Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SALES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Long-term trends in connected thermostat performance

Internet-connected thermostats (CTs) control heating and cooling systems in about 30% of North American homes, and capture half of annual thermostat sales. In 2017 the U.S. Environmental Protection Agency created a program to certify the performance of ENERGY STAR® Connected Thermostats. To demonstrate compliance with energy-saving criteria, thermostat vendors must submit performance summaries for a representative sample of up to 1250 homes. Vendors must then re-submit results from a new, representative sample every six months in order to maintain their ENERGY STAR certification. This procedure has created a unique record of each thermostat’s long-term performance in response to changes in weather, customer demographics, building stock, and algorithms. Our analysis covers submissions from 13 different vendors, who submitted data up to 7 times over four years. We found that these semi-annual samples generated relatively stable trends for comfort temperatures and Heating, Ventilating and Air Conditioning (HVAC) runtimes over the study period. However, some vendors achieved consistently more energy-conserving comfort temperatures and shorter HVAC runtimes than others. The most recent submission runtimes averaged 700 hours for heating and 1,300 hours for cooling, but some vendors achieved runtimes as much as 17% below the mean. This implies lower energy consumption is due in large part to more successful algorithms and control strategies used by those vendors.

Meier, Alan↗

EVSE Cybersecurity and Resilience

Consequence-driven Cybersecurity Analysis for Extreme Fast Charging Electric Vehicle Infrastructure Electric vehicle (EV) development and associated charging infrastructure are expected to advance rapidly. Thirty percent of all global vehicle sales may be EVs and hybrid EVs by 2025, and they will rely on increasingly sophisticated strategies for grid integration. Next-generation EV charging infrastructure is expected to include interconnected renewable resources, such as photovoltaic (PV) arrays and battery storage systems, along with grid-edge devices. Although distributed energy resources (DERs) are useful in several ways, such as peak shaving at high demand times and backup supply for added resilience, the integration of vehicle charging and DERs could create more avenues for cyberattack. Physical and/or remote access to EV charging station components, including charge ports, power electronics, controllers, and local generation (e.g., PV and energy storage) could be paths to cause power fluctuations, leading to altered operations at the charging station, escalated privileges to administrative systems, exfiltration of financial information (including personally identifiable information), and reduced grid stability. One compromised EV supply equipment component can open the door to a variety of exploitable vulnerabilities. Cloud computing and mobile application control have the potential to expand the threat surface to non-repudiation and firmware integrity challenges. Vendor clouds have access to hundreds of chargers, and if compromised, can scale the attack surface exponentially. The high power and voltage levels of xFC infrastructure (e.g., 400 kW at 1000- V DC) increase the hazards and ability to impact the grid and vehicles more than lower-power charging systems. Legacy communications systems and protocols could also put EV infrastructure at risk of cyberattacks requiring a robust patch management process. Communications networks link EVs and chargers to several stakeholders - including charging station operators, grid operators, vendors/manufacturers, and aggregators - who have both physical and network access to share information for control, monitoring, and analytics. Information in these networks that is vulnerable to compromise includes the state of charge, charging duration, payment information, electricity price, and load control. Analyzing and prioritizing these interconnections risks could help address cybersecurity related to data leakage and manipulation.

charging↗

Pushing Green: Leveraging Home Energy Score to Promote Deep-Energy Retrofits in Portland, Oregon

In the United States, 39% of total energy is consumed by the building sector, 20% of which is attributed to residential buildings. Older homes, built before 1992 when the U.S. Department of Energy’s (DOE) Building Energy Codes Program was established, represent approximately 68% of residential building stock in the country and often have significant air leakage, inadequate insulation and inefficient heating & cooling systems. These older homes have long been the elephant in the room: how can programs effectively increase efficiency in all of the homes in need? Developed by DOE, the Home Energy Score was established to provide homeowners, buyers, and renters a comparable score measuring a home's energy use. Much like the MPG rating of automobiles, the Home Energy Score provides an overview of a residential building’s energy efficiency. In 2016, the City of Portland passed an ordinance requiring all residential properties to receive a Home Energy Score before being listed for sale, a mandate that was implemented January 1, 2018. Since 2018, more than 22,000 homes throughout the Portland Metro area have received Home Energy Scores (amounting to over 10% of Portland's single-family homes). This paper explores the sample of Home Energy Scores throughout Portland, including at the neighborhood level, identifies trends in efficiency measures, describes how the data has been used to date and proposes ways program administrators can use the Home Energy Score to increase the impact of energy efficiency programs on a city-scale.

Antonopoulos, Chrissi A.↗

U.S. Federal Policy Considerations for the Management of Retired Large-Format Batteries

The global demand for large-format batteries used in electric vehicles (EV) and battery energy storage is expected to continue as governments call for zero emission policies. Total installed large-scale stationary battery energy storage is expected to increase almost 20-fold in the coming years - from 17 GW installed globally in 2020 to 358 GW projected in 2030. Similarly, light duty EVs sales globally are expected to increase more than 8-fold from 2020 to 2030 - from 3 million units to 25 million units. The expected demand for large-format batteries brings supply chain concerns, and economic opportunities. Domestic reuse and recycling is one potential circular economy solution for large-format batteries. This presentation discusses current U.S. law and regulatory landscape for the reuse and recycling of large-format batteries, and how certain policy frameworks impact reuse and end-of-life management decisions for large-format battery materials.

battery↗

Solar and Storage Techno-Economic Analysis Tutorial for the IEEE Photovoltaic Specialist Conference (PVSC)

This tutorial will highlight the most recent efforts from the National Renewable Energy Laboratory (NREL) to track solar photovoltaic (PV) technology trends and manufacturing costs, project levelized cost of electricity (LCOE), and project levelized cost of solar plus storage (LCOSS) for systems across the globe. We will begin with an overview of the global PV supply chain and 2021 benchmark input data for NREL's crystalline silicon (c-Si) and thin film PV module manufacturing cost models. The framework that we follow and will review during this tutorial provides a methodology to prepare bottom-up manufacturing cost models including the items within the U.S. Generally Accepted Accounting Principles (GAAP) and the International Financial Reporting Standards (IFRS). For the polysilicon, wafer, cell conversion, and module assembly steps of the c-Si supply chain, and for thin film modules, we will review input data and methods useful for calculating the costs of goods sold (COGS); research and development (R&D) expenses; and sales, general, and business administration (S, G, &A) expenses. This 2021 benchmark analysis is compiled for state-of-the-art c-Si and thin film module manufacturing. We will also review methods for our 2021 system benchmark costs calculations and LCOE technoeconomic analysis of PV systems and solar plus storage systems. Next generation technologies that lower PV manufacturing and installation costs, reduce operations and maintenance (O&M) expenses, and improve system energy yield will also be highlighted. Techniques for comparing LCOE performance will also be reviewed. We look forward to sharing NREL's extensive work in these areas and discussing ideas for future directions.

cost models↗

The Chilling Effects of Administrative Burden on Efficiency Policy Uptake: Examining the Case of Federal ESAs

Utilizing policies and programs which incentivize energy efficiency or on-site renewables is difficult. The challenges and costs associated with researching these policies, interacting with their providers, and ensuring regulatory compliance can be collectively referred to as administrative burden. To better understand the impact of administrative burden on energy efficiency policies, we investigated the administrative burden associated with energy sales arrangements (ESA). ESAs are a contracting vehicle related to energy savings performance contracts where an energy services company designs and constructs a renewable energy system at a federal site, transferring ownership of those generating assets to the site after a 20-year term. We conducted a series of in-depth interviews with a variety of relevant ESA stakeholders, including federal project managers, subject matter experts, and energy service companies. We then augmented these interviews with a review of the relevant literature. This research indicated that the current level of administrative burden decreases the adoption of renewable energy through ESAs by the federal government by raising upfront costs, depressing project attempts due to complexity, and introducing delays and challenges in successfully implemented projects. This chilling effect is especially pronounced in new policy vehicles and with inexperienced implementers. Findings from the specific case of ESAs can be generalized to other types of energy policy including efficiency programs. Policy makers decrease the efficacy of initiatives through increased administrative burden, and these effects will be most pronounced in programs with novel design or targeted at unfamiliar audiences.

Newkirk, Alex↗

Connecting Electric Vehicle Charging Infrastructure to Commercial Buildings

Electric vehicles (EVs) are growing in popularity and gaining meaningful market share with record sales year over year in the last decade. EV charging equipment, also known as EV chargers (EVC) or EV supply equipment (EVSE), must proportionally match the growing number of new EVs on the road for a comparable experience to gas-powered vehicles. The majority of EV charging currently happens at residential buildings. However, demand for EV charging at commercial buildings will significantly increase with wider mainstream EV adoption and as businesses return to more normal operation following COVID-19 pandemic disruptions. Charging equipment can include various sub-systems like power conditioning module, control software, safety devices, metering, communication, cooling, connectors, and its wiring. EV charging at commercial buildings could be used for public, workplace, and commercial fleet charging. This document aims to describe how EVC can be connected to commercial buildings, including considerations for facility managers, and the effects that charging will have on the buildings electrical distribution system. More specifically, this resource provides an overview of: understanding EV charging basics: how charging equipment connects to the building and to EVs; required infrastructure updates needed at the building site to connect EVC to existing distribution systems; network strategies for cost-effective operation; metering and utility considerations for billing and incentives; charging equipment ownership options; future trends in EVC connection to buildings.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Electric Vehicle Managed Charging: Estimating the Potential Bulk Power System Value

With more and more electric vehicles (EVs) on the road, the grid of the future can greatly benefit from EV managed charging, which coordinates charging based on people's travel needs, electricity supply, and grid conditions. The added flexibility could be especially valuable for the bulk power system as it transitions to high shares of variable renewable generation, like wind and solar. Numerous studies have estimated the potential value of EV managed charging. In this study, NREL leveraged more detailed modeling of EV adoption, use, charging, and bulk power system operations to understand the potential value. Unique to this study, NREL modeled different charging flexibility types and dispatch mechanisms - as well as participation rates among drivers in having their EV charging managed - starting from vehicle-specific descriptions of charging flexibility. The study is based on a passenger light-duty vehicle adoption scenario with 100% EV sales by 2035 and a New England power system in 2038 with 84% clean generation and 26% of the electric load met by net imports. The 2038 New England light-duty vehicle feet is modeled as 45% electric.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Industrial Assessment Center Program Final Progress Report

During September 1, 2021 to August 31, 2023 period, the University of Massachusetts’ Industrial Assessment Center completed 36 industrial assessments at plants across New England. Total annual sales for those plants, which employed 2,664 people, were close to $1.15 billion. Our 212 recommendations amounted to potential savings of $7,069,352, which represented 24.14% of the total energy costs these facilities incurred.

Industrial Assessments Energy Efficiency Student T↗

An early deployment strategy for carbon capture, utilisation, and storage

This report describes the current use of CO2 for EOR, and discusses potential expansion of EOR using CO2 from power plants. Analysis of potential EOR development in the USA, where most current CO2-based EOR production takes place, indicates that relatively low cost, traditional sources of CO2 for EOR (CO2 domes and CO2 from natural gas processing plants) are insufficient to exploit the full potential of EOR. To achieve that full potential will require use of CO2 from combustion and gasification systems, such as fossil fuel power plants, where capture of CO2 is more costly. The cost of current CCUS systems, even with the revenue stream for sale of the CO2 for EOR, is too high to result in broad deployment of the technology in the near term. In the longer term, research and development may be sufficient to reduce CO2 capture costs to a point where CCUS would be broadly deployed. This report describes a case study of conditions in the USA to explore a financial incentive to promote early deployment of CCUS, providing a range of immediate benefits to society, greater likelihood of reducing the long-term cost of CCUS, and greater likelihood of broad deployment of CCUS and CCS in the long term. Additionally, it may be possible to craft such an incentive in a manner that its cost is more than offset by taxes flowing from increased domestic oil production. An example of such an incentive is included in this report.

20 FOSSIL-FUELED POWER PLANTS↗

The SEAD global efficiency medal competition: accelerating market transformation for efficient televisions

The Global Efficiency Medal competition, a cornerstone activity of the Super-efficient Equipment and Appliance Deployment (SEAD) Initiative, is an awards program that encourages the production and sale of super-efficient products. SEAD is a voluntary multinational government collaboration of the Clean Energy Ministerial (CEM). This winner-takes-all competition recognizes products with the best energy efficiency, guides early adopter purchasers towards the most efficient product choices and demonstrates the levels of energy efficiency achievable by commercially available and emerging technologies. The first Global Efficiency Medals were awarded to the most energy-efficient flat panel televisions; an iconic consumer purchase. SEAD Global Efficiency Medals were awarded to televisions that have proven to be substantially more energy efficient than comparable models available at the time of the competition (applications closed in the end of May 2012). The award-winning TVs consume between 33 to 44 percent less energy per 2 unit of screen area than comparable LED-backlit LCD televisions sold in each regional market and 50 to 60 percent less energy than CCFL-backlit LCD TVs. Prior to the launch of this competition, SEAD conducted an unprecedented international round-robin test (RRT) to qualify TV test laboratories to support verification testing for SEAD awards. The RRT resulted in increased test laboratory capacity and expertise around the world and ensured that the test results from participating regional test laboratories could be compared in a fair and transparent fashion. This paper highlights a range of benefits resulting from this first SEAD awards competition and encourages further investigation of the awards concept as a means to promote energy efficiency in other equipment types.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Regulator Interface Strategies Implemented at the Y-12 National Security Complex Old Salvage Yard Soils Remediation Project, Oak Ridge, TN - 12162

The Oak Ridge Y-12 National Security Complex housed an area known as the Old Salvage Yard (OSY) that was approximately 7 acres. The OSY was used as an area for the accumulation, processing and storage of scrap metal and equipment from Y-12 operations extending from 1968 until 2009. Areas in the northern sections of OSY also have been used for the storage of used oils containing solvents and the accumulation and recycling or de-heading and crushing of 55-gal metal drums. Scrap metal operations historically involved the accumulation, sorting, storage, public sale or disposal of scrap metal and equipment. Non-containerised storage of scrap metal was routine until 1995 when scrap metal received at OSY was placed in B-24 and B-25 boxes. Under the American Recovery and Reinvestment Act (ARRA), approximately 26,759 cubic meters of scrap metal and debris were removed and disposed at both on and off-site disposal facilities including the on-site, Oak Ridge Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) landfill in 2010 and 2011. This removal action was performed in accordance with a CERCLA Record of Decision (ROD) and a close working relationship with both the U.S. Environmental Protection Agency (EPA) Region IV and Tennessee Department of Environment and Conservation (TDEC). Due to efficiencies and the excellent cooperative relationship forged with EPA Region IV and TDEC for Y-12 ARRA Cleanup Projects, a surplus of funding was available for additional remediation work that was completed in fiscal year (FY) 2011. The underlying OSY soils were targeted for characterization and potential remediation. To expedite these important activities, the U.S. Department of Energy Oak Ridge Environmental Management partnered with the regulators during detailed planning sessions through a variety of means to quickly and efficiently characterize and pinpoint areas requiring remediation according to previous ROD commitments. Data Quality Objectives (DQOs), data-sharing, real-time characterization reporting, surface and groundwater modeling and other interface planning activities were utilized to help facilitate and complete characterization and remediation activities. As a result of these strategies, the surgical extraction of one contiguous area of soil approximately 354 cubic meters is planned for FY12. The strategies discussed resulted in a major reduction of footprint remediation (i.e., 2.8% of the original estimate) which was originally estimated at over 26,759 cubic meters. The original estimate was developed using historical data collected at various times over the period of 20 years. By leveraging a hybrid sampling approach that involved both statistically-based and biased sampling locations, the area of contamination was significantly reduced resulting in both a compliant remedial design that is cost effective while mitigating a principle threat sources to surface and groundwater at the Y-12 plant. One remedial action boundary of 354 cubic meters was verified in the northern section of the Western OSY area known as the old drum de-header station for VOCs. The original estimate for disposal was in excess of 26,759 cubic meters. This area is scheduled for waste characterization and profile development in the first half of fiscal year 2012. The anticipated disposal facility is an on-site Oak Ridge CERCLA disposal landfill known as the Environmental Management Waste Management Facility (EMWMF). By utilizing the careful strategic planning, field-based screening and close cooperation of regulatory stakeholders as detailed in this paper, the total area of soil requiring remedial action within the Y-12 OSY footprint was 354 cubic meters or 2.8% of the original planned estimate. A potential waste reduction of 97.2% was realized over the original planned estimate for OSY Soils. Significant cost savings were achieved by - Minimizing the footprint of the remedial action; - Confirmatory analysis of soils instead of use of historical sampling results for waste profile development; - Targeting traditional laboratory analysis for soils that failed field screen protocols for radionuclides, heavy metals and VOCs; - Providing accurate and precise definition of RABs; and - Reduction of target contaminants for focused laboratory analysis instead of broad-range contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enabling a Sustainable Future: Zero-Emission Vehicles Cost Analysis to Inform Decarbonization Pathways

Despite being only 5% of vehicles on the road, medium- and heavy-duty vehicles (MHDVs) are the second largest contributor to transportation emissions (21%) and a major source of local air pollution disproportionally affecting disadvantaged communities. This talk summarizes a cost analysis for zero emissions vehicles (battery electric EVs and hydrogen fuel cell FCEVs) for all medium and heavy duty applications, ranging from large pick-up trucks, to delivery vans, buses, and heavy trucks. Results show that with continued improvements in vehicle and fuel technologies (in line with U.S. Department of Energy targets and vetted with industry), zero-emission vehicles (ZEVs) can reach total-cost-of-driving parity with conventional diesel vehicles by 2035 for all medium- and heavy-duty (MD/HD) vehicle classes without incentives. Assuming economics drives adoption, ZEV sales could reach 42% of all MD/HD trucks by 2030, reflecting lower combined vehicle purchase and operating costs (using real-world payback periods). Two technological solutions - battery electric vehicles (BEVs) and fuel cell electric vehicles (FCEVs) - are viable in multiple market segments, offering alternative pathways for decarbonization: a) BEVs tend to become cost-competitive for smaller trucks before 2030 and for short-haul (<500-mile) heavy trucks before 2035. b) Hydrogen FCEVs tend to become cost-competitive for long-haul (>500-mile) heavy trucks by 2035. Results are very sensitive to technology improvement trajectories, adoption decision-making, and uncertain assumptions about future freight demand, logistics, and vehicle use explored in multiple scenarios.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Revenue Opportunities through Ancillary Services for Nuclear Power Plants with Integrated Firebrick Resistance- Heated Energy Storage (FIRES)

Deregulation of electricity markets has brought about major changes in the ways investments in and operation of power plants are planned and optimized. Although many NPPs have seen reduced revenue in recent years as power purchase agreement end and wholesale market electricity prices have remained low, there are opportunities to expand the technical capabilities of NPPs, participate in additional market services and increase revenue. This transaction summarizes the opportunities provided by participation in ancillary services markets potentially made possible by integration of thermal energy storage capacity, specifically the Firebrick Resistance-heated Energy Storage System (FIRES), into future nuclear power plants with high-temperature reactors and Nuclear Air-Brayton combined cycle (NACC) power conversion. The restructuring, or deregulation, of electric power systems in most of Europe and North America has had a substantial impact on the economic performance of currently operating nuclear power plants (NPPs) and the prospects for new builds. Owners of NPPs in some markets have expressed concern that low wholesale electricity market prices and insufficient compensation for capacity, reliability, and other services are threatening the financial viability of their plants. However, both current and future NPPs have the potential to increase their competitiveness by increasing the flexibility of their electricity output. Flexible output has previously only been possible in water-cooled reactors through load-following operation, which requires core power maneuvers and operation of the steam turbine at reduced efficiency. Integration of thermal energy storage systems (TESS) provides an alternative, providing the plant the option to either output electricity or store heat for greater later electric output. The plant owner may thus increase sales of electricity during hours when it is most valuable. Even more, some TESS technologies have the potential to greatly increase the net ramp rate capability of the plant. The ability to rapidly change net power output to the grid may make it possible for NPPs to secure additional revenue by providing additional minute-by-minute balancing services to the grid. FIRES is only one technology out of many that might provide additional technical capabilities at NPPs, and this discussion has only highlighted the opportunities in a single market. Analysis of other options, include steam accumulator systems, nitrate salt TESS, phase change material TESS, and opportunities in other markets are subjects of ongoing work. Deregulation of electricity markets has brought about major changes in the ways investments in and operation of power plants are planned and optimized. Although many NPPs have seen reduced revenue in recent years as power purchase agreements end and wholesale market electricity prices have remained low, there are opportunities to expand the technical capabilities of NPPs, participate in additional market services, and increase revenue. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

CNL Technologies for Heavy Water Detritiation - 19437

Canadian Nuclear Laboratories (CNL) is responsible for a large amount of heavy water owned by the Government of Canada. A significant portion of this heavy water has been downgraded and is chemically and/or radiologically contaminated (besides tritium). Storage, monitoring and disposal of this water incurs significant costs. Upgrading following chemical purification (including removal of radionuclides other than tritium) of this water is feasible with commercial processes. However, removal of the tritium to the level that would allow the heavy water to be available for non-nuclear applications requires very specialized processes. CNL has developed and demonstrated the Combined Electrolysis and Catalytic Exchange (CECE) detritiation technology to reduce the tritium to the level at which the heavy water can be classified as non-radioactive. The CECE process consists of a Liquid Phase Catalytic Exchange (LPCE) bed, where the transfer of hydrogen isotopes between water and gaseous hydrogen occurs, and an electrolysis cell (E-cell) that produces hydrogen and separates the isotopes of hydrogen, adding to the enrichment achieved in the LPCE catalyst bed. The application of the CECE technology to the tritium-contaminated heavy water would restore its full market value. As part of a project supported by CNL Decommissioning and Waste Management, a business case is being developed to build and operate a facility that will purify and detritiate heavy water to render it commercially attractive. The main goal of the current study is to evaluate the net benefits of detritiation and product sale versus the cost of permanent storage or disposal. Such a facility would not only eliminate the need to store the heavy water as a radioactive waste material and provide revenue, but would also serve as a demonstration of CNL's technology for similar applications elsewhere. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Colonie, New York, FUSRAP Site: Pathway from Remediation to Redevelopment - 19465

The Colonie, New York, Formerly Utilized Sites Remedial Action Program (FUSRAP) Site consists of a 4.5-hectare (11.2-acre) US Department of Energy (DOE)-owned vacant property (Main Site) and 56 commercial and residential vicinity properties (VPs). The site was owned and operated by National Lead Industries (NL) from 1937 to 1984. The Main Site was used for manufacturing fuel and weapons components using uranium and thorium. Depleted uranium dust was emitted from exhaust stacks that contaminated the site and the VPs. NL also filled in portions of the site with industrial waste and released contaminants to groundwater. The state court shut the plant down in 1984. The site was acquired by DOE in 1985, which remediated the VPs and began to remediate the Main Site up to 1997. The US Army Corps of Engineers (USACE) undertook remedial actions beginning in 1997. The site has three Operable Units (Main Site, Groundwater, and VPs). The Main Site soil was remediated to residential standards except for three small easement areas. The soils in the easement areas are safe for exposure to workers. There is a groundwater plume beneath the site that will require the use of monitoring and temporary land use controls until cleanup standards are met. The VPs require no further action. A 2-year transition period from USACE to the DOE Office of Legacy Management (LM) began on June 18, 2018, with the receipt of the Site Closeout Report from USACE. LM has determined that the 4.5-hectare site is excess to its mission needs and intends to pursue sale of the property for redevelopment. There are several processes required before the disposal can occur. Organizations with similar sites that are federally owned and ready for private redevelopment may benefit from reviewing the Colonie site disposition processes. This paper will discuss (1) Determining disposal alternatives for the Colonie, New York, site. (2) Describing the federal requirements for the disposal of excess real property. (3) Communicating to stakeholders that the site is ready for disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evolution of Stakeholder Relations at the Mound Laboratory-End of DoE's Mission to the Present - 19551

In November 1989, the same month the Berlin Wall fell, the US Environmental Protection Agency (EPA) placed the Mound Laboratory (Mound Plant or Mound site) in Ohio on the National Priorities List (NPL) due to volatile organic compound contamination in the groundwater. As a result of the Cold War ending, the United States sought to greatly reduce the nation's nuclear weapons arsenal, consolidate the US Department of Energy's (DOE) mission, and close many DOE facilities. In 1991, the City of Miamisburg learned that DOE was planning to close the Mound Laboratory. The city spent two years lobbying in Washington, DC, to keep the facility open; however, that effort was not successful. By 1993, DOE, EPA, and Ohio EPA had signed a Federal Facility Agreement that formalized EPA and Ohio EPA oversight of the DOE environmental cleanup of the Mound NPL site under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The decontamination and cleanup of the Mound site fell under two federal laws, CERCLA and the Resource Conservation and Recovery Act. DOE, EPA, Ohio EPA, the City of Miamisburg, and other local stakeholders all agreed that the Mound site should be cleaned up to an industrial/commercial land use standard. This would allow the site to transition into a privately owned business park. In 1994, the City of Miamisburg created the nonprofit Miamisburg Mound Community Improvement Corporation (MMCIC) that would own, market, and redevelop the site. The City also chartered the Mound Reuse Committee to act as an independent advisory organization, composed of representatives from the local community and business, government, education, and special interest groups. In 1994, DOE and the MMCIC entered into a lease agreement that facilitated immediate reuse of site buildings that were no longer required by DOE and did not require remediation. In 1995, DOE, EPA, and Ohio EPA developed the Mound 2000 Process to more effectively use CERCLA Removal Action authority to evaluate and remediate, as necessary, disparate areas of the Mound site. The Mound 2000 process divided the site into smaller, more manageable areas that accelerated cleanup and allowed areas to be reused more quickly. All areas of the Mound site were cleaned up to meet the EPA standard for industrial/commercial land use. The CERCLA process included opportunities for the public to review proposed cleanup strategies. Public input on cleanup and reuse included that from local citizens, businesses, Miamisburg City Council, local schools and financial institutions, Ohio EPA, Montgomery County, and the State of Ohio. In 1998, while site cleanup was still in process, DOE agreed to sell the entire Mound property to the MMCIC for $10.00. The site sales agreement accelerated reuse by allowing DOE to offer ownership of discrete land parcels to MMCIC as soon as EPA confirmed those areas met CERCLA standards for property transfer. This allowed the Mound site to become one of the first former DOE weapons sites to transition to reuse as a privately owned and operated community asset. Many other former DOE production facilities require continued federal ownership to protect the integrity of the environmental cleanup. In 2011, the MMCIC changed its name to the Mound Development Corporation (MDC) and continued to transition the site for reuse as part of the Mound Business Park. The MMCIC/MDC is a nonprofit economic development arm of the City of Miamisburg. DOE supported the economic development efforts with grants and matching funds. Individual land parcels were transferred from DOE to the MDC according to the DOE Mound Land Transfer Process. Ownership of parcels was transferred to the MDC via quitclaim deeds with no repair, replacements, or rebuild of areas. Each parcel's quitclaim deed contains the CERCLA institutional controls. To reduce the property tax burden, the Miamisburg City Council passed an ordinance that allowed the City to accept temporary ownership of specific parcels and hold ownership until the MDC could either lease or sell them. With the exception of one 23-acre parcel that includes the Operable Unit 1 area (site of former sanitary landfill), the entire site has been transferred to the MDC. Today, the former Mound Laboratory site is home to the vibrant Mound Business Park operated by the MDC. The site contains numerous buildings with active businesses and multiple areas suitable for new construction. Private companies continue cutting-edge work that carries forward the legacy of more than 50 years of DOE research, development, production, and inspiration from the former Mound Laboratory scientists, engineers, technicians, and support personnel. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗