Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Space launch systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Performing a Large-Scale Modal Test on the B2 Stand Crane at NASA's Stennis Space Center

A modal test of NASA's Space Launch System (SLS) Core Stage is scheduled to occur at the Stennis Space Center B2 test stand. A derrick crane with a 150-ft long boom, located at the top of the stand, will be used to suspend the Core Stage in order to achieve defined boundary conditions. During this suspended modal test, it is expected that dynamic coupling will occur between the crane and the Core Stage. Therefore, a separate modal test was performed on the B2 crane itself, in order to evaluate the varying dynamic characteristics and correlate math models of the crane. Performing a modal test on such a massive structure was challenging and required creative test setup and procedures, including implementing both AC and DC accelerometers, and performing both classical hammer and operational modal analysis. This paper describes the logistics required to perform this large-scale test, as well as details of the test setup, the modal test methods used, and an overview and application of the results.

Stasiunas, Eric C.↗

Validation & Verification of Electrical Components B2 Test Facility

The research focus of this project is to assist in the closure of Measurement, Monitoring and Control System (MMCS) and other electrical requirements in support of the B2 Space Launch System (SLS) Core Stage Green Run Test Project. Alongside this goal I am to understand project management tools to analyze and control activities/tasks associated with those items. The project I am working on will assist electrical engineers in developing and or identifying closure rationale for the MMCS and electrical requirements. Also as serving the role of a training project manager, I am to develop and maintain a method for tracking progress with estimate completion dates specifically identifying those items during this performance window. The methods I used in order to perform the research consisted of worddocuments, excel sheets, and pdf documents needed for review. For example, documents consisted of: a SLS Core Stage Green Run Facility Requirement Document (FRD) identifying the SSC MMCS and electrical requirements, a Stage Controller to SSC Interface Control Document (ICD) identifying the SSC requirements, and the B2 SLS Core Stage Green Run Test project System Requirements Document (SRD) which identifies the MMCS and electrical requirements. The files were sent to me by both mentors, Mr. Barry Robinson and Ms. Dawn Davis. Overall, the review process for the word documents and excel spreadsheets proved to be successful. The data for the electrical components were accurate and were consistent with the original recorded data. However, the consistency with the pdf documents did not follow up all the way. Attention to this mistake was made and further revisions were done in order for the data to agree with each other. Furthermore, an itinerary was designed using Microsoft Outlook in order to track progress with estimated completion dates. This project contributes to NASA/Center Missions and Goals through the Waterfall Model. The Waterfall Model is a linear system used for engineering design. In the Waterfall Model, the fourth step is Verification and Validation. This involves installation, testing, and debugging of the B2 SLS Core Stage electrical components. For the SLS Core Stage Green Run Test Project, each requirement contained in this approved requirements set will have at least one Verification Item (VI) assigned to it. During the design phase, VIs will mostly consist of Analysis or Inspection types. Design phase VIs and closure information will be documented in Dynamics Data Management System (DDMS) in the form of analysis reports and design documentation.

Bastian, Tyler↗

Software Tool for Tracking & Mapping the NASA Orion AA-2 Test Flight Ejectable Data Recorders in Real Time

On 2 July 2019, the NASA Ascent Abort 2 flight took place off the Florida coast to test the emergency systems to separate the Orion Crew Module (CM) from the future Space Launch System rocket in the event of a malfunction. During this high-altitude test, instrumentation data was recorded on twelve customized buoyant Ejectable Data Recorders (EDRs) and subsequently jettisoned from the CM in mid-air. Upon release, the EDRs activated their GPS-Iridium beacon systems and began transmitting Short Burst Data (SBD) messages via the Iridium satellite network to relay their individual location and system health information. To locate, track and retrieve each EDR from the ocean surface in real-time, multiple open-source programming tools (Python and Linux shells) were developed for parsing the incoming Iridium binary SBD messages. For this, a Linux laptop was used to receive the Iridium-generated emails containing the SBD messages and autonomously execute the parsing tools. The received SBD data contained location, timestamp and health status information that was translated, saved, and subsequently used for simultaneously generating a continuously updated color-coded tabular display summary and unique KML files used with Google Earth to track their locations. Once their locations were known, dedicated recovery vessels retrieved all EDRs from the ocean. An additional tool was also developed in order to generate 5- and 10-minute geolocation predictions for each EDR by deriving the displacement distance, elapsed time, displacement heading and velocity based on the latest known information available. The recovery vessels were also tracked with the use of a separate commercial GPS beacon system. After jettison, 67% of the EDRs transmitted valid data by the time they were retrieved from the ocean. However, the real-time information presented by the plotting tool allowed for the ready depiction of EDR dispersal patterns and reference drift trajectories, which contributed to the recovery of all twelve EDRs and the AA-2 flight data. Lastly, the available data showed that the distance between the software’s reported drift/predicted locations and the recovery locations did not exceed 38 meters, therefore demonstrating the advantages of this software tool for supporting real-time tracking and recovery efforts of beacon devices.

Moxey, Lucas↗

Design and Stability of an On-Orbit Attitude Control System Using Reaction Control Thrusters

NASA is providing preliminary design and requirements for the Space Launch System Exploration Upper Stage (EUS). The EUS will provide upper stage capability for vehicle ascent as well as on-orbit control capability. Requirements include performance of on-orbit burn to provide Orion vehicle with escape velocity. On-orbit attitude control is accommodated by a on-off Reaction Control System (RCS). Paper provides overview of approaches for design and stability of an attitude control system using a RCS.

Hall, Robert A.↗

Kennedy Space Center

Among 2011's many accomplishments, we safely retired the Space Shuttle Program after 30 incredible years; completed the International Space Station and are taking steps to enable it to reach its full potential as a multi-purpose laboratory; and helped to expand scientific knowledge with missions like Aquarius, GRAIL, and the Mars Science Laboratory. Responding to national budget challenges, we are prioritizing critical capabilities and divesting ourselves of assets no longer needed for NASA's future exploration programs. Since these facilities do not have to be maintained or demolished, the government saves money. At the same time, our commercial partners save money because they do not have to build new facilities. It is a win-win for everyone. Moving forward, 2012 will be even more historically significant as we celebrate the 50th Anniversary of Kennedy Space Center. In the coming year, KSC will facilitate commercial transportation to low-Earth orbit and support the evolution of the Space Launch System and Orion crew vehicle as they ready for exploration missions, which will shape how human beings view the universe. While NASA's Vision is to lead scientific and technological advances in aeronautics and space for a Nation on the frontier of discovery KSC's vision is to be the world's preeminent launch complex for government and commercial space access, enabling the world to explore and work in space. KSC's Mission is to safely manage, develop, integrate, and sustain space systems through partnerships that enable innovative, diverse access to space and inspires the Nation's future explorers.

Griffin, Amanda↗

Identification of Novel Desiccation-Tolerant S. cerevisiae Strains for Deep Space Biosensors

NASA's BioSentinel mission, a secondary payload that will fly on the Space Launch Systems first Exploration Mission (EM-1), utilizes the budding yeast S. cerevisiae to study the biological response to the deep space radiation environment. Yeast samples are desiccated prior to launch to suspend growth and metabolism while the spacecraft travels to its target heliocentric orbit beyond Low Earth Orbit. Each sample is then rehydrated at the desired time points to reactivate the cells. A major risk in this mission is the loss of cell viability that occurs in the recovery period following the desiccation and rehydration process. Cell survival is essential for the detection of the biological response to features in the deep space environment, including ionizing radiation.The aim of this study is to mitigate viable cell loss in future biosensors by identifying mutations and genes that confer tolerance to desiccation stress in rad51, a radiation-sensitive yeast strain. We initiated a screen for desiccation-tolerance after rehydrating cells that were desiccated for three years, and selected various clones exhibiting robust growth. To verify retention of radiation sensitivity in the isolated clonesa crucial feature for a successful biosensorwe exposed them to ionizing radiation. Finally, to elucidate the genetic and molecular bases for observed desiccation-tolerance, we will perform whole-genome sequencing of those rad51 clones that exhibit both robust growth and radiation sensitivity following desiccation. The identification and characterization of desiccation-tolerant strains will allow us to engineer a biological model that will be resilient in face of the challenges of the deep space environment, and will thus ensure the experimental success of future biosensor missions.

S. cerevisiae↗

Assessment of the Orion-SLS Interface Management Process in Achieving the EIA 731.1 Systems Engineering Capability Model Generic Practices Level 3 Criteria

NASA is currently developing the next generation crewed spacecraft and launch vehicle for exploration beyond earth orbit including returning to the Moon and making the transit to Mars. Managing the design integration of major hardware elements of a space transportation system is critical for overcoming both the technical and programmatic challenges in taking a complex system from concept to space operations. An established method of accomplishing this is formal interface management. In this paper we set forth an argument that the interface management process implemented by NASA between the Orion Multi-Purpose Crew Vehicle (MPCV) and the Space Launch System (SLS) achieves the Level 3 tier of the EIA 731.1 System Engineering Capability Model (SECM) for Generic Practices. We describe the relevant NASA systems and associated organizations, and define the EIA SECM Level 3 Generic Practices. We then provide evidence for our compliance with those practices. This evidence includes discussions of: NASA Systems Engineering Interface (SE) Management standard process and best practices; the tailoring of that process for implementation on the Orion to SLS interface; changes made over time to improve the tailored process, and; the opportunities to take the resulting lessons learned and propose improvements to our institutional processes and best practices. We compare this evidence against the practices to form the rationale for the declared SECM maturity level.

Jellicorse, John J.↗

Combustion Stability Verification for the Thrust Chamber Assembly of J-2X Developmental Engines 10001, 10002, and 10003

The J-2X engine, a liquid oxygen/liquid hydrogen propellant rocket engine available for future use on the upper stage of the Space Launch System vehicle, has completed testing of three developmental engines at NASA Stennis Space Center. Twenty-one tests of engine E10001 were conducted from June 2011 through September 2012, thirteen tests of the engine E10002 were conducted from February 2013 through September 2013, and twelve tests of engine E10003 were conducted from November 2013 to April 2014. Verification of combustion stability of the thrust chamber assembly was conducted by perturbing each of the three developmental engines. The primary mechanism for combustion stability verification was examining the response caused by an artificial perturbation (bomb) in the main combustion chamber, i.e., dynamic combustion stability rating. No dynamic instabilities were observed in the TCA, although a few conditions were not bombed. Additional requirements, included to guard against spontaneous instability or rough combustion, were also investigated. Under certain conditions, discrete responses were observed in the dynamic pressure data. The discrete responses were of low amplitude and posed minimal risk to safe engine operability. Rough combustion analyses showed that all three engines met requirements for broad-banded frequency oscillations. Start and shutdown transient chug oscillations were also examined to assess the overall stability characteristics, with no major issues observed.

Morgan, C. J.↗

SSME to RS-25: Challenges of Adapting a Heritage Engine to a New Vehicle Architecture

A key constituent of the NASA Space Launch System (SLS) architecture is the RS-25 engine, also known as the Space Shuttle Main Engine (SSME). This engine was selected largely due to the maturity and extensive experience gained through 30-plus years of service. However, while the RS-25 is a highly mature system, simply unbolting it from the Space Shuttle and mounting it on the new SLS vehicle is not a "plug-and-play" operation. In addition to numerous technical integration and operational details, there were also hardware upgrades needed. While the magnitude of effort is less than that needed to develop a new clean-sheet engine system, this paper describes some of the expected and unexpected challenges encountered to date on the path to the first flight of SLS.

Ballard, Richard O.↗

Concept Assessment of a Fission Fragment Rocket Engine (FFRE) Propelled Spacecraft

The March, 2012 issue of Aerospace America stated that ―the near-to-medium prospects for applying advanced propulsion to create a new era of space exploration are not very good. In the current world, we operate to the Moon by climbing aboard a Carnival Cruise Lines vessel (Saturn 5), sail from the harbor (liftoff) shedding whole decks of the ship (staging) along the way and, having reached the return leg of the journey, sink the ship (burnout) and return home in a lifeboat (Apollo capsule). Clearly this is an illogical way to travel, but forced on Explorers by today's propulsion technology. However, the article neglected to consider the one propulsion technology, using today's physical principles that offer continuous, substantial thrust at a theoretical specific impulse of 1,000,000 sec. This engine unequivocally can create a new era of space exploration that changes the way spacecraft operate. Today's space Explorers could travel in Cruise Liner fashion using the technology not considered by Aerospace America, the novel Dusty Plasma Fission Fragment Rocket Engine (FFRE). This NIAC study addresses the FFRE as well as its impact on Exploration Spacecraft design and operation. It uses common physics of the relativistic speed of fission fragments to produce thrust. It radiatively cools the fissioning dusty core and magnetically controls the fragments direction to practically implement previously patented, but unworkable designs. The spacecraft hosting this engine is no more complex nor more massive than the International Space Station (ISS) and would employ the successful ISS technology for assembly and check-out. The elements can be lifted in "chunks" by a Heavy Lift Launcher. This Exploration Spacecraft would require the resupply of small amounts of nuclear fuel for each journey and would be an in-space asset for decades just as any Cruise Liner on Earth. This study has synthesized versions of the FFRE, integrated one concept onto a host spacecraft designed for manned travel to Jupiter's moon, Callisto, and assessed that round trip journey. This engine, although unoptimized, produced 10 pounds force of thrust at a delivered specific impulse of 527,000 seconds for the entire 15-year mission while providing enormous amounts of electrical power to the spacecraft. A payload of 60 metric tons, included in the 300 metric ton vehicle, was carried to Callisto and back; the propellant tanks holding the 4 metric tons of fuel were not jettisoned in the process. The study concluded that the engine and spacecraft are within today's technology, could be built, tested, launched on several SLS (Space Launch System) (or similar) launchers, integrated, checked out, moved to an in-space base such as at a Lagrange point and operated for decades.

Engine↗

NASA Marshall Space Flight Center Tools for Human Factors Engineering Assessments for Safe Sls Worksites

NASA Marshall Space Flight Center (MSFC) Human Factors Engineering (HFE) Team is implementing mockup fabrication, virtual reality (VR) and motion capture (MoCap) into HFE analyses of SLS worksites through its Virtual Environments Lab (VEL). MSFC HFE Team is responsible for the Space Launch System (SLS) worksite analyses of the integration activities performed at the Kennedy Space Center (KSC). With a wide variety of tasks, it is important to verify that SLS can be safely integrated at KSC early in the design process. If the ground support crew cannot safely complete the tasks, redesign efforts must be implemented. MSFC HFE is responsible for verification through methods such as drawing inspection, observation of tasks performed, and building physical mockups. There is a need, however, for a faster analysis early in the process that can impact design safety before drawings are finalized. This need is addressed through MSFC’s VEL.

Andrews, Tanya↗

Compass Final Report: Nuclear Electric Propulsion (NEP)-Chemical Vehicle 1.2

Many previous studies have examined sending crews to and from Mars. The most economical involved a ‘conjunction’ class whereby the crew spends around 500 days on Mars waiting for a ‘cheap’ return. The total mission time results in over a 1000-day mission duration (about 3 years). Given the current experience level of only one year on the International Space Station (ISS), it of interest to reduce that time to only two years, thus reducing risk and minimizing required Mars surface infrastructure. The Phase 1.1 Study goal was stated as follows, “Determine the feasibility of a two-year roundtrip class Mars mission concept of operation that enables boots on Mars no later than 2036.” While the Phase1 study did show feasibility for the NEP-Chemical option, the 2036 Opposition opportunity was found to stress the schedule due to proposed technology development schedules. A 2039 Opposition (which requires even more energy than the 2036 case) was chosen as representative for Phase 1.2. Phase 1.2 also sought to further refine the concept, building on the feasibility, but addressing several challenges brought by the red team and habitat team. Given the date of 2039, nearer term technologies, primarily nuclear thermal and nuclear electric were deemed as the most viable for these missions. As will be shown, the energy required to perform such a mission in only two years (for the 2039 opportunity at least) is about three times that of the three-year conjunction mission. The rocket equation shows that this mission would then require several times the propellant of the three-year mission unless the specific impulse (ISP) of the propulsion system can be increased. Based on lunar needs, a limit of five Space Launch System (SLS) launchers with 8.4m fairings was imposed for the piloted transportation portion of the mission, limiting the size of the system. When using nuclear electric propulsion, the main limiting factor was packaging the required radiator area. The higher Isp nuclear electric propulsion (NEP) system option is described herein but with a twist: in order to keep the size of radiators packageable in one SLS and use proven reactor power system technology (~1200K reactor outlet temperature and superalloy-class Brayton) the NEP system had to be combined with a chemical propulsion system. This combination of electric propulsion and high thrust chemical was found to be useful in previous design studies combining solar electric propulsion (SEP) and chemical propulsion. Such a combination allowed the low-thrust system to provide significant change in velocity (∆V) during the interplanetary portions of the mission, thereby notably reducing the ∆V required by the high thrust system to capture and depart from the Mars gravity well. Here the high thrust ‘impulsive’ system is more efficient due to the Oberth Effect. A plethora of trades, both at the mission and system level, as well as the subsystem level were performed to develop these vehicle concepts. An entire family of NEP-Chemical transportation vehicles is described herein. The main driver and the primary focus was the piloted vehicle but additional concepts for cargo were performed using the same ‘building blocks’ in order to reduce costs and provide commonality.

Nuclear Power↗

Identification of Novel Desiccation-Tolerant S. cerevisiae Strains for Deep Space Biosensors

NASA's BioSentinel mission, a secondary payload that will fly on the Space Launch System's first Exploration Mission (EM-1), utilizes the budding yeast S. cerevisiae to study the biological response to the deep space radiation environment. Yeast samples are desiccated prior to launch to suspend growth and metabolism while the spacecraft travels to its target heliocentric orbit beyond Low Earth Orbit. Each sample is then rehydrated at the desired time points to reactivate the cells. A major risk in this mission is the loss of cell viability that occurs in the recovery period following the desiccation and rehydration process. Cell survival is essential for the detection of the biological response to features in the deep space environment, including ionizing radiation. The aim of this study is to mitigate viable cell loss in future biosensors by identifying mutations and genes that confer tolerance to desiccation stress in rad51, a radiation-sensitive yeast strain. We initiated a screen for desiccation-tolerance after rehydrating cells that were desiccated for three years, and selected various clones exhibiting robust growth. To verify retention of radiation sensitivity in the isolated clones - a crucial feature for a successful biosensor - we exposed them to ionizing radiation. Finally, to elucidate the genetic and molecular bases for observed desiccation-tolerance, we will perform whole-genome sequencing of those rad51 clones that exhibit both robust growth and radiation sensitivity following desiccation. The identification and characterization of desiccation-tolerant strains will allow us to engineer a biological model that will be resilient in face of the challenges of the deep space environment, and will thus ensure the experimental success of future biosensor missions.

S. cerevisiae↗

Deep Space Habitat Concept Demonstrator

This project will develop, integrate, test, and evaluate Habitation Systems that will be utilized as technology testbeds and will advance NASA's understanding of alternative deep space mission architectures, requirements, and operations concepts. Rapid prototyping and existing hardware will be utilized to develop full-scale habitat demonstrators. FY 2014 focused on the development of a large volume Space Launch System (SLS) class habitat (Skylab Gen 2) based on the SLS hydrogen tank components. Similar to the original Skylab, a tank section of the SLS rocket can be outfitted with a deep space habitat configuration and launched as a payload on an SLS rocket. This concept can be used to support extended stay at the Lunar Distant Retrograde Orbit to support the Asteroid Retrieval Mission and provide a habitat suitable for human missions to Mars.

Bookout, Paul S.↗

Integrated Main Propulsion System Performance Reconstruction Process/Models

The Integrated Main Propulsion System (MPS) Performance Reconstruction process provides the MPS post-flight data files needed for postflight reporting to the project integration management and key customers to verify flight performance. This process/model was used as the baseline for the currently ongoing Space Launch System (SLS) work. The process utilizes several methodologies, including multiple software programs, to model integrated propulsion system performance through space shuttle ascent. It is used to evaluate integrated propulsion systems, including propellant tanks, feed systems, rocket engine, and pressurization systems performance throughout ascent based on flight pressure and temperature data. The latest revision incorporates new methods based on main engine power balance model updates to model higher mixture ratio operation at lower engine power levels.

Lopez, Eduardo↗

8.4 M Deep Space Habitat– Medical Bay Concept Design and Human Factors Engineering Analysis

Maintaining crew health throughout long duration deep space missions presents significant new design challenges. Since communication with Earth will be limited and it is not possible to return in the event of a medical emergency it is critical that medical care on a deep space mission be as autonomous as possible. The goal of this project was to design and assess a medical system concept for the Deep Space Habitat Concept Demonstrator derived from the core stage of the Space Launch System. The Medical Bay was designed as a primary location to support the medical care of4 crew members on a1000-daymission. It includes workspace, stowage, and direct access to all necessary medical equipment and supplies. A Human Factors Engineering Analysis was conducted to test ergonomic effectiveness and system requirement compliance. This initial design will continue to be used by the Human Factors Engineering Team and the Advanced Concepts Office at NASA’s Marshall Spaceflight Center for further demonstration, analysis, and design conception for deep space travel.

Mary Claire Mancl↗

Validation of Multiphase CFD Predictions of the SLS Launch Environment against Artemis I Flight Data

NASA’s Space Launch System (SLS) is powered by four Aerojet-Rocketdyne RS-25 engines, previously referred to as Space Shuttle Main Engines (SSMEs), with two RSRMV solid rocket boosters (SRBs) derived from the Shuttle booster as seen in Fig. 1. Ignition and the start transient of the SRBs, each of which generate 3.6 million pounds of thrust, create a series of large magnitude pressure waves separate from launch acoustics that have the potential to damage the vehicle if unmitigated. This portion of the SLS launch environment consists of igniter shock (IS), ignition overpressure (IOP), and duct overpressure (DOP).

T. Rivord↗

Near Earth Asteroid Scout Solar Sail Engineering Development Unit Test Suite

The Near Earth Asteroid (NEA) Scout project is a 6U reconnaissance mission to investigate a near Earth asteroid utilizing an 86m(sub 2) solar sail as the primary propulsion system. This will be the largest solar sail NASA has launched to date. NEA Scout is currently manifested on the maiden voyage of the Space Launch System in 2018. In development of the solar sail subsystem, design challenges were identified and investigated for packaging within a 6U form factor and deployment in cis-lunar space. Analysis was able to capture understanding of thermal, stress, and dynamics of the stowed system as well as mature an integrated sail membrane model for deployed flight dynamics. Full scale system testing on the ground is the optimal way to demonstrate system robustness, repeatability, and overall performance on a compressed flight schedule. To physically test the system, the team developed a flight sized engineering development unit with design features as close to flight as possible. The test suite included ascent vent, random vibration, functional deployments, thermal vacuum, and full sail deployments. All of these tests contributed towards development of the final flight unit. This paper will address several of the design challenges and lessons learned from the NEA Scout solar sail subsystem engineering development unit. Testing on the component level all the way to the integrated subsystem level. From optical properties of the sail material to fold and spooling the single sail, the team has developed a robust deployment system for the solar sail. The team completed several deployments of the sail system in preparation for flight at half scale (4m) and full scale (6.8m): boom only, half scale sail deployment, and full scale sail deployment. This paper will also address expected and received test results from ascent vent, random vibration, and deployment tests.

Lockett, Tiffany Russell↗