signals from micro-seismic monitoring to enable enhanced understanding of the evolution around the gallery following its excavation due to ventilation, saturation and heating, and to image a water-bearing concretion layer. HADES URL will also be used to test wireless techniques to transmit monitoring data from the underground to the surface. The main focus of this contribution is to evaluate magneto-inductive data transmission; and to optimise energy usage. At the Bure underground facility in France, monitoring systems have been developed and will be embedded into the steel liner for the mock-up high-level waste disposal tunnel. The aim of this programme is to establish the capacity to conduct integrated monitoring activities inside the disposal cell, on the cell liner and in the near-field and to assess the capability of the monitoring to withstand construction and liner emplacement procedures. These projects, which are supported by focused development and testing of the monitoring systems, will allow the testing of both the effectiveness of these techniques applied to disposal situations and to understand the limits of these monitoring technologies. This approach should also enhance the confidence of key stakeholders in the ability to understand/confirm the changes occurring within a disposal cell. In addition, remote or 'non-intrusive' monitoring technologies are evaluated to provide a means of enhancing understanding of what is occurring in an isolated disposal cell. The projects also test solutions for embedded monitoring systems in challenging (risk of damage) situations. The outputs from this work will lead to improved understanding of these state-of-the-art techniques and allow focused development of those techniques beneficial to future monitoring programmes. It is also planned, as part of the MoDeRn programme of stakeholder engagement to show some of these monitoring demonstrations to lay stakeholders in order to receive their feed-back on the approach taken and their views on the value of this work. This feedback will help improve our understanding of how this work and future work on monitoring can be more effectively communicated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Building and Commissioning of the Batch Pyrolysis Plant in Studsvik, Sweden - 12447

After a sequence of lab scale and bench scale trials the building of a pyrolysis plant could begin at the Studsvik site in Sweden. The facility is primarily aimed at treatment of uranium contaminated organic waste originating at fuel manufacturing plants and other facilities where the main contamination is uranium. The plant is an extension/addition to the already operating incinerator. In order to further widen the waste acceptance criteria the design of the off-gas treatment system does not have the same design as that of the incinerator. The building of the facility began in April 2011, and the first heating of the facility took place in late December, 2011. The site acceptance tests are planned for January, as are the first inactive trials aimed at optimisation of process control. The facility is planned to be operating with radioactive materials from February 2012. The pyrolysis unit is primarily aimed at treatment of uranium contaminated waste, under conditions that facilitate leaching and recovery of the uranium from the ashes. However, a number of other uses are conceivable. The batch fed pyrolysis unit, with its chosen design of the off-gas treatment system, enables treatment of some waste fractions that are difficult to treat in the incinerator. For instance small campaigns, i.e. smaller quantities of waste (typically <5 tonnes), or waste containing high levels of chlorine and sulphur are possible to treat in the pyrolysis unit. The pyrolysis unit is also expected to perform well in the treatment of other 'difficult' waste fractions, for instance waste containing pyrophoric materials, or other types of waste that benefit from the high level of process control, i.e. control of temperature and atmosphere throughout the process, that can be obtained in the pyrolysis unit compared to the incinerator. Furthermore, treatment in the pyrolysis unit minimises the risk of cross contamination between different waste treatment campaigns. This feature is obtained thanks to the low gas flow rates in the vessel, which means that a higher retention of nuclides in the ashes is obtained, but also through a design that facilitates cleaning of the pyrolysis vessel and the system beyond this, or even exchanging the most critical components, such as the pyrolysis vessel itself, if need be. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development, Testing and Validation of a Waste Assay System for the Measurement and Characterisation of Active Spent Fuel Element Debris From UK Magnox Reactors - 12533

This paper describes the development, testing and validation of a waste measurement instrument for characterising active remote handled radioactive waste arising from the operation of Magnox reactors in the United Kingdom. Following operation in UK Magnox gas cooled reactors and a subsequent period of cooling, parts of the magnesium-aluminium alloy cladding were removed from spent fuel and the uranium fuel rods with the remaining cladding were removed to Sellafield for treatment. The resultant Magnox based spent fuel element debris (FED), which constitutes active intermediate level waste (ILW) has been stored in concrete vaults at the reactor sites. As part of the decommissioning of the FED vaults the FED must be removed, measured and characterised and placed in intermediate storage containers. The present system was developed for use at the Trawsfynydd nuclear power station (NPS), which is in the decommissioning phase, but the approach is potentially applicable to FED characterisation at all of the Magnox reactors. The measurement system consists of a heavily shielded and collimated high purity Germanium (HPGe) detector with electromechanical cooling and a high count-rate preamplifier and digital multichannel pulse height analyser. The HPGe based detector system is controlled by a software code, which stores the measurement result and allows a comprehensive analysis of the measured FED data. Fuel element debris is removed from the vault and placed on a tray to a uniform depth of typically 10 cm for measurement. The tray is positioned approximately 1.2 meters above the detector which views the FED through a tungsten collimator with an inverted pyramid shape. At other Magnox sites the positions may be reversed with the shielded and collimated HPGe detector located above the tray on which the FED is measured. A comprehensive Monte Carlo modelling and analysis of the measurement process has been performed in order to optimise the measurement geometry and eliminate interferences from radioactive sources and FED in the immediate vicinity of the measurement position. The detector system has been calibrated and high activity radioactive sources of Cs-137, Co-60 and Na-22 have been used to validate the measurement process. The data acquisition and analysis software code has been tested and validated in keeping with the software quality assurance requirements of both ISO:9001-2008 - TICK-IT in the UK and NQA-1. The measurement and analysis system has been comprehensively tested with high activity sources, is flexible and may be applicable to a wide range of remote handled radioactive waste measurement applications. It is due to be installed at Trawsfynydd NPS later this year. This paper describes the Waste Tray Assay System (WTAS) that has been developed for the measurement of Magnox FED waste. The WTAS has been tested with a range of radioactive sources and its operation has been simulated with benchmarked MCNP Monte Carlo calculations. The measurement software has been validated as has the operation of the system for a range of strong radioactive sources. A system based on the design is due for installation and operation in 2012. The system has application to the measurement of Magnox Fuel Element Debris (FED) waste at other Magnox reactor sites. The major design objective of the WTAS that has been achieved is the ability of the assay system to determine the content of Cs-137, and in turn to enable the fissile burden to be assessed using a radionuclide fingerprint, in the presence of higher and highly variable quantities of Co-60, typically from nimonic springs. The approach can be used in other Magnox FED waste configurations where the detector is located above the FED waste sorting tray and where the collimation is fixed below the detector and at a distance above the tray. In this case, which has also been investigated, there are different shielding problems and mechanical support issues. The extensive use of MCNP Monte Carlo modelling to simulate the geometry of the sorting cell and the distribution of radioactive sources has helped to ensure that all of the detector shielding requirements are addressed and suitable Cs-137 and Co-60 discrimination can be achieved. The WTAS in its present form or in other configurations has relevance to the measurement of other active ILW and highly active RH waste. Examples include high activity RH LLW and RH TRU (Transuranic) waste as defined in the United States arising from both commercial nuclear and Department of Energy (DOE) operations. The analysis is able to analyse a range of radionuclides beyong those expected in the Magnox FED cases. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Underwater characterization of control rods for waste disposal using SMOPY

Storage of spent fuel assemblies in cooling ponds requires careful control of the geometry and proximity of adjacent assemblies. Measurement of the fuel burnup makes it possible to optimise the storage arrangement of assemblies taking into account the effect of the burnup on the criticality safety margins ('burnup credit'). Canberra has developed a measurement system for underwater measurement of spent fuel assemblies. This system, known as 'SMOPY', performs burnup measurements based on gamma spectroscopy (collimated CZT detector) and neutron counting (fission chamber). The SMOPY system offers a robust and waterproof detection system as well as the needed capability of performing radiometric measurements in the harsh high dose - rate environments of the cooling ponds. The gamma spectroscopy functionality allows powerful characterization measurements to be performed, in addition to burnup measurement. Canberra has recently performed waste characterisation measurements at a Nuclear Power Plant. Waste activity assessment is important to control costs and risks of shipment and storage, to ensure that the activity level remains in the range allowed by the facility, and to declare activity data to authorities. This paper describes the methodology used for the SMOPY measurements and some preliminary results of a radiological characterisation of AIC control rods. After describing the features and normal operation of the SMOPY system, we describe the approach used for establishing an optimum control rod geometric scanning approach (optimum count time and speed) and the method of the gamma spectrometry measurements as well as neutron check measurements used to verify the absence of neutron sources in the waste. We discuss the results obtained including {sup 60}Co, {sup 110m}Ag and {sup 108m}Ag activity profiles (along the length of the control rods) and neutron results including Total Measurement Uncertainty evaluations. Full self-consistency checks were performed and these demonstrate the validity of the techniques. The results are described and analysed in the context of the measurement performance of the equipment. Different casks were fully characterized using a 60 mm{sup 3} CZT detector, to determine the total activities and spatial profiles. A total activity range measurement of 1x10{sup 8} - 1x10{sup 13} Bq/cm was found to be achievable. Finally, comments are made, based on our measurements, on the ability of this equipment for performing in-situ characterisation of wastes in the harsh environments typical of fuel assembly and waste storage ponds and silos. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Intelligent uranium fission converter for neutron production on the periphery of the nuclear reactor core (MARIA reactor in Swierk - Poland)

The multipurpose, high flux research reactor MARIA in Otwock - Swierk is an open-pool type, water and beryllium moderated and graphite reflected. There are two not occupied experimental H1 and H2 horizontal channels with complex of empty rooms beside them. Making use of these two channels is not in conflict with other research or commercial employing channels. They can work simultaneously, moreover commercial channels covers the cost of reactor working. Such conditions give beneficial possibility of creating epithermal neutron stand for researches in various field at the horizontal channel H2 of MARIA reactor (co-organization of research at H1 channel is additionally planned). At the front of experimental channels the neutron flux is strongly thermalized - neutrons with energies above 0.625 eV constitute only ∼2% of the total flux. This thermalized neutron flux will be used to achieve high flux of epithermal neutrons at the level of 2x10{sup 9} n cm{sup -2}s{sup -1} by uranium neutron converter (fast neutron production - conversion of reactor core thermal neutrons to fast neutrons - and then filtering, moderating and finally cutting of unwanted gamma radiation). The intelligent converter will be placed in the reactor pool, near the front of the H2 channel. It will replace one graphite block at the periphery of MARIA graphite reflector. The converter will consist of 20 fuel elements - low enriched uranium plates. A fuel plate will be a part which will measure 110 mm wide by 380 mm long and will consist of a thin layer of uranium sealed between two aluminium plates. These plates, once assembled, form the fuel element used in converter. The plates will be positioned vertically. There are several important requirements which should be taken into account at the converter design stage: -maximum efficiency of the converter for neutrons conversion, -cooling of the converter need to be integrated with the cooling circuit of the reactor pool and if needed equipped with self-cooling system (enhanced comparing to the cooling properties inherent with regular rector pool water flows), -proper cooling conditions can be ensured by an appropriate water flow, so the resistance to flow has to be optimised, -the requirement of the minimum resistance to water flow leads to the openwork design of the fuel element separator, which, on the other hand, has to be strong enough to ensure the needed strength for mechanical load due to the fuel weight and forces associated with the water flow, -the possibility of changing beam and flux qualities by rotating the converter or repositioning the converter plates by moving or replacing with another materials. In order to minimize the neutron activation of the fuel in the converter, the possibility was predicted to remove the converter and to replace it with an aluminium dummy for the time when the beam at the channel H2 is not used. This means that both, the converter and the dummy, have to be easily removable from the converter socket. There has to be also the place in the water pool, near the research stand or in technological pool, where the converter can be safely stored (this place have to be proper for operation with plates i.e. changing amount of plates). Thermal and neutron load of the fuel plates in the converter will be inhomogeneous. In order to equalize these loads, the converter should be designed in such way that it would be possible to change the order of fuel plates. Moreover replacing the amount of the plates gives the opportunity to obtain different fluxes of neutrons (quantitatively and qualitatively i.e. energetically). The project of the converter is based on Monte Carlo calculation concerning neutron production and on Computational Fluid Dynamics (CFD) i.e. modelling of converter for thermodynamical aspects. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

'A Good Decision Is Based On Information, Not On Numbers' - A Process For National Strategic Decision Making - 17203

Waste management decision making is the process used by waste owners to determine and justify choices in across the lifecycle of a waste (from the manner of generation or retrieval to final disposition). In the UK, waste owners in the nuclear industry are obligated, by their environmental permits and authorisations, to demonstrate the application of robust and well-underpinned decision making processes for waste management. This is captured through the requirement for waste owners to demonstrate the identification and implementation of Best Available Technique (BAT). The National Waste Programme (NWP), led by LLW Repository Ltd, is a UK wide programme which leads the implementation of the UK National Strategy for the management of solid LLW from the nuclear industry [1] and which aims to deliver a self-sustaining culture for optimised management of Low Level Waste (LLW) in the UK. Recognising the requirement on waste owners, the NWP has - in conjunction with appointed contractors - led the development and publication of national strategic optioneering studies (so-called national strategic BAT studies) to support waste owners. Recognising the benefits that this approach to optioneering and strategic decision making could have for other waste producers, this paper provides an overview of the process used for the development of the suite of national strategic BAT assessments for the NWP. It details: the main phases of the process, the key features of each process phase, the benefits of the approach and key learning from its deployment in practice. Note: The legislative regime in England and Wales requires the identification and application of BAT. There is an equivalent regime in Scotland known as Best Practicable Environmental Option (BPEO) and Best Practicable Means (BPM). The requirements are comparable across the two legislative regimes and, for the purposes of simplicity, the term BAT will be utilised in this paper. The approach and outcomes of the national strategic optioneering process described are applicable across the UK. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vattenfall Decommissioning Planning in Sweden - 17544

A rapid decrease in the power prices in the Nordic market for the last three years has drastically reduced the profitability of the nuclear power plants in Sweden. This has resulted in a very quick re-evaluation of the optimal life-term of the older generation, from the 1970's, nuclear units in Sweden. Hence, it was decided last year to shut-down the Vattenfall Ringhals-1 BWR and the Ringhals-2 PWR by 2020 and 2019, respectively, for financial reasons. Before that decision, the planning had been to operate the units until 50 years life-time, i.e. 2024 and 2025. This decision resulted in a prompt start of the planning for decommissioning of the two units. The planning started with a project, called AVANS, to ensure that the overall planning and to-be-developed organisations had well defined requirements and a common platform. Another project, STURE, was started to ensure the continued operation and in some case movement of common site functions to the two younger units on the Ringhals site, i.e. the PWRs Ringhals-3 and Ringhals-4. This project also has the responsibility to optimise operation of Ringhals-1 and Ringhals-2 to EOL and the subsequent removal of the nuclear fuel from the units after necessary cool-down. A third project started is the actual decommissioning project, TYKO, benefiting from experience gained and staff involved in still ongoing decommissioning of a legacy materials reactor, i.e. the Studsvik R2/R2-0 reactor. The planning and experience to date for the three projects will be presented in the paper, as well as lessons-learned and future plans, including some critical items identified wrt dismantling and site function transfer. Half of the nuclear units in Sweden, six units, and one legacy power reactor, will be starting decommissioning within the next few years. Impacts on the back-end system; the financial situation, with respect to the state-controlled financial funding; and the supplier market are discussed in the paper. Furthermore, the planning process and the planned management of the interfaces between the involved organisations is described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

French Atomic and alternative energies commission decommissioning policy and strategies: What is at stake lessons learned and feedback experience - 15013

Since its creation in 1945, the French Atomic Energy and Alternative Energies Commission has carried out research programmes on civil use of nuclear, and its application. CEA has set up and run various types of installations from research (accelerators, pond reactors, fast reactors, laboratories) to industry (power reactor, processing facilities). There are currently more than several tens of facilities which are presently closed down pending dismantling or in the process of being dismantled by CEA, the governmental body for research and development in nuclear and renewable energies. When operating, all these installations have generated radioactive waste. When they are shutdown, either as a result of the programmes for which they were set up, or due to equipment wearing out or being obsolete, these installations must be cleaned up, dismantled and decommissioned, taking into account their nuclear nature and requirements related to safety and environment. During the decommissioning process, the implementer has to deal with safety and site remediation issues. Dealing with these installations is a long-term programme which must be carefully planned and financed in order to optimise its management. The paper will describe the CEA's decommissioning policy, strategies adopted, and draw up lessons learned and feedback experience, showing that: - Safety is guaranteed, - Dismantling is a technically controllable operation, but R and D actions are to be developed for specific problems as characterization or operation in hostile environment. Moreover all the methods and techniques improve as a result of feedback experience, - The amount of material and waste produced by the dismantling are manageable. The very low, low and intermediate level waste can be stored on existing shallow land burial centres, some new repositories have to be created for specific waste (graphite, radium,...) and for high and intermediate level long live waste, which are stored in interim storage , - The dismantling must be optimized, especially by appliance of a good strategy based on rational industrial choices. - Communication and transparency with stakeholders is essential for global process acceptance, - The lessons learned and how feedback experience could benefit for future decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Cigeo, the French geological disposal project - 15067

Cigeo, the French geological disposal project, is the result of 20 years of studies and research led by Andra. Following a nation-wide selection and siting process, research focused on an argillaceous formation near Bure, a village on the boundary of the Meuse and Haute-Marne departments in eastern France, for the construction of an underground research laboratory. Based on the results submitted to the French Government and Parliament in 2005, a planning act was passed in 2006, establishing geological disposal as the reference solution for managing high-level and intermediate-level long-lived waste. The act sets out guidelines for managing this waste and includes a road-map leading up to the commissioning of the geological disposal facility in 2025. A public debate was held in 2013 and the project team took note of the ensuing change requests. Meanwhile, studies and design work continue, with a particular focus on the need for optimisation and an assessment of the cost of disposal.(authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contribution of the numerical simulations in the development of the French HLLW vitrification Processes - 15126

For many years, the CEA (Commissariat a l'energie Atomique et aux energies Alternatives) Marcoule France has developed various processes dedicated to radioactive waste confinement, especially vitrification processes for HLLW. For 10 years now, the numerical simulation has become an important tool for research and development projects held in the CEA-AREVA Joint Vitrification Laboratory (LCV). Induction heating, fluid mechanics and thermal simulations take part of all new R and D projects. The contributions of such simulations are, first, the enhancement of the working knowledge of existing process. Those data are very useful to define optimisation choices, for example upgrades made on the hot metallic melter used since the 90's at La Hague facility. Second, the simulations are, of course, also used at the conception stage of new processes as a tool allowing wide ranges parametric tests. This has been extensively used in the design of the cold crucible inductive melter (CCIM) commissioned in 2010 at La Hague plant. Finally, it is a powerful and relatively cheap tool for prospective studies for processes of the future. Whatever the purpose, the potential benefits are gains on the reliability, the output capacity and the life time. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and testing of a sensitive heat-flow calorimeter for measuring radioactive waste in 55-gallon (US) drums - 15334

A sensitive large volume calorimeter for measuring the thermal power generated by the radioactive decay of heat producing materials in 55-gallon drums has been developed and tested. The technology is applicable to the measurement of all radionuclides that decay by alpha or beta decay such as waste or product material containing plutonium, tritium and americium. It is also relevant to the measurement of drums where gamma rays from radioactive decay are captured locally in attenuating materials and the resulting rate of thermal energy deposition (sample thermal power) is of sufficient magnitude for a calorimetry measurement. The initial application of the drum calorimeter is for measuring and characterizing plutonium-bearing waste drums. The calorimeter design has optimised the two characteristics of high thermal sensitivity and reduced measurement times. In order to achieve these characteristics for large volume drums, the heat-flow method of operation was chosen in a single measurement chamber configuration. Using a drum-lifting device, the waste drum is positioned on a sliding platform and subsequently moved by the operator inside an octagonal inner chamber, which acts as the heat sink. The heat-sink chamber has significant thermal inertia and remains effectively at a constant temperature throughout the duration of a drum measurement. The octagonal inner measurement chamber is constructed inside a multi-layer external thermal enclosure, which provides both thermal insulation and significant thermal inertia. The external thermal enclosure isolates the measurement process from the effects of changes in the external ambient temperature. During a measurement, heat flows from the drum being measured to the heat sink. This heat-flow is measured by a series of thermopile sensor assemblies, which are positioned between the waste drum and the heat sink. A high sensitivity of greater than 200 μV/mW (microvolts per milliwatt) has been achieved using multiple close-coupled thermopile sensors in each assembly. Reduced measurement times are achieved by positioning the thermopile sensor assemblies close to the drum surface in order to reduce the thermal transport delay. The instrument incorporates a calibrated precision power supply, which requires annual recalibration and is traceable to national standards. It is used to power a calibration heater that has been built into a calibration and test drum. The calibration and test drum is used both to calibrate the instrument and provide periodic confirmation of correct operation. Measurements of calorimeter performance are reported for a range of drum thermal powers. Long-term temperature drift measurements are used to provide estimates of the minimum detectable drum thermal power and hence the minimum detectable activity for both plutonium and tritium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and performance testing of a novel far field Gamma system to assay radioactive waste in 400 and 200 litre drums - 15339

A Far Field Gamma ray Measurement system has been developed for measuring and assaying both 400 and 200 litre waste drums with a wide range of activity at nuclear power stations. These include radioactive waste drums with surface dose-rates of less than 2 mSv/h (200 mrem/h) and, at the higher range of activity, 400 litre drums with surface dose-rates of up to 50 mSv/h (5 rem/h). The assay system incorporates an electro-mechanically cooled high purity Germanium profile detector and advanced digital spectroscopic analysis electronics. A novel optimised conical-trapezoidal collimator has been incorporated to reduce the effect of the radioactive background in addition to the conventional detector lead shield with tin and copper graded lining to reduce the effect of lead X-rays. Two features have been incorporated to reduce detector dead time and maintain detector resolution when measuring high activity drums. The first is the inclusion of two automated tungsten filters of different thickness as an integral part of the detector collimator. The filters are used in conjunction with an automated rail system on which the detector platform is mounted. The detector can be positioned at different distances from the drum surface in order to reduce detector dead time. The deployment of the filters and the adjustment of the drum - detector position are automatically controlled based on a user defined dose-rate limit table. The data is provided by two Geiger-Muller dose-rate detectors, which are used to measure the drum surface dose-rate. This data is subsequently used to adjust the detector position and in cases of higher dose-rate deploy one or other of the tungsten filters. The drum rotation platform incorporates a load cell to determine drum weight and hence the drum density. This information is used to calculate an attenuation correction based on the assumption of uniform drum density and uniform distribution of activity within the drum. Where the waste drums have a more complicated and known regular internal structure, such as a small radioactive region surrounded by an annulus of shielding material, the analysis algorithms incorporated into the far field geometry and attenuation correction spectroscopic data analysis code are able to make a more accurate determination of drum activity than would be possible assuming a completely uniform drum. The detector energy and efficiency calibration is achieved using a point source with multiple gamma ray energy peaks. The response of the high purity Germanium detector is also modelled using the Monte Carlo Neutron Photon code and the model is benchmarked using the measured point source calibration data. The performance of the instrument has been determined for a range of uniform density matrix drums containing a set of Eu-152 line or rod sources located in re-entrant tubes positioned on an equal volume basis. When rotated, the test drums with volume distributed line sources simulate waste drums of different density each with a uniformly distributed radioactive source. The measurements have been validated using Monte Carlo simulations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cigeo, The French Geological Disposal Facility Project: Preliminary Design (APS) Phase - 16038

The Cigeo project has been in the works for 25 years. Numerous studies have been conducted, increasingly associated with the Meuse/Haute-Marne site, with further specific research thanks to direct access to the Callovo-Oxfordian clay formation from the underground laboratory of Bure-Saudron. These studies and research initially aimed to demonstrate the feasibility of the repository. They also helped gain a high level of understanding of phenomena to support design studies and demonstrate safety. Transition to the industrial phase began with the development of a plan for delivering waste to the facility for disposal. The plan introduced sequencing for the various types of waste to be disposed of, and was optimised to determine the size of inspection, transfer and handling facilities. In describing the life of the repository and therefore the vision for its operation, it has become obvious that our generation should not impose choices on future generations. We must provide them with reference technical solutions, with the financial resources to implement them. It is also our duty to begin the construction and initial operating phases. However, because the facility will operate over several generations, we must leave a degree of flexibility so that they may reassess the options that we define and adopt their own solutions, as necessary. They will also benefit from operational experience gathered as facility operations develop. This is the context in which the preliminary design phase is being finalised in preparation for the detailed design phase, with the aim of gradual commissioning during the latter part of the next decade. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best Practice on Facility Characterisation from a Material and Waste End- State Perspective - 16041

Radiological characterisation plays a significant role in the process of decommissioning of shut-down nuclear facilities in order to ensure the protection of the environment and radiation safety. At all stages of a decommissioning programme or project, adequate radiological characterisation is of crucial importance, not least from a material and waste perspective. The radiological characterisation is a key element for planning, controlling and optimising decommissioning and dismantling activities. Experience has shown that data and information from the operation of a facility can - supplemented by recently collected and analysed data and information - be of crucial importance for decisions on waste management and for characterisation of radioactive waste. Once the dismantling has been done, some information may be hard, costly or even impossible to obtain later in the waste management process. This was the reason why the Working Party on Decommissioning and Dismantling (WPDD) of the OECD Nuclear Energy Agency (NEA) decided in late 2013 to extend the mandate of the Task Group on Radiological Characterisation and Decommissioning (TGRCD) for a second phase focusing on nuclear facility characterisation from a waste and material end-state perspective whereas the first phase focused on overall strategies of radiological characterisation. This paper gives an overview of the activities and findings within both phases up to now. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life Extension of Nuclear Plant Facilities through Monitoring and Detailed Analysis - 16175

The UK has accumulated a substantial legacy of radioactive waste from various civil nuclear and defence programmes. Presently, however most of the UK radioactive waste is generated from nine power stations which generate approximately one sixth of the of the country's electricity. Irradiated fuel is removed from these reactors and safe management of the radioactive solid and liquid effluents is required. The safe management of these effluents is essential. Sellafield, in West Cumbria UK, contains two reprocessing plants, one designed to process nuclear fuel from Magnox reactors (CO{sub 2} cooled with Uranium bar fuel) and the other to process nuclear fuel from Advanced Gas cooled Reactors and Pressurized Water Reactors. The reprocessing stage enables extraction of fissile material for recycling. This leaves a volume of dilute but high-level waste. The high-level radioactive liquid waste is concentrated to reduce its volume and then incorporated into borosilicate glass, using a process called vitrification. The glass is then poured into stainless steel containers and placed in long term storage. This required concentration of HLW liquor is achieved using a suite of aging evaporators. All evaporators are of similar design constructed from corrosion resistant stainless steel having dimensions height ∼11 m, internal diameter 3.05 m and capable of holding 13.7 m{sup 3} of liquor. The basic principle of operation is to heat the dilute liquor under partial vacuum, at constant volume, until the target concentration is achieved. Heating of the liquor is achieved using steam heated coils within the evaporator, and steam in the jacket which surrounds the lower half of the evaporator vessel. The evaporator is then brought to atmospheric pressure and the concentrated liquor is ejected whilst hot. The evaporator is then cooled with water cooled coils and a water filled jacket. New dilute liquor is then added for a new batch. The process is then repeated. As the evaporators reach the end of their original design life accurate prediction of the current condition of nuclear plant facilities is essential to safely justify continued plant operation by ensuring structural integrity. This poses a significant challenge as many aging UK nuclear facilities were not inherently built with inspection in mind. The potential life limiting components of the HA evaporators at Sellafield are the surfaces that contact the product liquor at elevated temperatures i.e. the steam heated surfaces of the coils within the evaporator vessel and the vessel base and wall surrounded by the steam jacket. Each heating component is critical to the operational life of the evaporator - the removal from service of a coil heating component significantly reduces the operational flexibility and remnant life of this plant. Over the last decade a variety of cutting-edge expertise and methodologies have been utilised to accurately measure and then predict the current condition of the plant and also to predict its remnant life. This paper provides an overview of the development of several techniques deployed, namely non-destructive testing/inspection, in-house software development and finite element modelling. These methods have been validated by lab-scale or full-scale experiments along with historical plant data. These techniques have been evolved and refined for over a decade, providing vital insights into the physical behaviour of this complex reprocessing system. This enables not only accurate assessment of the current condition of the plant equipment but also allows scientifically underpinned predictions to be made of how it will behave into the future. This is critical for Sellafield as this knowledge feeds into their safety case to the Office of Nuclear Regulation to justify continued operation. It is concluded that this integrated approach provides a robust analysis tool which has driven change and optimisation of plant procedures ensuring continued safe operation whilst extending the life of the facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Retrieval, Disruption and Processing of Legacy Nuclear Waste - 16179

The UK National Nuclear Laboratory (NNL) is currently undertaking, in conjunction with Sellafield Ltd, a series of high profile trials of robotic equipment on a full scale test facility at their Workington Laboratory in England. These trials are designed to underpin and substantiate the processes proposed for the remote retrieval, disruption and processing of legacy Miscellaneous Beta Gamma Waste (MBGW) from a number of different donor plants on the Sellafield site, including some of the older fuel storage ponds and storage silos. These processes will be conducted inside the new Box Encapsulation Plant (BEP) which is due to be commissioned at Sellafield by 2020. These processes will subsequently enable Sellafield Ltd to safely recover legacy Intermediate Level Waste (ILW) from the older storage facilities on site and process it into a safer form which is more suitable for long term storage and then ultimately final disposal in a Geological Disposal Facility. As part of this legacy waste processing within the BEP plant, MBGW waste items will have to be remotely removed from a variety of different types of import skips. This waste will then be transferred, using robots, into the export container, which is a 3 m{sup 3} box liner, where the processed waste will be flood grouted to produce an encapsulated waste package. As part of this processing, any MBGW items consisting of sealed containers will have to be remotely disrupted before being grout encapsulated. This disruption is in order to (a) release any trapped liquors or gases from the containers and (b) ensure full grout infiltration of the container contents, thus minimising the amount of free liquors and voids within the final waste product. The NNL are conducting this technical work to confirm the viability of the proposed concept, processes and equipment. The developed solution consists of a linear layout of processing equipment with a pair of heavy duty, standard industrial, 'commercially off the shelf' (COTS) robots positioned around a Waste Handling Table. These robots have a 500 kg payload capacity and are operated remotely to handle all of the various types of MBGW waste, including the heavy and bulky items. The robots can be operated in manual tele-operation mode as well as pre-programmed automatic mode and have a range of primary and secondary tooling in order to perform the waste processing and disruption tasks as well as undertake general house-keeping and cleaning duties within the cell. The main tools include two types of hydraulic grab for the main waste recovery and handling tasks and a hydraulic shear for the waste disruption activities, but a number of other tools have also been designed and built for ancillary activities, such as a set of general purpose gripper jaws, drilling tool, bolt removal tool, pump tool, spray tool and a number of different housekeeping tools etc. The robot trials were started in November 2014, and have attracted a significant degree of high level stakeholder interest, including the UK Nuclear Decommissioning Authority (NDA), Office for Nuclear Regulation (ONR), Environment Agency (EA) and Radioactive Waste Management Limited (RWML) witnessing a number of the critical demonstration trials. Robots of the type selected are readily available, robust, reliable and easy to use. The trials have been very successful in proving the retrieval, processing and disruption operations, reducing the burden in the legacy waste facilities. Utilising robots to perform these tasks will lower the probability of producing non-compliant waste packages. In addition the robots can increase the consolidation of incoming waste skips into outgoing 3 m{sup 3} box liners, significantly increasing packing efficiencies and reducing the overall number of export containers produced thus lowering the decommissioning and waste storage/disposal costs. The trials have also enabled an assessment of the optimum way to operate the robots, as well as their reliability and maintainability issues. Engineering work associated with recovering failed robots and removing them from a typical Sellafield plant environment and then subsequently replacing them with functioning robots has also been undertaken and further work is now planned. The success of the trials, completed safely to a very challenging timescale, has enabled the use of robots in BEP to be endorsed as a viable option by the key stakeholders. Following a robust decision making process, this was a clear cut decision. The technical development and testing of the robot technology is currently continuing in order to investigate areas such as robot reliability, failure recoveries, human factors, ease of waste identification, optimisation of throughput rates, nuclearisation modifications etc. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Working in partnership with the UK nuclear industry to package waste - 16263

Radioactive Waste Management (RWM) is a wholly owned subsidiary of the Nuclear Decommissioning Authority (NDA), which is responsible for managing the effective clean-up of the UK's nuclear legacy. RWM is responsible for delivering a geological disposal facility and providing radioactive waste management solutions. To this end, RWM provides advice to waste owners to help them retrieve, condition and package waste now in ways that make them suitable for disposal later. To facilitate planning decisions and hazard reduction, RWM operates the Disposability Assessment process. This is used to provide advice to waste producing organisations on approaches to waste packaging and interim storage of packaged wastes. This advice is intended to ensure compatibility with future geological disposal requirements, as far as this is possible in advance of the availability of Waste Acceptance Criteria for a Geological Disposal Facility (GDF). As such, it is an enabler for early hazard reduction on UK nuclear sites through the facilitation of packaging. This paper explains how RWM is working with waste owners through the Disposability Assessment process to deliver optimised waste packaging solutions through proactive and early engagement. This includes specific examples of how the process has been used in a flexible way to contribute to accelerated and sustainable hazard reduction at UK sites using a partnership approach. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗