Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Cost Analysis and Projections for U.S.-Manufactured Automotive Lithium-ion Batteries

This document reports on a study conducted to estimate the cost of U.S-produced automotive battery packs for model years (MY) 2023 to 2035, using Argonne National Laboratory’s BatPaC tool. The costs were estimated by designing batteries for several classes of vehicles for four discrete model years (2023, 2026, 2030, and 2035), where a representative battery technology and material prices are selected based on information available today. Correlations were developed from the four discrete years to enable annual pack cost estimates as a function of pack size (kWh) and model year. A consolidated cost curve was then developed that includes battery size, technology by model year, and the anticipated sales volumes of each class of vehicles over the years. This cost curve estimates the volume-averaged, U.S.-manufactured battery pack cost of PHEVs and BEVs in the United States to be $\$140$/kWh for the model year 2023, which will reduce to $\$86$/kWh in MY2035. Applying tax credits from section 45X of the Inflation Reduction Act can further reduce the average pack cost to as low as $\$56$/kWh in MY2029. The report also includes several sensitivity studies that investigate the effect of pack production volume, material prices, fast charge requirements, and labor rates.

25 ENERGY STORAGE↗

Advanced Fuel Cycle Cost Basis Report: Module D1-1: Uranium-based Ceramic LWR Fuel Fabrication (Rev.2)

Cost module on LWR fuel fabrication to accompany the Advanced Fuel Cycle Cost Basis Report. In this update, we are adding detailed life cycle cost data and a calculated, levelized fabrication cost derived from a non-proprietary bottom-up estimate prepared in 1978 by Oak Ridge National Laboratory (ORNL) (Judkins and Olsen 1978a). In 2018, the 1978 ORNL estimate was escalated by SA&I authors to 2017 USD using factors that represent inflation, escalation above inflation typical of nuclear projects, and the effects of more stringent safety and environmental regulations. In this FY-21 document, the $/kgU results in 2017 USD from the unpublished 2018 interim study (Williams and Ganda 2018) can be escalated to 2020 USD using a factor of 1.052. The literature-based unit cost (or price) data from previous (2004–2017) AFC-CBRs are escalated to 2020 USD using factors from Chapter 8 of the main FY-21 AFC-CBR document. This data, in addition to the results of the updated bottom-up estimate, are used to define the “what-it-takes” (WIT) range for the unit fabrication costs for conventional ceramic UOX light-water reactor (LWR) fuel. This FY-23 document also includes calculated unit costs for accident-tolerant LWR fuels (ATFs) of three different types. Some of these fuels constitute a ceramic pelletized form with fuel meat uranium compounds other than UO2 (a.k.a.,. UOX), thus the change in the title of this module in which the word “UO2” is changed to “Uranium-based Ceramic.”

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Quality Guidelines for Energy System Studies: Capital Cost Scaling Methodology: Revision 4b Report

The National Energy Technology Laboratory (NETL) regularly updates legacy analysis with new studies and cases as the Department of Energy objectives change, technology performance improves, costs are reduced, regulations change, market drivers are established, fuel prices fluctuate, and any number of other relevant factors vary in the market. As legacy studies are updated by NETL, the underlying performance and cost of the cases presented changes, and as such, the methods for interpreting and scaling the cost estimates change. Therefore, it is important that NETL maintain public guidance documents associated with different sets of cost estimates that delineate how a specific set, based on report vintage and/or year published, should be scaled. This Quality Guidelines for Energy System Studies report, providing guidance on capital cost scaling, should generally be applied to NETL case costs included in the report “Cost and Performance Baseline for Fossil Energy Plants Volume 1: Bituminous Coal and Natural Gas to Electricity Revision 4b,” (NETL, 2025) or any cases derived from the cases presented in the referenced report.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost Analysis of Heavy-Duty Vehicle Proton Exchange Membrane Fuel Cell Stationary Power Plants

Heavy-duty PEM fuel cells could be a low-cost, low emission alternative to combustion turbines for re-electrifying hydrogen if used as part of a long duration grid energy storage systems. Many studies expect heavy duty PEM fuel cell production costs to reduce as manufacturing volumes ramp up and their expected durability of 25,000-30,000 hours aligns well with a 30-year life for hydrogen seasonal energy storage plants that would likely operate less than 10% of the year. The labor, material, and equipment costs associated with installing PEM fuel cells and their required balance of plant for stationary applications have not been thoroughly explored, however. This study performs a detailed design and cost analysis of a 100 MW stationary PEM fuel cell power plant, capturing costs such as cooling, power electronics, pipes, valves, fittings, cabling, conduit, concrete foundations, buildings, and land. It employs methods consistent with NLR's solar PV benchmarking cost analysis and annual technology baseline to derive the total installed costs of stationary PEM fuel cell plants that utilize heavy duty PEM fuel cells.

08 HYDROGEN↗

Methodology for Evaluating Energy Savings, Cost-Effectiveness, and Societal Impacts of Commercial Energy Code Changes

This document lays out the Department of Energy’s (DOE’s) methodology for evaluating the cost-effectiveness of energy code and standard proposals and editions. The evaluation is applied to new provisions or editions of ANSI/ASHRAE/IES Standard 90.1 and the International Energy Conservation Code. The methodology follows standard lifecycle cost (LCC) economic analysis procedures. A cost-effectiveness evaluation requires three steps: 1) evaluating the energy and energy cost savings of code changes; 2) evaluating the incremental and replacement costs related to the changes; and 3) determining the cost-effectiveness of energy code changes based on those costs and savings over time.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Designing Harvesting and Hauling Cost Models for Energy Cane Production for Biorefineries

The harvesting and hauling operations of bioenergy feedstock is an important area in biofuel production. Production costs can be minimized by maintaining optimal machinery units for these operations. The objective of this study is to design an optimal harvesting unit for bioenergy refinery and estimate harvesting and hauling costs of energy cane. A biorefinery with the annual capacity of processing twenty-five million imp. gallons of ethanol were considered. Given the efficiency of harvesting, a two-row soldier system was considered. Considering the year-round supply of energy cane to the refinery, the optimal machinery unit was designed, and the combined operation costs were derived. The average estimated ownership, repair, labor and fuel and lubricant costs of biomass harvest unit were calculated to be $\$$0.50, $\$$0.54, $\$$1.78 and $\$$1.51/mt, respectively. The costs distribution generated showed harvesting and hauling costs could range between $\$$5.47–$\$$9.23/mt of energy cane. The methodology and the research output will provide guidelines for investors in designing harvesting and hauling units and estimating costs for different scales of operation.

09 BIOMASS FUELS↗

The scaling relationship between telescope cost and aperture size for very large telescopes

Cost data for ground-based telescopes of the last century are analyzed for trends in the relationship between aperture size and cost. We find that for apertures built prior to 1980, costs scaled as aperture size to the 2.8 power, which is consistent with the precious finding of Meinel (1978). After 1980, 'traditional' monolithic mirror telescope costs have scaled as aperture to the 2.5 power. The large multiple mirror telescopes built or in construction during this time period (Keck, LBT, GTC) appear to deviate from this relationship with significant cost savings as a result, although it is unclear what power law such structures follow. We discuss the implications of the current cost-aperture size data on the proposed large telescope projects of the next ten to twenty years. Structures that naturally tend towards the 2.0 power in the cost-aperture relationship will be the favorable choice for future extremely large apertures; out expectation is that space-based structures will ultimately gain economic advantage over ground-based ones.

telescope costs↗

Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

Overruns↗

Recent Developments of Thermal Protection Materials to Enable Lower Cost Space Missions

Introduction: Starting with the Commercial Crew Program, a new paradigm has emerged at NASA. Rather than designing rockets and spacecrafts for every mission optimized to achieve science, NASA has begun to use a service-based model and utilizing public-private partnership in developing the vehicles that can bring broader benefits as well as lower the cost for NASA missions. Commercial companies own and operate those vehicles. This allows NASA to not design missions from the bottom up, and has cost, risk, and schedule savings implications. On the other side, the constraints require meeting the requirements in terms of mass, volume, power, etc. By leveraging NASA developed technologies, commercial companies can quickly demonstrate the commercial mission concept, and, through technology transfer, adopt needed technology to address supply chain problems. A downside is that the technology has to be sufficiently mature to be transferred by NASA, which means that it requires significant investment, expertise, and time to develop. Space entities are focused on rapid development with an emphasis on manufacturing and integration innovation with reduced cost and schedule and quick entrance into the market. Thermal Protection Systems (TPS) are mission critical, but their development takes years, and involve access to arc jets or unique test facilities. Therefore, their development is both risky and investment heavy. NASA ARC developed several new TPS materials over the last decade (C-PICA, HEEET, 3MDCP, 3DMAT, ADEPT woven TPS) and brought them to high TPS maturity, making them enablers for commercials space missions from LEO, Lunar Sample Return, Mars, and Venus missions. LEO missions are relevant to future Mars missions due to the comparable entry conditions. External Partners' Missions: C-PICA is a recent improvement on NASA’s heritage PICA lightweight TPS ablator. C-PICA is now considered an enabling technology for New Frontiers and other NASA missions. C-PICA was infused into several missions from external partners. Varda Space Industries’ Winnebago-1 spacecraft successfully returned to Earth from LEO on Feb. 21st, 2024, using a C-PICA heatshield. Inversion Space’s Ray vehicle will test both ARC’s C-PICA and SIRCA TPS materials on a LEO return mission later in 2024. The Kentucky Re-Entry Probe Experiment (KREPE) is another example of a low-cost flight experiment to demonstrate the use of small entry capsules to gather data with three instrumented Kentucky Re-entry and Universal Payload System (KRUPS) capsules. NASA Arc provided C-PICA and Soft-PICA for two of the next KRUPS capsules scheduled to re-enter Earth from the ISS later in 2024. Finally, Rocket Lab’s low-cost mission to Venus, scheduled to launch in December 2024, will search for habitable conditions in Venus’ cloud layer, making use of NASA ARC provided HEEET insulation layer heat shield, and SIRCA backshell TPS materials. Future NASA Missions: NASA’s ability to help commercial missions can lead to future low-cost missions for several reasons: Competition encourages lower cost; technology maturation is now done at an integrated system level; and a common design architecture between commercial and scientific applications requires no specialized engineering design. From an engineering perspective, both of these commercial LEO capsules aforementioned are capable of a Mars entry; the commercial payload mut be replaced with as science payload. Finally, several NASA mission concepts, that could be candidates for future SIMPLEx program calls, such as VATMOS-SR and Nephele, both proposing to target the Venusian atmosphere, would make use of the HEEET insulation layer TPS for part of their heat shield.

TPS materials↗

Recent Developments of Thermal Protection Materials to Enable Lower Cost Space Missions

Introduction: Starting with the Commercial Crew Program, a new paradigm has emerged at NASA. Rather than designing rockets and spacecrafts for every mission optimized to achieve science, NASA has begun to use a service-based model and utilizing public-private partnership in developing the vehicles that can bring broader benefits as well as lower the cost for NASA missions. Commercial companies own and operate those vehicles. This allows NASA to not design missions from the bottom up, and has cost, risk, and schedule savings implications. On the other side, the constraints require meeting the requirements in terms of mass, volume, power, etc. By leveraging NASA developed technologies, commercial companies can quickly demonstrate the commercial mission concept, and, through technology transfer, adopt needed technology to address supply chain problems. A downside is that the technology has to be sufficiently mature to be transferred by NASA, which means that it requires significant investment, expertise, and time to develop. Space entities are focused on rapid development with an emphasis on manufacturing and integration innovation with reduced cost and schedule and quick entrance into the market. Thermal Protection Systems (TPS) are mission critical, but their development takes years, and involve access to arc jets or unique test facilities. Therefore, their development is both risky and investment heavy. NASA ARC developed several new TPS materials over the last decade (C-PICA, HEEET, 3MDCP, 3DMAT, ADEPT woven TPS) and brought them to high TPS maturity, making them enablers for commercials space missions from LEO, Lunar Sample Return, Mars, and Venus missions. LEO missions are relevant to future Mars missions due to the comparable entry conditions. External Partners' Missions: C-PICA is a recent improvement on NASA’s heritage PICA lightweight TPS ablator. C-PICA is now considered an enabling technology for New Frontiers and other NASA missions. C-PICA was infused into several missions from external partners. Varda Space Industries’ Winnebago-1 spacecraft successfully returned to Earth from LEO on Feb. 21st, 2024, using a C-PICA heatshield. Inversion Space’s Ray vehicle will test both ARC’s C-PICA and SIRCA TPS materials on a LEO return mission later in 2024. The Kentucky Re-Entry Probe Experiment (KREPE) is another example of a low-cost flight experiment to demonstrate the use of small entry capsules to gather data with three instrumented Kentucky Re-entry and Universal Payload System (KRUPS) capsules. NASA Arc provided C-PICA and Soft-PICA for two of the next KRUPS capsules scheduled to re-enter Earth from the ISS later in 2024. Finally, Rocket Lab’s low-cost mission to Venus, scheduled to launch in December 2024, will search for habitable conditions in Venus’ cloud layer, making use of NASA ARC provided HEEET insulation layer heat shield, and SIRCA backshell TPS materials. Future NASA Missions: NASA’s ability to help commercial missions can lead to future low-cost missions for several reasons: Competition encourages lower cost; technology maturation is now done at an integrated system level; and a common design architecture between commercial and scientific applications requires no specialized engineering design. From an engineering perspective, both of these commercial LEO capsules aforementioned are capable of a Mars entry; the commercial payload mut be replaced with as science payload. Finally, several NASA mission concepts, that could be candidates for future SIMPLEx program calls, such as VATMOS-SR and Nephele, both proposing to target the Venusian atmosphere, would make use of the HEEET insulation layer TPS for part of their heat shield.

TPS materials↗

AN OVERVIEW OF TOOL FOR RESPONSE ACTION COST ESTIMATING (TRACE)

Tools and techniques that provide improved performance and reduced costs are important to government programs, particularly in current times. An opportunity for improvement was identified for preparation of cost estimates used to support the evaluation of response action alternatives. As a result, CH2M HILL Plateau Remediation Company has developed Tool for Response Action Cost Estimating (TRACE). TRACE is a multi-page Microsoft Excel{reg_sign} workbook developed to introduce efficiencies into the timely and consistent production of cost estimates for response action alternatives. This tool combines costs derived from extensive site-specific runs of commercially available remediation cost models with site-specific and estimator-researched and derived costs, providing the best estimating sources available. TRACE also provides for common quantity and key parameter links across multiple alternatives, maximizing ease of updating estimates and performing sensitivity analyses, and ensuring consistency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Postmortem Cost and Schedule Analysis - Lessons Learned On NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative fusion energy confinement device developed by the Princeton Plasma Physics Laboratory (PPPL) and Oak Ridge National Laboratory (ORNL) under contract from the US Department of Energy. The project was technically very challenging, primarily due to the complex component geometries and tight tolerances that were required. As the project matured these challenges manifested themselves in significant cost overruns through all phases of the project (i.e. design, R&D, fabrication and assembly). The project was subsequently cancelled by the DOE in 2008. Although the project was not completed, several major work packages, comprising about 65% of the total estimated cost (excluding management and contingency), were completed, providing a data base of actual costs that can be analyzed to understand cost drivers. Technical factors that drove costs included the complex geometry, tight tolerances, material requirements, and performance requirements. Management factors included imposed annual funding constraints that throttled project cash flow, staff availability, and inadequate R&D. Understanding how requirements and design decisions drove cost through this top-down forensic cost analysis could provide valuable insight into the configuration and design of future state-of-the art machines and other devices.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A Spatial-Economic Cost-Reduction Pathway Analysis for U.S. Offshore Wind Energy Development from 2015-2030

The potential for cost reduction and economic viability for offshore wind varies considerably within the United States. This analysis models the cost impact of a range of offshore wind locational cost variables across more than 7,000 potential coastal sites in the United States' offshore wind resource area. It also assesses the impact of over 50 technology innovations on potential future costs between 2015 and 2027 (Commercial Operation Date) for both fixed-bottom and floating wind systems. Comparing these costs to an initial assessment of local avoided generating costs, this analysis provides a framework for estimating the economic potential for offshore wind. Analyzing economic potential within this framework can help establish a refined understanding across industries of the technology and site-specific risks and opportunities associated with future offshore wind development. The findings from the original report indicate that under the modeled scenario, offshore wind can be expected to achieve significant cost reductions and may approach economic viability in some parts of the United States within the next 15 years.

17 WIND ENERGY↗

Estimating the Effects of Module Area on Thin-Film Photovoltaic System Costs: Preprint

We investigate the potential effects of module area on the cost and performance of photovoltaic systems. Applying a bottom-up methodology, we analyzed the costs associated with thin-film modules and systems as a function of module area. We calculate a potential for savings of up to 0.10 dollars/W and 0.13 dollars/W in module manufacturing costs for CdTe and CIGS respectively, with large area modules. We also find that an additional 0.04 dollars/W savings in balance-of-systems costs may be achieved. Sensitivity of the dollar/W cost savings to module efficiency, manufacturing yield, and other parameters is presented. Lifetime energy yield must also be maintained to realize reductions in the levelized cost of energy; the effects of module size on energy yield for monolithic thin-film modules are not yet well understood. Finally, we discuss possible non-cost barriers to adoption of large area modules.

14 SOLAR ENERGY↗

A New Model to Determine Installed System Cost and LCOE for ARPA-E's MOSAIC Micro-Concentrator PV Program: Preprint

The US Department of Energy's Advanced Research Projects Agency-Energy (ARPA-E) started a three-year program in December 2015 called Microscale Optimized Solar-cell Arrays with Integrated Concentration (MOSAIC). It consists of 11 teams from across the United States. Its goal is to have project teams leverage expertise from conventional flat-plate photovoltaic (PV) system configuration and concentrated photovoltaic (CPV) module technology to produce a new class of modules for residential, commercial, and utility-scale markets. The intent is to increase performance and facilitate cost-effective deployment of solar power systems across a wide range of geographical locations in part by concentrating both direct and diffuse components of the sun's irradiance. This paper describes a collaboration of ARPA-E and the National Renewable Energy Laboratory (NREL) to develop a bottom-up system cost model for MOSAIC research teams. The model includes an estimate of regional, all-in, CPV installed cost, and levelized cost of energy (LCOE) by using customized inputs parameters, such as module efficiency, cost, and physical dimensions. This techno-economic cost model can help researchers analyze tradeoffs among different design parameters and then prioritize their distinct research opportunities. Moreover, it establishes a standardized cost benchmarking for MOSAIC micro-CPV systems and a normalized comparison against traditional CPV and today's highly competitive flat-plate PV systems. The model is a valuable design tool within the program, helping validate the various technical approaches and compare future deployed system competitiveness versus incumbent technologies in the PV industry.

14 SOLAR ENERGY↗

Survey of Costs Arising From Potential Radionuclide Scattering Events

The potential effects from scattering radioactive materials in public places include health, social, and economic consequences. These are substantial consequences relative to potential terror activities that include use of radioactive material dispersal devices (RDDs). Such an event with radionuclides released and deposited on surfaces outside and inside people's residences and places of work, commerce, and recreation will require decisions on how to recover from the event. One aspect of those decisions will be the cost to clean up the residual radioactive contamination to make the area functional again versus abandonment and/or razing and rebuilding. Development of cleanup processes have been the subject of experiment from the beginning of the nuclear age, but formalized cost breakdowns are relatively rare and mostly applicable to long term releases in non-public sites. Pre-event cleanup cost estimation of cost for cleanup of radioactive materials released to the public environment is an issue that has seen sporadic activity over the last 20 to 30 years. This paper will briefly review several of the more important efforts to estimate the costs of remediation or razing and reconstruction of radioactively contaminated areas. The cost estimates for such recoveries will be compared in terms of 2005 dollars for the sake of consistency. Dependence of cost estimates on population density and needed degree of decontamination will be shown to be quite strong in the overall presentation of the data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford River Protection Project Life cycle Cost Modeling Tool to Enhance Mission Planning - 13396

The Life cycle Cost Model (LCM) Tool is an overall systems model that incorporates budget, and schedule impacts for the entire life cycle of the River Protection Project (RPP) mission, and is replacing the Hanford Tank Waste Operations Simulator (HTWOS) model as the foundation of the RPP system planning process. Currently, the DOE frequently requests HTWOS simulations of alternative technical and programmatic strategies for completing the RPP mission. Analysis of technical and programmatic changes can be performed with HTWOS; however, life cycle costs and schedules were previously generated by manual transfer of time-based data from HTWOS to Primavera P6. The LCM Tool automates the preparation of life cycle costs and schedules and is needed to provide timely turnaround capability for RPP mission alternative analyses. LCM is the simulation component of the LCM Tool. The simulation component is a replacement of the HTWOS model with new capability to support life cycle cost modeling. It is currently deployed in G22, but has been designed to work in any full object-oriented language with an extensive feature set focused on networking and cross-platform compatibility. The LCM retains existing HTWOS functionality needed to support system planning and alternatives studies going forward. In addition, it incorporates new functionality, coding improvements that streamline programming and model maintenance, and capability to input/export data to/from the LCM using the LCM Database (LCMDB). The LCM Cost/Schedule (LCMCS) contains cost and schedule data and logic. The LCMCS is used to generate life cycle costs and schedules for waste retrieval and processing scenarios. It uses time-based output data from the LCM to produce the logic ties in Primavera P6 necessary for shifting activities. The LCM Tool is evolving to address the needs of decision makers who want to understand the broad spectrum of risks facing complex organizations like DOE-RPP to understand how near-term programmatic decisions affect life cycle costs and commitments. (authors)

54 ENVIRONMENTAL SCIENCES↗

Triple Effect Economics: How Do Electric Vehicles, Solar Photovoltaics, and Work-from-Home Transform Household Electricity Cost?

Solutions for deep decarbonization need to be affordable as well as sustainable to garner widespread adoption. The past two decades have seen the introduction of new technologies and paradigms such as electric vehicles (EVs), solar photovoltaics (PVs), and increased work-from-home (WFH), which impact a household's overall energy consumption and cost in different ways. However, much attention has not been paid to explore the joint impact these technologies have on a household's electricity cost burden. Leveraging the 2020 Residential Energy Consumption Survey (RECS), this study presents an integrated model to unravel the extent to which the bundled adoption of EV-PV and stay-at-home decisions impact the total electricity cost of households. National level RECS data revealed that, compared to the baseline (i.e., households that did not own any of these technologies), households that own EVs, PVs, and engage in WFH observed a 13.5% decline in their electricity bills, despite a 25% increase in electricity consumption. The model results indicated that bundled adoption of EVs-PVs reduces electricity costs more significantly for a household, compared to the increased costs imposed by more household members staying at home. This holistic assessment presents an opportunity for decision makers to contextualize the changing energy costs and design effective strategies to foster a sustainable and cost saving mechanism. Policies such as bundled incentivization to motivate co-adoption, education about energy-management strategies, and add-on subsidies to adopt energy-efficient appliances, will not only accelerate decarbonization but increase household financial savings.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗