Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integrated Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

HP upgrade operational streamlining

New computer technology and resources must be successfully integrated into CDSLR station operations to manage new complex operational tracking requirements, support the on site production of new data products, support ongoing station performance improvements, and to support new station communication requirements. The NASA CDSLR Network is in the process of upgrading station computer resources with HP UNIX workstations, designed to automate a wide range of operational station requirements. The primary HP upgrade objective was to relocate computer intensive data system tasks from the controller computer to a new advanced computer environment designed to meet the new data system requirements. The HP UNIX environment supports fully automated real time data communications, data management, data processing, and data quality control. Automated data compression procedures are used to improve the efficiency of station data communications. In addition, the UNIX environment supports a number of semi-automated technical and administrative operational station tasks. The x window user interface generates multiple simultaneous color graphics displays, providing direct operator visibility and control over a wide range of operational station functions.

Edge, David R.↗

JPL Contamination Control Engineering

JPL has extensive expertise fielding contamination sensitive missions-in house and with our NASA/industry/academic partners.t Development and implementation of performance-driven cleanliness requirements for a wide range missions and payloads - UV-Vis-IR: GALEX, Dawn, Juno, WFPC-II, AIRS, TES, et al - Propulsion, thermal control, robotic sample acquisition systems. Contamination control engineering across the mission life cycle: - System and payload requirements derivation, analysis, and contamination control implementation plans - Hardware Design, Risk trades, Requirements V-V - Assembly, Integration & Test planning and implementation - Launch site operations and launch vehicle/payload integration - Flight ops center dot Personnel on staff have expertise with space materials development and flight experiments. JPL has capabilities and expertise to successfully address contamination issues presented by space and habitable environments. JPL has extensive experience fielding and managing contamination sensitive missions. Excellent working relationship with the aerospace contamination control engineering community/.

Molecular Contamination Spectral Effects (MCSE) Ch↗

Automated rover sequence report generation

A web-based rover mission operations report and its various elements are described. The system was used for documentation of the Field Integrated Development and Operations (FIDO) rover May 2000 field test and results from the field test are provided. Implementation of automated sequence report generation for the operations report is explained in detail.

rovers mission operations↗

Space Mobile Network (SMN) User Demonstration Satellite (SUDS) for a Practical On-Orbit Demonstration of User Initiated Services (UIS)

This paper will discuss the various aspects of implementation of the Space Mobile Network (SMN) architecture framework within the context of operations of various nodes equipped with the User Initiated Services (UIS) protocol. These aspects include development of a Client-Server architecture in which space based Clients can create links with ground based Servers to negotiate passes with ground stations or contacts with the Tracking and Data Relay Satellite (TDRS) fleet. A key feature of this concept is that Users may require a mix of low data rate continuous contacts with one or more of the TDRS fleet and sporadic contacts with ground stations as passes become available. SUDS (SMN User Demonstration Satellite) will have the availability of TDRS contacts, the U.S. Naval Academy's ground station, NASA Near Earth Network ground sites and others. This mode of operations must be integrated within the traditional mode of scheduling contacts and passes. Thus, SUDS fits into a heterogeneous network operations concept of operations.

CubeSat and Autonomy↗

Ground-tended payload operations of Space Station Freedom

The concepts and capabilities that supported ground-tended Space Station Freedom (SSF) utilization and operations are described. On-board computer control support capabilities are required, and potential approaches for computer sequencing are discussed. An integrated process which links the planning processes with the implementation and execution of the operations is required to perform continuous, long-term utilization of SSF. Payload designs that make accommodations for ground-tended operation can be supported by the operations infrastructure. The payload operations integration center and Space Station Control Center are to support continuous operations of payloads that are designed to be operated from the ground. An overall process of ground-tended payload operations which links the weekly planning and continuous ground-tended execution functions is defined.

Noneman, Steven R.↗

Implementing Distributed Operations: A Comparison of Two Deep Space Missions

Two very different deep space exploration missions--Mars Exploration Rover and Cassini--have made use of distributed operations for their science teams. In the case of MER, the distributed operations capability was implemented only after the prime mission was completed, as the rovers continued to operate well in excess of their expected mission lifetimes; Cassini, designed for a mission of more than ten years, had planned for distributed operations from its inception. The rapid command turnaround timeline of MER, as well as many of the operations features implemented to support it, have proven to be conducive to distributed operations. These features include: a single science team leader during the tactical operations timeline, highly integrated science and engineering teams, processes and file structures designed to permit multiple team members to work in parallel to deliver sequencing products, web-based spacecraft status and planning reports for team-wide access, and near-elimination of paper products from the operations process. Additionally, MER has benefited from the initial co-location of its entire operations team, and from having a single Principal Investigator, while Cassini operations have had to reconcile multiple science teams distributed from before launch. Cassini has faced greater challenges in implementing effective distributed operations. Because extensive early planning is required to capture science opportunities on its tour and because sequence development takes significantly longer than sequence execution, multiple teams are contributing to multiple sequences concurrently. The complexity of integrating inputs from multiple teams is exacerbated by spacecraft operability issues and resource contention among the teams, each of which has their own Principal Investigator. Finally, much of the technology that MER has exploited to facilitate distributed operations was not available when the Cassini ground system was designed, although later adoption of web-based and telecommunication tools has been critical to the success of Cassini operations.

Cassini Mission↗

Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: Terminal Operations HITL 1: Primary Results

This presentation covers the primary results of the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project Terminal Operations Foundational Human-in-the-Loop (HITL) simulation. The study tasked 16 pilots (half with manned piloting experience, and the other half with unmanned piloting experience) with maintaining "well clear" from other traffic while performing three different types of approaches into the Santa Rosa airport. A detect and avoid (DAA) system was provided to pilots to assist their ability to manage separation. The DAA system used in this test conformed to the criteria defined by RTCA Special Committee 228 (SC-228) in their Phase 1 Minimum Operational Performance Standards (MOPS) for UAS intending to operate in the NAS. The Phase 1 system was not designed to account for terminal operations, focusing instead on en route operations. To account for this, three different alerting and guidance configurations were presently tested in order to determine their effect on pilots operating the system in the terminal area. Results indicated that pilots with the alerting and guidance condition that provided the least amount of assistance (fewer alert levels and guidance types) experienced slightly increased pilot response times and rates of losses of separation. Additional data is presented on the effects of approach type and descriptive data on pilot maneuver preferences and ATC interoperability.

terminal environmen↗

Overview of Model-Based Systems Engineering Efforts to Evolve the Airspace Research Roadmap

NASA’s Air Traffic Management-Exploration (ATM-X) UAM Airspace Subproject is conducting research that evolves UAM airspace towards a highly automated and operationally flexible system of the future. The complexity of UAM airspace evolution requires a plan to effectively organize, integrate, and communicate NASA’s research and development. The planning tool, called the UAM airspace research roadmap, or just roadmap, is key to the execution of NASA’s UAM airspace research over the next ten years. Implemented through Model-Based Systems Engineering (MBSE) methodology, the roadmap will help to prioritize and coordinate research efforts, and to integrate results that build towards NASA’s research goals of evolving UAM airspace for integration of UAM operations into the National Airspace System (NAS). This paper presents an overview of on-going MBSE efforts to meet these overarching goals. Note: Included mp4 video of presentation included in record, runtime 9 mins 57 secs.

Model-Based Systems Engineering↗

Overview of Model-Based Systems Engineering Efforts to Evolve the Airspace Research Roadmap

NASA’s Air Traffic Management-Exploration (ATM-X) UAM Airspace Subproject is conducting research that evolves UAM airspace towards a highly automated and operationally flexible system of the future. The complexity of UAM airspace evolution requires a plan to effectively organize, integrate, and communicate NASA’s research and development. The planning tool, called the UAM airspace research roadmap, or just roadmap, is key to the execution of NASA’s UAM airspace research over the next ten years. Implemented through Model-Based Systems Engineering (MBSE) methodology, the roadmap will help to prioritize and coordinate research efforts, and to integrate results that build towards NASA’s research goals of evolving UAM airspace for integration of UAM operations into the National Airspace System (NAS). This paper presents an overview of on-going MBSE efforts to meet these overarching goals.

Model-Based Systems Engineering↗

Lessons Learned: Using UTM paradigm for Urban Air Mobility Operations

Urban Air Mobility (UAM) aims to reduce congestion on the roads and highways by offering air taxi as an alternative to driving on surface roads. Integration of UAM operations in the National Airspace System (NAS) has been the focus of the research conducted at NASA Ames Research Center. A simulation was performed in collaboration with Uber Technologies Inc to investigate if NASA’s UTM architecture and its implementation as demonstrated in the 2019 UTM field tests were extensible for UAM operations, and if the data exchange between multiple operators as planned under UTM were adequate for UAM operations in the shared airspace. In order to explore these research questions, three Use Cases were defined to investigate different airspace management challenges. This paper will describe the lessons learned from exercising the uses cases and the airspace management services including scheduling and separation developed to facilitate initial UAM operations.

Urban Air Mobility↗

Integration and Test of Shuttle Small Payloads

Recommended approaches for space shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of shuttle small payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration and interface testing; (7) Postflight operations. This paper is of special interest to those payload projects that have small budgets and few resources: that is, the truly faster, cheaper, better projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

Wright, Michael R.↗

Opportunities for Breakthroughs in Large-Scale Computational Simulation and Design

Opportunities for breakthroughs in the large-scale computational simulation and design of aerospace vehicles are presented. Computational fluid dynamics tools to be used within multidisciplinary analysis and design methods are emphasized. The opportunities stem from speedups and robustness improvements in the underlying unit operations associated with simulation (geometry modeling, grid generation, physical modeling, analysis, etc.). Further, an improved programming environment can synergistically integrate these unit operations to leverage the gains. The speedups result from reducing the problem setup time through geometry modeling and grid generation operations, and reducing the solution time through the operation counts associated with solving the discretized equations to a sufficient accuracy. The opportunities are addressed only at a general level here, but an extensive list of references containing further details is included. The opportunities discussed are being addressed through the Fast Adaptive Aerospace Tools (FAAST) element of the Advanced Systems Concept to Test (ASCoT) and the third Generation Reusable Launch Vehicles (RLV) projects at NASA Langley Research Center. The overall goal is to enable greater inroads into the design process with large-scale simulations.

Alexandrov, Natalia↗

Desert Research and Technology Studies (DRATS) Traverse Planning

Slide 1] The Desert Research and Technology Studies (DRATS) include large scale field tests of manned lunar surface exploration systems; these tests are sponsored by the Director s Office of Integration (DOI) [sic, Directorate Integration Office (DIO)] within the Constellation Program and they include geological exploration objectives along well designed traverses. These traverses are designed by the Traverse Team, an ad hoc group of some 10 geologists form NASA and academia, as well as experts in mission operation who define the operational constraints applicable to specific simulation scenarios. [Slide 2] These DRATS/DOI tests focus on 1) the performance of major surface systems, such as rovers, mobile habitats, communication architecture, navigation tools, earth-moving equipment, unmanned reconnaissance robots etc. under realistic field conditions and 2) the development of operational concepts that integrate all of these systems into a single, optimized operation. The participation of science is currently concentrating on geological sciences, with the objective of developing suitable tools and documentation protocols to sample representative rocks for Earth return, and to generate some conceptual understanding of the ground support structure that will be needed for the real time science-support of a lunar surface crew. [Slide 3] Major surface systems exercised in the June 2008 analog tests at the Moses Lake site, WA. [Upper left] The Chariot Rover (developed at Johnson Space Center) is an unpressurized vehicle driven by fully suited crews. [Upper right] Mobile Habitat provided by the Jet Propulsion Laboratory. Chariot is the more nimble and mobile vehicle and the idea is to drive the habitat remotely to some rendezvous place where Chariot would catch up - after a lengthy traverse - at the end of the day. [Lower left] The K-10 remotely operated robot (provided by NASA Ames Research Center) conducting scientific/geologic reconnaissance of the prospective traverse region, locating specific sites for more detailed exploration by Chariot and its crew. [Lower right] This earth-moving equipment (provided by NASA KSC) can be attached to Chariot and is envisioned to, for example, level an outpost site or to mine lunar soi

Horz, Friedrich↗

The human as supervisor in automated systems

This hierarchical approach to information display forces the development of a set of human oriented system models which will guide the design of the displays. If the appropriate information is provided at the appropriate time, it is likely that less information will be displayed at any given time, and the quality of the displayed information will require less operator effort to integrate into an assimilatable form. A problem with contemporary control rooms is that there is too much information for an operator to be able to assimilate quickly, easily, and accurately. It is suggested that necessary direction for research in the area of automated control room design is to develop displays which provide active decision aiding for the modern controller. Displays are needed which provide information compatible with the operator's current internal model, filter out irrelevant information, and summarize and condense lower level information.

Mitchell, C. M.↗

Advanced transportation system study: Manned launch vehicle concepts for two way transportation system payloads to LEO

The purpose of the Advanced Transportation System Study (ATSS) task area 1 study effort is to examine manned launch vehicle booster concepts and two-way cargo transfer and return vehicle concepts to determine which of the many proposed concepts best meets NASA's needs for two-way transportation to low earth orbit. The study identified specific configurations of the normally unmanned, expendable launch vehicles (such as the National Launch System family) necessary to fly manned payloads. These launch vehicle configurations were then analyzed to determine the integrated booster/spacecraft performance, operations, reliability, and cost characteristics for the payload delivery and return mission. Design impacts to the expendable launch vehicles which would be required to perform the manned payload delivery mission were also identified. These impacts included the implications of applying NASA's man-rating requirements, as well as any mission or payload unique impacts. The booster concepts evaluated included the National Launch System (NLS) family of expendable vehicles and several variations of the NLS reference configurations to deliver larger manned payload concepts (such as the crew logistics vehicle (CLV) proposed by NASA JSC). Advanced, clean sheet concepts such as an F-1A engine derived liquid rocket booster (LRB), the single stage to orbit rocket, and a NASP-derived aerospace plane were also included in the study effort. Existing expendable launch vehicles such as the Titan 4, Ariane 5, Energia, and Proton were also examined. Although several manned payload concepts were considered in the analyses, the reference manned payload was the NASA Langley Research Center's HL-20 version of the personnel launch system (PLS). A scaled up version of the PLS for combined crew/cargo delivery capability, the HL-42 configuration, was also included in the analyses of cargo transfer and return vehicle (CTRV) booster concepts. In addition to strictly manned payloads, two-way cargo transportation systems (CTRV's) were also examined. The study provided detailed design and analysis of the performance, reliability, and operations of these concepts. The study analyzed these concepts as unique systems and also analyzed several combined CTRV/booster configurations as integrated launch systems (such as for launch abort analyses). Included in the set of CTRV concepts analyzed were the medium CTRV, the integral CTRV (in both a pressurized and unpressurized configuration), the winged CTRV, and an attached cargo carrier for the PLS system known as the PLS caboose.

Duffy, James B.↗

Lunar Science and Mission Systems Integration for Real-Time Long Duration Remote Robot Surface Operations

Conducting lunar science with a robot on the Moon that is commanded in real-time from Earth by distributed workgroups for long durations is a specific activity that has been developed by many projects including NASA’s Volatiles Investigating Polar Exploration Rover (VIPER) mission. VIPER’s nominal mission period for surface operations was set for 100 Earth days (four lunar days). VIPER’s science knowledge acquisition was set to focus on characterizing the distribution of water and volatiles across a range of thermal environments, within a traverse planned to optimize science return across up to 20 km. While VIPER’s status is the subject of discussion, there is research and analysis from the development and simulations phases that are of benefit to the lunar science community and future remote science operations projects. Discussed here are some findings on the process of integrating lunar science with mission system operations.

VIPER↗

Evaluation of a Tactical Surface Metering Tool for Charlotte Douglas International Airport Via Human-in-the-Loop Simulation

NASA has been working with the FAA and aviation industry partners to develop and demonstrate new concepts and technologies that integrate arrival, departure, and surface traffic management capabilities. In March 2017, NASA conducted a human-in-the-loop (HITL) simulation for integrated surface and airspace operations, modeling Charlotte Douglas International Airport, to evaluate the operational procedures and information requirements for the tactical surface metering tool, and data exchange elements between the airline controlled ramp and ATC Tower. In this paper, we focus on the calibration of the tactical surface metering tool using various metrics measured from the HITL simulation results. Key performance metrics include gate hold times from pushback advisories, taxi-in/out times, runway throughput, and departure queue size. Subjective metrics presented in this paper include workload, situational awareness, and acceptability of the metering tool and its calibration

air traffic management↗