Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Regulatory Protection and Control Standards Applicable to The Vietnam Grid Under High Inverter-Based Resource (IBR) Penetration: A Review of Standards Applicable for Vietnam Grid

This report provides a review of the current standards and practices followed by regulatory authorities for interconnection of inverter-based resources (IBR). With the increased penetration of IBRs into the transmission and distribution networks, the legacy protection methodologies are getting challenged. Due to the lack of regulations on IBR operations under a fault it is essential to have a thorough understanding of the present-day interconnection standards to ensure proper IBR operations. A focus is placed on the regulation and standards enforced by the North American Reliability Corporation (NERC), Federal Energy Regulatory Commission (FERC), Institute of Electrical and Electronics Engineer (IEEE), Underwriters Laboratories (UL) and other regulations proposed by the responsible commissions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

One Year In: Tracking the Impacts of NEM 3.0 on California’s Residential Solar Market

On December 15, 2022, the California Public Utilities Commission passed an overhaul of the net metering program for the state’s investor-owned utilities. The changes replaced the long-standing net energy metering (NEM) tariffs with a net billing tariff (NBT) structure—colloquially known as “NEM 3.0”—which significantly reduces the compensation for behind-the-meter solar photovoltaic (PV) systems. The NEM tariffs remained open for new interconnection applications until April 15, 2023, but after that date, all new interconnection applications were submitted under NBT. Now, one year later, we have an opportunity to evaluate how the California solar market has evolved under this new compensation regime. As a precursor to its annual Tracking the Sun report, Berkeley Lab has released a short technical brief describing key trends in the California residential solar market since the roll-out of the new NBT structure. The purpose of this analysis is to provide empirical insights into how the market has evolved over the past year, confirming some expectations while also revealing several striking surprises.

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Blandford

This report is a solar resource and infrastructure assessment for the town of Blandford, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Blandford. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, most distribution lines providing electricity to Blandford are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. We can expect significant upgrades to these circuits, if any of the in-process projects are to proceed, which might then free up additional capacity for new projects. There is one circuit which serves a section of North Blandford Road that is not over-saturated; for the immediate future, this is the most cost-effective location for new large-scale projects to be sited. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in preferred locations. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Wendell

This report is a solar resource and infrastructure assessment for the town of Wendell, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Wendell. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Wendell are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. It appears that National Grid is planning an upgrade to the Wendell Depot substation, which might then allow in-process projects are to proceed, and potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Westhampton

This report is a solar resource and infrastructure assessment for the town of Westhampton, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Westhampton. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Westhampton are oversaturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. Future upgrades could potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Antigua and Barbuda Distributed Energy Resources Deployment Guidelines

This document is designed to provide comprehensive considerations, best practices and guidance for deployment of Distributed Energy Resources (DERs) in Antigua and Barbuda. The document provides lists of various technology selection guidance including technical specifications, requirements and applicable key standards and code associated with key DERs and balance of plant equipment. The document also presents the key microgrid design considerations to integrate the DERs to achieve the economic, decarbonization and resiliency goals. Taking into account sensitive grid for such islands, for grid readiness and screening the potential DER interconnection, general approach is highlighted along with the potential technical interconnection requirements. Furthermore, this document shows the key stakeholders involved in such DER integration and/or microgrid project and how key responsible project team can be qualified. Finally, this document refers to key information about warranties and consumer rights and maintenance of the systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2024 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis.

14 SOLAR ENERGY↗

Enhancing Cloud Cybersecurity: Prescriptive Controls for Operational Technology

This whitepaper provides strategic insights and recommendations into security cloud-based solutions for electric utilities, encompassing operational technology (OT), virtual power plants (VPP), distributed energy resources (DERs), applications, networks, and data storage as they transition to and leverage cloud infrastructure through managed service providers (MSPs) and cloud service providers (CSPs). Principles derived from established frameworks serve as a foundation for best practices across cybersecurity projects and remove the constraints of settling on a single framework. For organizations that prefer not to integrate a specific framework altogether, elements of the proposed approach could be adopted or tailored to best fit defined requirements and expected functionalities. The Cirrus assessment, a utility cloud feasibility tool, and the roadmap it provides serve as a precursor to this paper, which seeks to be a valuable resource for defining next steps following cloud technology integration feasibility appraisal. With its comprehensive approach to adoption, the Cirrus framework offers strategic guidance on responsibly preparing for or deploying a utility cloud solution. The previously published whitepaper, “Use Case-Informed Framework for Utility Cloud Migration,” details the guiding strategy, research, and deployment of cloud solutions within electric and interconnected grid systems. Before implementing the controls suggested in this document, it is recommended that stakeholders complete Cirrus's cloud integration assessment and pair the results with their unique cybersecurity controls to form a comprehensive cloud-based utility cybersecurity plan. The Cirrus outcome will consider a series of future architectures for the grid before and after the energy transition and evaluate the arguments for and against cloud applications for each electric and interconnected grid layer. This document is a companion to the original whitepaper, "Use Case-Informed Framework for Utility Cloud Migration" to further identify and recommend security controls based on Cirrus’s cloud integration assessment output. The following whitepaper outlines the cybersecurity controls that secure cloud-service models pertinent to the electric sector using the predefined categories identify, protect, detect, and respond and recover. The objective is to outline prescriptive security controls based on the type of architecture and data stored in the cloud. The focus includes dissecting the shared responsibility model and elucidating what on-premises Infrastructure as a Service (IaaS), Platform as a Service (PaaS), and Software as a Service (SaaS) entail. A pivotal consideration in this context is allocating responsibility for foundational cybersecurity aspects—having used Cirrus for the cloud integration assessment. The ensuing controls detailed herein also represent a checklist of controls necessary for a secure cloud transition, equipping utilities with the knowledge to navigate this digital transformation with confidence and strategic foresight in a safe and responsible manner.

42 ENGINEERING↗

Evaluating the Thermal Impacts of Inadvertent Export on Service Transformers

As more DER interconnect to the system there are times where the total generation (or load) of a DER cannot be supported by the system. To more quickly allow these DER to interconnect they may need to regulate their output to a different export capacity than their nameplate capacity via a power control system (PCS). In the time it takes PCS to respond, however, an inadvertent export may occur, where the DER operates beyond its export limit. This report evaluates the potential thermal impact such momentary violations may have on service transformers, to determine whether response times should be more tightly controlled or not.

42 ENGINEERING↗

Average and Marginal Capacity Credit Values of Renewable Energy and Battery Storage in the United States Power System

As deployment of renewable resources and storage continue to significantly grow in the coming decades, these technologies will play increasingly important roles in maintaining power systems' resource adequacy. Few analyses so far offer comprehensive comparisons of forward-looking average and marginal capacity credits of variable renewable energy and storage in the U.S. interconnections across a wide range of possible futures. To fill this research gap, we quantify the average and marginal capacity credits of solar PV, onshore and offshore wind, and batteries between 2026 and 2050 across the U.S power systems to examine the temporal trends, spatial patterns, and trade-offs between these two capacity accreditation approaches. Across technologies, capacity credits of solar PV most clearly follow downward trends over time, reflecting the significant rise in solar PV generation share as the grid decarbonizes. While battery storages' generation shares also rise significantly over time, their capacity credits always remain stably high due to their capabilities to be dispatched strategically during critical periods to maintain reliability. On the other hand, capacity credits of wind technologies in general follow slight upward trends as their generation shares level off. There are strong spatial variabilities of both average and marginal capacity credits across technologies, but capacity credits of solar PV displaying the most obvious spatial patterns with high capacity credits concentrating in wind-rich, solar-poor regions in SPP, PJM, and MISO, suggesting potential reliability benefits of interconnection-wide planning for renewable energy deployments. Additionally, except for offshore wind, average capacity credits of all other renewable technologies tend to be higher than their marginal capacity credits, indicating that existing renewable resources tend to be accredited higher than new resources at almost any time.

25 ENERGY STORAGE↗

AOI [1] Advanced Manufacturing of Ceramic Anchors with Embedded Sensors for Process and Health Monitoring of Coal Boilers

Researchers at West Virginia University (WVU) developed methods to fabricate and test ceramic anchors with an embedded sensor technology for monitoring the health and processing conditions within pulverized coal (PC) and fluidized-bed combustion (FBC) boiler systems. The technology included the development of advanced manufacturing processes for 2D/3D printing electroceramic (conductive ceramic) sensor designs within the ceramic anchor microstructure during the manufacturing process. This advanced manufacturing process would allow for the precise control of local microstructure and composition in order to engineer layer-by-layer any protective and electrically active materials within the refractory anchor. This 3D printing technology would permit the rapid and controlled design of the refractory microstructure and embedded sensor design throughout the volume of the ceramic anchor. The work also included a method to interconnect the sensors to boiler shell through the anchor clamp, where the sensor signals will be processed by low-power electronics and transmitted wirelessly to a central processing hub. The end-goal of the program was to produce a ceramic anchor sensor system which would be ready for implementation within a coal boiler, and/or other similar refractory liner systems (such as that in the glass and metal manufacturing areas). The project objectives were to: 1) Define the chemical and microstructural stability, in addition to the electrical properties, of oxide and non-oxide ceramic composites to be embedded within the ceramic anchor compositions that may operate up to 1400ºC; 2) Develop and implement the 2D/3D printing technology to pattern and control the microstructure of the ceramic anchor and embedded sensor circuits; 3) Develop an interconnect technology which will permit easy installation of the ceramic anchors and signal collection at the boiler shell; 4) Develop low power analog electronics and wireless communication hardware to efficiently collect the sensor signal at each processing unit and transmit data to a central hub for data analysis; 5) Demonstrate the smart ceramic anchor system for temperature and liner fracture within a high-temperature processing unit, such as a boiler furnace or glass melting furnace floor/wall liner.

20 FOSSIL-FUELED POWER PLANTS↗

A Clean Energy Deployment Baseline for the Energy Community and Low-Income Tax Credit Bonuses [Slides]

The Inflation Reduction Act of 2022 introduced, for the first time, place-based federal tax incentives for projects sited in “Energy Communities,” potentially changing the economic calculus of where projects are best sited. Storage projects can qualify for a 10-percentage-point bonus to the Investment Tax Credit (e.g., from 30% to 40%), while wind and solar projects may qualify for either the ITC bonus or a 10% bonus to the Production Tax Credit (e.g., from $\$27.5$ to $\$30.25$/MWh). Energy Communities are areas with historical ties to fossil fuel industries and above average unemployment levels (FFEU), with closed coal mines or power plants, or contaminated properties. They seek to identify locations across the US that could especially benefit from economic revitalization. This report explores how the new federal tax credit incentives are impacting clean energy deployment patterns and establishes historical baselines against which future changes can be compared. We include a few case studies of clean energy projects going specifically to areas that were recently impacted by coal power plant closures to provide concrete examples of investments in Energy Communities. However, this publication does not assess how much of the incentive benefits pass from clean energy developers to hosting communities, nor does it offer a comprehensive view of the economic effects of clean energy deployment on Energy Communities. Key highlights include: - As clean energy projects take multiple years to conceptualize and develop, it is likely too early to see shifts towards Energy Community locations either among newly built projects or those that entered interconnection queues in 2023. - Approximately 35% of onshore wind, 50% of solar, and 60% of storage capacity built in 2023 and the first half of 2024 are located in Energy Communities, making them likely eligible for bonus incentives. While these bonus incentives were not available to projects coming online before 2023, we used 2023 Energy Community definitions to classify whether past projects were built in what is now considered an Energy Community. The deployment levels for 2023-2024 are similar to recent years (2020-2022) for solar and storage but slightly lower for wind. - Clean energy capacity has surged in the interconnection queues over the last few years, with about 45-50% of both recently proposed and total queued capacity being located in Energy Communities. While the amount of capacity in Energy Communities has also grown, its relative share is either stable (solar and storage) or slightly lower (wind) among projects that entered the queue in 2023. - Clean energy projects can be built at lower costs in Energy Communities. The levelized cost of energy after incentives was on average $\$9$/MWh (24%) lower for solar projects and $\$2$/MWh (6%) lower for wind projects built in 2023, relative to projects not located in Energy Communities. Wholesale electricity values at Energy Community locations relative to the rest of the market vary by region. The average value was often higher for wind projects (-$\$3$ to $\$11$/MWh) but lower for solar projects (-$\$6$ to 0/MWh). - Distributed solar that is owned by commercial entities is eligible for the Energy Community bonus and also, potentially, a Low-Income Community bonus. Residential solar installations in qualifying Energy Communities that are third-party owned represent about 10% of the total residential market. Larger commercial and industrial solar installations in Energy Communities make up 17% of the total market in 2023. Nearly 2 GW of distributed solar was built in areas qualifying as Low-Income Communities in 2023, exceeding the available annual program cap of 700 MW. Continued tracking of these trends will be important for system planners, investors, and local communities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Utility-Scale Operational Consequences for Solar Grid Services

This report delves into the critical aspects of grid services provided by solar inverter-based resources (IBRs), with an emphasis on the evolving landscape of microgrids, virtual power plants (VPPs), aggregators, and distributed energy resource management systems (DERMS). As the energy sector undergoes a transformative shift towards more decentralized and resilient grid architectures, understanding the multifaceted risks associated with these technologies becomes paramount. The report categorizes these risks into organizational, technical, and procedural domains, providing a thorough risk assessment framework that stakeholders can utilize to anticipate and mitigate potential issues. In addressing the increasing complexity of grid interconnections, the report highlights the importance of Cyber-Informed Engineering (CIE). By embedding engineering controls and cybersecurity measures into the early stages of system design, this approach aims to fortify grid infrastructure against emerging cyber threats. The analysis includes an exploration of best practices and strategies for integrating CIE principles to enhance grid security and resilience. To provide practical insights, the report conducts a detailed consequence analysis of various grid services and cyber mitigations that can be applied through the interconnection process. This analysis evaluates the potential impacts of different failure modes and vulnerabilities, offering a clear understanding of the consequences that could arise from disruptions within the energy grid. The findings are further enriched by a series of case studies that illustrate real-world scenarios and lessons learned from past incidents. Through this comprehensive examination of grid services and their criticality, the report aims to prepare industry professionals with the knowledge and tools necessary to navigate the complexities of modern energy systems. By providing a comprehensive approach that includes risk assessment, cybersecurity, and consequence analysis, solar stakeholders can more effectively guarantee the reliability, efficiency, and security of the energy grid.

14 SOLAR ENERGY↗

Characterizing Microwave Losses in Superconducting Coaxial Cables for Quantum Systems

As superconducting quantum systems scale up to enable applications like large-scale quantum computing, challenges such as fabrication yield, wiring complexity, and microwave crosstalk drive the need for high-fidelity, low-loss, modular interconnects. In recent experiments, the performance of these interconnects is often limited by cable loss, a factor that becomes even more critical as we aim for higher fidelity operations and connect increasingly coherent modules. In this talk, we present a detailed characterization of microwave losses in commercially available superconducting cables and discuss how material characterization techniques can be useful for understanding their microscopic origin.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

OLCF’s Advanced Computing Ecosystem (ACE): FY25 Update for Ongoing Efforts

The advent of widespread use of artificial intelligence (AI) and machine learning (ML) models in science, coupled with fast data production rates of scientific instruments strain the traditional batch-oriented high-performance computing (HPC) environment. As scientific exploration continues to require more data and faster processing and analysis, new emerging technologies and capabilities to enable cross-facility and time-sensitive workflows are required for seamless integration of HPC and experimental facilities. The Advanced Computing Ecosystem (ACE) is a strategic initiative within the Oak Ridge Leadership Computing Facility (OLCF) established in 2024 to support the development of cutting-edge technologies to advance computational research and infrastructure at OLCF and across the Department of Energy (DOE). Several DOE initiatives are spearheading the evolution of the scientific landscape by blurring facility boundaries and connecting the user facilities to advance scientific capabilities and ensure energy dominance. The DOE Integrated Research Infrastructure (IRI) program is one example that is laying a foundation to support complex cross-facility workflows. The IRI program aims to integrate diverse computational resources, data infrastructures, and scientific instruments to facilitate collaboration and accelerate scientific discovery. The Interconnected Science Ecosystem (INTERSECT) initiative at Oak Ridge National Laboratory (ORNL) is another example that aims to revolutionize scientific research through AI-driven, interconnected autonomous laboratories and research facilities. Finally, the American Science Cloud (AmSC), recently announced in the “One Big Beautiful Bill”, aims to leverage prior infrastructure efforts of the IRI and automation and AI efforts of INTERSECT (and others) to build a federated, AI-augmented AmSC platform to unify the DOE’s computing, experimental, and data resources to catalyze scientific innovation.

97 MATHEMATICS AND COMPUTING↗

Regulatory and Technical Challenges and Barriers to Adoption of Distributed Wind Energy in Agricultural Settings

Distributed wind (DW) energy development can benefit agricultural landowners through the possibility of improved resilience of electrical service from onsite generation and associated economic benefits. DW development currently faces technical and regulatory challenges related to interconnection of projects with distribution or transmission equipment on the main electrical grid. A review was conducted of barriers to adoption for agricultural DW projects and potential roles of various stakeholders in addressing them. One major barrier is that the unique characteristics of wind energy generation such as its variability and intermittency, may require upgrades for the whole power line, which can lead to prohibitive cost burdens on individual interconnection customers. Another barrier is compliance with federal, state, or utility-level regulations that require technology-agnostic, industry-standard equipment that is often not technically realistic for DW projects. DW developers, grid infrastructure owner-operators, regulators, and standards publishers can work together to address these challenges and facilitate DW development.

17 WIND ENERGY↗

Mitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture

Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗