Recent Performance and Ignition Tests of the pulsed SNS H- Source for 1-MW Neutron Production

After acquiring several reliable spare targets, SNS ramped the beam power from 850 kW to 1.4 MW, which required an increase in H- beam pulse length from 0.88 to 1.0 ms at 60 Hz. This increase initially produced slow 2-MHz power ramp-ups and, after several weeks of uninterrupted operation, it produced plasma outages every time the pulse length was raised above ~0.95 ms. Similar outages were previously observed towards the end of long service cycles, which were believed to indicate that the breakdown voltage of the high purity hydrogen started to exceed the induced electric fields. In 2011 the RF was reconfigured to start with 10 cycles of 1.96 MHz, which yielded the shortest H- beam rise times and apparently eliminated those plasma outages. The new, pulse-length dependent outages were eliminated by increasing the initial frequency to 1.985 MHz. However, careful frequency studies are unable to justify this frequency. In addition, the paper discusses the issues and solutions for the electron-dump voltage, which starts to sag and become unstable after several weeks of high current operation.

43 PARTICLE ACCELERATORS↗

Wind Turbine Gearbox Oil Filtration and Condition Monitoring

This is an invited presentation for a pre-conference workshop, titled advances and opportunities in lubrication: wind turbine, at the 2015 Society of Tribologists and Lubrication Engineers (STLE) Tribology Frontiers Conference held in Denver, CO. It gives a brief overview of wind turbine gearbox oil filtration and condition monitoring by highlighting typical industry practices and challenges. The presentation starts with an introduction by covering recent growth of global wind industry, reliability challenges, benefits of oil filtration and condition monitoring, and financial incentives to conduct wind operation and maintenance research, which includes gearbox oil filtration and condition monitoring work presented herein. Then, the presentation moves on to oil filtration by stressing the benefits of filtration, discussing typical main- and offline-loop practices, highlighting important factors considered when specifying a filtration system, and illustrating real-world application challenges through a cold-start example. In the next section on oil condition monitoring, a discussion on oil sample analysis, oil debris monitoring, oil cleanliness measurements and filter analysis is given based on testing results mostly obtained by and at NREL, and by pointing out a few challenges with oil sample analysis. The presentation concludes with a brief touch on future research and development (R and D) opportunities. It is hoping that the information presented can inform the STLE community to start or redirect their R and D work to help the wind industry advance.

16 TIDAL AND WAVE POWER↗

STATUS OF TRISO FUEL IRRADIATIONS IN THE ADVANCED TEST REACTOR SUPPORTING HIGH-TEMPERATURE GAS-COOLED REACTOR DESIGNS

The United States Department of Energy’s Advanced Reactor Technologies (ART) Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is irradiating up to seven low enriched uranium (LEU) tri-isotopic (TRISO) particle fuel (in compact form) experiments in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory (INL). These irradiations and fuel development are being accomplished to support development of the next generation reactors in the United States. The experiments will be irradiated over the next several years to demonstrate and qualify new TRISO coated particle fuel for use in high temperature gas reactors. The goals of the experiments are to provide irradiation performance data to support fuel process development, to qualify fuel for normal operating conditions, to support development and validation of fuel performance and fission product transport models and codes, and to provide irradiated fuel and materials for post irradiation examination (PIE) and safety testing. The experiments, which will each consist of several independent capsules, will be irradiated in an inert sweep gas atmosphere with individual on-line temperature monitoring and control of each capsule. The sweep gas will also have on-line fission product monitoring on its effluent to track performance of the fuel in each individual capsule during irradiation. The first experiment (designated AGR-1) started irradiation in December 2006 and was completed in November 2009. The second experiment (AGR-2) started irradiation in June 2010 and completed in October 2013. The third and fourth experiments have been combined into a single experiment designated (AGR-3/4), which started its irradiation in December 2011 and completed in April 2014. Since the purpose of this experiment was to provide data on fission product migration and retention in the NGNP reactor, the design of this experiment was significantly different from the first two experiments, though the control and monitoring systems are very similar. The final experiment, AGR-5/6/7, is scheduled to begin irradiation in early summer 2017.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Group IV nanocrystals with ion-exchangeable surface ligands and methods of making the same

Methods are described that include reacting a starting nanocrystal that includes a starting nanocrystal core and a covalently bound surface species to create an ion-exchangeable (IE) nanocrystal that includes a surface charge and a first ion-exchangeable (IE) surface ligand ionically bound to the surface charge, where the starting nanocrystal core includes a group IV element.

36 MATERIALS SCIENCE↗

Operation of a cascade air conditioning system with two-phase loop

A method of operating a heat transfer system includes starting operation of a first heat transfer fluid vapor/compression circulation loop including a fluid pumping mechanism, a heat exchanger for rejecting thermal energy from a first heat transfer fluid, and a heat absorption side of an internal heat exchanger. A first conduit in a closed fluid circulation loop circulates the first heat transfer fluid therethrough. Operation of a second two-phase heat transfer fluid circulation loop is started after starting operation of the first heat transfer fluid circulation loop. The second heat transfer fluid circulation loop transfers heat to the first heat transfer fluid circulation loop through the internal heat exchanger and includes a heat rejection side of the internal heat exchanger, a liquid pump, and a heat exchanger evaporator. A second conduit in a closed fluid circulation loop circulates a second heat transfer fluid therethrough.

42 ENGINEERING↗

Lessons Learned from a Laser Injury Event - Limitations of Skill-Of-The-Craft

A technician at INL received 2nd degree burns to the middle and ring fingers of his left hand while performing a preventive maintenance (PM) procedure on a Class 4 industrial laser on August 30, 2011. The task required placement of a “target” in the beam path to verify mirror alignment. The technician, believing the laser was in a safe mode, reached into the beam pathway to place the target, saw a flash and immediately withdrew his hand. Three INL technicians were assigned to perform a 2000 hour run time PM on a laser. A pre-job briefing was held August 29, 2011 by the acting foreman and the technicians started the PM. They had completed 25 steps in Section I of the work order by the end of the day. The laser systems were placed under LO/TO and the internal optics were cleaned and/or replaced. The LO/TO was released and the next morning, August 30, 2011, the technicians prepared to take a diagnostic shot inside the internal optics. The laser was powered up at the HMI, and the person in charge (PIC) selected the “Mirror Alignment” program from the human machine interface (HMI) screen, enabled the pendent and pressed the “Cycle Start” button. The technicians believed the laser was in “simmer” mode at this point and that no beam was being generated out of the resonator. A beam was being generated in the “Mirror Alignment” program when the “Cycle Start” button was pressed. They decided to check the #4 aperture target and see if they were aligned at that location. One of the technicians reach to place the target at the end of the Z box and a “Flash” occurred. The technician immediately retracted his hand with the target. The PIC turned off the high voltage (HV) at the pendent. The foreman and supervisor were informed of the incident and the injured technician was escorted to an onsite medical facility. The nurse evaluated the injury and sent the technician to a physician for further evaluation. A physician examined the technician’s hand. The technician’s left middle and ring fingers received 2nd degree burns to both finger tips. A prescription burn ointment and bandage was applied. The employee was returned to work with no restrictions.

99 GENERAL AND MISCELLANEOUS↗

SIW21-95: Hybridizing Synchronous Condensers with Grid-Forming Battery Energy Storage Systems

One of the main challenges associated with deployment of high shares of inverter-based resources (IBRs) in power grid is not only reduced system inertia but also degrading system strength that may cause severe stability impacts. A minimum level of system strength is needed for the power system to remain stable under normal conditions and to return to a steady state condition following a system disturbance. Significant system strength reduction is expected in almost all planned areas for solar and wind generation deployment. Synchronous condensers (SC) have been considered as one main technology to address the system strength issues for the areas with high levels of IBRs. SCs can help improving reliability and resiliency of power system but they do not provide the full range of services needed by power systems for reliable and economic integration of high shares of inverter-coupled variable generation such as PV generation. Services related to active power controls cannot be provided by SCs due to lack of prime mover. Even for provision of reactive power SCs have certain constraints based on their thermal and stability limits. NREL has been conducting research on a hybridized concept that combines SCs with grid forming (GFM) battery energy storage systems (BESS). This super flexible AC transmission system (SuperFACTS) that combines these two technologies in a single plant under the same controller offers a unique scalable set of services to the power system at all levels (transmission, sub-transmission, distribution, islands and isolated microgrids). Depending on use cases, SuperFACTS can be controlled to provide fully dispatchable and flexible operation using energy storage component, provide a full range of existing and future ancillary and reliability services to the grid (similar or better than conventional sources), maintain adequate levels of grid strength and inertia, and provide fault current for proper operation of protection systems. Therefore, this economic and easy to commercialize solution has potential for significant impacts on certain segments of global energy sector. All types of gird services (market based, reliability and resiliency) can be provided by SuperFACTS plants. GFM BESS can act as a self-black start source for each SuperFACTS module, which in turn can act a black start resource for co-located PV and wind power plants, segments of transmission and distribution networks, for conventional power plants, etc. The issue of in-rush currents during black start is addressed by overcurrent capability of SCs. In this paper we describe the results of modeling for SuperFACTS concept.

grid forming↗

System and method embodiments for element extraction and separation

The present disclosure provides system and method embodiments for extracting and separating rare earth elements (REEs) from various starting materials and sources. The system and method embodiments disclosed herein facilitate efficient REE extraction, separation, and/or isolation, even when the REEs are present in a starting material at a relatively low level compared to undesirable metals co-present in the starting material. In at least some examples, the disclosed system and method embodiments may be used to recover one or more REEs from coal derived acid mine drainage.

Boukhalfa, Hakim↗

Challenges for Lithuania: Ignalina NPP Early Closure

As a condition of accession into the European Union (EU), Lithuania is committed to the closure and decommissioning of Ignalina NPP comprising two RBMK-1500 reactor units (Fig. 1). It was agreed in a special protocol to the Accession Treaty that, in return for adequate EU financial assistance, Unit 1 would be closed before 2005 and Unit 2 by the end of 2009. The first unit was duly shut down on December 31, 2004. Lithuania, which has borders with Russia (Kaliningrad territory), Poland, Latvia and Belarus, spent fifty years as part of the Soviet Union and was deeply integrated into its economy and electrical infrastructure. At the break-up of the USSR, Lithuania inherited electricity generating capacity designed to supply the north-west region including ownership of Ignalina NPP located in the north-east of the country. Ignalina NPP Unit 1 was commissioned in 1983, Unit 2 in 1987; the planned lifespan of each unit was 30 years. Construction of a third unit was started but never completed. Since Lithuania became independent in 1990, Ignalina NPP has typically contributed more than 70% of national power supply. The town of Visaginas (population approx. 30,000) was purpose built to serve the plant and staff were brought in from throughout the USSR. With 3200 direct employees, Ignalina NPP remains by far the largest employer. Although there are pockets of Russian-language speakers in communities throughout Lithuania, Visaginas is the only example on a whole-town scale. Thus closure of Ignalina NPP within the restricted timescale required by the EU Accession Treaty commitment set an exceptional challenge to Lithuania. However, since the preparatory phase of decommissioning started in 2000, notable progress has been made, experience gained and lessons learnt. At present Unit 1 remains partially fueled in a state of care and maintenance. Partly burnt fuel is being transferred from Unit 1 to Unit 2 for further irradiation in order to minimize the commitment of new fuel thereby reducing operating costs and the final quantity of spent fuel. Design and construction of the facilities for spent fuel storage, waste processing and free-release is ongoing. The siting of the Near Surface Repository is now in the final stages of approval and construction of the landfill facility is under tendering. In order to facilitate the approval process and minimize the transport of waste, both disposal facilities will be within the boundary of the NPP site. Approximately 450 staff are employed at the shutdown Unit 1 for the safe maintenance of essential systems. The total staffing level at the plant is currently being reduced by around 200 each year, with a larger release to take place at the closure of Unit 2. It is envisaged that 2000 staff will be required for the dismantling operations. Although Ignalina NPP is still in the early stages of closure and decommissioning, some important lessons have already been learnt: Firstly, the importance considering social and financial issues as well as technical factors in deciding the decommissioning strategy. This should be done before the preparation is started of the FDP. The same broad consideration should also be given to the economic restructuring of the local area. Consultation is necessary with local and national authorities, and other stakeholders up to ensure a common vision. At Ignalina NPP it was considered essential to staff morale and the maintenance of a strong safety culture to guarantee the special social and employment benefits to dismissed staff in law [9]. At the same time, measures were also adopted to encourage certain key personnel to remain at the plant until closure. The case of Lithuania, which at independence had no legislative framework or management infrastructure for radioactive waste, may be exceptional; however, for all decommissioning projects it is necessary to have, from the outset, a clear strategy on waste storage and disposal. Finally, coordination at all levels must be assured, especially with the involvement of the nuclear regulators and other regulatory authorities, to achieve a smooth progression from operation into decommissioning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Progress and Status of the Ignalina Nuclear Power Plant's New Solid Waste Management and Storage Facilities

A considerable amount of dry radioactive waste from former NPP operation has accumulated up to date and is presently stored at the Ignalina NPP site, Lithuania. Current storage capacities are nearly exhausted and more waste is to come from future decommissioning of the two RMBKtype reactors. Additionally, the existing storage facilities does not comply to the state-of-the-art technology for handling and storage of radioactive waste. In 2005, INPP faced this situation of a need for waste processing and subsequent interim storage of these wastes by contracting NUKEM with the design, construction, installation and commissioning of new waste management and storage facilities. The subject of this paper is to describe the scope and the status of the new solid waste management and storage facilities at the Ignalina Nuclear Power Plant. In summary: The turnkey contract for the design, supply and commission of the SWMSF was awarded in December 2005. The realisation of the project was initially planned within 48 month. The basic design was finished in August 2007 and the Technical Design Documentation and Preliminary Safety Analyses Report was provided to Authorities in October 2007. The construction license is expected in July 2008. The procurement phase was started in August 2007, start of onsite activities is expected in November 2007. The start of operation of the SWMSF is scheduled for end of 2009. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of the generalized Riemann solver and the gas-kinetic scheme for inviscid compressible flow simulations

The generalized Riemann problem (GRP) scheme for the Euler equations and gas-kinetic scheme (GKS) for the Boltzmann equation are two high resolution shock capturing schemes for fluid simulations. The difference is that one is based on the characteristics of the inviscid Euler equations and their wave interactions, and the other is based on the particle transport and collisions. The similarity between them is that both methods can use identical MUSCL-type initial reconstructions around a cell interface, and the spatial slopes on both sides of a cell interface involve in the gas evolution process and the construction of a time-dependent flux function. Although both methods have been applied successfully to the inviscid compressible flow computations, their performances have never been compared. Since both methods use the same initial reconstruction, any difference is solely coming from different underlying mechanism in their flux evaluation. Therefore, such a comparison is important to help us to understand the correspondence between physical modeling and numerical performances. Since GRP is so faithfully solving the inviscid Euler equations, the comparison can be also used to show the validity of solving the Euler equations itself. The numerical comparison shows that the GRP exhibits a slightly better computational efficiency, and has comparable accuracy with GKS for the Euler solutions in 1D case, but the GKS is more robust than GRP. For the 2D high Mach number flow simulations, the GKS is absent from the shock instability and converges to the steady state solutions faster than the GRP. The GRP has carbuncle phenomena, likes a cloud hanging over exact Riemann solvers. The GRP and GKS use different physical processes to describe the flow motion starting from a discontinuity. One is based on the assumption of equilibrium state with infinite number of particle collisions, and the other starts from the non-equilibrium free transport process to evolve into an equilibrium one through particle collisions. The different mechanism in the flux evaluation deviates their numerical performance. Through this study, we may conclude scientifically that it may NOT be valid to use the Euler equations as governing equations to construct numerical fluxes in a discretized space with limited cell resolution. To adapt the Navier-Stokes (NS) equations is NOT valid either because the NS equations describe the flow behavior on the hydrodynamic scale and have no any corresponding physics starting from a discontinuity. This fact alludes to the consistency of the Euler and Navier-Stokes equations with the continuum assumption and the necessity of a direct modeling of the physical process in the discretized space in the construction of numerical scheme when modeling very high Mach number flows. The development of numerical algorithm is similar to the modeling process in deriving the governing equations, but the control volume here cannot be shrunk to zero.

97 MATHEMATICS AND COMPUTING↗

TRACE and TRAC-BF1 benchmark against Leibstadt plant data during the event inadvertent opening of relief valves

In framework of introducing TRACE code to transient analyses system codes for Leibstadt Power Plant (KKL), a conversion process of existing TRAC-BF1 model to TRACE has been started within KKL. In the first step, TRACE thermal-hydraulic model for KKL has been developed based on existing TRAC-BF1 model. In order to assess the code models a simulation of plant transient event is required. In this matter simulations of inadvertent opening of 8 relief valves event have been performed. The event occurs at KKL during normal operation, and it started when 8 relief valves open resulting in depressurization of the Reactor Pressure Vessel (RPV). The reactor was shutdown safely by SCRAM at low level. The high pressure core spray (HPCS) and the reactor core isolation cooling (RCIC) have been started manually in order to compensate the level drop. The remaining water in the feedwater (FW) lines flashes due to saturation conditions originated from RPV depressurization and refills the reactor downcomer. The plant boundary conditions have been used in the simulations and the FW flow rate has been adjusted for better prediction. The simulations reproduce the plant data with good agreement. It can be concluded that the TRAC-BF1 existing model has been used successfully to develop the TRACE model and the results of the calculations have shown good agreement with plant recorded data. Beside the modeling assessment, the TRACE and TRAC-BF1 capabilities to reproduce plant physical behavior during the transient have shown satisfactory results. The first step of developing KKL model for TRACE has been successfully achieved and this model is further developed in order to simulate more complex plant behavior such as Turbine Trip. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Decontamination Process of Internal Part Pipes - 13442

The Marcoule Site, created in 1955 is one of the first nuclear sites in France. It combines the activities of the Research Centre of the French Atomic Energy Commission (CEA) and AREVA industrial operations. Today, a large part of the operations on this site consists of the cleaning and the dismantling of nuclear Installations, once the end of their life cycle has been reached. An example can be the reprocessing plant UP1. This unit, started in 1958 has been stopped in 1997 and its dismantling started quickly thereafter. Technical challenges of the UP1 dismantling are mainly linked to a very high risk of exposure due to a large variety of contaminated equipments and residuals of fission products, potential sources of irradiation. The dismantling of Hall 71 is a typical example of such challenge. This paper will present a solution developed by AREVA Clean-Up business unit, in collaboration with COFIM Industry, to remove contamination incrusted inside the pipes before starting the cutting operations, thus reducing irradiation risk. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Implementing Geological Disposal of Radioactive Waste Technology Platform From the Strategic Research Agenda to its Deployment - 12015

Several European waste management organizations (WMOs) have initiated a technology platform for accelerating the implementation of deep geological disposal of radioactive waste in Europe. The most advanced waste management programmes in Europe (i.e. Finland, Sweden, and France) have already started or are prepared to start the licensing process of deep geological disposal facilities within the next decade. A technology platform called Implementing Geological Disposal of Radioactive Waste Technology Platform (IGD-TP) was launched in November 2009. A shared vision report for the platform was published stating that: 'Our vision is that by 2025, the first geological disposal facilities for spent fuel, high-level waste, and other long-lived radioactive waste will be operating safely in Europe'. In 2011, the IGD-TP had eleven WMO members and about 70 participants from academia, research, and the industry committed to its vision. The IGD-TP has started to become a tool for reducing overlapping work, to produce savings in total costs of research and implementation and to make better use of existing competence and research infrastructures. The main contributor to this is the deployment of the IGD-TP's newly published Strategic Research Agenda (SRA). The work undertaken for the SRA defined the pending research, development and demonstration (RD and D) issues and needs. The SRA document describing the identified issues that could be worked on collaboratively was published in July 2011. It is available on the project's public web site (www.igdtp.eu). The SRA was organized around 7 Key Topics covering the Safety Case, Waste forms and their behaviour, Technical feasibility and long-term performance of repository components, Development strategy of the repository, Safety of construction and operations, Monitoring, and Governance and stakeholder involvement. Individual Topics were prioritized within the Key Topics. Cross-cutting activities like Education and Training or Knowledge Management as well as activities remaining specific for the WMOs were as well identified in the document. For example, each WMO has to develop their own waste acceptance rules, and plan for the economics and the funding of their waste management programmes. The challenge at hand for the IGD-TP is to deploy the SRA. This is carried out by agreeing on a Deployment Plan (DP) that guides organizing the concrete joint activities between the WMOs and the other participants of the IGD-TP. The first DP points out the coordinated RD and D projects and other activities that need to be launched to produce these results over the next four to five years (by the end of 2016). The DP also describes general principles for how the joint work can be organised and funded. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Realization of the National Disposal Facility for Radioactive Waste in Bulgaria - 16611

Radioactive waste is generated in the Republic of Bulgaria from the operation and decommissioning of the country's nuclear power plants and from other sources in research, medical applications, and the industry. The need for building a National Disposal Facility (NDF) is recognized by the Bulgarian government and described and justified in its Environment Impact Assessment Decision. The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is endeavoring to build a near-surface repository for short-lived low- and intermediate-level radioactive waste (SL-LILW) to discharge its statutory responsibilities in waste management is. The European Union (EU) finances the establishment of the NDF through the Kozloduy International Decommissioning Support Fund (KIDSF). After an international tendering procedure, SERAW placed a contract for the development of the design of the NDF to the Consortium of Westinghouse Electric Spain S.A.R and DBE Technology GmbH of Germany, with ENRESA, the Spanish National Waste Management Agency providing technical review and support. Two Bulgarian companies participate also in the project as subcontractors - EQE Bulgaria and to a lesser extent KK-Project. The repository project official name is 'Technical Design and ISAR Preparation for the National Disposal Facility at Bulgaria', usually abbreviated as 'R-Project 5'. After obtaining SERAW's approval for the preferred repository conceptual design variant, the R Project 5 focused on developing the Technical Design on the one hand, and on preparing the Intermediate Safety Analysis Report (ISAR) to demonstrate the safety and suitability of the proposed NDF design on the other. These documents were handed over to the Bulgarian Nuclear Regulatory Authority (BNRA) as well as to the different authorities involved in the comprehensive licensing process required for nuclear facilities in the country. The corresponding permits have mostly been received or are expected for early 2016. In the last quarter of 2015 the procurement procedure for repository construction as turn-key project was started with the pre-qualification of possible constructors for the Phase I repository realization on a lump sum contract basis. Repository construction is now expected to start in 2016, with the start of waste disposal now scheduled for around 2020. With the realization of the Bulgarian National Disposal Facility an important milestone for waste disposal in the European Union is about to be achieved. This paper is a sequel of previously presented papers on the NDF construction, now including details of the complex licensing process that this disposal facility underwent, now in its final stages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Evolution of Chemical Waste Treatment in the Nuclear Industry Simple Solutions for Complex Problems - 16694

The U.S. nuclear waste treatment industry was born in the 1980s and early 1990s with the end of the Cold War, the peak of commercial nuclear power, and after implementation of federal regulations that drove new disposal requirements for radioactive waste generators. New regulations resulted in soaring costs for radioactive waste disposal, and thus an industry was born that focused on recycling, volume reduction, and waste form improvement. New treatment facilities and technologies were started that primarily dealt with low-level radioactive wastes; however, there was little to no treatment capacity for wastes commingled with hazardous chemicals. Large volumes of 'mixed wastes', of which many became known as 'orphan wastes', were being stored on U.S. Department of Energy (DOE) sites with no path for disposal and thus posed a risk to workers, the public, and the environment. Perma-fix Environmental Services, Inc. (Perma-Fix), which started in the hazardous waste industry in 1990 and had developed facilities and technologies to treat hazardous wastes, evolved in the late 90's to meet this mixed waste market opportunity. By adapting our technologies and collaborating with waste generators to understand their needs, we successfully developed treatment and disposition solutions for some of the most challenging mixed wastes in the U.S. By establishing a pathway for treatment and disposal of orphan wastes, Perma-Fix played an important role in the safe treatment and disposition of orphan wastes, which facilitated closure of DOE sites such as Rocky Flats, Mound, and Fernald. We found that understanding chemistry and having experience in managing the hazardous constituents of mixed wastes allowed us to apply solutions that were not overly complex and expensive. Further, by adapting proven hazardous waste treatment solutions to wastes commingled with contaminants such as polychlorinated biphenyls (PCBs), mercury, and organics we were able to safely manage even more problematic mixed wastes. During the 1980's, commercial low-level radioactive waste treatment and disposal solutions were being developed. At the same time, the federal government began dealing with increasing stakeholder demands for permanent solutions of more complex radioactive wastes such as high-level waste (HLW) and transuranic (TRU) wastes. HLW and TRU waste disposal became a contentious political issue between the federal government, regulatory agencies, and the public. As a result, DOE was mandated to develop treatment and disposal methodologies to address these wastes. DOE's Waste Isolation Pilot Plant (WIPP) facility solved most issues with disposition of TRU wastes; however, for HLW (for example tank wastes at Hanford, Savannah River, and Idaho) the complexity of the wastes and the fact that government entities were developing political solutions for waste treatment resulted in a variety of complex and expensive solutions. Decades later we still do not have a permanent solution for HLW. Whether some simple commercial approaches are possible, what regulatory changes should occur, and what the implications may be if we do not change our current path, will be discussed. After two decades, we see the low-level nuclear waste industry maturing and replicating the path of the hazardous waste industry. When new hazardous waste federal regulations were enacted in the 1970's and 1980's, the hazardous waste industry began to boom with new company start-ups and construction of numerous treatment and disposal facilities. Initially, this was a good business to be in, managing dangerous wastes in an environmentally safe and responsible manner, and it was profitable. However, over-capacity and fierce competition drove down pricing, and companies failed. This ultimately led to a major consolidation within the hazardous waste industry. Similarly and more recently in the nuclear industry, over-capacity and competition has driven down profitability, companies have failed, and there is a major consolidation occurring within sectors of the industry. For consolidation to be successful and healthy for either industry, a leader must emerge to set the direction for the others and establish a sustainable path that is acceptable for waste generators, stakeholders, and investors. This was the case for the hazardous waste industry. This paper will examine the parallels between the hazardous and nuclear waste industries as they have matured and evolved, and what discuss the long term implications of consolidation within the nuclear industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Peculiarities of Transition from Operation to Decommissioning for the Chernobyl NPP - 18486

Usually the transition period is supposed to last around 5 years and to cover the eventual defueling of the reactor and the reactor cooling pool, completion of the characterization survey and preparation of all necessary documents to start the decommissioning activities in accordance with the decommissioning strategy chosen and the decommissioning plan approved. It was not the case for the Chernobyl NPP due to a number of reasons and obstacles, including delayed defueling due to unavailability of the storage capacities, lack of preparatory work due to prescheduled decommissioning, luck of experience of RBMK-type reactors decommissioning, influence of the destroyed Chernobyl-4 Unit and related works on site. All these factors not only delayed the completion of the characterization survey, but added complications to development of the decommissioning strategy and the decommissioning plan. De facto the issue of end state is still open as the end state for the destroyed Chernobyl-4 as well as the prospects of the exclusion zone transformation need further clarifications and justifications. As a result, the need to reconsider the standard concept of transition period was recognized already by the end of 2000, when Chernobyl-1 and Chernobyl-2 were out of operation for a few years. It was clear that the personnel had generally a bad perception of the prescheduled permanent shutdown decision and a low motivation to change and to learn. The first signs of organizational degradation were visible and the framework of the operational license did not fit well to prevent it. So it was decided to start the legal and organizational transformation into the decommissioning mode without waiting for polishing of the decommissioning strategy and decommissioning plan as in this case both documents seemed to need further adjustments anyway. The transition period (or the termination of operation as it called in the national nuclear safety regulations) was considered as the first phase of decommissioning to be covered by the decommissioning license. The detailed plan of activities for the transition period with proper safety justification documents was the main part of the relevant license application. Human resource management plan and adoption of the management system were important constituents as well. It was also considered reasonable to start some dismantling works already at this phase to avoid further delays and degradation, the works being carefully justified. Eventually such approach added to streamlining the decommissioning process and to avoid further organizational and technical degradation. Flexibility in transition from operation to decommissioning seems necessary in cases of prescheduled or post-accidental decommissioning but may be also beneficial for a scheduled decommissioning case. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning Status and Preliminary Engineering Planning for Chinshan NPP in Taiwan - 19114

The Chinshan Nuclear Power Plant, which consists of two BWR units and was owned by Taiwan Power Company (TPC), has an electrical output of 636 MWe for each unit. Unit No. 1 and Unit No. 2 were licensed till December 2018 and July 2019, respectively. According to regulations of decommissioning in Taiwan, decontamination and dismantling of a NPP should be completed within 25 years. Therefore, TPC had started compiling the decommissioning plans (DP, 17 chapters) with INER, national engineering companies and international consultants since 2012. The DP of Chinshan NPP has been approved by the regulator, Atomic Energy Council (AEC), in the end of June, 2017. There are 17 chapters in the decommissioning plans, which deal with all aspects of safety-related considerations during the decommissioning period, such as spent fuel management, waste management, personnel/workers planning, schedules/working items, environmental management and monitoring. Those items are discussed in detail in this paper in accordance with the approved DP. The implementation of decommissioning will be started while the Environmental Impact Assessment (EIA) is still under approval by EPA, which is expected to be completed in the end of 2018 or the mid of 2019. Once the decommissioning be started, all dismantling, decontamination, management teams, and preparation would be kicked off simultaneously in a very short period of time. In this paper, the planning assumptions, strategies from INER and TPC, management of radioactive waste, conversion of Turbine Building and detailed description of turbine-generator set are discussed. For the Turbine Building dismantling, inventories of equipment, cutting technology determination, storage logistics, container options and radwaste treatment and reduction would be important factors to be evaluated in the beginning. Afterwards, WBS (work breakdown structure) would be determined and be the basis for working bids, construction of a new storage warehouse, an incinerator and a super high pressure compactor. This preliminary engineering planning would be applied in the decommissioning of Chinshan NPP for the first time and be duplicated in Kuosheng NPP and Maanshan NPP in Taiwan as well. (authors)