Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SRS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Planning Tool for Strategic Evaluation of Facility Plans - 13570

Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

54 ENVIRONMENTAL SCIENCES↗

Reevaluation of Vitrified High-Level Waste Form Criteria for Potential Cost Savings at the Defense Waste Processing Facility - 13598

At the Savannah River Site (SRS) the Defense Waste Processing Facility (DWPF) has been immobilizing SRS's radioactive high level waste (HLW) sludge into a durable borosilicate glass since 1996. Currently the DWPF has poured over 3,500 canisters, all of which are compliant with the U. S. Department of Energy's (DOE) Waste Acceptance Product Specifications for Vitrified High-Level Waste Forms (WAPS) and therefore ready to be shipped to a federal geologic repository for permanent disposal. Due to DOE petitioning to withdraw the Yucca Mountain License Application (LA) from the Nuclear Regulatory Commission (NRC) in 2010 and thus no clear disposal path for SRS canistered waste forms, there are opportunities for cost savings with future canister production at DWPF and other DOE producer sites by reevaluating high-level waste form requirements and compliance strategies and reducing/eliminating those that will not negatively impact the quality of the canistered waste form. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment Program for the Savannah River Site Liquid Waste Facilities - 13610

The Liquid Waste facilities at the U.S. Department of Energy's (DOE) Savannah River Site (SRS) are operated by Liquid Waste Operations contractor Savannah River Remediation LLC (SRR). A separate Performance Assessment (PA) is prepared to support disposal operations at the Saltstone Disposal Facility and closure evaluations for the two liquid waste tank farm facilities at SRS, F-Tank Farm and H-Tank Farm. A PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified in operations and closure regulatory guidance. The Saltstone Disposal Facility is subject to a State of South Carolina industrial solid waste landfill permit and the tank farms are subject to a state industrial waste water permit. The three Liquid Waste facilities are also subject to a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Due to the regulatory structure, a PA is a key technical document reviewed by the DOE, the State of South Carolina and the EPA. As the waste material disposed of in the Saltstone Disposal Facility and the residual material in the closed tank farms is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005, the U.S. Nuclear Regulatory Commission (NRC) is also a reviewing agency for the PAs. Pursuant to the Act, the NRC also has a continuing role to monitor disposal actions to assess compliance with stated performance objectives. The Liquid Waste PA program at SRS represents a continual process over the life of the disposal and closure operations. When the need for a PA or PA revision is identified, the first step is to develop a conceptual model to best represent the facility conditions. The conceptual model will include physical dimensions of the closed system, both the engineered and natural system, and modeling input parameters associated with the modeled features, both initial values (at the time of facility closure) and degradation rates/values. During the development of the PA, evaluations are conducted to reflect not only the results associated with the best available information at the time but also to evaluate potential uncertainties and sensitivities associated with the modeled system. While the PA will reflect the modeled system results from the best available information, it will also identify areas for future work to reduce overall PA uncertainties moving forward. DOE requires a PA Maintenance Program such that work continues to reduce model uncertainties, thus bolstering confidence in PA results that support regulatory decisions. This maintenance work may include new Research and Development activities or modeling as informed by previous PA results and other new information that becomes available. As new information becomes available, it is evaluated against previous PAs and appropriate actions are taken to ensure continued confidence in the regulatory decisions. Therefore, the PA program is a continual process that is not just the development of a PA but seeks to incorporate new information to reduce overall model uncertainty and provide continuing confidence in regulatory decisions. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater Monitoring Report Generation Tools - 12005

Compliance with National and State environmental regulations (e.g. Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) aka SuperFund) requires Savannah River Site (SRS) to extensively collect and report groundwater monitoring data, with potential fines for missed reporting deadlines. Several utilities have been developed at SRS to facilitate production of the regulatory reports which include maps, data tables, charts and statistics. Components of each report are generated in accordance with complex sets of regulatory requirements specific to each site monitored. SRS developed a relational database to incorporate the detailed reporting rules with the groundwater data, and created a set of automation tools to interface with the information and generate the report components. These process improvements enhanced quality and consistency by centralizing the information, and have reduced manpower and production time through automated efficiencies. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operation of Bubblers in the Savannah River Site Defense Waste Processing Facility Melter - 12166

Savannah River Remediation (SRR) LLC acquired the liquid waste contract at the Savannah River Site (SRS) in the summer of 2009. In order to achieve the main goal of the contract, closing of High Level Waste (HLW) tanks, it was necessary to process more waste throughout the SRS liquid waste facilities. The Defense Waste Processing Facility (DWPF) would need to increase its production rate of radioactive waste glass filled canisters as a part of the plan to achieve this commitment. To attain the increased production rate, four bubblers were installed in the DWPF Melter in September 2010 to agitate the DWPF Melter glass pool. The four bubblers were designed to be installed in existing nozzles on the top-head of the DWPF Melter. The design and fabrication of the four (4) bubblers was accomplished through SRR critical subcontractor EnergySolutions LLC. In addition to the existing bubbler design, a new design concept has been approved and is in the process of fabrication. The new design will allow for the lower end (inside melter) of the bubbler to be replaced while the upper end (outside melter) of the bubbler is reused to minimize cost and waste at the DWPF. The bubblers have been operating in the DWPF Melter for approximately 1 year. The originally installed bubbler set was replaced in January 2011. The bubblers were visually examined once removed from the melter and showed minimal signs of wear. Material testing of the Inconel 690 is being performed to determine if the bubblers operational life can be extended. The use of the bubblers has changed the dynamics within the melter glass pool. This is shown through indications that the bubblers have increased the glass pool circulation. Overall, performance of the bubblers has been encouraging and the DWPF Melter has seen a significant improvement in its ability to process waste since the bubbler installation. The installation of the bubblers accomplished the goal of increasing the glass production capability of DWPF Melter. Currently the DWPF Melter is producing glass at a rate of 91 to 93 kg of glass/hour (200 to 205 lbs of glass/hour). As a result of this increased glass production rate the DWPF has been able to produce the most canisters since radioactive operations began in 1996. These accomplishments can be directly attributed to the bubblers ability to increase mixing/convection within the glass melt pool thereby improving the heat transfer from melt pool to the cold cap. Further, this has helped SRR take a significant step forward toward closing the HLW tanks at the aggressive pace set forth in the most recent liquid waste contract at the SRS. As a path forward, the DWPF is continuing work with SRNL to complete the final metallurgical examination of the bubbler samples to help determine methods to increase the design life of the bubblers beyond the current 6-month restriction. Also, the DWPF is continuing work with EnergySolutions on a new bubbler design concept to minimize cost and waste at the DWPF. The new design will allow for the lower end (inside melter) of the bubbler to be replaced while the upper end (outside melter) of the bubbler is reused. This new design is currently in the final design approval phase and EnergySolutions will be selecting a fabricator to begin the work to build bubbler sets 5 and 6 using the new design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

F-Tank Farm Performance Assessment Updates through the Special Analysis Process at Savannah River Site - 12169

The F-Area Tank Farm (FTF) is owned by the U.S. Department of Energy and operated by Savannah River Remediation, LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF is in the north-central portion of the SRS and occupies approximately 22 acres within F-Area. The FTF is an active radioactive waste storage facility consisting of 22 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. An FTF Performance Assessment (PA) was prepared to support the eventual closure of the FTF underground radioactive waste tanks and ancillary equipment. The PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified below for final closure of FTF. The FTank Farm is subject to a state industrial waste water permit and Federal Facility Agreement. Closure documentation will include an F-Tank Farm Closure Plan and tank-specific closure modules utilizing information from the performance assessment. For this reason, the State of South Carolina and the Environmental Protection Agency must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. The projected waste tank inventories in the FTF PA provide reasonably bounding FTF inventory projections while taking into account uncertainties in the effectiveness of future tank cleaning technologies. As waste is removed from the FTF waste tanks, the residual contaminants will be sampled and the remaining residual inventory is characterized. In this manner, tank specific data for the tank inventories at closure will be available to supplement the waste tank inventory projections currently used in the FTF PA. For FTF, the new tank specific data will be evaluated through the Special Analysis process. The FTF Special Analyses process will be utilized to evaluate information regarding the final residual waste that will be grouted in place in the FTF Tanks and assess the potential impact the new inventory information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. The purpose of this paper is to discuss the Special Analysis process and share insights gained while implementing this process. An example of an area of interest in the revision process is balancing continuous improvement versus configuration control of agreed upon methodologies. Other subjects to be covered include: 1) defining the scope of the revisions included in the Special Analysis, 2) determining which PA results should be addressed in the Special Analysis, and 3) deciding whether the Special Analysis should utilize more qualitative or quantitative assessments. For the SRS FTF, an FTF PA has been prepared to provide the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of FTF. The FTF Special Analyses process will be utilized to evaluate the impact new information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. In preparing SAs, it is crucial that the scope of the SA be well defined within the SA, since the specific scope will vary from SA to SA. Since the SAs are essentially addendums to the PA, the SA scope should utilize the PA as the baseline from which the SA scope is defined. The SA needs to focus on evaluating the change associated with the scope, and not let other changes interfere with the ability to perform that evaluation by masking the impact of the change. In preparing the SA, it is also important to let the scope determine whether the Special Analysis should utilize more qualitative or quantitative assessments and also which results from the PA should be addressed in the Special Analysis. These decisions can vary from SA and should not be predetermined. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deployment of Performance Management Methodology as part of Liquid Waste Program at Savannah River Site - 12178

In 2009, Savannah River Remediation LLC (SRR) assumed the management lead of the Liquid Waste (LW) Program at the Savannah River Site (SRS). The four SRR partners and AREVA, as an integrated subcontractor are performing the ongoing effort to safely and reliably: - Close High Level Waste (HLW) storage tanks; - Maximize waste throughput at the Defense Waste Processing Facility (DWPF); - Process salt waste into stable final waste form; - Manage the HLW liquid waste material stored at SRS. As part of these initiatives, SRR and AREVA deployed a performance management methodology based on Overall Equipment Effectiveness (OEE) at the DWPF in order to support the required production increase. This project took advantage of lessons learned by AREVA through the deployment of Total Productive Maintenance and Visual Management methodologies at the La Hague reprocessing facility in France. The project also took advantage of measurement data collected from different steps of the DWPF process by the SRR team (Melter Engineering, Chemical Process Engineering, Laboratory Operations, Plant Operations). Today the SRR team has a standard method for measuring processing time throughout the facility, a reliable source of objective data for use in decision-making at all levels, and a better balance between engineering department goals and operational goals. Preliminary results show that the deployment of this performance management methodology to the LW program at SRS has already significantly contributed to the DWPF throughput increases and is being deployed in the Saltstone facility. As part of the liquid waste program on Savannah River Site, SRR committed to enhance production throughput of DWPF. Beyond technical modifications implemented at different location of the facility, SRR deployed performance management methodology based on OEE metrics. The implementation benefited from the experience gained by AREVA in its own facilities in France. OEE proved to be a valuable tool in order to support the enhancement program in DWPF by providing unified metrics to measure plant performances, identify bottleneck location, and rank the most time consuming causes from objective data shared between the different groups belonging to the organization. Beyond OEE, the Visual Management tool adapted from the one used at La Hague were also provided in order to further enhance communication within the operating teams. As a result of all the initiatives implemented on DWPF, achieved production has been increased to record rates from FY10 to FY11. It is expected that thanks to the performance management tools now available within DWPF, these results will be sustained and even improved in the future to meet system plan targets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Air Pathway Modeling of the E-Area Low-Level Waste Facility at the Savannah River Site - 12253

This investigation was initiated to address a concern expressed by the Department of Energy's Low Level Waste Disposal Facility Federal Review Group (LFRG) Review Team during their review of the 2008 E-Area Performance Assessment (PA). The concern was the potential for overlapping of atmospheric plumes, emanating from the soil surface above SRS LLW disposal facilities within the E-Area, to contribute to the dose received by a member of the public during the Institutional Control (IC) period. The implication of this concern was that the dose to the maximally-exposed individual (MEI) located at the SRS boundary might be underestimated during this time interval. To address this concern a re-analysis of the atmospheric pathway releases from E-Area was required. A new atmospheric release model (ARM) capable of addressing the LFRG plume overlap concern was developed. The conceptual approach to assessing the atmospheric dose to a member of the public from E-Area LLW disposal facilities is to perform sub-surface simulations of the release of volatile radionuclides from the waste zones through the overlying engineered barriers to determine a flux rate at the land surface. Then, atmospheric dispersion of the radionuclide flux is simulated in an atmospheric transport model to compute air concentrations in the vicinity of the hypothetically exposed individual. A re-analysis of atmospheric dispersion portion of the atmospheric pathway releases was not undertaken, however the Dose Release Factors (DRF's) previously computed in a atmospheric transport study were retained to convert the new surface emanation fluxes (computed with the ARM) into doses received by the MEI at the appropriate points of compliance (POC). In this way, the dose received by the MEI could be compared to the maximum permissible dose level, defined in DOE Order 435.1 as being 100 uSv/yr (10 mrem/yr). The main conclusion of this study is that for atmospheric releases from the E-Area disposal facilities, plume overlap does not cause the total dose to the MEI at the SRS boundary during IC to exceed the PA performance objective. This conclusion directly addresses the LFRG PA review team issue. Furthermore, even though the LFRG comment did not express concern for such overlap to occur during the post-Closure period, applying the 100% plume overlap strategy to atmospheric releases during this period also demonstrates that the PA performance objective for the MEI will also not be exceeded during that time-frame either. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site, Liquid Waste Program, Savannah River Remediation American Recovery and Reinvestment Act Benefits and Lessons Learned - 12559

Utilizing funding provided by the American Recovery and Reinvestment Act (ARRA), the Liquid Waste Program at Savannah River site successfully executed forty-one design, procurement, construction, and operating activities in the period from September 2009 through December 2011. Project Management of the program included noteworthy practices involving safety, integrated project teams, communication, and cost, schedule and risk management. Significant upgrades to plant capacity, progress toward waste tank closure and procurement of needed infrastructure were accomplished. Over 1.5 million hours were worked without a single lost work day case. Lessons Learned were continually identified and applied to enhance the program. Investment of Recovery Act monies into the Liquid Waste Program has ensured continued success in the disposition of radioactive wastes and the closure of high level waste tanks at SRS. The funding of a portion of the Liquid Waste Program at SRS by ARRA was a major success. Significant upgrades to plant capacity, progress toward waste tank closure and procurement of needed infrastructure was accomplished. Integrated Project Teams ensured quality products and services were provided to the Operations customers. Over 1.5 million hours were worked without a single lost work day case. Lessons Learned were continually reviewed and reapplied to enhance the program. Investment of Recovery Act monies into the Liquid Waste Program has ensured continued success in the disposition of radioactive wastes and the closure of high level waste tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhancing performance assessments using the ASCEM tool-set - 15222

The Office of Soil and Groundwater Remediation within the U.S. Department of Energy's Office of Environmental Management (EM) is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is an open source and modular computing framework that incorporates new advances and tools for predicting contaminant fate and transport in natural and engineered systems. ASCEM integrates modeling tools into a common work-flow that facilitates integrated approaches to modeling and site characterization, and enables robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project includes collaboration with end users engaged in performance assessments and subsurface simulation. Two working groups are engaged in performance assessment activities at the Hanford Site and Savannah River Site (SRS). The Hanford Site working group is focused on evaluating an alternative conceptual model that includes fine-scale heterogeneities. The baseline conceptual model for the performance assessment includes the large-scale stratigraphy at the site. The working group is applying the ASCEM tool-set to develop and evaluate alternative conceptual models and evaluate the effect of heterogeneities on long-term transport under rainfall-driven conditions. Because the heterogeneous models require long compute times due to increased model complexity, the simulations are implemented on a high-performance computing platform to reduce simulation times. The ASCEM Akuna work-flow enables efficient organization, simulation execution, and processing and visualization of results. Current performance assessments for waste tank closure at the SRS are limited to two-dimensional axi-symmetric representations. The SRS working group is collaborating with the site contractor to address technical review issues by resolving fine-scale tank features and simulating three-dimensional flow with Richards equation for selected closure scenarios using the ASCEM simulator, Amanzi. The Akuna tool-set is being applied to support model setup, sensitivity analysis, uncertainty quantification, and visualization. Both of the ASCEM working groups are addressing issues that cannot readily be evaluated with the existing tools. In these efforts, ASCEM is being used to provide technical underpinnings for ongoing performance assessments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automation of environmental compliance data acquisition and management - 15267

Regulatory sampling for environmental compliance at the Savannah River Site (SRS), Aiken, South Carolina employs several different types of sampling techniques at various sampling frequencies. These sampling events result in the collection of large quantities of data and generate substantial data-related documents. The use of paper documents resulted in the need for manual input of data collected in the field and distribution of documents from one group to the next. To efficiently and effectively manage the extensive amounts of data and documents, elements of the sampling process were automated using hand-held field tablets and an electronic application. The tablets allow for easier distribution of sampling documents, and the application allows for digital transfer of sampling information and collected field data. The transition to automated data acquisition and management has resulted in a more efficient and reliable manner for conducting business at SRS. This system benefits numerous organizations at SRS by utilizing a centralized database for efficient management of all environmental data collected. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater monitoring report streamlining techniques - 15305

Compliance with national and state environmental regulations (e.g. RCRA and CERCLA [SuperFund] requires Savannah River Site (SRS) to extensively collect and report groundwater monitoring data, with potential fines for missed reporting deadlines. Large reports, which may contain dozens to hundreds of monitoring stations, are especially challenging to present data in a way that is quick and easy to interpret. Initially analyzing hundreds to thousands of records of data to be summarized in the report can be daunting, and producing maps can be extremely time consuming. Several utilities have been developed at SRS to facilitate production of the regulatory reports which include data tables, charts, maps, and cross-sections. Components of each report are generated in accordance with complex sets of regulatory requirements specific to each site monitored. SRS developed a relational database to incorporate the detailed reporting rules with the groundwater data, and created a set of automation tools to interface with the information and generate the report components. Maps produced with ArcGIS use a technique that can be repeatedly used to display data very quickly and in a consistent form. Cross-sections developed with RockWorks provide a more technical and geological analysis and representation of well and boring data, while allowing for automated data placement. These process improvements have streamlined the repetitive job of creating data tables, charts, maps, and cross-sections. It has also enhanced report quality and consistency by centralizing the information, and has reduced manpower and production time through automated efficiencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Salt Waste Processing Facility project lessons learned: Acquisition through construction - 15518

The Salt Waste Processing Facility (SWPF), located at the Savannah River Site (SRS) in Aiken, South Carolina, is a multi-billion dollar Liquid Radioactive Waste (LRW) processing facility that represents the keystone for the U.S. Department of Energy (DOE)-EM clean-up mission at SRS. The SWPF facilitates DOE-EM clean-up at SRS by decontaminating the salt waste, which is the dominant volumetric component in the LRW tanks, thereby allowing the cleaned salt waste to be removed from the tanks and stabilized into an approved grout-based final waste form. The small volume of removed radionuclides is sent to the Defense Waste Processing Facility (DWPF) for vitrification. Emptied LRW storage tanks are then grouted into an approved configuration for final closure. The SWPF project is currently 100% complete with design, 80% complete with construction, and 10% complete with commissioning. To date there have been numerous lessons learned with regard to project acquisition, design, procurement, construction, and quality assurance (QA) approaches (both good practices and mistakes) that are considered to be of significant value in improving the state of major project execution within the DOE-EM clean-up program as well as to the wider DOE enterprise. An overview of the current SWPF project status is provided and key lessons learned in the aforementioned areas are presented relative to improving future DOE major project execution performance. Specific areas to be addressed include strategies to optimize integration of design and nuclear safety, constructability tools for design and construction synchronization, commercial grade dedication (CGD) approaches to mitigate atrophy in the nuclear supply chain, and QA perspectives to facilitate effective and efficient project execution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Facility Improvements and Modifications to Extend the Operational Life of the Modular Caustic-Side Solvent Extraction Process - 16082

Savannah River Remediation, LLC (SRR) is working to remove, stabilize, and dispose of approximately 36.7 million gallons (138.9 million liters) of liquid radioactive waste currently stored in 43 underground waste tanks, and ultimately close waste tanks. In 2008, as an interim salt treatment system to remove cesium from high level waste salt solutions prior to the Salt Waste Processing Facility start up, the Modular Caustic-Side Solvent Extraction Unit (MCU) initiated the removal of cesium from liquid radioactive salt waste prior to disposal. The MCU was designed and built for an expected three-year operational life and five-year design life. The first MCU cold runs began in June 2007 and hot startup was completed in April 2008. MCU remains in hot operation to this day, aiding in multiple, high-level tank closures. In an effort to continue liquid waste disposition at the Savannah River Site (SRS), equipment upgrades and operational improvements have been made to extend the life of the MCU beyond the original three years. Several pieces of fixed equipment have been converted into removable equipment which reduces the downtime associated with equipment change-outs and thereby reduces the dose to workers and processing impacts. Multiple pumps and filters have been upgraded to more robust designs. Process monitoring and controls have been upgraded to improve process performance. Redundant centrifugal contactor vibration equipment has been installed on each contactor in order to better assess the reliability, processing performance, and lifetime of the contactors. A new Solvent Hold Tank (SHT) Sampler has been installed to minimize the organic cross-contamination within the sampler, dose to workers, and sample analysis time. To increase processing availability and aid in visually obtained data, camera port has been added to the Salt Solution Feed Tank (SSFT). In order to decrease the overall background dose to the workers, the Process Vessel Ventilation (PVV) duct work now has the capability to be flushed to remove contamination. The caustic wash addition system has been modified to be a once-through system to improve equipment reliability, decrease downtime, and decrease dose to workers. In addition, the solvent that MCU utilizes to extract Cesium out of salt waste has been upgraded to Next Generation Solvent (NGS) which is based on MaxCalix extractant instead of a BobCalix extractant. Further, these upgrades and improvements have allowed MCU to be able to process at higher flow rates (up to 8.5 GPM) and with increased throughput (as high as 1.3 million gallons in FY13 and 5.3 million gallons since hot operations initiated) that have allowed SRR to continue the disposition of nuclear salt waste. The continued operation of MCU ensures more curies are stabilized into a glass matrix at SRS's Defense Waste Processing Facility (DWPF) and less curies are retained within South Carolina at SRS's Saltstone Disposal Facility (SDF). Unique challenges associated with modifying and improving a demonstration plant that is in hot operations and was designed to be temporary with a limited plant footprint have been successfully overcome. Further, creative strategies for removing old equipment have been utilized given the limited decontamination agents available for use that will not interfere with the organic solvent. This paper presents and discusses the deployment of these upgrades and operational improvements to MCU in order to allow continued, increased salt waste processing beyond the initial design life. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Filtration Improvements in Support of Increased Salt Waste Processing Throughput at the Savannah River Site - 16173

Crossflow Filtration is currently used at the U.S. Department of Energy (DOE) Savannah River Site (SRS) for the removal of actinides, strontium and sludge solids from the high-level salt waste stored in underground tanks. At SRS, crossflow filtration is deployed in the Actinide Removal Process (ARP). Salt waste is transferred from an underground waste tank to one of two strike tanks where it is struck with Monosodium Titanate (MST), which adsorbs uranium, plutonium and strontium. The MST laden salt waste is then transferred to the ARP filtration facility, which contains the crossflow filter. The filtrate, which is called Clarified Salt Solution (CSS), is sent to a downstream facility for cesium removal, while the MST and sludge solids are concentrated at the filtration facility and eventually sent to the Defense Waste Processing Facility (DWPF) for vitrification. ARP and the downstream cesium removal facility, the Modular Caustic Side Solvent Extraction Unit (MCU), were both developed as an interim salt waste processing technology and as smaller scale radioactive demonstration plants for the Salt Waste Processing Facility (SWPF), which is currently under construction. Since the beginning of ARP in 2008, there have been challenges with achieving desired filtration rates through the crossflow filter system. Historically the crossflow filter system has been the flow limiter in salt waste processing and many changes have been made and are planned to achieve desired throughput, especially as MCU increases its processing capacity. Some of these changes include the design of a new crossflow filter, the implementation of a new process chemistry flowsheet and several operational changes. The modifications to the ARP crossflow filter have helped contribute to periods of record throughput in salt waste processing in FY 2015. This paper will discuss the technical challenges and system limitations of retrofitting an older facility as well as past, present and future modifications to the ARP filtration process in order to achieve salt waste processing goals at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Evaporator Vessel Repair by Robotics and Powder Injection Laser Welding - 18107

In February 2016 a leak was identified in the 25H evaporator at the Savannah River Site (SRS). The 25H evaporator is used to manage water volume in high level waste (HLW) tanks during solid salt cake and sludge removal. The location and the cause of the leak were unknown. Orano Federal Services (formerly AREVA Federal Services) applied its robotics expertise and commercial nuclear expertise to perform the inspection. Orano and Framatome (formerly AREVA NP INC) combined a BROKK, a commonly used tracked vehicle with remote control, with the KUKA, an automated robotic arm, commonly used in automobile manufacturing, to perform the partial dismantlement and inspection. Once inspection was complete and the leak was identified, Orano conducted a study on two welding processes: Gas Tungsten Arc (GTA-Tig) and Powder Injection Laser Welding. Based on the inspection of the SRS HLW evaporator's material type being Hastelloy{sup R}, along with the remote repair and material thin wall condition, the Powder Injection Laser Welding was chosen for this application. Orano has developed the remote powder injection laser welding and delivery process that will be used to conduct the repair of the SRS HLW evaporator in the fall of 2017. The process includes robotic delivery of components and robotic performance of the weld. Specialized robotic equipment were developed or adapted from other industries to perform the high hazard job of repairing an eroded section of the evaporator pot. The integration of multiple innovative remote techniques provides a unique solution in a highly radioactive environment. These techniques and innovations can be capitalized upon to solve many different remote repairs on equipment resulting in time savings, reduced dose to personnel, and recovery of initial investment in equipment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental Technetium Release from Simulated Salt-stone Cementitious Waste Form - 18419

Experiments are being conducted to evaluate the early release of technetium (Tc) from fresh salt-stone waste forms using dynamic flow-through tests. Salt-stone is a chemically reducing, grout-based waste form used by the U.S. Department of Energy (DOE) to dispose of low-activity salt solutions arising from high-level radioactive waste tank closure activities at the Savannah River Site (SRS). A key safety function of salt-stone is maintaining a low-flow, chemically reducing environment that will attenuate the release of redox-sensitive radioelements such as Tc. Salt-stone also provides a physical barrier due to its low intrinsic permeability, which limits both water and oxygen ingress. These release experiments, conducted to support the U.S. Nuclear Regulatory Commission's monitoring role during tank closure, are designed to provide independent information on how well salt-stone will perform its safety function. The dynamic leach tests were conducted in a Hassler-type core-holder permeameter system that allows an accelerated flow rate of simulated SRS groundwater through an intact cylinder of salt-stone spiked with Tc-99 at a concentration of approximately 2,100 Bq/g (3 ppm). The first salt-stone specimen to be tested (Specimen 2) was prepared with Grade 100 ground granulated blast-furnace slag and aged for 119 days in a temperature-controlled, low-oxygen, high-humidity environment. Before test completion, 9.5 pore volumes (PV) of simulated SRS groundwater were passed through the salt-stone cylinder. After a few PV, apparent saturated hydraulic conductivity (K{sub sat}) values calculated from flow data reached a steady-state value of approximately 1.0 x 10{sup -9} cm/s, which is within the range of previously reported data. Tc-99 concentrations in leachate peaked early during the leach test at 2.0 x 10{sup -7} M and then declined to approximately 4 x 10{sup -8} M after 9.5 PV. The leachate Tc-99 concentration after elution of 9.5 PV is broadly consistent with a Tc solution concentration controlled by the solubility of reduced Tc solids. The range of Tc-99 concentrations is similar to the range reported for a column test that was sponsored by DOE, but the time pattern of release differs. The second salt-stone specimen tested (Specimen 3) was aged for 372 days and it further differed from the first specimen in that its Grade 100 slag component had been finely ground using a mortar and pestle in an attempt to make it more reactive. This second test yielded Tc release behavior broadly similar to that observed during the first test, except that the early Tc peak (at 1.2 x 10{sup -6} M) was six times higher and the concentration after 6.7 PV (8.8 x 10{sup -8} M) was approximately two times higher than in the first test. In addition, the steady-state K{sub sat} was an order of magnitude lower than that of the first specimen. During the second test, the injection pump was intentionally turned off for a period of 11 days (i.e., approximate residence time for 1 PV) and a Tc spike was observed when pumping resumed, suggesting that longer residence times may promote higher Tc effluent concentrations. During a second intentional shut-down of the pump for 25 days (approximate residence time for 2 PV), another Tc spike was observed. An unplanned excursion to higher confining pressure physically affected the specimen, temporarily lowering the apparent K{sub sat} followed by a subsequent increase in both K{sub sat} and Tc effluent concentration. One hypothesis is that the transient spike in confining pressure and resulting salt-stone compression and later decompression may have induced Tc release from otherwise inactive pores. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aluminum Clad SNF: Technical Considerations and Challenges for Extended (>50 years) Dry Storage - 1900y

The U.S. Department of Energy (DOE) manages a significant inventory (>13 MTHM) of aluminum clad spent nuclear fuel (ASNF) using a combination of wet and dry storage at three primary sites; Hanford, Idaho National Laboratory (INL), and Savannah River Site (SRS). The majority of this ASNF is generated from U.S. and international research test reactors (RTR), examples include Advanced Test Reactor (ATR) at INL and High-Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL). The Obama Administration suspension of the Yucca Mountain repository, issuance of the January 2013 DOE 'Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste,' delays in implementing the 'regionalization' SNF approach recommended in the 1995 'Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement,' and limited ASNF processing capability at SRS H-Canyon means that interim storage has become the de-facto strategy for managing ASNF. The 1995 Idaho Settlement Agreement requires the DOE to transfer all SNF stored at INL to interim dry storage prior to December 31, 2023 and wet storage capacity at the SRS is nearing capacity. This situation was recognized by the DOE Spent Nuclear Fuel Working Group (SNFWG) and at its June 2016 meeting formed a ASNF sub-working group comprised subject matter experts to evaluate this area and provide a report of findings. The ASNF sub-working group met many times over several month period to review the engineering and technical basis of existing and planned DOE ASNF dry storage facilities and additional studies on the behavior of ASNF under different conditions, including during reactor service. The ASNF sub-working group focused its review on RTR SNF. Based on these reviews, the ASNF sub-working group identified five knowledge gaps and technical data needs that should be addressed to ensure viability and safety of extended, greater than 50 years, sealed or vented interim dry storage of ASNF. These five areas include; behavior/chemistry of aluminum oxyhydroxide layer in dry storage, radiolytic gas generation properties of aluminum oxyhydroxide layers, effect of episodic breathing and radiolytic generation of corrosive gases during storage, performance of ASNF in existing dry storage systems, and effects of high temperature (>1000 C) drying on chemistry and behavior of aluminum oxyhydroxide layers. The ASNF sub-working group also recommended development of an action plan to identify technical and engineering activities needed to address the knowledge gaps and technical data needs. Results of the ASNF sub-working group are documented in 2017 report 'Aluminum Clad Spent Nuclear Fuel: Technical Considerations and Challenges for Extended (>50 years) Dry Storage,' DOE-ID/RPT-1575. The INL assembled a team comprised of twenty INL and Savannah River National Laboratory SNF management and subject matter experts to develop this action plan. Over the course of 2 months the team worked to develop the action plan. The plan identified and recommended six technical and engineering tasks needed to address the previously identified knowledge gaps and technical data needs. DOE Environmental Management Office of Technology Development is providing funding to the INL to execute these tasks. This paper will present and discuss the results of the ASNF sub-working group, tasks identified in the action plan, and experimental activities underway at INL and SRNL to address the action plan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗