Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Facility Construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗

Construction of Boron‐ and Nitrogen‐Enriched Nanoporous π‐Conjugated Networks Towards Enhanced Hydrogen Activation

Abstract Boron‐enriched scaffolds have demonstrated unique features and promising performance in the field of catalysis towards the activation of small gas molecules. However, there is still a lack of facile approaches capable of achieving high B doping and abundant porous channels in the targeted catalysts. Herein, construction of boron‐ and nitrogen‐enriched nanoporous π‐conjugated networks (BN‐NCNs) was achieved via a facile ionothermal polymerization procedure with hexaazatriphenylenehexacarbonitrile [HAT(CN) 6 ] sodium borohydride as the starting materials. The as‐produced BN‐NCN scaffolds were featured by high heteroatoms doping (B up to 23 wt. % and N: up to 17 wt. %) and permanent porosity (surface area up to 759 m 2 g −1 mainly contributed by micropores). With the unsaturated bonded B species acting as the active Lewis acid sites and defected N species acting as the active Lewis base sites, those BN‐NCNs delivered attractive catalytic performance towards H 2 activation/dissociation in both gaseous and liquid phase, acting as efficient metal‐free heterogeneous frustrated Lewis pairs (FLPs) catalysts in hydrogenation procedures.

Li, Meijia↗

An Earth Orbiting Satellite Service and Repair Facility

A conceptual design was produced for the Geosynchronous Satellite Servicing Platform (GSSP), an orbital facility capable of repairing and servicing satellites in geosynchronous orbit. The GSSP is a man-tended platform, which consists of a habitation module, operations module, service bay and truss assembly. This design review includes an analysis of life support systems, thermal and power requirements, robotic and automated systems, control methods and navigation, and communications systems. The GSSP will utilize existing technology available at the time of construction, focusing mainly on modifying and integrating existing systems. The entire facility, along with two satellite retrieval vehicles (SRV), will be placed in geosynchronous orbit by the Advanced Launch System. The SRV will be used to ferry satellites to and from the GSSP. Technicians will be transferred from Earth to the GSSP and back in an Apollo-derived Crew Transfer Capsule (CTC). These missions will use advanced telerobotic equipment to inspect and service satellites. Four of these missions are tentatively scheduled per year. At this rate, the GSSP will service over 650 satelites during the projected 25 year lifespan.

Berndt, Andrew↗

Proposed Facility Modifications to Support Propulsion Systems Testing Under Simulated Space Conditions at Plum Brook Station's Spacecraft Propulsion Research Facility (B-2)

Preparing NASA's Plum Brook Station's Spacecraft Propulsion Research Facility (B-2) to support NASA's new generation of launch vehicles has raised many challenges for B-2's support staff. The facility provides a unique capability to test chemical propulsion systems/vehicles while simulating space thermal and vacuum environments. Designed and constructed in the early 1960s to support upper stage cryogenic engine/vehicle system development, the Plum Brook Station B-2 facility will require modifications to support the larger, more powerful, and more advanced engine systems for the next generation of vehicles leaving earth's orbit. Engine design improvements over the years have included large area expansion ratio nozzles, greater combustion chamber pressures, and advanced materials. Consequently, it has become necessary to determine what facility changes are required and how the facility can be adapted to support varying customers and their specific test needs. Exhaust system performance, including understanding the present facility capabilities, is the primary focus of this work. A variety of approaches and analytical tools are being employed to gain this understanding. This presentation discusses some of the challenges in applying these tools to this project and expected facility configuration to support the varying customer needs.

Edwards, Daryl A.↗

Control System Plans for SNS Upgrade Projects

The Spallation Neutron Source at Oak Ridge National Laboratory is planning two major upgrades to the facility. The Proton Power Upgrade project, currently underway, will double the machine power from 1.4 to 2.8 MW by adding seven additional cryomodules and associated equipment. The Second Target Station project, currently in conceptual design, will construct a new target station effectively doubling the potential scientific output of the facility. This paper discusses the control system upgrades required to integrate these projects into the existing EPICS based control systems used for the machine and neutron instrument beamlines. While much of the control system can be replicated from existing solutions, some systems require new hardware and software. Operating two target stations simultaneously will require a new run permit system to safely manage beam delivery.

Hartman, Steven↗

Investigating Benefits and Challenges of Converting Retiring Coal Plants into Nuclear Plants

A coal-to-nuclear (C2N) transition means siting a nuclear reactor at the site of a recently retired coal power plant. Three overarching questions from the C2N transition guide this research: where in the United States are retired coal facilities located and what factors make a site feasible for transition; what factors of technology, cost, and project timeline drive investor economics over such a decision; and how will C2N impact local communities? The study team evaluated the siting characteristics of recently retired plants and those operating coal-fired power plant sites run by a utility or an independent power producer utilizing publicly available data to screen U.S. coal power plant sites to nuclear-feasible locations. After screening all retired coal sites to a set of 157 potential candidates and screening operating sites to a set of 237 candidates, the study team estimates that 80% of retired and operating coal power plant sites that were evaluated have the basic characteristics needed to be considered amenable to host an advanced nuclear reactor. For the recently retired plant sites evaluated, this represents a capacity potential of 64.8 GWe to be backfit at 125 sites. For the operating plant sites evaluated, this represents a capacity potential of 198.5 GWe to be backfit at 190 sites. This report evaluates a case study for the detailed impacts and potential outcomes from a C2N transition. Based on the nuclear technology choices and sizes evaluated to replace a large coal plant of 1,200 MWe generation capacity at the case study site, nuclear overnight costs of capital could decrease by 15% to 35% when compared to a greenfield construction project, through the reuse of infrastructure from the coal facility. Nuclear replacement designs can have a lower capacity size because nuclear power plants run at higher capacity factors than coal power plants. In the case study replacing coal capacity with 924 GWe of nuclear capacity, the study team found regional economic activity could increase by as much as $\$275 million$ and add 650 new, permanent jobs to the region of analysis. The evaluated site choice in the report is hypothetical for analysis purposes only and based on available data and documented assumptions. Consequently, the findings only inform at a general level. A community, investor, or other interested stakeholder can use these results to set up a detailed, in-depth analysis for a specific application of interest, such as evaluating a C2N transition of a specific coal power plant and a specific nuclear technology design. The report was subjected to independent peer reviews by experts in systems engineering and regional economic modeling to evaluate analysis and assumptions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Beryllium disease among construction trade workers at Department of Energy nuclear sites: A follow‐up

Abstract Background Construction workers at U.S. Department of Energy (DOE) nuclear weapons facilities are screened to identify DOE‐related occupational illnesses, including beryllium sensitization (BeS) and chronic beryllium disease (CBD). The study objectives were to estimate beryllium disease risks and the CBD claims acceptance rate in the energy workers' benefits program. Methods Workers diagnosed with BeS via beryllium lymphocyte proliferation test (BeLPT) included in screening examinations were interviewed about subsequent diagnosis of CBD. We estimated the proportion who developed CBD based on the ratio of CBD cases, based on self‐reported compensation claim status, to all workers with BeS interviewed. We used stratified analyses to explore trends in disease frequency by age, race, sex, DOE employment duration, site, trade group, and cigarette smoking history. Results Between 1998 and 2020, 21,854 workers received a BeLPT; 262 (1.20%) had BeS (two abnormals or one abnormal plus one borderline test); 212 (0.97%) had a single abnormal BeLPT. Of 177 BeS workers interviewed, 35 (19.8%) reported an accepted CBD compensation claim. The claims acceptance rate among BeS workers increased with years of DOE employment, from 8.4% with <5 years to 33.3% for >25 or more years. Five of 68 interviewed workers with a single positive BeLPT reported CBD claim acceptance; an additional CBD case was confirmed by chart review (8.8%). Conclusions Years of DOE work predict the risk of developing CBD among those sensitized and getting a claim for CBD accepted. Ongoing surveillance and increased awareness of the risk of beryllium exposure and CBD as an occupational disease among construction workers are needed.

Cloeren, Marianne↗

Finding of Adverse Effect and Proposed Mitigation for the Demolition of Building 23-530, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish Building 23-530 in Mercury (Nevada State Historic Preservation Office [SHPO] Resource No. B15270), which is on the Nevada National Security Site (NNSS) in Nye County, Nevada. The purpose of the undertaking is related to the modernization of Mercury for future mission needs. The NNSA/NFO will implement this undertaking in accordance with the Programmatic Agreement Between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA. Building 23-530, a dormitory called Freedom Hall, was constructed in Mercury in 1982 and served as a support facility for nuclear testing for the last decade of the Cold War. The town of Mercury and the immediate surrounding area have been determined eligible for listing in the National Register of Historic Places (NRHP) as the Mercury Historic District (MHD, SHPO Resource No. D230) under Criteria A and C for their importance in supporting nuclear testing and scientific research from 1951 through 1992 (Reed 2019). Building 23-530 was identified as a contributing element to the MHD in a 2018 architectural survey of the district (Reno et al. 2018) and recorded on a Nevada Architectural Resource Assessment (ARA) form (Reno et al. 2017). Building 23-530 was also identified in Appendix C of the Mercury PA as a Category II contributing element. Category II properties are those that have several representatives in the MHD but may possess different engineering or architectural characteristics that distinguish them from other classes of similar elements. Building 23-530 is a historic property for the purposes of compliance with Section 106 of the National Historic Preservation Act (NHPA) and subject to the stipulations of the Mercury PA. The purpose of this letter report is to submit documentation related to the mitigation of the demolition of Building 23-530 (Nevada State Historic Preservation Office [SHPO] Resource No. B15270) in the Mercury Historic District (MHD, SHPO Resource No. D230) at the Nevada National Security Site (NNSS) in Nye County, Nevada. The dormitory is considered contributing to the significance of the district both for its historic importance in relation to nuclear testing under Criterion A and as a part of the distinctive design and construction of the district under Criterion C. This submission is intended to comply with the stipulations in the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA.

54 ENVIRONMENTAL SCIENCES↗

High intensity 5 eV atomic oxygen source and Low Earth Orbit (LEO) simulation facility

An atomic oxygen exposure facility has been developed for studies of material degradation. The goal of these studies is to provide design criteria and information for the manufacture of long life (20 to 30 years) construction materials for use in LEO. The studies that are being undertaken using the facility will provide: absolute reaction cross sections for use in engineering design problems; formulations of reaction mechanisms; and calibration of flight hardware (mass spectrometers, etc.) in order to directly relate experiments performed in LEO to ground based investigations. The facility consists of: (1) a CW laser sustained discharge source of O atoms having a variable energy up to 5 eV and an intensity between 10(15) and 10(17) O atoms s(-1) cm(-2); (2) an atomic beam formation and diagnostics system consisting of various stages of differential pumping, a mass spectrometer detector, and a time of flight analyzer; (3) a spinning rotor viscometer for absolute O atom flux measurements; and (4) provision for using the system for calibration of actual flight instruments. Surface analysis equipment is available for the characterization of material surfaces before and after exposure to O atoms.

Cross, J. B.↗

A proposal to demonstrate production of salad crops in the Space Station Mockup Facility with particular attention to space, energy, and labor constraints

The Salad Machine Research has continued to be a two path effort with the research at Marshall Space Flight Center (MSFC) focusing on the design, construction, and operation of a semiautomated system (Salad Machine) for the production of salad vegetables within a standard rack. Boeing Corporation in cooperation with NASA MSFC constructed a four drawer Salad Machine which was occasionally placed within the Space Station Freedom Mockup facility for view by selected visitors. Final outfitting of the Salad Machine is awaiting the arrival of parts for the nutrient delivery system. Research at the Alabama A&M facilities focused on compatibility of radish and lettuce plants when grown on the same nutrient solution. Lettuce fresh weight shoot yield was significantly enhanced when lettuce plants were grown on nutrient solution which was shared with radish. Radish tuber production was not significantly affected although there was a trend for radish from shared solutions to be heavier than those grown on separate nutrient solutions. The effect of sharing nutrient solutions on carbohydrate partitioning reflected the effect of sharing solution on fresh weight yield. Lettuce shoot dry weight was significantly greater for plants from shared solutions than from separate. There was no significant effect on sharing nutrient solution on radish tuber dry weight. Partitioning of nitrogen, calcium, magnesium, and potassium was not affected by sharing, there was, however, a disproportionate amount of potassium in the tissues, suggesting luxury consumption of potassium in all plants and tissues. It is concluded that lettuce plants benefit from sharing nutrient solution with radish and that radish is not harmed.

Brooks, Carolyn A.↗

GPR Robotic Assisted Non-Destructive Evaluation of Concrete Structures - 20196

Reinforced concrete structures are always under exposure of internal or external deteriorations due to many factors such as environmental, nuclear radiation or even construction deficiencies. The use of nondestructive test is one of the reliable methods to inspect structural members. In this case, GPR has a good capability to detect inside deteriorations of concrete structures. However, in many cases it is hard to inspect structural members by hand due to safety issues or inaccessibility. Thus, an alternative way to reduce such risks is to employ robot to carry nondestructive equipment. In this research, twelve reinforced concrete RC beams (8 x 16 x 96, width, height and length) are cast in the lab. Three RC beams have no defect and nine others various defects such as corrosion, de-bonded bars, void, delamination and honeycombing. The one-point load is applied at the center of the RC beam. The loading level is carried out at three levels: 50%, 75% and 100% of maximum load and total load-displacement diagram are performed. The load is held at each level and the robotic GPR is used to scan the side of RC beams. Then, RADAN software is employed to find out any defects at different loading conditions and visualize the crack propagation. The RADAN results show that the pattern of crack propagation for corrosion and debonding are same. Also, the load-displacement results present that inside defect cause reduction of load-capacity of RC beam. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spacecraft charging technology in the satellite X-ray test facility

A satellite X-ray test facility (SXTF) is planned for studying system generated electromagnetic pulse effects on full scale, operational spacecraft. The environment created by a distant, high altitude nuclear burst can be simulated using pulsed X-ray sources. The facility is to be installed in a thermal vacuum chamber with dimensions greater then 10 m diameter and 20 m height and equipped with solar simulators and equipment for simulating the charging environment of space. The spacecraft charging system consists of several low energy electron and hydrogen ion sources (5-25 keV), one or two medium energy electron accelerators (150-300 keV), an array of vacuum ultraviolet lamps, and geomagnetic field suppression coils. Military, scientific, and commercial spacecraft can be tested before launching into the radiation environment of space. construction of SXTF is scheduled to begin in 1982 and the facility should be available for general use in 1984. Potential users are encouraged to express their needs for specific testing environments in SXTF.

Sponaugle, T. J.↗

Status of advanced airfoil tests in the Langley 0.3-meter transonic cryogenic tunnel

A joint NASA/U.S. industry program to test advanced technology airfoils in the Langley 0.3-meter Transonic Tunnel (TCT) was formulated under the Langley ACEE Project Office. The objectives include providing U.S. industry an opportunity to compare their most advanced airfoils to the latest NASA designs by means of high Reynolds number tests in the same facility. At the same time, industry would again experience in the design and construction of cryogenic test techniques. The status and details of the test program are presented. Typical aerodynamic results obtained, to date, are presented at chord Reynolds number up to 45 x 10(6) and are compared to results from other facilities and theory. Details of a joint agreement between NASA and the Deutsche Forschungs- und Versuchsantalt fur Luft- and Raumfahrt e.V. (DFVLR) for tests of two airfoils are also included. Results of these tests will be made available as soon as practical.

Ladson, C. L.↗

Preliminary design of the redundant software experiment

The goal of the present experiment is to characterize the fault distributions of highly reliable software replicates, constructed using techniques and environments which are similar to those used in comtemporary industrial software facilities. The fault distributions and their effect on the reliability of fault tolerant configurations of the software will be determined through extensive life testing of the replicates against carefully constructed randomly generated test data. Each detected error will be carefully analyzed to provide insight in to their nature and cause. A direct objective is to develop techniques for reducing the intensity of coincident errors, thus increasing the reliability gain which can be achieved with fault tolerance. Data on the reliability gains realized, and the cost of the fault tolerant configurations can be used to design a companion experiment to determine the cost effectiveness of the fault tolerant strategy. Finally, the data and analysis produced by this experiment will be valuable to the software engineering community as a whole because it will provide a useful insight into the nature and cause of hard to find, subtle faults which escape standard software engineering validation techniques and thus persist far into the software life cycle.

Campbell, Roy↗

DUNE Phase II: scientific opportunities, detector concepts, technological solutions

The international collaboration designing and constructing the Deep Underground Neutrino Experiment (DUNE) at the Long-Baseline Neutrino Facility (LBNF) has developed a two-phase strategy toward the implementation of this leading-edge, large-scale science project. The 2023 report of the US Particle Physics Project Prioritization Panel (P5) reaffirmed this vision and strongly endorsed DUNE Phase I and Phase II, as did the European Strategy for Particle Physics. While the construction of the DUNE Phase I is well underway, this White Paper focuses on DUNE Phase II planning. DUNE Phase-II consists of a third and fourth far detector (FD) module, an upgraded near detector complex, and an enhanced 2.1 MW beam. The fourth FD module is conceived as a “Module of Opportunity”, aimed at expanding the physics opportunities, in addition to supporting the core DUNE science program, with more advanced technologies. This document highlights the increased science opportunities offered by the DUNE Phase II near and far detectors, including long-baseline neutrino oscillation physics, neutrino astrophysics, and physics beyond the standard model. It describes the DUNE Phase II near and far detector technologies and detector design concepts that are currently under consideration. A summary of key R&D goals and prototyping phases needed to realize the Phase II detector technical designs is also provided. DUNE's Phase II detectors, along with the increased beam power, will complete the full scope of DUNE, enabling a multi-decadal program of groundbreaking science with neutrinos.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Structural and thermal testing of lightweight reflector panels

The paper describes the test facility developed for testing large lightweight reflective panels with very accurate and stable surfaces, such as the mirror panels of composite construction developed for the NASA's Precision Segmented Reflector (PSR). Special attention is given to the panel construction and the special problems posed by the characteristics of these panels; the design of the Optical/Thermal Vacuum test facility for structural and thermal testing, developed at the U.S. AFPL; and the testing procedure. The results of the PSR panel test program to date are presented. The test data showed that the analytical approaches used for the panel design and for the prediction of the on-orbit panel behavior were adequate.

Mcgregor, J.↗

Experimental measurements of fluid flow in an 84-pin hexagonal rod bundle with spacer grid for a gas-cooled fast modular reactor

A 50 MW e helium-cooled fast modular reactor (FMR) is under development, and as part of the Department of Energy Integrated Research Project (IRP), Texas A&M University is conducting the thermal-hydraulic characterization of its baseline core configuration. Here, we experimentally investigated the axial and cross flow fields characteristics in the hexagonal fuel rod bundle composed of 84 rods, a central rod, and spacer grids at a Reynolds number of 12,000. A fully transparent experimental facility resembling of one unit of the fuel assembly was constructed. Time-resolved particle image velocimetry (TR-PIV) measurements were performed to characterize hydraulic behavior downstream the spacer grid. Velocity measurements were conducted in the axial and radial direction of the rod bundle. From the PIV velocity vector fields, the full-field flow statistics were computed for the mean velocity, vorticity, and Reynolds stresses. An analysis of the energy decay downstream of the spacer grid was conducted with calculations of secondary-flow intensities, turbulent kinetic energy, power spectrum, and spatial-temporal velocity cross correlations. The vorticity field was obtained and pairs of counter-rotating vortexes were identified using a 3D reconstruction of several measurement planes. The data from this experimental campaign will be used to validate numerical models based on Computational Fluid Dynamics and other codes.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗