Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Task Force”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Forecasting the impact of virtual environment technology on maintenance training

To assist NASA and the Air Force in determining how and when to invest in virtual environment (VE) technology for maintenance training, we identified possible roles for VE technology in such training, assessed its cost-effectiveness relative to existing technologies, and formulated recommendations for a research agenda that would address instructional and system development issues involved in fielding a VE training system. In the first phase of the study, we surveyed VE developers to forecast capabilities, maturity, and estimated costs for VE component technologies. We then identified maintenance tasks and their training costs through interviews with maintenance technicians, instructors, and training developers. Ten candidate tasks were selected from two classes of maintenance tasks (seven aircraft maintenance and three space maintenance) using five criteria developed to identify types of tasks most likely to benefit from VE training. Three tasks were used as specific cases for cost-benefit analysis. In formulating research recommendations, we considered three aspects of feasibility: technological considerations, cost-effectiveness, and anticipated R&D efforts. In this paper, we describe the major findings in each of these areas and suggest research efforts that we believe will help achieve the goal of a cost-effective VE maintenance training system by the next decade.

Schlager, Mark S.↗

Frequency encoded auditory display of the critical tracking task

The use of auditory displays for selected cockpit instruments was examined. In auditory, visual, and combined auditory-visual compensatory displays of a vertical axis, critical tracking task were studied. The visual display encoded vertical error as the position of a dot on a 17.78 cm, center marked CRT. The auditory display encoded vertical error as log frequency with a six octave range; the center point at 1 kHz was marked by a 20-dB amplitude notch, one-third octave wide. Asymptotic performance on the critical tracking task was significantly better when using combined displays rather than the visual only mode. At asymptote, the combined display was slightly, but significantly, better than the visual only mode. The maximum controllable bandwidth using the auditory mode was only 60% of the maximum controllable bandwidth using the visual mode. Redundant cueing increased the rate of improvement of tracking performance, and the asymptotic performance level. This enhancement increases with the amount of redundant cueing used. This effect appears most prominent when the bandwidth of the forcing function is substantially less than the upper limit of controllability frequency.

Stevenson, J.↗

An Introduction to Intelligent Processing Programs Developed by the Air Force Manufacturing Technology Directorate

The Air Force has numerous on-going manufacturing and integration development programs (machine tools, composites, metals, assembly, and electronics) which are instrumental in improving productivity in the aerospace industry, but more importantly, have identified strategies and technologies required for the integration of advanced processing equipment. An introduction to four current Air Force Manufacturing Technology Directorate (ManTech) manufacturing areas is provided. Research is being carried out in the following areas: (1) machining initiatives for aerospace subcontractors which provide for advanced technology and innovative manufacturing strategies to increase the capabilities of small shops; (2) innovative approaches to advance machine tool products and manufacturing processes; (3) innovative approaches to advance sensors for process control in machine tools; and (4) efforts currently underway to develop, with the support of industry, the Next Generation Workstation/Machine Controller (Low-End Controller Task).

Sampson, Paul G.↗

Statistical Short-Range Guidance for Peak Wind Forecasts on Kennedy Space Center/Cape Canaveral Air Force Station, Phase III

This final report describes the development of a peak wind forecast tool to assist forecasters in determining the probability of violating launch commit criteria (LCC) at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS). The peak winds are an important forecast element for both the Space Shuttle and Expendable Launch Vehicle (ELV) programs. The LCC define specific peak wind thresholds for each launch operation that cannot be exceeded in order to ensure the safety of the vehicle. The 45th Weather Squadron (45 WS) has found that peak winds are a challenging parameter to forecast, particularly in the cool season months of October through April. Based on the importance of forecasting peak winds, the 45 WS tasked the Applied Meteorology Unit (AMU) to develop a short-range peak-wind forecast tool to assist in forecasting LCC violations.The tool includes climatologies of the 5-minute mean and peak winds by month, hour, and direction, and probability distributions of the peak winds as a function of the 5-minute mean wind speeds.

Crawford, Winifred↗

Peak Wind Forecasts for the Launch-Critical Wind Towers on Kennedy Space Center/Cape Canaveral Air Force Station, Phase IV

This final report describes the development of a peak wind forecast tool to assist forecasters in determining the probability of violating launch commit criteria (LCC) at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS). The peak winds arc an important forecast clement for both the Space Shuttle and Expendable Launch Vehicle (ELV) programs. The LCC define specific peak wind thresholds for each launch operation that cannot be exceeded in order to ensure the safety of the vehicle. The 45th Weather Squadron (45 WS) has found that peak winds are a challenging parameter to forecast, particularly in the cool season months of October through April. Based on the importance of forecasting peak winds, the 45 WS tasked the Applied Meteorology Unit (AMU) to update the statistics in the current peak-wind forecast tool to assist in forecasting LCC violations. The tool includes onshore and offshore flow climatologies of the 5-minute mean and peak winds and probability distributions of the peak winds as a function of the 5-minute mean wind speeds.

Crawford, Winifred↗

Performance of a Local Mesoscale Model with Data Denial

Forecasters at the 45th Weather Squadron (45 WS) use observations from the Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS) wind tower network and daily rawinsonde observations (RAOB) to issue and verify wind advisories, watches, and warnings for operations. They are also used by the Spaceflight Meteorology Group and Melbourne, Florida National Weather Service to initialize locally run mesoscale models. Due to impending budget cuts, some or all of the mainland wind towers and RAOBs may be eliminated, The loss of these data may significantly impact the forecast capability of the 45 WS and SMG. The Applied Meteorology Unit (AMU) was tasked to conduct an objective independent modeling study to determine how important these observations are to the accuracy of the model output used by the forecasters as input to their forecasts. To accomplish this, the AMU performed a sensitivity study using the Weather Research and Forecasting (WRF) model run with and without KSC/CCAFS wind tower and CCAFS RAOB observations and assessed the accuracy of model forecasts by comparing them to the observations.

Watson, Leela↗

Pathfinder Lander Rover Recharge System, and MARCO POLO Controls and ACME Regolith Feed System Controls and Integration

This project stems from the Exploration, Research, and Technology Directorate (UB) Projects Division, and one of their main initiatives is the "Journey to Mars". Landing on the surface of Mars which is millions of miles away is an incredibly large challenge. The terrain is covered in boulders, deep canyons, volcanic mountains, and spotted with sand dunes. The robotic lander is a kind of spacecraft with multiple purposes. One purpose is to be the protective shell for the Martian rover and absorb the impact from the landing forces; another purpose is to be a place where the rovers can come back to, actively communicate with, and recharge their batteries from. Rovers have been instrumental to the Journey to Mars initiative. They have been performing key research on the terrain of the red planet, trying to unlock the mysteries of the land for over a decade. The rovers that will need charging will not all have the same kind of internal battery either. RASSOR batteries may differ from the PbAC batteries inside Red Rover's chassis. NASA has invested heavily in the exploration of the surface of Mars. A driving force behind further exploration is the need for a more efficient operation of Martian rovers. One way is to reduce the weight as much as possible to reduce power consumption given the same mission parameters. In order to reduce the mass of the rovers, power generation, communication, and sample analysis systems currently onboard Martian rovers can be moved to a stationary lander deck. Positioning these systems from the rover to the Lander deck allows a taskforce of smaller, lighter rovers to perform the same tasks currently performed by or planned for larger rovers. A major task in transferring these systems to a stationary lander deck is ensuring that power can be transferred to the rovers.

Internship↗

Recent developments in analysis of crack propagation and fracture of practical materials

Present U.S. Air Force and proposed U.S. civil airworthiness regulations are based on considerations of 'damage tolerance' in aircraft structures. Airworthiness is assured by demonstrating that damage that escapes one in a sequence of periodic inspections will not grow to critical size before the next inspection. The evaluations conducted employ fracture mechanics analyses. Problems arise because the features of fracture mechanics applications related to aircraft structures are more complex than the cases of fracture mechanics which have been mainly investigated. NASA has, therefore, conducted a variety of research tasks to extend the capabilities of fracture mechanics to deal with some of these complexities. The current stage of development of these capabilities is described. Attention is given to the limitations of linear elastic fracture mechanics, a two-parameter fracture criterion, aspects of fatigue crack propagation, and crack propagation and fracture in built-up structures.

Hardrath, H. F.↗

Perl Tools for Automating Satellite Ground Systems

The freeware scripting language Pert offers many opportunities for automating satellite ground systems for new satellites as well as older, in situ systems. This paper describes a toolkit that has evolved from of the experiences gained by using Pert to automate the ground system for the Compton Gamma Ray Observatory (CGRO) and for automating some of the elements in the Earth Observing System Data and Operations System (EDOS) ground system at Goddard Space Flight Center (GSFC). CGRO is an older ground system that was forced to automate because of fund cuts. Three 8 hour shifts were cut back to one 8 hour shift, 7 days per week. EDOS supports a new mission called Terra, launched December 1999 that requires distribution and tracking of mission-critical reports throughout the world. Both of these ground systems use Pert scripts to process data and display it on the Internet as well as scripts to coordinate many of the other systems that make these ground systems work as a coherent whole. Another task called Automated Multimodal Trend Analysis System (AMTAS) is looking at technology for isolation and recovery of spacecraft problems. This effort has led to prototypes that seek to evaluate various tools and technology that meet at least some of the AMTAS goals. The tools, experiences, and lessons learned by implementing these systems are described here.

McLean, David↗

0g Climbing - The Challenge of Walking in Space

Space walking is poorly named, as it has little in common with how animals walk on Earth. Space walking is more akin to mountain climbing in scuba gear, while parachuting in a freefall -- an odd combination of effects and equipment to help people do a demanding job. Robots are now being studied for service in this same domain, working on large scale space structures like the Space Station, servicing science or military platforms in high orbit, or riding on the outside of a space craft in transit to Mars, the Moon or other destinations. What have we learned about climbing in 0g? How should machines be controlled for serving in this role? What can they do to overcome the problems that humans have faced? In order to move about in this environment, a robot must be able to climb autonomously, using gaits that smoothly manage its momentum and that minimize contact forces (walking lightly) while providing for safety in the event of an emergency requiring the system to stop. All three of these objectives are now being explored at NASA's Johnson Space Center, using the Robonaut system and a set of mockups that emulate the 0g condition. NASA's goal for Robonaut is to develop the control technology that will allow it to climb on the outside of the Space Shuttle, the Space Station, and satellite mockups at JSC, enabling the robot to perform EVA task setups or serve as an Astronaut's assistant.

Ambrose, Robert O.↗

0g Climbing - The Challenge of Walking in Space

Space walking is poorly named, as it has little in common with how animals walk on Earth. Space walking is more akin to mountain climbing in scuba gear, while parachuting in a freefall-an odd combination of effects and equipment to help people do a demanding job. Robots are now being studied for service in this same domain, working on large scale space structures like the Space Station, servicing science or military platforms in high orbit, or riding on the outside of a space craft in transit to Mars, the Moon or other destinations. What have we learned about climbing in 0g? How should machines be controlled for serving in this role? What can they do to overcome the problems that humans have faced? In order to move about in this environment, a robot must be able to climb autonomously, using gaits that smoothly manage its momentum and that minimize contact forces (walking lightly) while providing for safety in the event of an emergency requiring the system to stop. All three of these objectives are now being explored at NASA's Johnson Space Center, using the Robonaut system and a set of mockups that emulate the 0g condition. NASA's goal for Robonaut is to develop the control technology that will allow it to climb on the outside of the Space Shuttle, the Space Station, and satellite mockups at JSC, enabling the robot to perform EVA task setups or serve as an Astronaut's assistant.

Ambrose, Robert O.↗

Phase VI Glove Durability Testing

The current state-of-the-art space suit gloves, the Phase VI gloves, have an operational life of 25 -- 8 hour Extravehicular Activities (EVAs) in a dust free, manufactured microgravity EVA environment. Future planetary outpost missions create the need for space suit gloves which can endure up to 90 -- 8 hour traditional EVAs or 576 -- 45 minute suit port-based EVAs in a dirty, uncontrolled planetary environment. Prior to developing improved space suit gloves for use in planetary environments, it is necessary to understand how the current state-of-the-art performs in these environments. The Phase VI glove operational life has traditionally been certified through cycle testing consisting of International Space Station (ISS)-based EVA tasks in a clean environment, and glove durability while performing planetary EVA tasks in a dirty environment has not previously been characterized. Testing was performed in the spring of 2010 by the NASA Johnson Space Center (JSC) Crew and Thermal Systems Division (CTSD) to characterize the durability of the Phase VI Glove and identify areas of the glove design which need improvement to meet the requirements of future NASA missions. Lunar simulant was used in this test to help replicate the dirty lunar environment, and generic planetary surface EVA tasks were performed during testing. A total of 50 manned, pressurized test sessions were completed in the Extravehicular Mobility Unit (EMU) using one pair of Phase VI gloves as the test article. The 50 test sessions were designed to mimic the total amount of pressurized cycling the gloves would experience over a 6 month planetary outpost mission. The gloves were inspected periodically throughout testing, to assess their condition at various stages in the test and to monitor the gloves for failures. Additionally, motion capture and force data were collected during 18 of the 50 test sessions to assess the accuracy of the cycle model predictions used in testing and to feed into the development of improved cycle model tables. This paper provides a detailed description of the test hardware and methodology, shares the results of the testing, and provides recommendations for future work.

Mitchell, Kathryn↗

Distribution of SLS Integrated Load Uncertainty to Surface Pressures and Sectional Loads

Aerodynamic loads that are important to launch vehicle programs such as NASA’s Space Launch System (SLS) include both integrated loads such as the force & moment on the entire vehicle and distributed loads. In this work two examples of distributed loads are considered: the pressure field on the surface of the vehicle and sectional loads, which are one-dimensional distributions along the axis of the launch vehicle. In some modern flight programs, the integrated loads, such as lift and drag, used to design the guidance and control laws for the vehicle come from wind tunnel testing, while distributed loads are produced using Computational Fluid Dynamics(CFD). The first task that is addressed in this paper, then, is to provide a formal method to adjust the distributed loads so that integrating them matches the prescribed integrated load. In addition, the integrated loads in a launch vehicle typically include an uncertainty estimate. The second task is to distribute this prescribed integrated uncertainty to each point in a distributed load. Both tasks are addressed using the same technique, which is to create distributed load profiles that isolate adjustments to one integrated load while leaving the others unaffected. These adjustments are informed by Proper Orthogonal Decomposition (POD) of the entire CFD-based distributed load database. Once applied, the adjusted distributed loads can be used to evaluate any scalar quantity of interest that might be needed by downstream users such as structural analysis or trajectory modelers.

SLS↗

An investigation of motion base cueing and G-seat cueing on pilot performance in a simulator

The effect of G-seat cueing (GSC) and motion-base cueing (MBC) on performance of a pursuit-tracking task is studied using the visual motion simulator (VMS) at Langley Research Center. The G-seat, the six-degree-of-freedom synergistic platform motion system, the visual display, the cockpit hardware, and the F-16 aircraft mathematical model are characterized. Each of 8 active F-15 pilots performed the 2-min-43-sec task 10 times for each experimental mode: no cue, GSC, MBC, and GSC + MBC; the results were analyzed statistically in terms of the RMS values of vertical and lateral tracking error. It is shown that lateral error is significantly reduced by either GSC or MBC, and that the combination of cues produces a further, significant decrease. Vertical error is significantly decreased by GSC with or without MBC, whereas MBC effects vary for different pilots. The pattern of these findings is roughly duplicated in measurements of stick force applied for roll and pitch correction.

Mckissick, B. T.↗

Simulation Training Versus Real Time Console Training for New Flight Controllers

For new flight controllers, the two main learning tools are simulations and real time console performance training. These benefit the new flight controllers in different ways and could possibly be improved. Simulations: a) Allow for mistakes without serious consequences. b) Lets new flight controllers learn the working style of other new flight controllers. c) Lets new flight controllers eventually begin to feel like they have mastered the sim world, so therefore they must be competent in the real time world too. Real time: a) Shows new flight controllers some of the unique problems that develop and have to be accounted for when dealing with certain payloads or systems. b) Lets new flight controllers experience handovers - gathering information from the previous shift on what the room needs to be aware of and what still needs to be done. c) Gives new flight controllers confidence that they can succeed in the position they are training for when they can solve real anomalies. How Sims could be improved and more like real-time ops for the ISS Operations Controller position: a) Operations Change Requests to review. b) Fewer anomalies (but still more than real time for practice). c) Payload Planning Manager Handover sheet for the E-1 and E-3 reviews. d) Flight note in system with at least one comment to verify for the E-1 and E-3 reviews How the real time console performance training could be improved for the ISS Operations Controller position: a) Schedule the new flight controller to be on console for four days but with a different certified person each day. This will force them to be the source of knowledge about every OCR in progress, everything that has happened in those few days, and every activity on the timeline. Constellation program flight controllers will have to learn entirely from simulations, thereby losing some of the elements that they will need to have experience with for real time ops. It may help them to practice real time console performance training in the International Space Station or Space Shuttle to gather some general anomaly resolution and day-to-day task management skills.

Heaton, Amanda↗

Lateral Load Testing of the Advanced Stirling Convertor (ASC-E2) Heater Head

Free-piston Stirling convertors are fundamental to the development of NASA s next generation of radioisotope power system, the Advanced Stirling Radioisotope Generator (ASRG). The ASRG will use General Purpose Heat Source (GPHS) modules as the energy source and Advanced Stirling Convertors (ASCs) to convert heat into electrical energy, and is being developed by Lockheed Martin under contract to the Department of Energy. Achieving flight status mandates that the ASCs satisfy design as well as flight requirements to ensure reliable operation during launch. To meet these launch requirements, GRC performed a series of quasi-static mechanical tests simulating the pressure, thermal, and external loading conditions that will be experienced by an ASC E2 heater head assembly. These mechanical tests were collectively referred to as lateral load tests since a primary external load lateral to the heater head longitudinal axis was applied in combination with the other loading conditions. The heater head was subjected to the operational pressure, axial mounting force, thermal conditions, and axial and lateral launch vehicle acceleration loadings. To permit reliable prediction of the heater head s structural performance, GRC completed Finite Element Analysis (FEA) computer modeling for the stress, strain, and deformation that will result during launch. The heater head lateral load test directly supported evaluation of the analysis and validation of the design to meet launch requirements. This paper provides an overview of each element within the test and presents assessment of the modeling as well as experimental results of this task.

Cornell, Peggy A.↗

Lateral Load Testing of the Advanced Stirling Convertor (ASC-E2) Heater Head

Free-piston Stirling convertors are fundamental to the development of NASA s next generation of radioisotope power system, the Advanced Stirling Radioisotope Generator (ASRG). The ASRG will use General Purpose Heat Source (GPHS) modules as the energy source and Advanced Stirling Convertors (ASCs) to convert heat into electrical energy, and is being developed by Lockheed Martin under contract to the Department of Energy. Achieving flight status mandates that the ASCs satisfy design as well as flight requirements to ensure reliable operation during launch. To meet these launch requirements, GRC performed a series of quasi-static mechanical tests simulating the pressure, thermal, and external loading conditions that will be experienced by an ASC-E2 heater head assembly. These mechanical tests were collectively referred to as "lateral load tests" since a primary external load lateral to the heater head longitudinal axis was applied in combination with the other loading conditions. The heater head was subjected to the operational pressure, axial mounting force, thermal conditions, and axial and lateral launch vehicle acceleration loadings. To permit reliable prediction of the heater head s structural performance, GRC completed Finite Element Analysis (FEA) computer modeling for the stress, strain, and deformation that will result during launch. The heater head lateral load test directly supported evaluation of the analysis and validation of the design to meet launch requirements. This paper provides an overview of each element within the test and presents assessment of the modeling as well as experimental results of this task.

Cornell, Peggy A.↗

Lateral Load Testing of the Advanced Stirling Convertor (ASC-E2) Heater Head

Free-piston Stirling convertors are fundamental to the development of NASA s next generation of radioisotope power system, the Advanced Stirling Radioisotope Generator (ASRG). The ASRG will use General Purpose Heat Source (GPHS) modules as the energy source and Advanced Stirling Convertors (ASCs) to convert heat into electrical energy, and is being developed by Lockheed Martin under contract to the Department of Energy. Achieving flight status mandates that the ASCs satisfy design as well as flight requirements to ensure reliable operation during launch. To meet these launch requirements, GRC performed a series of quasi-static mechanical tests simulating the pressure, thermal, and external loading conditions that will be experienced by an ASC-E2 heater head assembly. These mechanical tests were collectively referred to as "lateral load tests" since a primary external load lateral to the heater head longitudinal axis was applied in combination with the other loading conditions. The heater head was subjected to the operational pressure, axial mounting force, thermal conditions, and axial and lateral launch vehicle acceleration loadings. To permit reliable prediction of the heater head s structural performance, GRC completed Finite Element Analysis (FEA) computer modeling for the stress, strain, and deformation that will result during launch. The heater head lateral load test directly supported evaluation of the analysis and validation of the design to meet launch requirements. This paper provides an overview of each element within the test and presents assessment of the modeling as well as experimental results of this task.

Cornell, Peggy A.↗