Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Scientific Programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Pioneer Venus Overview

A Pioneer Venus Overview is discussed. Pioneer Venus consists of two basic spacecraft: Orbiter and Multiprobe. The latter was separated into five separate vehicles near Venus. These were the probe transporter (called the Bus), a large atmospheric entry probe (dubbed Sounder) and three identical smaller probes (called North , Day, and Night in accordance with their entry locations). At Venus all six spacecraft communicated directly back to the Earth-based Deep Space Network (DSN) and, in the case of the Multiprobe mission, to two special receiving sites near Guam and Santiago (Chile). At the time this Special Issue was submitted for publication the nominal mission was complete and the Orbiter was continuing into an extended mission phase. It appears so that sufficient fuel remains to permit full operation through calendar year 1980, at least. The scientific payload, Principle Investigator, and his affiliation are listed for each Pioneer Venus spacecraft. This special issue is primarily devoted to short descriptions of the instruments listed with the exception of the Orbitor Cloud Photopolarimeter. Detailed instrument descriptions for this experiment have been published. Before proceeding with descriptions of the individual instruments, four special archival-type reports are included. The first deals with spacecraft design and operation. The Pioneer Venus spacecraft were unique and very special design features and operational modes needed to be incorporated. These are summarized therein. It should be noted that neither the scientific objectives nor the scientific results of the Pioneer Venus program are described or discussed in detail. The objectives have been published elsewhere.

Colin, Lawrence↗

The Mars 2001 Athena Precursor Experiment (APEX)

The Athena Precursor Experiment (APEX) is a suite of scientific instruments for the Mars Surveyor Program 2001 (MSP'01) lander. The major elements of the APEX pay load are: (1) Pancam/Mini-TES, a combined stereo color imager and mid-infrared point spectrometer. (2) An Alpha-Proton-X-Ray Spectrometer (APXS) for in-situ elemental analysis. (3) A Mossbauer Spectrometer for in-situ determination of the mineralogy of Fe-bearing rocks and soils. (4) A Magnet Array that can separate magnetic soil particles from non-magnetic ones.

Squyres, S. W.↗

Development of Electrostatically Clean Solar Array Panels

Certain missions require Electrostatically Clean Solar Array (ECSA) panels to establish a favorable environment for the operation of sensitive scientific instruments. The objective of this program was to demonstrate the feasibility of an ECSA panel that minimizes panel surface potential below 100mV in LEO and GEO charged particle environments, prevents exposure of solar cell voltage and panel insulating surfaces to the ambient environment, and provides an equipotential, grounded structure surrounding the entire panel. An ECSA panel design was developed that uses a Front Side Aperture-Shield (FSA) that covers all inter-cell areas with a single graphite composite laminate, composite edge clips for connecting the FSA to the panel substrate, and built-in tabs that interconnect the FSA to conductive coated coverglasses using a conductive adhesive. Analysis indicated the ability of the design to meet the ECSA requirements. Qualification coupons and a 0.5m x 0.5m prototype panel were fabricated and tested for photovoltaic performance and electrical grounding before and after exposure to acoustic and thermal cycling environments. The results show the feasibility of achieving electrostatic cleanliness with a small penalty in mass, photovoltaic performance and cost, with a design is structurally robust and compatible with a wide range of current solar panel technologies.

Stern, Theodore G.↗

Potential Mars Surveyor 2001 Landing Sites: Low-Elevation Cratered "Highlands" in Central and Eastern Sinus Meridiani and Near Amenthes Fossae

The main scientific goal for the Mars Surveyor Program 2001 (MSP 01) landed mission is to collect and characterize 91 rock and 13 soil core samples using an integrated instrument suite onboard the Athena Rover. If possible, these samples will be retrieved and returned to Earth via a MSP 05 or MSP 07 mission. Preliminary engineering constraints for the MSP 01 landing site call for a location that lies between 15 S and 30 N, and below about 2 km elevation (based on Viking-era topography). Desirable landing sites for MSP 01 are to be located "in the ancient highlands where the environmental conditions may have been favorable to the preservation of evidence of possible prebiotic or biotic processes including the emergence (and, potentially, the persistence) of life". We interpret this to mean that the desirable sites include those that have evidence of aqueous sediments that might have been deposited during the Noachian and/or Hesperian Epochs of Mars' history. In addition to the search for subaqueous sedimentary deposits, we took into consideration the fact that the rover, Athena, will need to be able to access these materials. Thus, a site where aeolian deflation has occurred might be desirable because it might expose, in situ, layered sedimentary deposits. Deflated areas, of course, might include potential landing hazards in the form of meterscale buttes and mesas (e.g., Christmas Lake Valley, OR), thus careful study of such sites with high resolution images will be required before a decision is made to land. We have been examining three regions that have potential to be considered for MSP 01 landing sites. This work is based on Viking (VIS, IRTM) and Phobos 2 (Termoskan) observations and should be regarded as preliminary because we believe that the final site selection should also be based upon analysis of Mars Global Surveyor observations that help constrain mineralogy (TES) and local geomorphology (MOC, MOLA). (1) Eastern Sinus Meridiani Region (proposed by K. S. Edgett) Sinus Meridiani is a persistent low-albedo (< 0. 16) region on the martian equator that has been recognized for about 400 years. All of Sinus Meridiani is below the 2 km elevation constraint for MSP 01. The region includes cratered highlands, valley networks, aeolian dunes, and possible aqueous sedimentary deposits. The landing site study region is located in the eastern portion of Sinus Meridiani. It is bounded by latitudes 10 S to 2 N, longitudes 355 W to 345 W, and the elevations are mostly 1-2 km. The center of this area contains a medium-albedo (0.19-0.21), relatively smooth-surfaced deposit that was suggested by Rice to be a lacustrine deposit. Several potential landing areas can be suggested within this region. Based on Viking and Phobos 2 data, the favored sites so far are centered at 7.6 S, 346.9 W and 0.8 S, 349 W. Thermal inertias are 3.2-7.0 x 10(exp -3) cal /sq cm s(exp -0.5)/K; and rock abundances are around 2-6%. The site at 7.6 S, 346.9 W is at the southern end of the smooth, medium-albedo unit that might have a lacustrine origin. At this location, numerous channels appear to have drained toward the smooth unit. Viking images from orbit 747A show this area at about 15 m/pixel ground resolution. The images reveal that aeolian deflation has occurred along the deposit's margins. Bright (i.e., albedo >= 0.21) aeolian dunes are present on the channel floors and in some of the depressions on the smooth unit. The bright, apparently active dunes might consist of material (perhaps lakedeposited sands) that has been eroded from the smooth unit. The site at approximately 0.8 S, 349 W is selected because it offers an opportunity to solve a long-standing puzzle about Mars remote sensing. There are three main "color" units on Mars: "dark red, dark gray, and bright red". This landing site would allow the Athena rover an opportunity to investigate all three materials within close proximity (the best place on Mars to do so). There are no high resolution (better than 100 m/pixel) Viking or Mariner images of this site. (2) Central Sinus Meridiani Region (proposed by K. S. Edgett and T. J. Parker) Central Sinus Meridiani is characterized by two types of surfaces [4]. One is like typical martian cratered highlands elsewhere- there are old valley networks and old impact craters. The other is relatively smooth and flat. These two units are in contact around 3.1 S between 5 W and 4 E longitudes. Valley networks- including one at 6'S, 358 W that rivals the Grand Canyon of Arizona- once drained toward the smooth unit. Edgett and Parker [4] proposed that the smooth unit might consist of sediments laid down in a large Noachian-aged sea/ocean that would have covered much of the northern hemisphere. Schultz and Lutz [I I I suggested that it is a paleopolar layered deposit. Regardless, the smooth unit where it contacts the cratered terrain would make an excellent site for Athena rover to investigate. The site is best seen in Viking high resolution images from orbits 408B (about 30 m/pixel) and 746A (about 12 m/pixel). These images suggest that aeolian deflation has occurred along the margin of the smooth unit, and this deflation has exposed horizontal larrs of material. The elevation is about 0.5 km; thermal inertias are 6.5-8.0 x 10(exp -3) cal /sq cm s(exp -0.5) / K; rock abundances are 2-4%; and the surface is probably sandy with dark drifts and ripples but almost no actual dunes. We suggest a landing around 3.2 S, 3.0 W would test the aqueous sediment hypothesis and provide a potentially smooth surface on which to land. (3) Amenthes Fossae Region (proposed by S. N. Huntwork and K. S. Edgett) The Amenthes Fossae are a series of graben/fissures that are circumferential to the southeast side of Isidis Planitia. These fissures cross a variety of ancient, heavily cratered Noachian terrain and younger, Hesperian and Amazonian terrain. We focused our search on a region 0-15 N, 250 - 270 W. Elevations are -0.5 to 2 km. Depending upon whether Isidis Planitia was ever a water-rich environment, this region might have been influenced by aqueous sedimentation. Valley networks are common, and they drained toward the north and northwest. We focused our work on a set of Viking orbiter high-resolution images, 719A 1-48. These have resolutions 16-24 rri/pixel. We examined images 20-23, centered at 2 N, 258 W. This site, on the plains just southwest of a 42 km-diameter crater, includes a valley network channel, a relatively young crater ejecta deposit, a few buttes composed of presumably ancient, Noachian bedrock, and a "plains" unit. The plains might make an ideal landing surface, except for the presence of some fine-scale ridges (oriented approximately N-S). The ridges are probably yardangs, thus this site offers a place where aeolian deflation has probably exposed some of the layered rock units that comprise the "plains". Thermal inertias are 7.9-8.3 x 10(exp -3) cal/sq cm s(exp -0.5) /K and rock abundances are 10-15%. A rover traverse might include the opportunity to go down to the floor (and sample along the walls) of the valley network channel at 2 N 258.1 W.

Edgett, K. S.↗

Mars

There is direct geomorphological evidence that in the past Mars had large amounts of liquid water on its surface. Atmospheric models would suggest that this early period of hydrological activity was associated with the presence of a thick atmosphere and warmer temperatures. It is possible that at some time in the future we might recreate a habitable climate on Mars, returning it to the life-bearing state it may have enjoyed early in its history. Our studies of Mars are still in a preliminary state but everything we have learned suggests that it may be possible to restore Mars to a habitable climate. Mars' current scientific value is indisputable but it is certainly true that extensive exploration followed by a careful and studied program of introducing life would yield an even greater scientific harvest. The scientific knowledge gained by studying the ways in which a biosphere could be introduced on Mars may inform us as to the preservation of the one on Earth.

McKay, Christopher P.↗

ALTUS Cumulus Electrification Study (ACES)

The ALTUS Cumulus Electrification Study (ACES) is an uninhabited aerial vehicle (UAV)-based project that will investigate thunderstorms in the vicinity of the Florida Everglades in August 2002. ACES is being conducted to both investigate storm electrical activity and its relationship to storm morphology, and validate Tropical Rainfall Measurement Mission (TRMM) satellite measurements. In addition, as part of NASA's UAV-based science demonstration program, this project will provide a scientifically useful demonstration of the utility and promise of UAV platforms for Earth science and applications observations. Part of the demonstration involves getting approvals from the Federal Aviation Administration and the NASA airworthiness flight safety review board. ACES will employ the ALTUS II aircraft, built by General Atomics - Aeronautical Systems, Inc. Key science objectives simultaneously addressed by ACES are to: (1) investigate lightning-storm relationships, (2) study storm electrical budgets, and (3) provide Lightning Imaging Sensor validation. The ACES payload, already developed and flown on ALTUS, includes electrical, magnetic, and optical sensors to remotely characterize the lightning activity and the electrical environment within and around thunderstorms. ACES will contribute important electrical and optical measurements not available from other sources. Also, the high altitude vantage point of the UAV observing platform (up to 55,000 feet) offers a useful 'cloud-top' perspective. By taking advantage of its slow flight speed (70 to 100 knots), long endurance, and high altitude flight, the ALTUS will be flown near, and when possible, above (but never into) thunderstorms for long periods of time, allowing investigations to be conducted over entire storm life cycles. In addition, concurrent ground-based observations will enable the UAV measurements to be more completely interpreted and evaluated in the context of the thunderstorm structure, evolution, and environment.

Kim, Tony↗

(CICT) Computing, Information, and Communications Technology Overview

The goal of the Computing, Information, and Communications Technology (CICT) program is to enable NASA's Scientific Research, Space Exploration, and Aerospace Technology Missions with greater mission assurance, for less cost, with increased science return through the development and use of advanced computing, information and communications technologies. This viewgraph presentation includes diagrams of how the political guidance behind CICT is structured. The presentation profiles each part of the NASA Mission in detail, and relates the Mission to the activities of CICT. CICT's Integrated Capability Goal is illustrated, and hypothetical missions which could be enabled by CICT are profiled. CICT technology development is profiled.

VanDalsem, William R.↗

Mars Ascent Vehicle Flight Analysis

The scientific objective of the Mars Surveyor Program 2005 mission is to return Mars rock, soil, and atmospheric samples to Earth for detailed analysis. The present investigation focuses on design of Mars Ascent Vehicle for this mission. Aerodynamic, aerothermodynamic, and trajectory design considerations are addressed to assess the ascent configuration, determine aerodynamic stability, characterize thermal protection system requirements, and ascertain the required system mass. Aerodynamic analysis reveals a subsonic static instability with the baseline configuration; however, stability augmentation options are proposed to mitigate this problem. The ascent aerothermodynamic environment is shown to be benign (on the order of the sea-level boiling point of water on Earth). As a result of these low thermal and pressure loads, a lightweight, low rigidity material can be employed as the aftbody aerodynamic shroud. The required nominal MAV lift-off mass is 426 kg for a December 2006 equatorial launch into a 300-km circular orbit with 30-degree inclination. Off-nominal aerodynamic and atmospheric conditions are shown to increase this liftoff mass by approximately 10%. Through performance of these analyses, the Mars Ascent Vehicle is deemed feasible with respect to the current mission mass and size constraints.

Desai, P. N.↗

Materials Characterization at Utah State University: Facilities and Knowledge-base of Electronic Properties of Materials Applicable to Spacecraft Charging

In an effort to improve the reliability and versatility of spacecraft charging models designed to assist spacecraft designers in accommodating and mitigating the harmful effects of charging on spacecraft, the NASA Space Environments and Effects (SEE) Program has funded development of facilities at Utah State University for the measurement of the electronic properties of both conducting and insulating spacecraft materials. We present here an overview of our instrumentation and capabilities, which are particularly well suited to study electron emission as related to spacecraft charging. These measurements include electron-induced secondary and backscattered yields, spectra, and angular resolved measurements as a function of incident energy, species and angle, plus investigations of ion-induced electron yields, photoelectron yields, sample charging and dielectric breakdown. Extensive surface science characterization capabilities are also available to fully characterize the samples in situ. Our measurements for a wide array of conducting and insulating spacecraft materials have been incorporated into the SEE Charge Collector Knowledge-base as a Database of Electronic Properties of Materials Applicable to Spacecraft Charging. This Database provides an extensive compilation of electronic properties, together with parameterization of these properties in a format that can be easily used with existing spacecraft charging engineering tools and with next generation plasma, charging, and radiation models. Tabulated properties in the Database include: electron-induced secondary electron yield, backscattered yield and emitted electron spectra; He, Ar and Xe ion-induced electron yields and emitted electron spectra; photoyield and solar emittance spectra; and materials characterization including reflectivity, dielectric constant, resistivity, arcing, optical microscopy images, scanning electron micrographs, scanning tunneling microscopy images, and Auger electron spectra. Further details of the instrumentation used for insulator measurements and representative measurements of insulating spacecraft materials are provided in other Spacecraft Charging Conference presentations. The NASA Space Environments and Effects Program, the Air Force Office of Scientific Research, the Boeing Corporation, NASA Graduate Research Fellowships, and the NASA Rocky Mountain Space Grant Consortium have provided support.

Dennison, J. R.↗

Spectral Calibration of the MSFC Solar Ultraviolet Magnetograph

This paper describes the scientific goals of a sounding rocket program called the Solar Ultraviolet Magnetograph Investigation (SUMI), presents a brief description of the optics that were developed to meet those goals and discusses the spectral, spatial and polarization characteristics of SUMI's Toroidal Variable-Line-Space (TVLS) gratings; which are critical to SUMI's measurements of the magnetic field in the Sun's transition region.

West, Edward↗

Spectral Calibration of the MSFC Solar Ultraviolet Magnetograph

This paper will describe the scientific goals of a sounding rocket program called the Solar Ultraviolet Magnetograph Investigation (SUMI), present a brief description of the optics that were developed to meet those goals and discuss the spectral, spatial and polarization characteristics of SUMI's Toroidal Variable-Line-Space (TVLS) gratings which are critical to SUMI's measurements of the magnetic field in the Sun's transition region.

West, Edward A.↗

Development of Grazing Incidence Optics for Neutron Imaging and Scattering

Because of their wave nature, thermal and cold neutrons can be reflected from smooth surfaces at grazing incidence angles, be reflected by multilayer coatings or be refracted at boundaries of different materials. The optical properties of materials are characterized by their refractive indices which are slightly less than unity for most elements and their isotopes in the case of cold and thermal neutrons as well as for x-rays. The motivation for the optics use for neutrons as well as for x-rays is to increase the signal rate and, by virtue of the optic's angular resolution, to improve the signal-to-noise level by reducing the background so the efficiency of the existing neutron sources use can be significantly enhanced. Both refractive and reflective optical techniques developed for x-ray applications can be applied to focus neutron beams. Typically neutron sources have lower brilliance compared to conventional x-ray sources so in order to increase the beam throughput the neutron optics has to be capable of capturing large solid angles. Because of this, the replicated optics techniques developed for x-ray astronomy applications would be a perfect match for neutron applications, so the electroformed nickel optics under development at the Marshall Space Flight Center (MSFC) can be applied to focus neutron beams. In this technique, nickel mirror shells are electroformed onto a figured and superpolished nickel-plated aluminum cylindrical mandrel from which they are later released by differential thermal contraction. Cylindrical mirrors with different diameters, but the same focal length, can be nested together to increase the system throughput. The throughput can be increased further with the use of the multilayer coatings deposited on the reflectivr surface of the mirror shells. While the electroformed nickel replication technique needs to be adopted for neutron focusing, the technology to coat the inside of cylindrical mirrors with neutron multilayers has to be developed. The availability of these technologies would bring new capabilities to neutron instrumentation and, hence, lead to new scientific breakthroughs. We have established a program to adopt the electroformed nickel replication optics technique for neutron applications and to develop the neutron multilayer replication technology.

Gubarev, M. V.↗

Corrosion Protection for Space and Beyond

Florida is home to NASA's Launch Operations Center. Since its establishment in July 1962, the spaceport has served as the departure gate for every American manned mission and hundreds of advanced scientific spacecraft under the Launch Services Program. The center was renamed the John F. Kennedy Space Center in late 1963 to honor the president who put America on the path to the moon. Today, NASA is on the edge of a bold new chaIlenge: the ConsteIlation Program. ConsteIlation is a NASA program to create a new generation of spacecraft for human spaceflight, consisting primarily of the Ares I and Ares V launch vehicles, the Orion crew capsule, the Earth Departure stage and the Lunar access module. These spacecraft will be capable of performing a variety of missions, from Space Station resupply to lunar landings. The ambitious new endeavor caIls for NASA to return human explorers to the moon and then venture even farther, to Mars and beyond. As the nation's premier spaceport, Kennedy Space Center (KSC) will playa critical role in this new chapter in exploration, particularly in the conversion of the launch facilities to accommodate the new launch vehicles. To prepare for this endeavor, the launch site and facilities for the next generation of crew and cargo vehicles must be redesigned, assembled and tested. One critical factor that is being carefuIly considered during the renovation is protecting the new facilities and structures from corrosion and deterioration.

Calle, Luz Marina↗

In-flight Operation of the Dawn Ion Propulsion System Through Year One of Cruise to Ceres

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, 4 Vesta, and the dwarf planet 1 Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 rocket that placed the 1218-kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide an additional delta- V of approximately 11 km/s for the heliocentric transfers to each body and for all orbit transfers including orbit capture/escape and transition to the various science orbits. Deterministic thrusting to Vesta began in December 2007 and concluded with orbit capture at Vesta in July 2011. The transfer to Vesta included a Mars gravity assist flyby in February 2009 that provided an additional delta-V of 2.6 km/s and was the only postlaunch mission delta-V not provided by IPS. During the mission at Vesta the IPS was used for all orbit transfers which included six different near-polar science mapping orbits. Thrusting for departure from Vesta and the start of cruise to Ceres began on July 25, 2012 with escape from Vesta occurring on September 5, 2012. To date the IPS has been operated for approximately 31,000 hours, consumed approximately 300 kg of xenon, and provided a delta-V of approximately 8.3 km/s. IPS performance characteristics are very close to the expected performance based on analysis and testing performed prelaunch. Thrusting for cruise to Ceres will continue until the spring of 2015, with a planned arrival date at Ceres in April 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations from Vesta departure through the first year of cruise to Ceres.

Hayabusa spacecraft↗

In-Flight Operation of the Dawn Ion Propulsion System Through the Preparations for Escape From Vesta

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, 4 Vesta, and the dwarf planet 1 Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 rocket that placed the 1218-kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total delta-V of approximately 11 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers for all Vesta and Ceres science orbits. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional delta-V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. An additional 231 hours of IPS thrusting was used to enter the first Vesta science orbit, called Survey orbit, on August 3, 2011 at an altitude of about 2,735 km. The IPS was then used over the next year to transfer the spacecraft to the other science orbits: a high altitude mapping orbit (HAMO-1) in September 2011 at an altitude of approximately 673 km, a low altitude mapping orbit (LAMO) at approximately 210 km altitude, and a second high altitude mapping orbit (HAMO-2) at approximately 673 km altitude. To date the IPS has been operated for approximately 24,327 hours, consumed approximately 260 kg of xenon, and provided a delta-V of approximately 7 km/s. IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. Thrusting for escape from Vesta and cruise to Ceres is planned to start in late July 2012 with a planned arrival date at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through preparations for departure from Vesta.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Orbit Capture at Vesta

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta -II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. Onboard the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the ?V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The first 80 days after launch were dedicated to the initial checkout of the spacecraft which was followed by about ten months of full-power thrusting leading to a Mars gravity assist in February 2009 that provided 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. Deterministic thrusting for heliocentric transfer to Vesta resumed in June 2009 and was concluded with orbit capture at Vesta in July 2011. IPS was operated for approximately 23,400 hours, consumed approximately 250 kg of xenon, and provided a delta-V of approximately 6.7 km/s to achieve orbit capture at Vesta. IPS performance characteristics are very close to the expected performance characteristics based on analysis performed pre-launch. The only significant problem to have occurred over the almost four years of IPS operations in flight was the temporary failure of a valve driver board in DCIU-1, resulting in a loss of thrust of approximately 29 hours. Thrusting operations resumed after switching to DCIU-2, and power cycling conducted after orbit capture indicates DCIU-1 is completely operational. After about three weeks of survey operations IPS will be used to maneuver the spacecraft as needed for science operations including orbit transfers. After approximately one year of science operations IPS will then be used for escape from Vesta and begin thrusting for cruise to Ceres with a planned arrival date at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through orbit capture and the start of science operations at Vesta.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System: Status at One Year from the Vesta Rendezvous

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The Dawn ion thruster [I thought we only called it a thruster. Both terms are used in the paper, but I think a replacement of every occurrence of "engine" with "thruster" would be clearer.] design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. Since resumption of cruise to Vesta IPS has been operated at throttled power levels, most of the time at full power, and with a duty cycle of approximately 93%, leading to an arrival at Vesta in July of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through one year from the spacecraft's rendezvous with Vesta.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Start of the Vesta Cruise Phase

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. IPS will be operated for over two years at throttled power levels leading to arrival at Vesta in September of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of deterministic thrusting to Vesta.

Garner, Charles E.↗