Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “GPM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Lessons Learned From Smallsat Microwave Sounders Data Assimilation in the NASA Goddard Earth Observing System (GEOS)

The NASA Time-Resolved Observations of Precipitation structure and storm Intensity with a Constellation of Smallsats (TROPICS) mission is a constellation of small satellites carrying state-of-art microwave temperature and humidity sounders with 12 channels between 91 GHz and 205 GHz frequency. Including TROPICS-pathfinder, launched on 30 June 2021, five TROPICS satellites operate and provide temperature and humidity data to NWP and atmospheric retrieval communities. This study evaluates the quality of radiance data from these five satellites. It assesses data impacts on NASA Goddard Earth Observing System (GEOS) global NWP analysis and forecasts while seeking answers to the following key questions: 1. What information do TROPICS satellites bring to NWP analysis? 2. How will TROPICS data assimilation affect NWP forecasts, including tropical cyclone analysis and forecasts? 3. What are the benefits of having multiple TROPICS satellites in NWP forecasts? 4. What are the weaknesses regarding instrument stability, consistency, and data quality of these CubeSats? 5. Can multiple TROPICS make similar impacts as conventional MW sensors such as ATMS or GPM Microwave Imager (GMI)? The sensitivities of each TROPICS channel to temperature, water vapor, cloud, and precipitation are examined in various weather conditions. Results from observing system experiments assimilating TROPICS radiance are used for evaluation metrics, including forecast skills and fit to other observations such as radiosondes and microwave and infrared sounders. Finally, the lessons learned from using these cube satellite radiance data in the GEOS atmospheric data assimilation system are shared.

Min-Jeong Kim↗

Data Integrity Challenges in NASA Giovanni

The Geospatial Interactive Online Visualization ANd aNalysis Infrastructure (Giovanni) is an online tool developed by the NASA Goddard Earth Sciences (GES) Data and Information Services Center (DISC), one of 12 NASA Science Mission Directorate Data Centers (DAACs) to analyze and visualize NASA remote sensing and model data without downloading data and software. As of this writing, over 2000 Earth satellite and model variables are available in Giovanni, including several well-known NASA satellite missions (e.g., TRMM, GPM) and projects (e.g., MERRA-2, GPCP). There are twenty-two plots provided by Giovanni that can be used to analyze, compare, and explore Earth data across disciplines. Results can be shared with colleagues and downloaded for further analysis. Giovanni has helped publish over 3000 referral papers over the years. As open science policies roll in, data integrity has become a major challenge for Giovanni and other tools. For integrity, both data and workflows must be transparent. FAIR-compliant data, including input, intermediate, and result products, as well as their associated statistics, metadata, and information, are needed. The NASA Data Product Development Guide for Data Producers provides a key resource on how to develop FAIR-compliant data products. Data quality information is also needed from data producers and analysis services like Giovanni. The workflow part is quite challenging and requires workflow management improvements, such as recording workflows and making them available to users. In this presentation, we will discuss the data integrity challenges in Giovanni.

data analysis, visualization↗

Use of nanofiltration to reduce cooling tower water usage.

Nanofiltration (NF) can effectively treat cooling-tower water to reduce water consumption and maximize water usage efficiency of thermoelectric power plants. A pilot is being run to verify theoretical calculations. A side stream of water from a 900 gpm cooling tower is being treated by NF with the permeate returning to the cooling tower and the concentrate being discharged. The membrane efficiency is as high as over 50%. Salt rejection ranges from 77-97% with higher rejection for divalent ions. The pilot has demonstrated a reduction of makeup water of almost 20% and a reduction of discharge of over 50%.

54 ENVIRONMENTAL SCIENCES↗

Use of nanofiltration to reduce cooling tower water consumption.

Nanofiltration (NF) can effectively treat cooling-tower water to reduce water consumption and maximize water usage efficiency of thermoelectric power plants. A pilot is being run to verify theoretical calculations. A side stream of water from a 900 gpm cooling tower is being treated by NF with the permeate returning to the cooling tower and the concentrate being discharged. The membrane efficiency is as high as over 50%. Salt rejection ranges from 77-97% with higher rejection for divalent ions. The pilot has demonstrated a reduction of makeup water of almost 20% and a reduction of discharge of over 50%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Mid-latitude Continental Convective Clouds (MC3E) Experiment Final Campaign Report

The Mid-latitude Continental Convective Clouds Experiment (MC3E) took place from April 22 through June 6, 2011, centered at the ARM Southern Great Plains site (http://www.arm.gov/sites/sgp) in northcentral Oklahoma. MC3E was a collaborative effort between the ARM Climate Research Facility and the National Aeronautics and Space Administration’s (NASA’s) Global Precipitation Measurement (GPM) mission Ground Validation (GV) program. The campaign leveraged the largest ground-based observing infrastructure available in the central United States, including recent upgrades through the American Recovery and Reinvestment Act of 2009, combined with an extensive sounding array, remote sensing and in situ aircraft observations, and additional radar and in situ precipitation instrumentation. The overarching goal of the campaign was to provide a three-dimensional characterization of convective clouds and precipitation for the purpose of improving the representation of convective lifecycle in atmospheric models and the reliability of satellite-based retrievals of precipitation.

Jensen, M↗

Efforts to Improve Efficiency of Extraction Well Operation at the Fernald Preserve, Harrison, Ohio – 16177

The Fernald Preserve, a former uranium processing facility that produced high-purity uranium metal products during the Cold War, is located in southwest Ohio. The facility became a US Department of Energy Office of Legacy Management (LM) site in November 2006, following completion of the Comprehensive Environmental Response, Compensation, and Liability Act environmental remediation and site restoration (with the exception of groundwater). When the site was turned over to LM, approximately 76.5 ha of the Great Miami Aquifer remained contaminated with uranium above the final remediation level of 30 μg/L. Here, uranium contamination is being removed from groundwater in the Great Miami Aquifer through a pump-and-treat operation, which is predicted to continue until 2033. Twenty extraction wells pump about 30 million liters per day. Operation of the system is impacted by iron in the groundwater that promotes iron fouling of the well pumps, motors, and screens. The design of the well field evolved over 21 years and reflected a conservative system that could respond to a wide range of pumping conditions. For instance, some of the extraction wells were sized with pumps and motors that would allow the well to pump up to 1890 L/min (500 gpm) if warranted. The added flexibility, though, came at the cost of operational efficiency. We describe the efforts that have been taken by LM since the Fernald site was transferred to LM to mitigate the operational impacts from the iron fouling aquifer conditions and improve the efficiency of the well-field operation. Variable-frequency drives were installed at six wells to replace flow control valves. Several wells with oversized pumps and motors were changed from 24-hour per day operation to 8-hour per day operation to allow the pumps to operate closer to their design flow rates. Pumps and motors were “right-sized” at many wells to improve pumping efficiency. The process used to rehabilitate (or clean) well screens was improved, and a process was developed to clean pumps without having to pull them from the well. To reduce pressure drops, improvements were also made to the configuration of the discharge piping. A new control system was installed for each well to allow local control and local tracking of energy used. The amount of energy used daily compared to number of gallons pumped provides a method to assess pump performance and determine when action is necessary to restore well pump efficiency. Additionally, the metrics being employed to help quantify well-field efficiency improvements are described, and the benefits achieved by proactively managing the pump-and-treat operation are presented.

54 ENVIRONMENTAL SCIENCES↗

Energy-Efficient Forward Osmosis for FGD Wastewater Volume Minimization

A variant of forward osmosis, the Aquapod© process, was shown to be capable of concentrating FGDWW five-fold without the need for softening. The thermal and electrical energy consumption per unit of water produced was estimated to be 190 kJ/kg and ~2.2 kWh/m3, respectively. The FO process, in conjunction with a spray dryer, can achieve ZLD of 100 gpm of FGDWW with an estimated capital costs of $6.25 Million and a variable cost of $4.35/m3 of wastewater treated.

01 COAL, LIGNITE, AND PEAT↗

Thermal Stimulation and Injectivity Testing at Raft River, ID EGS Site

The Raft River geothermal field is the site of an innovative Department of Energy Enhanced Geothermal System (EGS) project to determine the viability of using combined thermal and hydraulic stimulation techniques to improve energy production. Well RRG-9 is currently undergoing a stimulation program using injectate from the US Geothermal Raft River Power Plant and cold water from a cooling tower make-up water well. The stimulation began on 13 June 2013 with injection from the power plant at a temperature of about 39 °C and a pressure of 275 psig. Next, two positive displacement plunger type pumps were used to increase the injection pressure and flow rate for about one month. The highest rate achieved was 258 gpm at a pressure of 741 psig. During this time, fluid from the cooler water well was injected for about 2 weeks at various pressures. Then, the pumps were removed and plant injection resumed on 25 September. Plant injection will continue until the spring of 2014, when a high pressure hydraulic stimulation will be conducted. A series of seismic monitoring stations deployed around the well are providing data on seismic events occurring at the site. Over the past year, 51 microseismic events have been recorded, all less than Magnitude 1. During injection, several diagnostic tests were conducted to gain a better understanding of the well and reservoir. A step-rate test was performed on 22 August to measure the in-situ stress and aid in modeling in-situ fractures. A tracer was injected into the well on 9 September. No tracer was detected in adjacent production wells after several months. A second borehole televiewer survey was conducted for comparison to pre-stimulation images. Here, a third borehole televiewer survey is planned after the high pressure stimulation. Injection test data is evaluated in real time. A modified Hall plot analysis indicates the effective permeability is increasing. The injectivity index supports the results of the modified Hall plot analysis. As the thermal stimulation has continued, the injectivity index has consistently followed an upward trend from 0.1 gpm/psi to 0.53 gpm/psi.

enhanced geothermal systems↗

Radiative Heat Transport and Optical Characterization of High Temperature Molten Salts

The goal of this project was to advance the field of molten fluoride radiative heat transfer (RHT), through optical property measurements, heat transfer loop construction and operation, and computational fluid dynamics simulations. The following outcomes have been accomplished. A comprehensive review has been conducted to compile all available RHT-relevant optical absorption data for molten fluorides. The various measurement methods have also been compiled and critiqued. Thermal emission measurement methods have been refined and documented. A unique thermal emissivity measurement facility has been constructed and used to measure the emissivity of flowing FLiBe-exposed SS316 samples. A slight increase has been observed in the emissivity compared to unexposed SS316. A dual reflectance-emission setup was partially demonstrated for the purpose of molten fluoride absorption measurement. Preliminary infrared edge data for FLiNaK was obtained. A visible near-infrared (NIR) measurement setup has been constructed and will be used to measure absorption of corrosion products in FLiBe. A new multi-band thermal radiation method using blackbody-weighted spectral bands for the absorption-coefficient was deployed to investigate the thermal performance of the UW Natural Circulation FLiBe Loop under various power levels and operating conditions. The results showed an increasing and decreasing trend in the overall heat transfer with optical thickness with a maximum at optical thickness τ D ≈Ο(1). A forced convection FLiBe loop was constructed for the purpose of studying corrosion and thermal hydraulic phenomena. A vertical cantilever pump is used to achieve up to 5 gpm and 5 m/s flow velocity in hot and cold test sections. A methodology has been established for modeling radiative heat transfer (RHT) in molten salt coolants for the purpose of quantifying the contribution of thermal radiation in conditions relevant to FHR or MSR systems. The comparison between the results obtained for forced and mixed convection showed that in the studied ranges of optical thickness, the maximum effect of RHT on overall heat transfer was 60% improvement observed at z/D = 250 for forced convection; whereas for mixed convection, that value was higher at 170% observed at z/D = 30. The highest effect of RHT on the overall energy distribution was observed at τ D ≈3.4. Negligible effect (<20%) was observed above τ D =18 and below τ D ≈0.002. A CFD code-to-code comparison was conducted using COMSOL Multiphysics at UW-Madison and STAR-CCM at MIT, for a forced and mixed convection laminar flow for a grey medium in a vertical heated using both COMSOL Multiphysics at UW-Madison and STAR-CCM at MIT. The relative error was the largest at τ D =40 for the radiative heat flux, bulk temperature, and Nusselt number. On the other hand, the relative error was the least at τ D =0.002 for the conductive heat flux, bulk temperature, and Nusselt number.

Anderson, Mark↗

Cold Climate Integrated Heat Pump

This paper introduces development of a residential air-source integrated heat pump for cold climates (CCIHP). The heat pump is multi-functional to meet all the home comfort demands, including space cooling, space heating, domestic water heating and energy storage. The CCIHP is an ideal solution to decarbonize northern homes via providing efficient space heating and water heating to replace natural gas. It uses a three-stage compressor and a single set of heat exchangers and valves to deliver all the functions, and thus achieve cost reduction. We developed an innovative system configuration and related controls to solve typical charge unbalance in heat pumps, accelerate charge migration and smoothen mode transition in integrated heat pumps. Laboratory investigations were conducted for individual modes and verified the control functions. Laboratory tests demonstrated that the unit delivered outstanding performance. It achieved 17.0 SEER (seasonal cooling energy efficiency rating) and 11.0 HSPF (heating seasonal performance factor). In the most efficient mode (combined space cooling and water heating mode), the unit reached a total energy efficiency of 35.0 EER and required only 25 minutes to heat a 50-gallon tank of water. The CCIHP can heat 1.7 GPM water from 58 to 125°F in a direct flow-through, when the ambient temperature is above 47°F. In a dedicated water heating mode using outdoor air source, the heat pump operated down to 17°F, achieving a COP > 2.6, and heated 50-gallon water within 1 hour.

Shen, Bo↗

Thermal hydraulic limits analysis using statistical propagation of parametric uncertainties

The MIT Research Reactor (MITR) is evaluating the conversion from highly enriched uranium (HEU) to low enrichment uranium (LEU) fuel. In addition to the fuel element re-design, a reactor power upgraded from 6 MW to 7 MW is proposed in order to maintain the same reactor performance of the HEU core. Previous approach in analyzing the impact of engineering uncertainties on thermal hydraulic limits via the use of engineering hot channel factors (EHCFs) was unable to explicitly quantify the uncertainty and confidence level in reactor parameters. The objective of this study is to develop a methodology for MITR thermal hydraulic limits analysis by statistically combining engineering uncertainties with an aim to eliminate unnecessary conservatism inherent in traditional analyses. This method was employed to analyze the Limiting Safety System Settings (LSSS) for the MITR, which is the avoidance of the onset of nucleate boiling (ONB). Key parameters, such as coolant channel tolerances and heat transfer coefficients, were considered as normal distributions using Oracle Crystal Ball to calculate ONB. The LSSS power is determined with 99.7% confidence level. The LSSS power calculated using this new methodology is 9.1 MW, based on core outlet coolant temperature of 60 deg. C, and primary coolant flow rate of 1800 gpm, compared to 8.3 MW obtained from the analytical method using the EHCFs with same operating conditions. The same methodology was also used to calculate the safety limit (SL) for the MITR, conservatively determined using onset of flow instability (OFI) as the criterion, to verify that adequate safety margin exists between LSSS and SL. The calculated SL is 10.6 MW, which is 1.5 MW higher than LSSS. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Neutron Magnetic Form Factor GNM Measurement at High Q2 with CLAS12

The neutron magnetic form factor, GnM , is a fundamental quantity that describes how magnetic properties are distributed within a neutron. This measurement provides insights into the internal structure of the neutron. Furthermore, by measuring GnM alongside three other form factors (GnE , GpE , GpM ), we can test the predictions of Quantum Chromodynamics (QCD), which is the fundamental theory governing the strong force that binds quarks and gluons. Additionally, these measurements play a significant role in constraining Generalized Parton Distributions (GPDs) and contribute to determining the angular momentum of the quarks within nucleons. The GnM was measured using the ratio of quasi-elastic e ? n to e ? p scattering from a deuteron target. The measurement covered a range of four-momentum transfer squared, Q2, from 5 to 12 GeV2, using three different beam energies (10.2, 10.4, and 10.6 GeV). The data is compared with previous measurements and several theoretical models. The preliminary results reveal that Gn M exceeds the predictions of the standard dipole parametrization by 12-20%, based on RG-B pass1 data. It is expected that this deviation from the standard dipole parametrization will diminish as we transition to using RG-B pass2 data, aligning GnM more closely with the dipole form factor. The ongoing RG-B pass2 analysis in CLAS12 holds considerable promise for significant improvement. This enhancement is achievable through collaborative efforts aimed at refining tracking efficiency, momentum correction, calibration, and alignment.

Baashen, Lamya↗

Characterization and Well Remediation Strategies for Improved Long-term Pump and Treat System Injection Well Performance - 17272

In June of 2012 the CH2M Hill Plateau Remediation Company completed construction of a 2,500 gallon-per-minute (gpm) pump and treat (P and T) system designed to remove technetium-99, uranium, carbon tetrachloride, trichloroethene, nitrate, and total and hexavalent chromium from incoming groundwater. The entire pump and treat system consists of the following primary components: 1) extraction wells (20+); 2) a radionuclide removal facility; 3) a biological system; 4) sludge processing; 5) vapor processing; and 6) injection wells. Overall efficiency of the 200 West P and T has been adversely impacted due to fouling in vertical injection wells where treated water is being reinjected into the subsurface. Fouling of the wells is thought to be caused by bacteria producing extracellular polymeric substances (EPS), as well as high manganese and iron in the biofilm. Due to decreased specific injectivity, all injection wells are on a maintenance schedule requiring rehabilitation. During rehabilitation, the wells are out of service affecting the overall capacity of the P and T, plus the rehabilitation process adds hundreds of thousands of dollars of cost to operate the P and T each year. Chemical and biological foulants may be coming from the P and T or are already present in the subsurface and active pumping has stimulated growth of the microbes present. Chemical and microbiological characterization efforts are in progress for the biological plant and injection well system to determine causative agents in the biofouling. P and T effluent tank samples, injection well distribution tanks, bailed samples from the fouled well, and post-rehabilitation samples were analyzed. Chemical constituents analyzed include, sulfate, phosphorus, chemical oxygen demand, total organic carbon, and iron. Microbial characterization included total heterotrophs, anaerobic heterotrophs, nitrate reducing bacteria, iron reducing bacteria and sulfate reducing bacteria. Molecular biological tools employed included 16S rRNA meta-genomes, and functional gene analysis using qPCR. Chemical analysis of the P and T effluent and injection well tanks showed the presence of ∼6.5 mg/L nitrate, 96 mg/L sulfate and phosphorus levels below 1 mg/L. Bailed samples from the injection well showed similar concentrations for each chemical, but following cleaning, TOC, total iron, manganese and other constituents were higher than prior to cleaning. These data show that bacterial nutrients and metals that may precipitate are present in the well water and are likely the causative agent in the biofouling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantitative assessment of sustainable remediation options for the M-1 air stripper system at SRS - 15702

The US Department of Energy (DOE) Savannah River Site (SRS) covers 310 sq. miles and is located south of Aiken, SC. The site produced materials used in the production of nuclear weapons from the 1950's to the 1980's. Trichloroethylene (TCE) and tetrachloroethylene (PCE) were the main solvents used in degreasing and other industrial operations. These solvents are categorized as dense non-aqueous phase liquids (DNAPLs), semi-volatile, and hazardous chemical compounds. In the 1980's, operations were initiated to remediate the contaminated soil and groundwater which continues today. The M-1 air stripper and well network has operated continuously since 1985 at an average electrical load of 150 kW and flow rate of 420 gpm. The influent TCE concentration to the air stripper has decreased exponentially from 25,200 ug/L in 1986 to 2,230 ug/L by the end of 2012, with the same energy consumption and water pumping rate. To analyze the operation of the SRS A/M Area groundwater remediation system using state-of-the-art modeling tools to provide suggested engineering and operational improvements to expend less resources while still containing the contaminant plume. Implementation of improvements will help DOE-EM apply sustainable remediation at its sites and help DOE achieve DOE-wide sustainability performance metrics. Located in the northern part of SRS within the lower reaches of the Tims Branch watershed (topographic elevation from ∼420 X to ∼ 118 X). Consists of facilities that fabricated reactor fuel and target assemblies (M-Area), and administrative and support facilities (A-Area). M-1 Air Stripper and Recovery Well Network Installed in 1985 to treat groundwater in order to reduce chlorinated solvent concentrations. 17 recovery wells have been installed over the years. Currently recovery wells 1-12 feed the M1 air stripper. The treated groundwater is discharged to a stream in Tims Branch. The monthly removal rate and the cumulative mass removed for TCE and PCE in the 12 recovery wells was analyzed for 1985-2012. 7 of 12 recovery wells have transitioned to more PCE than TCE removed. This is an expected result since TCE was initially used and then replaced by PCE. The rate of recovery in some wells was affected by the Dynamic Underground Stripping process. 7 wells exhibit exponential decay in contaminant removal while 5 exhibit steady concentrations, and 2 exhibit linear decreases. Future Work: Identify opportunities to improve efficiencies related to electrical energy, water usage, and the use of other resources, beginning with mechanical design modifications. Investigate operational strategies to increase system performance by optimizing the hydraulic loads, pumping rates, contaminant mass flow rates and well drawdown levels. Determine a set of metrics which will correlate the pumping rates, the cone of depression, and the interaction between the wells with the contaminant mass flow rates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Facility Improvements and Modifications to Extend the Operational Life of the Modular Caustic-Side Solvent Extraction Process - 16082

Savannah River Remediation, LLC (SRR) is working to remove, stabilize, and dispose of approximately 36.7 million gallons (138.9 million liters) of liquid radioactive waste currently stored in 43 underground waste tanks, and ultimately close waste tanks. In 2008, as an interim salt treatment system to remove cesium from high level waste salt solutions prior to the Salt Waste Processing Facility start up, the Modular Caustic-Side Solvent Extraction Unit (MCU) initiated the removal of cesium from liquid radioactive salt waste prior to disposal. The MCU was designed and built for an expected three-year operational life and five-year design life. The first MCU cold runs began in June 2007 and hot startup was completed in April 2008. MCU remains in hot operation to this day, aiding in multiple, high-level tank closures. In an effort to continue liquid waste disposition at the Savannah River Site (SRS), equipment upgrades and operational improvements have been made to extend the life of the MCU beyond the original three years. Several pieces of fixed equipment have been converted into removable equipment which reduces the downtime associated with equipment change-outs and thereby reduces the dose to workers and processing impacts. Multiple pumps and filters have been upgraded to more robust designs. Process monitoring and controls have been upgraded to improve process performance. Redundant centrifugal contactor vibration equipment has been installed on each contactor in order to better assess the reliability, processing performance, and lifetime of the contactors. A new Solvent Hold Tank (SHT) Sampler has been installed to minimize the organic cross-contamination within the sampler, dose to workers, and sample analysis time. To increase processing availability and aid in visually obtained data, camera port has been added to the Salt Solution Feed Tank (SSFT). In order to decrease the overall background dose to the workers, the Process Vessel Ventilation (PVV) duct work now has the capability to be flushed to remove contamination. The caustic wash addition system has been modified to be a once-through system to improve equipment reliability, decrease downtime, and decrease dose to workers. In addition, the solvent that MCU utilizes to extract Cesium out of salt waste has been upgraded to Next Generation Solvent (NGS) which is based on MaxCalix extractant instead of a BobCalix extractant. Further, these upgrades and improvements have allowed MCU to be able to process at higher flow rates (up to 8.5 GPM) and with increased throughput (as high as 1.3 million gallons in FY13 and 5.3 million gallons since hot operations initiated) that have allowed SRR to continue the disposition of nuclear salt waste. The continued operation of MCU ensures more curies are stabilized into a glass matrix at SRS's Defense Waste Processing Facility (DWPF) and less curies are retained within South Carolina at SRS's Saltstone Disposal Facility (SDF). Unique challenges associated with modifying and improving a demonstration plant that is in hot operations and was designed to be temporary with a limited plant footprint have been successfully overcome. Further, creative strategies for removing old equipment have been utilized given the limited decontamination agents available for use that will not interfere with the organic solvent. This paper presents and discusses the deployment of these upgrades and operational improvements to MCU in order to allow continued, increased salt waste processing beyond the initial design life. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Efforts to Improve Efficiency of Extraction Well Operation at the Fernald Preserve, Harrison, Ohio - 16177

The Fernald Preserve, a former uranium processing facility that produced high-purity uranium metal products during the Cold War, is located in southwest Ohio. The facility became a US Department of Energy Office of Legacy Management (LM) site in November 2006, following completion of the Comprehensive Environmental Response, Compensation, and Liability Act environmental remediation and site restoration (with the exception of groundwater). When the site was turned over to LM, approximately 76.5 ha of the Great Miami Aquifer remained contaminated with uranium above the final remediation level of 30 μg/L. Here, uranium contamination is being removed from groundwater in the Great Miami Aquifer through a pump-and-treat operation, which is predicted to continue until 2033. Twenty extraction wells pump about 30 million liters per day. Operation of the system is impacted by iron in the groundwater that promotes iron fouling of the well pumps, motors, and screens. The design of the well field evolved over 21 years and reflected a conservative system that could respond to a wide range of pumping conditions. For instance, some of the extraction wells were sized with pumps and motors that would allow the well to pump up to 1890 L/min (500 gpm) if warranted. The added flexibility, though, came at the cost of operational efficiency. We describe the efforts that have been taken by LM since the Fernald site was transferred to LM to mitigate the operational impacts from the iron fouling aquifer conditions and improve the efficiency of the well-field operation. Variable-frequency drives were installed at six wells to replace flow control valves. Several wells with oversized pumps and motors were changed from 24-hour per day operation to 8-hour per day operation to allow the pumps to operate closer to their design flow rates. Pumps and motors were 'right-sized' at many wells to improve pumping efficiency. The process used to rehabilitate (or clean) well screens was improved, and a process was developed to clean pumps without having to pull them from the well. To reduce pressure drops, improvements were also made to the configuration of the discharge piping. A new control system was installed for each well to allow local control and local tracking of energy used. The amount of energy used daily compared to number of gallons pumped provides a method to assess pump performance and determine when action is necessary to restore well pump efficiency. Additionally, the metrics being employed to help quantify well-field efficiency improvements are described, and the benefits achieved by proactively managing the pump-and-treat operation are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovations in Sustainable Passive Wastewater Treatment - 20236

Sustainable water treatment systems, engineered to mimic natural processes and utilize natural materials, yield economic and environmental benefits through reductions in long term operational inputs, including: power, chemicals, and labor. Golder is an industry leader in the development and implementation of sustainable technologies at operating and closed mines. We continue to innovate these technologies and customize solutions to meet client needs by applying past experience and focused research. Sustainable (or passive) water treatment systems include ponds, wetlands, flow-through natural media beds, and limestone drains. These systems can blend in with a natural environment, are highly cost-effective for long-term water treatment, and can outcompete traditional active treatment technologies. Application of sustainable technologies relative to active technologies can be influenced by the influent water matrix, effluent limitations, flow rate of water requiring treatment, and available land area. In this presentation, four Golder-developed systems are reviewed as case studies, demonstrating our continued progressive approach to advancing sustainable water treatment technologies to meet industry needs. These case studies focus on design innovations and operational performance from data collected from the operational systems. Resources (power, chemicals, labor) required for the operation of each case study are compared with those that would be required for operation of their active treatment technology alternatives. - Case Study 1 presents an anaerobic biochemical reactor (BCR), a technology typically implemented for metals treatment and acid neutralization, for the treatment of sulfate to low concentrations (<250 mg/L). Active treatment via reverse osmosis (RO) membrane filtration is typically required for treatment of sulfate to similar concentrations, this innovation provides potential for sustainable treatment to replace the need for energy, chemical, labor, and waste (brine) intensive RO treatment for specific applications. Magnetite waste rock materials from the site were upcycled for use in this system to provide sequestration of the sulfide generated in the BCR. - Case Study 2 examines another novel application of the conventional BCR, modified for the removal of radionuclides and metals (uranium, radium, and selenium) at a closed uranium mine. - Case Study 3 presents implementation of sustainable treatment for mine drain water from a historic mine site, now a state park with around 100,000 visitors per year. The system includes a pond, wetland, and manganese removal bed surrounded by public trails designed to maintain the character of the park. The system treats for arsenic, iron, and manganese at relatively high flows (up to 1,200 gpm), with large seasonal fluctuations in flow and quality. - Case Study 4 is a unique project for which Golder is currently designing a sustainable treatment system, with no energy input, to treat nitrate in mine water post-closure at a site near the arctic circle. In this unprecedented application, climate, management of freshet, and space availability presented substantial technical challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗