Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LAPSE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Automated Tracing and Segmentation Tool for Migrating Neurons in 4D Confocal Imagery

Accurate tracing and segmentation of subcellular components of migrating neurons in confocal image sequences are prerequisite steps in many neurobiology studies to understand the biological machinery behind the movement of developing neurons. In this paper, we present an automated tracking, tracing, and segmentation tool for soma, leading, and trailing process of migrating neurons in time-lapse image stacks acquired with a confocal fluorescence microscope. In our approach, we first localize each neuron in the maximum intensity projection of the first frame using manual labeling of the soma and end points of the leading and trailing process. By using each soma position at the first frame, we automatically track the somas in rest of the frames. Then, leading and trailing process are traced in each frame from the soma center to the labeled end tip of the process by using fast marching algorithm. Finally, the soma, leading and trailing processes of each neuron are segmented by using the soma center and traces as seed points, and their boundaries are separated from each other. Based on qualitative results, we demonstrate the capability to automatically track, trace, and segment the soma, leading, and trailing processes of a migrating neuron with minimal user input.

Karakaya, Mahmut↗

Hydrogeophysical investigations of the former S-3 ponds contaminant plumes

At the Oak Ridge Integrated Field Research Challenge site, near Oak Ridge, Tennessee, contaminants from the former S-3 ponds have infiltrated the shallow saprolite for over 60 years. Two- and three-dimensional DC-resistivity tomography is used to characterize the number and location of the main contaminant plumes, which include high concentration of nitrate. These contaminant plumes have typically an electrical resistivity in the range 2 20 ohm-m while the background saprolite resistivity is in the range 60 120 ohm-m, so the difference of resistivity can be easily mapped using DC-resistivity tomography to locate the contaminant pathways. We develop a relationship to derive the in situ nitrate concentrations from the 3D resistivity tomograms accounting for the effect of surface conductivity. The footprint of the contamination upon the resistivity is found to be much stronger than the local variations associated with changes in the porosity and the clay content. With this method, we identified a total of five main plumes (termed CP1 to CP5). Plume CP2 corresponds to the main plume in terms of nitrate concentration ( 50,000 ). We also used an active time constrained approach to perform time-lapse resistivity tomography over a section crossing the plumes CP1 and CP2. The sequence of tomograms is used to determine the changes in the nitrate concentrations associated with infiltration of fresh (meteoritic) water from a perched aquifer. This study highlights the importance of accounting for surface conductivity when characterizing plume distributions in clay-rich subsurface systems.

Revil, Andre↗

MicroBooNE Detector Move

On Monday, June 23, 2014 the MicroBooNE detector -- a 30-ton vessel that will be used to study ghostly particles called neutrinos -- was transported three miles across the Fermilab site and gently lowered into the laboratory's Liquid-Argon Test Facility. This video documents that move, some taken with time-lapse camerad, and shows the process of getting the MicroBooNE detector to its new home.

47 OTHER INSTRUMENTATION↗

Quadrature conductivity: A quantitative indicator of bacterial abundance in porous media

ABSTRACT The abundance and growth stages of bacteria in subsurface porous media affect the concentrations and distributions of charged species within the solid-solution interfaces. Therefore, spectral induced polarization (SIP) measurements can be used to monitor changes in bacterial biomass and growth stage. Our goal was to gain a better understanding of the SIP response of bacteria present in a porous material. Bacterial cell surfaces possess an electric double layer and therefore become polarized in an electric field. We performed SIP measurements over the frequency range of 0.1–1 kHz on cell suspensions alone and cell suspensions mixed with sand at four pore water conductivities. We used Zymomonas mobilis at four different cell densities (in- cluding the background). The quadrature conductivity spectra exhibited two peaks, one around 0.05–0.10 Hz and the other around 1–10 Hz. Because SIP measurements on bacterial suspensions are typically made at frequencies greater than 1 Hz, these peaks have not been previously reported. In the bac-terial suspensions in growth medium, the quadrature conduc-tivity at peak I was linearly proportional to the density of the bacteria. For the case of the suspensions mixed with sands, we observed that peak II presented a smaller increase in the quadrature conductivity with the cell density. A comparison of the experiments with and without sand grains illustrated the effect of the porous medium on the overall quadrature con- ductivity response (decrease in the amplitude and shift of the peaks to the lower frequencies). Our results indicate that for a given porous medium, time-lapse SIP has potential for mon- itoring changes in bacterial abundance within porous media.

Zhang, Chi↗

Transition and Transfer of Remediated Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites from U.S. Army Corps of Engineers (USACE) to U.S. Department of Energy (DOE)

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS&M). US DOE’s Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS&M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM’s perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS&M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness.

54 ENVIRONMENTAL SCIENCES↗

Appendix for the Final Technical Report - DE FE0009284

Carbon capture utilization storage (CCUS) is a potential technology to store anthropogenic emissions for CO 2 . Utilization often refers to CO 2 -enhanced oil recovery (CO 2 -EOR). An important factor in the success of CO 2 storage in saline formations or CO 2 -EOR reservoirs is ensuring that the storage occurs safely and is long-term. Assessment of well integrity has become more important for CCS and CO 2 -EOR as it has become apparent that wells represent the most likely migration pathway for CO 2 to leave a CCS storage unit or a CO 2 -EOR reservoir. Although wells represent a migration pathway they are also the best vehicle for employing technology monitoring CO 2 injection and storage. This contradiction of being a potential migration path and key monitoring technology leads to a need to understand how monitoring wells may be similar or different in comparison to other types of wells with respect to migration risk. The maturation and completion US Department of Energy sponsored research projects presents an opportunity to assess the integrity of monitoring wells that have been exposed to injected CO 2 . This paper discusses an integrity assessment of two monitoring wells in an operating CO 2 -EOR flood in Mississippi, USA. The CFU31F-2 and CFU31F-3 monitoring wells were constructed to test monitoring technologies in and above a commercial CO 2 -EOR project. The materials selected and the design of the well were optimized for monitoring. Carbonation in CFU31-F2 was seen as high as 7900 ft, above what was considered top of cement based on the logs. Time-lapse comparison of cement bond amplitude data and acoustic impedance maps show a deterioration of signal that implies a deterioration of cement bond or cement along much of the cemented annulus in the long-string section. Analysis of sidewall cores using XRD and LA-ICP-MS validated the log interpretation by confirming the degradation of cement (carbonation) along the casing-cement interface. The ultrasonic image maps also clearly identify the control lines and monitoring technology attached to the outside of the of the long-string casing on each well studied. The control lines appear as microdebonded or fluid filled vertical features implying that they could act as leakage pathways. The sidewall core through the control line at 10380 ft confirms that CO 2 is migrating along the control line with heavily carbonated cement at the control line interface. LA-ICP-MS and XRD on formation interface of the sidewall cores collected in both wells indicates that CO 2 is also moving of the cement-formation interface. LA-ICP-MS and XRD indicate that the amount carbonation in the center of the cores was less than the carbonation at the interfaces. Indicating that CO 2 is reaching the center of the cores by diffusing in from the interfaces and not migrating up from the reservoir though the porous matrix of the cement. This agrees with Duguid et al. [5] and Carey et al. [1] who have found that the interfaces in the well are more conductive than the porous network of the cement. Both the materials used to construct the well and the decision to attach monitoring technology to the outside of the well may have contributed to the migration of CO 2 along the interfaces. Careful consideration should be given to material selection to ensure that it does not degrade when in contact with the fluids in the reservoir and overlying strata. The addition of the control line on the outside of the casing complicated the cement placement and likely caused no cement to bond to the casing adjacent to the control line leading out of the reservoir. Further study of other wells with external lines should be conducted to see of the results of the construction of CFU31-F2 and -F3 is normal or an exception.

54 ENVIRONMENTAL SCIENCES↗

Augmenting C. elegans Microscopic Dataset for Accelerated Pattern Recognition

The detection of cell shape changes in 3D time-lapse images of complex tissues is an important task. However, it is a challenging and tedious task to establish a comprehensive dataset to improve the performance of deep learning models. In the paper, we present a deep learning approach to augment 3D live images of the Caenorhabditis elegans embryo, so that we can further speed up the specific structure pattern recognition. We use an unsupervised training over unlabeled images to generate supplementary datasets for further pattern recognition. Technically, we used Alex-style neural networks in a generative adversarial network framework to generate new datasets that have common features of the C. elegans membrane structure. We also made the dataset available for a broad scientific community.

Lu, Zheng↗

Top-End Installation for DESI Project at Mayall Telescope

In this time-lapse video, crews at the Mayall Telescope near Tucson, Arizona, lift and install the top-end components for the Dark Energy Spectroscopic Instrument, or DESI. The components, which include a stack of six lenses and other structures for positioning and support, weigh about 12 tons. DESI, scheduled to begin its sky survey next year, is designed to produce the largest 3-D map of the universe and produce new clues about the nature of dark energy.

3-D MAP↗

Compressible Arch Segments for the Cigeo Access Ramps, Drifts and Vaults - A Field Test - 17011

Andra is currently implementing the detailed engineering phase of the step-wise design development of Cigeo (the French HLW and IL-LLW Deep Geological Repository). Various technical issues are at stake, including the requirements linked to 'Reversibility / Retrievability', at different stages of the repository life cycle (from its construction start-up to its final closure and monitoring). These reversibility requirements have a significant impact on the way Cigeo is designed, will be progressively developed, operated, later closed and monitored. On a shorter term, one must demonstrate that the waste container retrieval operations are technically safe and feasible. In that sense, the structural dimensioning of the ramps and mains, as well as that of the IL-LLW disposal vaults, is critical, since the concrete liner supporting the rock walls must last over a period of some 100 to 150 years (lapse of time during which retrieval operations are likely to take place). The present paper starts with a description of the geomechanical conditions prevailing in the Callovo-Oxfordian (COX) clay-stone formation (aka the argillite). The structural dimensioning of the IL-LLW disposal vault liner, as calculated at the end of the basic engineering phase is indicated. The thickness values obtained so far have led to considering an alternative design in which a compressible material is positioned between the concrete liner intrados and the rock walls: in such situation, the 'creeping effect' of the rock is mitigated, for a time, by the compressible material (nearly a perfect elastoplastic material), hence reducing the stress level exerted inside the concrete liner. This situation enables to significantly reduce the liner thickness and provides potentially significant saving in the construction of the works concerned (preliminary sensitivity results are given). The following part of the paper is then focused on a practical case story: a technological demonstration (still ongoing) of a tunnel boring experiment, implemented underground (in a dedicated drift of the Meuse Haute Marne URL infrastructures, at scale 1:2 of the Cigeo drifts/vaults). In this excavation and construction experiment, the tunnel boring machine (TBM) lays (via an erector) 'classical' concrete arch segments (forming a ring) in a first portion of the drift and 'compressible' ones (the compressible material is positioned on their extrados) in a second portion of the drift. The technical demonstration objective is two-fold: the capacity to lay compressible arch segments with a TBM is checked, their structural behavior (with time) is compared with that of 'classical' ones. The way the compressible material is produced and then fixed on the arch concrete segment is also documented, c/w a description of the complementary testing campaign to be carried out on a test bench (on surface) of a concrete ring (at a scale 1:2 of Cigeo) formed of compressible arch segments. This paper concludes with a timeline of the experiment. Should the results obtained provide some perspectives of technical and economic improvement (i.e. saving vis-a-vis the 'classical' solution) a decision could be taken by Andra to incorporate this alternative solution in the 'design freeze' of Cigeo underground infrastructures. The positive outcomes of this technical test campaign would also pave the way for specifying the Cigeo TBM characteristics (dimensions and handling equipment), scheduled for manufacturing order around 2020. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Near Real-Time Two and Three-Dimensional Electrical Geophysical Monitoring of Natural and Engineered Processes Associated with Subsurface Remediation - 16052

Legacy soil and groundwater contamination associated with nuclear weapons production is projected to be one of the largest cleanup liabilities to the U.S. Department of Energy for the foreseeable future. Remediation of subsurface contaminants is complicated by the combined effects of geochemical heterogeneity, geological heterogeneity, and the difficulty and expense of adequate borehole access. Each of these complications contributes to uncertainty in the distribution of contaminants and the performance of in situ treatments, which increases risk to human health and the environment and cost to closure in general. Electrical resistivity tomography (ERT) is a method of remotely imaging the electrical properties of the subsurface, which are governed by both geochemical and geological structure, thereby providing useful proxies for understanding contaminant distribution and the behavior in situ remediation processes. Recent advancements in both data collection and data processing capabilities are enabling ERT monitoring to be executed and provided to site operators in near real-time. To summarize the process, ERT surveys are rapidly and continuously collected during a time-sensitive operation such as an amendment injection. At the completion of each survey, data are transferred by wireless internet to offsite supercomputing resources for parallel tomographic inversion. Inversion results are then transferred back to onsite operators and/or other locations for visualization. In this paper, we demonstrate the utility of time-lapse ERT for monitoring fluid transport (both gas and liquid phase). We then demonstrate two real-time imaging applications for monitoring both natural and engineered processes at the Hanford Site within the vadose and the saturated zones. We expect this new capability for autonomous real-time imaging to enable ERT to be used as a cost-effective, short-term rapid feedback mechanism for guiding subsurface remediation injections, in addition to longer term monitoring of post-injection performance and environmental impact, all using the same electrode array and instrumentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transition and Transfer of Remediated FUSRAP Sites from USACE to US DOE for Long-Term Surveillance and Maintenance - 16209

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS and M). US DOE's Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS and M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM's perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS and M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges of Transitioning Obsolete Legacy Systems to Decommissioning in NRU - 19047

The National Research Universal (NRU) Reactor permanently shut down on March 31, 2018 after over 60 years of service. The NRU reactor and its ancillary buildings are now being readied for decommissioning. The preparation for decommissioning will begin with the deactivation of NRU systems and the ancillary buildings. The focus of this paper will be to document some of the experiences of deactivating the Effluent Heat Recovery System (EHRS) and Building 440 which houses the Emergency Cooling Water Supply system for NRU. Both the EHRS and Building 440 are legacy and obsolete. The deactivation of the EHRS and Building 440 encountered a number of operational challenges such as lapses in maintenance and housekeeping, loss of motivation, and issues with work plans. Organizational challenges, lack of knowledge and expertise, lack of support, and conflicting intra-organizational priorities, are believed to influence the operational challenges. The impact of challenges encountered on the project is reviewed with an emphasis on Project Management and people. 'Lessons learned' based on the experiences of the authors is provided detailing, amongst other things, the importance of people in the success of deactivating the NRU reactor and its ancillary buildings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Large Volume Airborne Contamination Monitoring To Support Nuclear Processes' Deactivation and Decommissioning

Current D and D operations at Hanford have demonstrated a flaw in the current state of the art capability of defining airborne contamination boundaries - Airborne particulate emissions of Pu-239 from CM2H operations on the Hanford Pu Finishing Plant were detected well beyond areas controlled for airborne Pu, putting numerous workers at risk for radiological assimilations - Current air samplers and CAM systems were surveying insufficient volumes of air to accurately predict where respiratory protection was required - Hanford is located in a high radon environment, making air monitoring for alpha emitting actinides challenging in high alpha radon induced backgrounds. - Inexpensive HEPA based home and industrial air purifiers filter significantly higher volumes of air than commercially available continuous-air monitoring (CAM) systems. - Inexpensive models capable of filtered air volumes exceeding 1000 times that of a CAM. - Detector system can be built to detect x-rays generated from actinide decay. - Branching ratios of x-rays are 4 orders of magnitude more intense from Plutonium decay than its gamma emissions. - Detector system can be a low resolution systems, as x-ray region of interest is not terribly congested. - Detection systems evaluated will be designed based on slabs of NaI or pixelated NaI or CsI panels. - Simple graphical user interface software will be developed to operate the detection system. - Concept is to deploy some of these air-purifying systems in nonradiological areas around SRNL to confirm radon can be rejected with confidence. - Generate some filters contaminated with plutonium via electroplated Pu or lab generated simulated particles. - then deploy units in known airborne radiological environments to establish systems ability to accurately measure actinide based hot particles Lab analyses will follow up the system analyses to ensure hot particles were correctly identified. Analysis by Scintillation: - Application of scintillation media to the surface of the filters is being explored. - Evaluating slabs of ZnS(Ag), application of powdered ZnS(Cu) and spray on Perkin Elmer Enhance. - Scintillation events would then be digitized with a digital camera and quantified. - Comparing against sensitivity of a PMT or SiPD readout. - Currently evaluating a Thorlabs 8 Megapixel Monochrome Scientific CCD Camera, hermetically sealed cooled package with a wide angle lens. - Wide angle lens allows complete view of HEPA filter from 7 inches away. - Images taken of glow in the dark paint, as well as plutonium-induced fluorescence. - Plutonium was flamed mounted on a 1 inch diameter stainless steel planchet, covered with a layer of mylar and a section of scintillating ZnS obtained from Eljon. - Currently working on reducing signal-to-noise levels to boost sensitivity. - Dark box to hold contaminated or electroplated source covered filters under fabrication. Analysis by x-ray Spectroscopy: - Branching ratios for x-ray emissions from Plutonium isotopes are orders of magnitude more intense than gamma-ray emissions. - The nuclear databases are incomplete on the branching ratios of some of the isotopes. - Evaluating some custom built SrI2 x-ray spectrometers vs a conventional windowed NaI detector. - SrI2 detectors are carbon-composite-windowed 51 mm x 51 mm. - MCNP calculations to establish self absorbance of filter media on 17 keV x-ray. Radon Rejection: - Activated charcoal pre-filter acts as a Radon trap. - Adding a time lapse feature to camera to aid in radon rejection. SRS Plutonium Fuel Form D and D Operations: Currently deploying air sampler to D and D operation of Pu-238 facility at SRS to generate some field samples to analyze.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Upcoming Process Improvement Efforts at the Saltstone Facilities at the Savannah River Site - 20474

The Saltstone Facilities at the Savannah River Site (SRS) process and dispose of low activity salt solution waste generated by other liquid waste facilities. Today in the Liquid Waste System (LWS), approximately 125 million liters of salt waste remain to be processed. The Saltstone Production Facility (SPF) receives the decontaminated salt waste, which is mixed with dry feeds consisting of cement, fly ash and slag to produce the saltstone. The mixed slurry is pumped to the Saltstone Disposal Units (SDUs) for safe disposal in the Saltstone Disposal Facility (SDF). To support continuous Salt Waste Processing Facility (SWPF) operations at annual processing volumes many times higher than present, significant modifications are required to ensure that the SPF has the capacity to support the throughput of salt waste. These changes include several infrastructure upgrades that are being worked through the Enhanced Low Activity Waste Disposal (ELAWD) project. In addition to infrastructure upgrades, Savannah River Remediation (SRR), the Savannah River Site's Liquid Waste Contractor for the U.S. Department of Energy, has identified a flowsheet improvement opportunity of implementing a cement-free saltstone formulation to eliminate cement from the current three component formulation. This two-component formulation would simplify the procurement, transport, off-loading, and storage of the premix materials, and increase the storage capacity for the individual components. This flowsheet, when implemented, will reduce operational risk and improve throughput necessary to achieve disposal rates necessary for SWPF operations. Research has been completed to confirm the feasibility of this formulation, with the new cement-free flowsheet expected to be implemented in the next few years. Improvements have also been identified downstream of the SPF to increase SDU utilization. Specifically, a concentrated effort has taken place to raise the fill height in SDU 6 to the full disposal height, 13 meters, to maximize the usage of each SDU in support of the liquid waste disposal mission. This improvement has been made through additional thermal modeling and improved process understanding to create a SDU flammability model and control strategy more representative of facility operations. This work will allow for the completion of construction and operational readiness for SDU 7 while filling SDU 6 to ensure there is no lapse in available space once SWPF starts up. A summary of these improvements as they relate to increased throughput will be provided along with associated status. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Impact of Cultural Values and Organizational Processes on Nuclear Security Operations

Human performance is a pivotal factor in the design, testing, maintenance, and operation of security systems. The effectiveness of these systems relies not only on the capabilities, limitations, motives, and attitudes of the individuals involved, but also on the quality of training, instructional content, and evaluation methods provided. To uphold security standards, seamless integration between technologies and operators necessitates reliable human input. In security operations, human errors, often attributed to blame, sanctions, low motivation, individual accountability, or complacency, are primary causes of system failures. Complacency, characterized by a false sense of security, reflects a lack of awareness of potential threats and is a significant contributing factor to lapses in security. Security incidents arise from various factors, many extend beyond individual control, highlighting the need for a holistic approach to human performance that integrates organizational processes and team collaboration. Historically, errors have been attributed to individual moral or cognitive failures. However, insights from Operational Experiences (OEs) suggest that organizational processes weakness and deficiencies in nuclear cultural values contribute more significantly to security failures than individual mistakes. This paper consolidates lessons learned from diverse international nuclear security cultures and aims to highlight the importance of security culture in shaping global perspectives on nuclear security. It underscores the role of cultural values in shaping nuclear security practices and enhancing the resilience of security systems in the nuclear sector.

Zineddin, Dr. Z. [ORNL] (ORCID:0009000848740725)↗

Assessment of geophysical monitoring methods for detection of brine and CO 2 leakage in drinking water aquifers

Here, we evaluated and compared the effectiveness of four surface-based geophysical monitoring methods to downhole pressure and chemical methods to detect brine and CO 2 leakage in underground sources of drinking water overlying a CO 2 storage reservoir. This assessment uses synthetic monitoring data generated from 400 simulated aquifer impact data sets. Here, the six monitoring techniques can detect impacted groundwater once 20,000 tonnes of CO 2 have leaked into the drinking water resource. Geophysical methods are most effective at detecting shallow plumes. Although downhole monitoring methods outperform geophysical methods in detecting deep plumes, geophysical methods may help reduce the false negative during the post injection site care because they detect impacted groundwater where downhole sensors may be absent.

58 GEOSCIENCES↗