Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Data Quality Methodology (4.2.1)
SECARB-USA Deliverable 4.2.1 utilizes the outputs from the Needs Assessment (Subtask 2.1) to develop a data quality methodology. Many types of data are needed to evaluate a site for technical and financial viability. Several inventories of data types have been produced (for example NETL, 2010). The objective here is to organize the data types so that the needs met are specified. From this cross index (Table 1 in the Appendix), it will be possible in future tasks to (1) determine, on a site-specific basis, how much of each data type is required at each stage of a project to meet the need, and conversely (2) to further specify and define the data collection methods applied such that the data are tailored to fit that need. Derivative tables can then be developed to semi-quantitively evaluate the extent to which need is critical for early go/no decision points, or if it is more important than average, requiring faster or larger capitalization and spend to meet the need. In an additional step, the current availability of data for a site can be semi-quantitively assessed. From the table of data criticality and the table of data availability, site-specific cost for meeting the data needs can be determined, and allow a pre-permit spend estimated for a portfolio of projects. All of the data needs to evaluate a site are somewhat interconnected. We used criterion (2) above to determine if the data collection design would have to be modified to meet the need; if this was commonly true a linkage was shown. The application of this cross index to sites in the subsequent tasks will demonstrate that the demand for data types varies site-to-site and project-to-project. Examples of factors to be considered are the complexity of the geology, the injection goals such as rate and duration of the injection, and the types of risk and risk tolerance of key stakeholders. In future tasks the team will compare the demand for data with existing data availability. This will, in turn, determine when data needs to be acquired to support project development. For example, in a project area with complex structure, 3-D seismic data may be needed earlier and more urgently than in an area with simple rock body geometries. In some locations, a 3-D seismic survey has already been collected and can be purchased. In other locations the project developer will need to collect these data. For another example, a project near an urban area or near to a park may generate earlier and more substantive public concern than a site that is developed in mined lands. A calculation using the derivative from table 1 will show the different investment needs. Project cost will vary corresponding to data criticality and data availability.