Real-Time Asynchronous Information Processing in Distributed Power Systems Control
Not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not provided.
The research collaboration between NREL and BYPL focuses on the challenges caused by renewable integration into the power grid at large. Since the challenges and opportunities vary depending on the point of interconnection (distribution or transmission) the research team identified two tracks for research as listed below: 1. Power procurement - This research track focuses on the challenges and opportunities caused by GW scale renewable integration at the transmission level. Specifically, this track focuses on the contribution that utility-scale renewable energy procurement provides to distribution utilities, both from energy and capacity perspectives. In this track of research, utility customers are only considered as traditional (one-directional) consumers of energy. 2. Distributed energy resources - This research track focuses on the challenges and opportunities caused by many small-scale distributed renewable resource integrations at the distribution systems. At the power distribution level, distribution utilities may face not only new solar energy technologies, but also battery energy storage and electric vehicles as well. These three technologies (solar PV, battery energy storage, and electric vehicles) combined, pose unique challenges to distribution utilities. This track focuses on assessing the net-load evolution that distribution utilities observe as these emerging technologies make their way to the grid.
Abstract not provided.
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Portland International Airport in Oregon is exploring operating a fleet of 28 fuel cell electric buses to support airport operations and possibly provide backup power during outages. In this report, we evaluate the risk of hydrogen deployment at an airport considering the potential for seismic activity. We present a seismic risk assessment for pressurized piping for a generic hydrogen refueling station at the airport. Only pressurized piping was considered in the risk analysis because of its vulnerability and availability of fragility information unlike the other components. Seismic capacity of other components should be included as more information becomes available.
Portland International Airport in Oregon is exploring operating a fleet of 28 fuel cell electric buses to support airport operations and possibly provide backup power during outages. In this report, we evaluate the risk of hydrogen deployment at an airport considering the potential for seismic activity. We present a seismic risk assessment for pressurized piping for a generic hydrogen refueling station at the airport. Only pressurized piping was considered in the risk analysis because of its vulnerability and availability of fragility information unlike the other components. Seismic capacity of other components should be included as more information becomes available. To characterize the seismic hazard, we considered the initiating event frequency of a Cascadia Subduction Zone earthquake event based on data from the literature. Seismic stressors that translate to the site from an earthquake event are expressed as peak ground acceleration. Site disturbance is characterized as a function of soil conditions, represented by different shear wave velocity values, which affect how seismic waves propagate and impact structures. Pipe fragility curves as a function of seismic capacity were used to correlate ground acceleration and failure probability. These fragility characteristics were combined with site-specific soil conditions to calculate the probability of pipe rupture during a seismic event. It should be noted that multiple simultaneous failures due to an earthquake event as a common cause are not considered. Some epistemic uncertainties such as self-exciting shocks, aftershocks, and the time variant nature of the ground motion are not considered either.
Explore the source record for details and available documents.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Distribution control applications such as volt/var optimization, network reconfiguration, and distribution automation require accurate knowledge of the distribution system state. The lack of sufficient sensors on the primary side of distribution networks often limits the accuracy of the control decisions by these applications. The deployment of advanced metering infrastructure (AMI) provides utilities an opportunity to translate the AMI data on the secondary onto the primary so that it can be used as pseudo-measurements to augment the limited existing measurements on the primary. This paper develops a machine learning based approach for estimating service transformer primary-side voltages by using limited secondary-side AMI measurement. The machine learning model is developed by using random forest algorithm. The estimated primary-side voltages can be used by utilities as pseudo-measurements for distribution control applications. The detailed secondary model topology, which is an essential input data for many existing algorithms, is not required for the proposed method. The performance of the proposed method is validated by using AMI measurements from the field and an actual distribution feeder model of San Diego Gas & Electric Company.
This poster provides an overview of the performance evaluation of distributed energy resource management via advanced hardware-in-the-loop simulation.
Distributed generators performing black start to form isolated microgrids offer a flexible and resilient solution to service restoration in distribution systems. Employing the dynamic microgrid concept, distributed generators can form isolated microgrids by changing their physical boundaries through smart switches and conventional circuit breakers. However, the flexibility of distributed generators has not been thoroughly investigated and utilised in existing works. To address this issue, this letter presents a new model to the reconfiguration formulation in active distribution networks considering different operation modes of distributed generators. Compared with the existing models, this study provides a new formulation supporting different DGs' operation modes and fully making use of their flexibility. Illustrative results on IEEE 34-test systems verify the effectiveness of the proposed model.