SDTS Mezzanine Installation
A mezzanine was constructed around the Six-degree-of-freedom Dynamic Test System (SDTS) from January 14th to January 18th, 2022. It was a part of facility-wide upgrades to prepare SDTS for the future of NASA programs and will be used as a viewing platform for test customers to observe docking tests. This video shows an accelerated time lapse of the construction.
Installing Optimus System for Wall Pressures at 14x22
Explore the source record for details and available documents.
Installed Performance Assessment of an Array of Distributed Propulsors Ingesting Boundary Layer Flow
Explore the source record for details and available documents.
A Framework for Building Performance Analysis: Investment Return Approach for Energy Savings on Building Product Installation
Explore the source record for details and available documents.
Method using a electrostatic generator/motor rotor electrode system suitable for installation on the outer surface of an EMB rotor
Electrostatic generator electrodes mounted on the outer surface of a fiber-composite rotor. The conducting strips are mounted with a slight tilt in angle such that the electrodes will experience no tension or compression effects as the rotor spins up or slows down. The compression would come about from effects associated with the Poisson Ratio. This change can eliminate any metal fatigue or loss of bonding that might have arisen if the electrodes were to be aligned with the axis.
Removal of the Need for Boreholes for Micropile Design and Installation
Explore the source record for details and available documents.
Integrated Ventilation System Increases Energy Efficiency and Ease of Installations
The newly developed ventilation-integrated comfort system (VICS) reduces space requirements and costly ductwork needed for separate heating, cooling, and ventilation systems—without compromising performance.
Solar Installer Apprenticeships Employer Info Session
IREC and SEIA shared background information on registered apprenticeships and ongoing efforts to register a solar apprenticeship program.
2021 Prototype Installation and Testing Awardee: XFlow Energy Company
XFlow Energy Company (XFlow Energy) aims to reduce the cost of wind energy by designing vertical-axis wind turbines (VAWTs), which have a cheaper blade manufacturing process and a mechanically simpler design than traditional wind turbines, among other cost-saving advantages. However, a lack of modeling or simulation tools that can predict the coupling between aerodynamic and structural forces poses a significant challenge to developers of VAWTs. Known as aeroelastic models, these are not just important design tools - they're critical for certifying VAWTs of 25 kilowatts (kW), which is the size of XFlow Energy's prototype wind turbine. Without certification, XFlow Energy will not be able to deliver an independently validated product to its customers, and those customers will not be eligible for state and federal incentives. An accurate aeroelastic model could provide less-conservative structural optimization tactics than are currently used, resulting in a wind turbine with lower capital costs.
Geothermal Reserve Pits: Considerations for Installation on BLM-Administered Lands
Reserve pits, also known as sumps, are a common aspect of geothermal drilling operations. This paper describes the Bureau of Land Management's regulatory authorities and key environmental considerations associated with geothermal reserve pits. Reserve pit design, the need for environmental compliance measures, and reclamation approaches will vary depending on site-specific conditions. Groundwater and wildlife impacts are the most common environmental considerations related to reserve pits. In some cases, regulations or groundwater or soil conditions necessitate the use of a synthetic liner. However, the chemical composition of most geothermal drilling fluids and muds, completion fluids, and produced fluids that are discharged to reserve pits does not warrant pit liners. The potential for hazardous fluids, high water temperatures, and entrapment are concerns for wildlife. Common wildlife impact avoidance and mitigation measures include fencing, netting, and escape ramps. The need for these measures depends on localized site and environmental conditions. There are requirements to reclaim reserve pits following geothermal drilling operations. Reserve pits often remain in place to accommodate multiple phases of drilling and well testing. They are eventually backfilled and decommissioned.
Safety Related Concerns with Installation and Use of Switch-Rated Plug/Receptacle Combinations in Lieu of Metal-Enclosed Disconnect Switches
The manufacturers of Nationally Recognized Testing Laboratory (NRTL) listed, switch-rated, plug and receptacle combinations tout their convenience, reliability, efficiency, and compliance with both the National Fire Protection Association (NFPA) 70®, National Electric Code (NEC), and National Fire Protection Association 70E®, The Standard for Electrical Safety in the Workplace, as advantages to using these products in lieu of traditional metal-enclosed disconnect switches. The purpose of this paper is to raise awareness of several unintended consequences that can result when replacement involves high energy cord and plug connected equipment. This paper describes several possible issues in complying with the NFPA 70 Articles 110 and 400 and NFPA 70E Articles 110 and 130 that should be considered when using load rated plug/receptacle combinations. This paper is intended to address high energy circuits typically associated with 480 volt pin and sleeve type connections in applications where incident energy levels may exceed 1.2 calories/centimeter² (cal/cm²).
Method of installing a heat pipe wick into a container of differing thermal expansion coefficient
A heat pipe is disclosed includes a container, a container lid including a groove defined therein, a wick, and an end plug operably coupled to the wick. The end plug includes a pin extending therefrom. The groove of the container lid is configured to receive the pin.
2022 Prototype Manufacture and Installation Awardee: Sonsight Wind
The Sonsight Wind 3.5-kilowatt (kW) prototype turbine is designed to compete with solar power, meeting energy needs for a wide range of smaller-scale applications, such as powering individual homes and irrigation systems on farms and ranches in remote areas. The technology's innovative high-torque, low-rotations-per-minute generator permits the use of longer blades that, at moderate wind speed sites, generate the energy of a 5-kW turbine with lower thrust forces than similarly rated turbines. The 3.5-kW turbine is projected to ofer greater durability at a signifcantly lower levelized cost of energy. Sonsight Wind advanced the development of the prototype with a previous Competitiveness Improvement Project (CIP) funding award.
New Mexico?s First Enphase Microinverter Rooftop Solar Installation ? 13 Years of Performance Data.
Abstract not provided.
AUP first Pre-Series Cold Mass Installation into the Cryostat
For the HiLumi LHC Upgrade (HL-LHC), new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb3Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP), ten Cryostat Assemblies (LQXFA) for Q1 and Q3 replacement will be built, tested, and delivered to CERN. The first LQXFA was assembled and tested at Fermi National Accelerator Laboratory (FNAL) during fall 2022 and spring/summer 2023, respectively. This paper summarizes the assembly process and experience of the first LQXFA Cryostat Assembly at FNAL.
2022 Prototype Installation and Testing Awardee: Windward Engineering
The 60-kilowatt (kW) Zephyr 21/60 wind turbine from Windward Engineering uses a low-cost, full-span independent pitch system that can act as a redundant aerodynamic braking system. This design uses a relatively simple pneumatic rotary vane actuator, allowing each of the turbine's three blades to be pitched independently and any single blade to activate emergency braking for the entire turbine. A previous Competitiveness Improvement Project (CIP) funding award enabled Windward Engineering to design and develop the Zephyr 21/60 wind turbine's aeroelastic model and pitch system. At the end of this current Competitiveness Improvement Project award, a fully validated aeroelastic model will make it possible to certify Windward Engineering's Zephyr 21/60 design and quantify the technology's levelized cost of energy in preparation for certification and entry into the distributed wind market. The Zephyr 21/60 will feature an attractive levelized cost of energy, improved reliability, and a full-span pitch system for safe and redundant protection against rotor overspeed (which occurs when the rotor turns beyond its design limit).