Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power system operational models”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Experimental Validation of a Closed Brayton Cycle System Transient Simulation

The Brayton Power Conversion Unit (BPCU) located at NASA Glenn Research Center (GRC) in Cleveland, Ohio was used to validate the results of a computational code known as Closed Cycle System Simulation (CCSS). Conversion system thermal transient behavior was the focus of this validation. The BPCU was operated at various steady state points and then subjected to transient changes involving shaft rotational speed and thermal energy input. These conditions were then duplicated in CCSS. Validation of the CCSS BPCU model provides confidence in developing future Brayton power system performance predictions, and helps to guide high power Brayton technology development.

Johnson, Paul K.↗

Analytical Models of Frequency and Voltage in Large-Scale All-Inverter Power Systems

Low-order frequency response models for power systems have a decades-long history in optimization and control problems such as unit commitment, economic dispatch, and wide-area control. With a few exceptions, these models are built upon the Newtonian mechanics of synchronous generators, assuming that the frequency dynamics across a system are approximately homogeneous, and assume the dynamics of nodal voltages for most operating conditions are negligible, and thus are not directly computed at all buses. As a result, the use of system frequency models results in the systematic underestimation of frequency minimum nadir and maximum RoCoF, and provides no insight into the reactive power-voltage dynamics. This paper proposes a low-order model of both frequency and voltage response in grid-forming inverter-dominated power systems. The proposed model accounts for spatial-temporal variations in frequency and voltage behavior across a system and as a result, demonstrates the heterogeneity of frequency response in future renewable power systems. Electromagnetic transient (EMT) simulations are used to validate the utility, accuracy, and computational efficiency of these models, setting the basis for them to serve as fast, scalable alternatives to EMT simulation, especially when dealing with very large-scale systems, for both planning and operational studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Online Monitoring Technical Basis and Analysis Framework for Emergency Diesel Generators - Interim Report for FY 2013

The Light Water Reactor Sustainability program at Idaho National Laboratory is actively conducting research to develop and demonstrate online monitoring capabilities for active components in existing nuclear power plants. Idaho National Laboratory and the Electric Power Research Institute are working jointly to implement a pilot project to apply these capabilities to emergency diesel generators and generator step-up transformers. The Electric Power Research Institute Fleet-Wide Prognostic and Health Management Software Suite will be used to implement monitoring in conjunction with utility partners: Braidwood Generating Station (owned by Exelon Corporation) for emergency diesel generators, and Shearon Harris Nuclear Generating Station (owned by Duke Energy Progress) for generator step-up transformers. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for emergency diesel generators. Emergency diesel generators provide backup power to the nuclear power plant, allowing operation of essential equipment such as pumps in the emergency core coolant system during catastrophic events, including loss of offsite power. Technical experts from Braidwood are assisting Idaho National Laboratory and Electric Power Research Institute in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the Fleet-Wide Prognostic and Health Management Software Suite and tested using data from Braidwood. Parallel research on generator step-up transformers was summarized in an interim report during the fourth quarter of fiscal year 2012.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Continuous Reliability Enhancement for Wind (CREW) Database: Wind Plant Reliability Benchmark

To benchmark the current U.S. wind turbine fleet reliability performance and identify the major contributors to component-level failures and other downtime events, the Department of Energy (DOE) funded the development of the Continuous Reliability Enhancement for Wind (CREW) database by Sandia National Laboratories. This report is the second annual Wind Plant Reliability Benchmark, to publically report on CREW findings for the entire wind industry. The CREW database uses both high resolution Supervisory Control and Data Acquisition (SCADA) data from operating plants and Strategic Power Systems’ (SPS) ORAPWind® (Operational Reliability Analysis Program for Wind) data, which consists of downtime and reserve event records and daily summaries of Generating, Unavailable, and Reserve time for each turbine. Together, these data are used as inputs into CREW’s reliability modeling. The results presented here include: the primary CREW Benchmark statistics (operational availability, utilization, capacity factor, mean time between events, and mean downtime); time accounting from an availability perspective; time accounting in terms of the combination of wind speed and generation levels; power curve analysis; and top system and component contributors to unavailability.

Peters, Valerie A.↗

A Neural Optimizer With Decision-Focused Learning for Optimal Energy Storage Operation

Here, this article introduces a neural optimizer-based framework for optimizing battery energy storage system (BESS) control for grid services, including demand charge and energy cost reduction. By leveraging decision-focused learning (DFL), the proposed framework ensures seamless integration and adaptation, significantly enhancing control performance. A patch time-series transformer is employed for peak load forecasting, incorporating aleatoric uncertainty quantification to account for forecasting uncertainties within the decision-making process. The framework utilizes a solver-in-the-loop approach to generate optimal BESS actions, which are then used to train the neural optimizer-based agent. By co-optimizing both BESS operational modes and output power within the NN, the system achieves improved performance and robustness. After initial training, the forecasting and control models are jointly fine-tuned to account for forecasting errors, further improving decision precision and efficiency through DFL. Case studies are performed to validate the performance of the framework using multiple real-world datasets, demonstrating superior performance in monthly peak load forecasting compared to state-of-the-art models. In addition, the results are compared against existing decision-making approaches. The results demonstrate a reduction in monthly peak forecasting error by approximately 15% across various performance measures and achieve an optimization gap for BESS operation that is about three times smaller compared to existing methods.

Kim, Hyeonjin [Pacific Northwest National Laborato↗

Post-Disturbance Dynamic Distribution System Restoration with DGs and Mobile Resources

Distributed generations (DGs) can act as emergency power supplies when distribution systems suffer from outages. However, the generation capabilities of DGs are generally limited by a number of factors including weather conditions, fuel limitations, etc. In this context, mobile resources that are able to reallocate resources to desired locations are regarded as important complements to conventional fixed DGs in assisting distribution system restoration. In this paper, a distribution system restoration model with DGs and mobile resources is proposed. Firstly, the dispatch and allocation of mobile resources are modeled with respect to the characteristics of the traffic network. Then the developed mobile resource models are integrated into the distribution system restoration model to co-optimize the scheduling of DGs and mobile resources. Uncertainty factors are managed by a model predictive control approach so that system operators can dynamically adjust the restoration strategy with the up-to-date information. The effectiveness of the proposed method is validated through an IEEE 13-bus test system.

distributed generations (DGs)↗

Orbital performance of a one-year lifetime superfluid helium dewar based on ground testing and computer modelling

The ground-test results of the 550-liter superfluid-He dewar built for IRAS are presented and discussed, and a computer projection of its orbital performance life is developed. The ground-testing program included flow-swap, cold-flow, power-off, hot/cold-viewport, and strap-thermal-efficiency tests. After one set of trials, some design changes were made, and the thermal-network computer model of the system was modified as well. The driving boundary conditions of dewar orbital operation used in this model are vacuum-shell temperature = 170 K, aperture heating = 8.0 mW, and focal-plane power dissipation = 16.2 mW. An operational lifetime of 319 days and an He loss rate of 2.54 mg/sec are predicted.

Hopkins, R. A.↗

Radioisotope Stirling Engine Powered Airship for Atmospheric and Surface Exploration of Titan

The feasibility of an advanced Stirling radioisotope generator (ASRG) powered airship for the near surface exploration of Titan was evaluated. The analysis did not consider the complete mission only the operation of the airship within the atmosphere of Titan. The baseline airship utilized two ASRG systems with a total of four general-purpose heat source (GPHS) blocks. Hydrogen gas was used to provide lift. The ASRG systems, airship electronics and controls and the science payload were contained in a payload enclosure. This enclosure was separated into two sections, one for the ASRG systems and the other for the electronics and payload. Each section operated at atmospheric pressure but at different temperatures. The propulsion system consisted of an electric motor driving a propeller. An analysis was set up to size the airship that could operate near the surface of Titan based on the available power from the ASRGs. The atmospheric conditions on Titan were modeled and used in the analysis. The analysis was an iterative process between sizing the airship to carry a specified payload and the power required to operate the electronics, payload and cooling system as well as provide power to the propulsion system to overcome the drag on the airship. A baseline configuration was determined that could meet the power requirements and operate near the Titan surface. From this baseline design additional trades were made to see how other factors affected the design such as the flight altitude and payload mass and volume.

Titan↗

Stability of fissile solution systems - 14614

A Dynamic System Simulation (DSS) has been developed for aqueous homogenous reactors (AHR) and subcritical accelerator-driven system employing fissile solution fuel. These models are comprised of coupled non-linear differential equations describing the neutronics, thermal hydraulic and radiolytic gas behavior in the time domain. Models of specific historic AHR, SUPO (Super Power), KEWB (Kinetics Experiment Water Boiler), and SILENE exhibit close agreement with experimental data in all operating modes including steady-state, ramp and step reactivity insertions. The set of non-linear equations have been utilized to generate a generic transfer function for this class of systems. Output from specific DSS models operating at steady-state is then utilized as input parameters into a transfer function specific to each. Traditional Bode amplitude and phase, Nyquist and Nichols plots, are then generated to examine stability. Results for SUPO and a generic accelerator-driven system suggest these systems are unconditionally stable in the linear approximation. This treatment offers a method to examine the physics and time-based evolution of a critical excursion in a fissile solution system and provides a means to examine the severity of the consequence. This approach provides insight into the characteristics of such and even and sensitivity to materials involved and configuration of the physical system. (authors)

42 ENGINEERING↗

Adaptive Model Reduction for Parareal in Time Method for Transient Stability Simulations

Real time or faster than real time simulation can enable system operators to foresee the effect of crucial contingencies on the power system dynamics and take timely actions to prevent system instability. Parareal in time method uses concurrent computations on different segments of the time domain of interest to speed up the dynamic simulations. This paper describes the application of an adaptive nonlinear model reduction method in improving computational speed of the Parareal solver. The proposed method adaptively switches between a hybrid system with selective linearization and a completely linear system based on the size of a disturbance. The functions in the hybrid system are linearized based on the electrical distance between specific generators and the area where disturbances originated. The proposed method is tested on the 327-machine 2383-bus Polish system.

Osipov, Denis↗

Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.

17 WIND ENERGY↗

High electrification futures: Impacts to the U.S. bulk power system

Electrification of end-use technologies could have important implications for bulk power sector planning, operations, and impacts. By combining previously-defined electrification scenarios with capacity expansion modeling, we evaluate the potential challenges and opportunities associated with electrification. Our scenario analysis reveals that electrification reduces energy consumption and air emissions from across the energy sector, and its impacts on energy system costs are modest due, in part, to the abundance of low-cost resources in the United States.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Thermal Design for Extra-Terrestrial Regenerative Fuel Cell System

The Advanced Exploration Systems (AES) Advanced Modular Power Systems (AMPS) Project is investigating different power systems for various lunar and Martian mission concepts. The AMPS Fuel Cell (FC) team has created two system-level models to evaluate the performance of regenerative fuel cell (RFC) systems employing different fuel cell chemistries. Proton Exchange Membrane fuel cells PEMFCs contain a polymer electrolyte membrane that separates the hydrogen and oxygen cavities and conducts hydrogen cations (protons) across the cell. Solid Oxide fuel cells (SOFCs) operate at high temperatures, using a zirconia-based solid ceramic electrolyte to conduct oxygen anions across the cell. The purpose of the modeling effort is to down select one fuel cell chemistry for a more detailed design effort. Figures of merit include the system mass, volume, round trip efficiency, and electrolyzer charge power required. PEMFCs operate at around 60 C versus SOFCs which operate at temperatures greater than 700 C. Due to the drastically different operating temperatures of the two chemistries the thermal control systems (TCS) differ. The PEM TCS is less complex and is characterized by a single pump cooling loop that uses deionized water coolant and rejects heat generated by the system to the environment via a radiator. The solid oxide TCS has its own unique challenges including the requirement to reject high quality heat and to condense the steam produced in the reaction. This paper discusses the modeling of thermal control systems for an extraterrestrial RFC that utilizes either a PEM or solid oxide fuel cell.

thermal modeling↗

Thermal System Modeling for Lunar and Martian Surface Regenerative Fuel Cell Systems

The Advanced Exploration Systems (AES) Advanced Modular Power Systems (AMPS) Project is investigating different power systems for various lunar and Martian mission concepts. The AMPS Fuel Cell (FC) team has created two system-level models to evaluate the performance of regenerative fuel cell (RFC) systems employing different fuel cell chemistries. Proton Exchange Membrane fuel cells PEMFCs contain a polymer electrolyte membrane that separates the hydrogen and oxygen cavities and conducts hydrogen cations (protons) across the cell. Solid Oxide fuel cells (SOFCs) operate at high temperatures, using a zirconia-based solid ceramic electrolyte to conduct oxygen anions across the cell. The purpose of the modeling effort is to down select one fuel cell chemistry for a more detailed design effort. Figures of merit include the system mass, volume, round trip efficiency, and electrolyzer charge power required. PEMFCs operate at around 60 degrees Celsius versus SOFCs which operate at temperatures greater than 700 degrees Celsius. Due to the drastically different operating temperatures of the two chemistries the thermal control systems (TCS) differ. The PEM TCS is less complex and is characterized by a single pump cooling loop that uses deionized water coolant and rejects heat generated by the system to the environment via a radiator. The solid oxide TCS has its own unique challenges including the requirement to reject high quality heat and to condense the steam produced in the reaction. This paper discusses the modeling of thermal control systems for an extraterrestrial RFC that utilizes either a PEM or solid oxide fuel cell.

thermal modeling↗

Sampling Technique for Robust Odorant Detection Based on MIT RealNose Data

This technique enhances the detection capability of the autonomous Real-Nose system from MIT to detect odorants and their concentrations in noisy and transient environments. The lowcost, portable system with low power consumption will operate at high speed and is suited for unmanned and remotely operated long-life applications. A deterministic mathematical model was developed to detect odorants and calculate their concentration in noisy environments. Real data from MIT's NanoNose was examined, from which a signal conditioning technique was proposed to enable robust odorant detection for the RealNose system. Its sensitivity can reach to sub-part-per-billion (sub-ppb). A Space Invariant Independent Component Analysis (SPICA) algorithm was developed to deal with non-linear mixing that is an over-complete case, and it is used as a preprocessing step to recover the original odorant sources for detection. This approach, combined with the Cascade Error Projection (CEP) Neural Network algorithm, was used to perform odorant identification. Signal conditioning is used to identify potential processing windows to enable robust detection for autonomous systems. So far, the software has been developed and evaluated with current data sets provided by the MIT team. However, continuous data streams are made available where even the occurrence of a new odorant is unannounced and needs to be noticed by the system autonomously before its unambiguous detection. The challenge for the software is to be able to separate the potential valid signal from the odorant and from the noisy transition region when the odorant is just introduced.

Duong, Tuan A.↗

Small-Signal Stability Analysis of Large-Scale Power Systems in Response to Variability of Offshore Wind Power Plants

This paper presents a methodology for a small-signal stability analysis of large-scale power systems in response to variability of offshore wind power plants. This study considers the variability of wind power as the source of disturbance introduced to the system. To accomplish this goal, a singular value decomposition-total least squares extended Prony analysis is used to assess the small-signal voltage stability. In addition, a swing-based frequency response metric is used to assess the small-signal frequency stability. The case study here considers the integration of a 1000-MW offshore wind power plant, operating in Lake Erie, into the FirstEnergy/PJM service territory. This study uses a realistic model of the 63 000-bus test system that represents the U.S. Eastern Interconnection. The results verify the utility and practicality of this methodology for the integration studies of offshore wind power plants.

17 WIND ENERGY↗

Diii-D Research Advancing The Physics Basis For Optimizing The Tokamak Approach To Fusion Energy

DIII-D physics research addresses critical challenges for operation of ITER and the next generation of fusion energy devices. This is done through a focus on innovations to provide solutions for high performance long pulse operation, coupled with fundamental plasma physics understanding and model validation, to drive scenario development by integrating high performance core and boundary plasmas. Substantial increases in off-axis current drive efficiency from an innovative top launch system for EC power, and in pressure broadening for Alfven eigenmode control from a co-/counter-Ip steerable off-axis neutral beam, all improve the prospects for optimization of future long pulse/steady state high performance tokamak operation. Fundamental studies into the modes that drive the evolution of the pedestal pressure profile and electron vs. ion heat flux validate predictive models of pedestal recovery after ELMs. Understanding the physics mechanisms of ELM control and density pumpout by 3D magnetic perturbation fields leads to confident predictions for ITER and future devices. Validated modeling of high-Z shattered pellet injection for disruption mitigation, runaway electron dissipation, and techniques for disruption prediction and avoidance including machine learning, give confidence in handling disruptivity for future devices. With this physics understanding and suite of actuators, a high poloidal beta optimized-core scenario with an internal transport barrier that projects nearly to Q=10 in ITER at 9 MA was coupled to a detached divertor, and a near Super H-mode optimized-pedestal scenario with co-Ip beam injection, was coupled to a radiative divertor. The Hybrid core scenario was achieved directly, without the need for internal flux pumping, using off-axis current drive actuators, and a controller to avoid mode locking and disruptions in the ITER baseline scenario, based on plasma response to probing 3D fields, was demonstrated. Finally innovative tokamak operation using a negative triangularity shape showed many attractive features for future pilot plant operation.

Fenstermacher, M.↗