Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Earth Return Vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Aerocapture Design Study for a Titan Polar Orbiter

In 2014 a team at NASA Goddard Space Flight Center (GSFC) studied the feasibility of using active aerocapture to reduce the chemical Delta V requirements for inserting a small scientific satellite into Titan polar orbit. The scientific goals of the mission would be multi-spectral imaging and active radar mapping of Titan's surface and subsurface. The study objectives were to: (i) identify and select from launch window opportunities and refine the trajectory to Titan; (ii) study the aerocapture flight path and refine the entry corridor; (iii) design a carrier spacecraft and systems architecture; (iv) develop a scientific and engineering plan for the orbital portion of the mission. Study results include: (i) a launch in October 2021 on an Atlas V vehicle, using gravity assists from Earth and Venus to arrive at Titan in January 2031; (ii) initial aerocapture via an 8-km wide entry corridor to reach an initial 350X6000 km orbit, followed by aerobraking to reach a 350X1500 km orbit, and a periapse raise maneuver to reach a final 1500 km circular orbit; (iii) a three-part spacecraft system consisting of a cruise stage, radiator module, and orbiter inside a heat shield; (iv) a 22-month mission including station keeping to prevent orbital decay due to Saturn perturbations, with 240 Gb of compressed data returned. High-level issues identified include: (i) downlink capability - realistic downlink rates preclude the desired multi-spectral, global coverage of Titan's surface; (ii) power - demise of the NASA ASRG (Advanced Stirling Radioisotope Generator) program, and limited availability at present of MMRTGs (Multi-Mission Radioisotope Generators) needed for competed outer planet missions; (iii) thermal - external radiators must be carried to remove 4 kW of waste heat from MMRTGs inside the aeroshell, requiring heat pipes that pass through the aeroshell lid, compromising shielding ability; (iv) optical navigation to reach the entry corridor; (v) the NASA requirement of continuous critical event coverage for the orbiter, especially during the peak heating of the aerocapture when the radio link will be broken. In conclusion, although Titan aerocapture allows for considerable savings in propellant mass, this comes at a cost of increased mission complexity. Further architecture study and refinement is required to reduce high-level mission risks and to elucidate the optimum architecture.

Nixon, Conor A.↗

Launching to the Moon, Mars, and Beyond

The U.S. Vision for Space Exploration, announced in 2004, calls on NASA to finish constructing the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return to the Moon and go on the Mars. By exploring space, America continues the tradition of great nations who mastered the Earth, air, and sea, and who then enjoyed the benefits of increased commerce and technological advances. The progress being made today is part of the next chapter in America's history of leadership in space. In order to reach the Moon and Mars within the planned timeline and also within the allowable budget, NASA is building upon the best of proven space transportation systems. Journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, the Ares V Cargo Launch Vehicle, the Orion Crew Exploration Vehicle, and the Lunar Surface Access Module. What America learns in reaching for the Moon will teach astronauts how to prepare for the first human footprints on Mars. While robotic science may reveal information about the nature of hydrogen on the Moon, it will most likely tale a human being with a rock hammer to find the real truth about the presence of water, a precious natural resource that opens many possibilities for explorers. In this way, the combination of astronauts using a variety of tools and machines provides a special synergy that will vastly improve our understanding of Earth's cosmic neighborhood.

Dumbacher, Daniel L.↗

Artemis Innovative Assembly and Integration Operations of the Launch Abort Systemat KSC

This paper describes the Artemis program assembly and integration approach that enables affordable and low risk processing operations for the Launch Abort System at KSC. NASA is currently developing the Artemis 1 spacecraft to meet the test objectives of an uncrewed orbital mission to the moon and return to earth in 2021. The Artemis Orion spacecraft consists of a Crew Module (CM), a Service Module (SM), and a Launch Abort System (LAS) to safely transport a crew of 4 to the moon and return to earth. The LAS enables the CM to have an abort capability for the crew during the launch phase of the mission from the launch pad throughout the ascent phase. The LAS includes motor elements for abort, attitude control, and stage separation is assembled at the Launch Abort System Facility (LASF) adjacent to the CM/SM (CSM) assembly operations in the Neil Armstrong Operations and Checkout Building (O&C) at KSC. The LAS integration to the CSM is completed in the LASF and the completed Artemis spacecraft is integrated to the Space Launch System (SLS) in the Vehicle Assembly Building (VAB) at KSC. A significant LAS development flight test milestone was recently completed in 2019 for the Ascent Abort (AA-2) flight test at Cape Canaveral Air Force Station where a high-altitude abort test was successfully achieved using a Peacekeeper booster stage exercising all of the LAS systems including propulsion, avionics, and pyrotechnics demonstrating he LAS readiness for crewed flight. The first operational flight of the LAS will be for the Artemis 2 mission which is the first crewed mission for the Orion program planned in 2023.

William J Koenig↗

Validation of Fitness for Duty Standards Using Pre- and Post-Flight Capsule Egress and Suited Functional Performance Tasks in Simulated Reduced Gravity (Pilot Egress Fitness)

As NASA prepares for exploration missions, it will be critical to understand and build upon known crew capabilities. Specifically, we need to know the functional capacities of crew at different stages of a mission and characterize these profiles so that the appropriate vehicle requirements and mission concepts of operations (ConOps) can be developed. One of the most complex phases of any missions is when there is a transition between gravity environments. For instance, both physiological adaptation to microgravity and subsequent re-entry into a gravity environment result in reduced functional capacity, even with rigorous adherence to inflight countermeasures. Quantification of the astronauts’ post-landing functional performance is necessary to design ConOps for exploration missions. Specifically, these two high-risk tasks may have to be performed soon after gravity transitions: •Unassisted capsule egress task after return to Earth •Planetary extravehicular activity (EVA) soon after landing on Mars or the Moon This study has been broken down into two phases. A pilot phase to assess the overall feasibility and demonstrate the capability to do these tasks shortly after landing and the full Egress Fitness study, which will be part of the CIPHER complement. This study uses a functional task approach to characterize performance of these high-risk tasks in long-duration ISS crewmembers before flight and shortly after return to Earth. Prior to any testing, each astronaut subject completes a suit fit check to ensure adequate sizing and mobility to be able to complete the EVA tasks. Pilot Egress Fitness pre-flight and post-flight testing includes an Earth based emergency egress out of a functional capsule mockup, and a short Mars gravity EVA simulation including suit donning, hatch egress, ladder descent, task board cable operations, baggage transfer over sand/rocky regolith, alignment with a rear entry port, and suit egress. Pre-flight testing can occur almost anytime pre-flight, but post-flight scheduling is much more critical with the capsule egress test occurring 1-4 hours after landing and the planetary EVA approximately 18-36 hours after landing. Data collected for both tasks includes task completion time, photo, and video. The EVA portion also includes collection of metabolic and heart rate. Pilot Egress Fitness study has completed baseline pre-flight testing on 3 astronaut subjects. Post-flight testing of the first two subjects will be completed in November 2021 and the final subject around March 2022. Results and lessons learned from this pilot study will inform the full Egress Fitness study, which will incorporate additional pre-flight sessions, longer EVA tasks, and post-flight testing on R+1, 4, and 7 to characterize the timeframe of recovery

J R Norcross↗

Initial Test Firing Results for Solid CO/GOX Cryogenic Hybrid Rocket Engine for Mars ISRU Propulsion Applications

ORBITEC is developing methods for producing, testing, and utilizing Mars-based ISRU fuel/oxidizer combinations to support low cost, planetary surface and flight propulsion and power systems. When humans explore Mars we will need to use in situ resources that are available, such as: energy (solar); gases or liquids for life support, ground transportation, and flight to and from other surface locations and Earth; and materials for shielding and building habitats and infrastructure. Probably the easiest use of Martian resources to reduce the cost of human exploration activities is the use of the carbon and oxygen readily available from the CO2 in the Mars atmosphere. ORBITEC has conducted preliminary R&D that will eventually allow us to reliably use these resources. ORBITEC is focusing on the innovative use of solid CO as a fuel. A new advanced cryogenic hybrid rocket propulsion system is suggested that will offer advantages over LCO/LOX propulsion, making it the best option for a Mars sample return vehicle and other flight vehicles. This technology could also greatly support logistics and base operations by providing a reliable and simple way to store solar or nuclear generated energy in the form of chemical energy that can be used for ground transportation (rovers/land vehicles) and planetary surface power generators. This paper describes the overall concept and the test results of the first ever solid carbon monoxide/oxygen rocket engine firing.

Rice, Eric E.↗

Feasibility Study of a Multi-Tilt-Rotor Aircraft as the Artemis Lunar Training Vehicle

The Lunar Landing Research Vehicles (LLRVs) and the Lunar Landing Training Vehicles (LLTVs) provided astronauts of the Apollo program with essential experience and confidence required to complete the missions, and contributed to six successful manned landings on the moon. The primary challenge in terrestrial training was being able to replicate the ratio of tilt angle to linear acceleration that a pilot would experience in lunar gravity. Presently, as the Artemis program seeks to return humans to the Moon by 2025, engineers are evaluating suitable platforms to serve as an In-Flight Trainer (IFT) or Artemis Lunar Training Vehicle (ALTV) for astronauts training in the task of manual landing. The program is investigating the viability of current technology in the field of electric vertical takeoff and landing (eVTOL) vehicles and is evaluating using a multi-tilt-rotor aircraft platform as a candidate for a preliminary ALTV. The tilt-rotor capability enables the vehicle attitude to be decoupled from its flight path, which is a crucial requirement in realistically simulating lunar gravity on Earth. Other key considerations include compensating for a lack of aerodynamic forces while flying through the atmosphere of Earth, as well as the ability to simulate the dynamics of multiple different lander designs for the Human Landing System (HLS) program. This paper details the feasibility study and presents a preliminary flight control architecture for an IFT based on a notional multi-tilt-rotor platform. The model-following control law, based on nonlinear dynamic inversion (NDI), removes the need for gain scheduling. The inner-loop dynamic control allocation strategy consists of a static portion that is optimized offline for trim while compensating for the difference in gravity and a dynamic portion that is computed in real time. The reference model consists of the full closed-loop dynamics of a generic HLS design. The modularity of the flight control architecture enables evaluation of multiple HLS concepts with minimal modifications to the control law. Simulation results of the multi-tilt-rotor configuration following the final portion of the Apollo 11 descent trajectory are shown.

Jing Pei↗

The Ion Propulsion System for the Solar Electric Propulsion Technology Demonstration Mission

The Asteroid Redirect Robotic Mission is a candidate Solar Electric Propulsion Technology Demonstration Mission whose main objectives are to develop and demonstrate a high-power solar electric propulsion capability for the Agency and return an asteroidal mass for rendezvous and characterization in a subsequent human-crewed mission. The ion propulsion subsystem must be capable of operating over an 8-year time period and processing up to 10,000 kg of xenon propellant. This high-power solar electric propulsion capability, or an extensible derivative of it, has been identified as an enabling element of an affordable beyond low-earth orbit human-crewed exploration architecture. Under the NASA Space Technology Mission Directorate the critical electric propulsion and solar array technologies are being developed. The ion propulsion system for the Asteroid Redirect Vehicle is based on the NASA-developed 12.5 kW Hall Effect Rocket with Magnetic Shielding thruster and power processing technologies. This paper presents the conceptual design for the ion propulsion system, a status on the NASA in-house thruster and power processing is provided, and an update on acquisition for flight provided.

Ion Propulsion↗

Feasibility Study of a Multi Tilt-rotor Aircraft as the Artemis Lunar Training Vehicle

The Lunar Landing Research Vehicles (LLRVs) and the Lunar Landing Training Vehicles (LLTVs) provided astronaut candidates for the Apollo program with essential experience and confidence required to complete the missions, and contributed to six successful manned landings on the moon. The primary challenge in terrestrial training was being able to replicate the ratio of bank angle to linear acceleration that a pilot would experience in lunar gravity. Presently, as the Artemis program seeks to return humans to the Moon by 2025, engineers are evaluating suitable platforms to serve as an In-Flight Trainer (IFT) or Artemis Lunar Training Vehicle (ALTV) for astronauts training in the task of manual landing. The program is investigating the viability of current technology in the field of electric vertical takeoff and landing (eVTOL) vehicles and is evaluating using a multi tilt-rotor aircraft platform as a candidate platform for a preliminary ALTV. The tilt-rotor capability enables the vehicle attitude to be decoupled from its flight path, which is a crucial requirement in realistically simulating lunar gravity on Earth. Other key considerations include compensating for a lack of aerodynamic forces while flying through the atmosphere of Earth, as well as the ability to simulate the dynamics of multiple different lander designs for the Human Landing System (HLS) program. This paper details the feasibility study and presents a preliminary flight control architecture for an IFT based on a notional multi tilt-rotor platform. The modeling-following control law, based on nonlinear dynamic inversion (NDI), removes the need for gain scheduling because the vehicle operates across a wide range of flight conditions. The inner-loop dynamic control allocation strategy consists of a static portion that is optimized offline for trim while compensating for the difference in gravity and a dynamic portion that is computed in real time. The reference model consists of the full closed-loop dynamics of a generic HLS design. The modularity of the flight control architecture enables evaluation of multiple HLS concepts with minimal modifications to the control law. Simulation results of the multi tilt-rotor configuration following the final portion of the Apollo 11 descent trajectory are shown.

Jing Pei↗

Hierarchical neural networks for autonomous data analysis and decision making

A neural network based data analysis and decision making system to increase the autonomy of a planetary rover or similar exploratory vehicle is presented. A hierarchical series of neural networks for real time analysis of scientific images is used. The system under development emphasizes analysis of multispectral images by classifier and feature detector neural networks, to provide information on the mineral composition of a scene. A hierarchy of alternating analysis and decision making networks is being developed to allow increasingly fine scale analysis in regions of the image that are potentially important. It is noted that this system will facilitate both the selection of high priorty scientific information for transmission to earth, and the autonomous collection of rocks and soil for sample return.

Eberlein, Susan↗

Transportation: Destination Mars

As the agency space transportation lead center, Marshall Space Flight Center has been conducting transportation assessments for future robotic and human Mars missions to identify critical technologies. Five human Mars options are currently under assessment with each option including all transportation requirements from Earth to Mars and return. The primary difference for each option is the propulsion source from Earth to Mars. In case any of the options require heavy launch capability that is not currently projected as available, an in-house study has been initiated to determine the most cost effective means of providing such launch capability. This assessment is only considering launch architectures that support the overall human Mars mission cost goal of $25B. The guidelines for the launch capability study included delivery of 80 metric ton (176 KLB) payloads, 25 feet diameter x 92 feet long, to 220 nmi orbits at 28.5 degrees. The launch vehicle concept of the study was designated "Magnum" to differentiate from prior heavy launch vehicle assessments. This assessment along with the assessment of options for all transportation phases of a Mars mission are on-going.

Eoff, Bill↗

Establishing Trust in NASA’s Artemis Program Computer-Human Interface (CHI) Implementation

The NASA Artemis program will return humans to the moon. This time, with the help of commercial and international partners, the program’s objective is a permanent moon base. The moon base infrastructure, including an orbiting moon station and moon surface assets, will be developed for astronauts to stay for the long haul to learn to live and work on another planet in preparation for an eventual Humans-to-Mars mission. As the roundtrip communication delays increase in deep space exploration, more onboard systems autonomy and functionality will be needed to maintain and control the vehicle or habitat. These mission constraints will change the current Earth-based spacecraft ground control support approach that will demand more safe, efficient, and effective Computer-Human Interface (CHI) control. For Artemis, CHI is defined as the elements that the crew interfaces with-audio, video, lighting, and crew controls. Understanding how CHI will need to evolve to support deep space missions will be critical for the Artemis program-especially crew controls which is the focus of this paper. How does NASA ensure crew controls are reliable to control complex systems and prevent a catastrophic event due to human error-especially when the astronauts could be physiologically and/or psychologically impaired? NASA’s approach to mitigating catastrophic hazards in human spaceflight system development such as crew controls is through a holistic system engineering and Human System Integration methodology that embraces NASA’s Human-Rating Requirements-ensuring human performance characteristics to control/safely recover the crew from hazardous situations within the human interface design are considered. This paper discusses, at a high level, CHI for the Artemis program. Next, a discussion of what it means to human-rate a space system crew controls and how trust in the human-computer interface begins with the NASA human rating requirements. Finally, a discussion on how systems engineering, and the human system integration process ensures that crew control implementation incorporates the NASA human-rating requirements.

Human-Rating↗

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 1

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory↗

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 2

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory↗

An alternate concept for expanding man's presence in space

A logical next step after shuttle is a manned orbital service system (MOSS) consisting of a two-man crew module mated with a propulsion module. The resulting spacecraft would remain in low Earth orbit for months or years at a time conducting civil or military satellite servicing, experimental, or applications missions while being periodically supplied and refueled by Shuttle flights from the ground. The system would accumulate experience invaluable to the design of future large and more expensive spacecraft. Key features of the vehicle are versatility and mobility. With Centaur-type propulsion and a large payload, the MOSS could leave an initial orbit of 370 km (200 nmi) altitude and inclinations up to 56 deg, make a plane change of up to + or - 14 deg, reach altitudes to 5500 km (2970 nmi), and then return the payload to the original orbit altitude and inclination. Obviously, the size of the performance envelope varies with the payload and propulsion-unit selected. The MOSS can reach orbits and perform tasks not possible with Shuttle alone or with the much larger space stations currently being proposed.

Hook, W. R.↗

Influence of interplanetary trajectory selection on Mars atmospheric entry velocity

Many current manned Mars mission studies are using low lift-to-drag ratio (L/D) vehicles to aerobrake at both Mars and Earth. The use of these low L/D vehicles could limit the allowable velocity at the atmospheric interface. This paper will demonstrate that if entry velocity constraints are incorporated into the interplanetary analysis of aerobraking Mars missions, many opportunities can be achieved for a small increase in initial mass in low-Earth orbit (IMLEO). These opportunities result from varying the initial launch date and the encounter dates and possibly using a powered Venus swingby on either the inbound or outbound transfer. This paper demonstrates this technique by using three atmospheric entry velocity ranges at Mars arrival (6.0-8.5, 6.4-8.1, and 7.2-7.3 km/s), unconstrained Mars entry velocities, and an Earth return entry velocity below 14 km/s. The results indicate that, by carefully selecting the interplanetary trajectory, an optimum IMLEO mission can be found for even highly restrictive entry velocity missions in practically all of the 15 yr studied.

Striepe, Scott A.↗

Establishing Trust in NASA’s Artemis Campaign Computer-Human Interface (CHI) Implementation

The NASA Artemis program will return humans to the Moon. This time, with the help of commercial and international partners, the program's objective is a permanent moon base. The moon base infrastructure, including an orbiting moon station and moon surface assets, will be developed for astronauts to stay for the long haul to learn to live and work on another planet in preparation for an eventual Humans-to-Mars mission. As the roundtrip communication delays increase in deep space exploration, the crew will need more onboard systems autonomy and functionality to maintain and control the vehicle or habitat. These mission constraints will change the current Earth-based spacecraft to ground control support approach that will demand more safe, efficient, and effective Computer-Human Interface (CHI) control. For Artemis, CHI is defined as the elements that the crew interfaces with: audio, video, lighting, and crew controls subsystems. Understanding how CHI will need to evolve to support deep space missions will be critical for the Artemis program--especially crew controls, which is the focus of this paper. How does NASA ensure crew controls are reliable enough to control complex systems and prevent a catastrophic event due to human error--especially when the astronauts could be physiologically and/or psychologically impaired? NASA's approach to mitigating catastrophic hazards in human spaceflight system development such as crew controls, is through a holistic system engineering and Human System Integration methodology that focuses on incorporating NASA's Human-Rating Requirements-that ensures human performance characteristics to control/safely recover the crew from hazardous situations within the human interface design are considered. This paper discusses, at a high level, CHI for the Artemis program. Next, a discussion of what it means to human-rate a space system crew controls and how trust in the human-computer interface begins with the NASA human rating requirements. Finally, a discussion on how systems engineering and the human system integration process ensures that crew control implementation incorporates the NASA human-rating requirements.

artemis↗

Establishing Trust in NASA’s Artemis Campaign Computer-Human Interface (CHI) Implementation

The NASA Artemis program will return humans to the Moon. This time, with the help of commercial and international partners, the program's objective is a permanent moon base. The moon base infrastructure, including an orbiting moon station and moon surface assets, will be developed for astronauts to stay for the long haul to learn to live and work on another planet in preparation for an eventual Humans-to-Mars mission. As the roundtrip communication delays increase in deep space exploration, the crew will need more onboard systems autonomy and functionality to maintain and control the vehicle or habitat. These mission constraints will change the current Earth-based spacecraft to ground control support approach that will demand more safe, efficient, and effective Computer-Human Interface (CHI) control. For Artemis, CHI is defined as the elements that the crew interfaces with: audio, video, lighting, and crew controls subsystems. Understanding how CHI will need to evolve to support deep space missions will be critical for the Artemis program--especially crew controls, which is the focus of this paper. How does NASA ensure crew controls are reliable enough to control complex systems and prevent a catastrophic event due to human error--especially when the astronauts could be physiologically and/or psychologically impaired? NASA's approach to mitigating catastrophic hazards in human spaceflight system development such as crew controls, is through a holistic system engineering and Human System Integration methodology that focuses on incorporating NASA's Human-Rating Requirements-that ensures human performance characteristics to control/safely recover the crew from hazardous situations within the human interface design are considered. This paper discusses, at a high level, CHI for the Artemis program. Next, a discussion of what it means to human-rate a space system crew controls and how trust in the human-computer interface begins with the NASA human rating requirements. Finally, a discussion on how systems engineering and the human system integration process ensures that crew control implementation incorporates the NASA human-rating requirements.

artemis↗

The Mission Accessibility of Near-Earth Asteroids

Astrodynamical Earth departure dates; mission v; mission duration; stay time; etc. Physical I NEO size(?); rotation rate; dust satellites environment; chemistry; etc. Architectural Launch vehicle(s); crew vehicle(s); habitat module(s); budget; etc. Operational Operations experience; abort options profiles; etc. Astrodynamical Accessibility is the starting point for understanding the options and opportunities available to us. Here we shall focus on. Astrodynamical Accessibility.2 Earth departure date between 2015-01-01 and 2040-12-31 Earth departure C3 60 km2s2. Total mission v 12 kms. The total v includes (1) the Earth departure maneuver from a 400 km altitude circular parking orbit, (2) the maneuver to match the NEAs velocity at arrival, (3) the maneuver to depart the NEA and, (4) if necessary, a maneuver to control the atmospheric re-entry speed during Earth return. Total round trip mission duration 450 days. Stay time at the NEA 8 days Earth atmospheric entry speed 12 kms at an altitude of 125 km. A near-Earth asteroid (NEA) that offers at least one trajectory solution meeting those criteria is classified as NHATS-compliant.

Trajectory Optimization↗