Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Commanding”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Input Shaping to Reduce Solar Array Structural Vibrations

Structural vibrations induced by actuators can be minimized using input shaping. Input shaping is a feedforward method in which actuator commands are convolved with shaping functions to yield a shaped set of commands. These commands are designed to perform the maneuver while minimizing the residual structural vibration. In this report, input shaping is extended to stepper motor actuators. As a demonstration, an input-shaping technique based on pole-zero cancellation was used to modify the Solar Array Drive Assembly (SADA) actuator commands for the Lewis satellite. A series of impulses were calculated as the ideal SADA output for vibration control. These impulses were then discretized for use by the SADA stepper motor actuator and simulated actuator outputs were used to calculate the structural response. The effectiveness of input shaping is limited by the accuracy of the knowledge of the modal frequencies. Assuming perfect knowledge resulted in significant vibration reduction. Errors of 10% in the modal frequencies caused notably higher levels of vibration. Controller robustness was improved by incorporating additional zeros in the shaping function. The additional zeros did not require increased performance from the actuator. Despite the identification errors, the resulting feedforward controller reduced residual vibrations to the level of the exactly modeled input shaper and well below the baseline cases. These results could be easily applied to many other vibration-sensitive applications involving stepper motor actuators.

Doherty, Michael J.↗

An Object-Oriented Interface to the CCSDS Ground Telecommand Services

The Telecommand Data Routing and Channel Services defined by the Consultative Committee for Space Data Systems (CCSDS) are flexible enough to support a myriad of commanding models. Because the standard is so broad, the traditional approach has been to implement only the portion of the standard needed by the particular spacecraft being tested/operated. Tasked with providing Telecommand Services for an entire class of spacecraft, where each spacecraft may choose any valid CCSDS commanding model, NASA Code 584 designed a common architecture capable of handling the full CCSDS protocol. The solution uses another CCSDS standard - the Standard Formatted Data Unit (SFDU) as the interface to the Telecommand Services. SFDUs provide a consistent way of labelling data objects, as well as allowing data objects to encapsulate other data objects. The resulting interface is: - Flexible: The full Data Routing and Channel Services are available via a single interface. The client (i.e. the command source) may enter commands at any layer within the protocol stack, specify any of the data aggregation or segmentation methods, and dynamically set any configuration parameter defined in the standard. - Object-oriented: Each object specifies both the data and the actions to be performed with the data. An object may contain other objects. - Expandable: New capabilities are added by defining new objects. Objects pass thru the protocol layers until they reach the applicable layer. The resulting design is: - Modular: The logic for each protocol layer is contained in a separate Application Program Interface (API). The objects used for the external interface are also used for communication between layers. - Distributable: The design can be split along any layer boundary for distribution across multiple machines. The objects ensure data consistency across platforms. This paper describes the SFDU-based interface and the resulting protocol implementation. The implementation is currently used by NASA (National Aeronautics and Space Administration) for integration & test of the microwave Anisotropy Probe (MAP) and Earth observer-I (EO-l) spacecraft. It will be used for post-launch operations of these spacecraft as well as the Imager for Magnetopause to Aurora Global Exploration (IMAGE) spacecraft.

Ray, Timothy Joseph↗

STS-96 Mission Highlights

In this third part of a three-part video mission-highlights set, spacecrew operations between the STS-96 Space Shuttle Orbiter Discovery and the International Space Station, as well as STS reentry and landing is reviewed. The flight crew consists of Kent V. Rominger, Commander; Rick D. Husband, Pilot; and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette (Canadian), and Valery Ivanovich Tokarev (Russian). The primary goals of this mission were to work on logistics and resupply the International Space Station. This third part of the three part series includes footage from Flight Days 8-11 (FD 8-11) of the mission. FD 8 includes the crew members moving the last items from Discovery into the International Space Station (ISS), closing the final hatch on the orbiting outpost and commanding a series of 17 pulses of Discovery's reaction control system jets to boost the station's orbit. Discovery undocks from the station, performs a 2 1/2 lap flyaround of the station, before Husband fires Discovery's jets in a final burst to move Discovery away from the station, concluding six days of docked operations. After the flyaround, Husband fires Discovery's jets to depart the station's vicinity. Beginning FD 9, as Discovery departs from the station, Mission Specialists Tammy Jernigan and Dan Barry pack away the space suit gear they used during their spacewalk early in the mission, while Commander Kent Rominger and Pilot Rick Husband practice landings on a laptop computer program. Mission Specialists Julie Payette and Valery Tokarev help to stow gear and repressurize the shuttle's cabin to its standard 14.7 pounds per square inch. The crew also readies to deploy a small, student-built payload called STARSHINE (Student Tracked Atmospheric Research Satellite for Heuristic International Networking Equipment). In and around landing preparations and the STARSHINE deploy, the crew stowe all equipment used throughout the mission. The STARSHINE satellite ejects from a canister in Discovery's payload bay on FD 10. FD 11 is completed as Discovery swoops out of the darkness as Commander Kent Rominger sets the shuttle and his crewmates down on Runway 15 at the Shuttle Landing Facility in Florida to successfully complete the first shuttle mission of the year. Several different views of the landing are highlighted in the video.

Source record↗

A Table-Driven Control Method to Meet Continuous, Near-Real-Time Observation Requirements for the Solar X-Ray Imager

The design of the Solar X-Ray Imager (SXI) for the Geostationary Operational Environmental Satellite (GOES) presents an unusual scenario for controlling the observing sequences. The SXI is an operational instrument, designed not primarily for scientific research, but for providing "operational" data used by the National Oceanic and Atmospheric Administration (NOAA) to forecast the near-term space weather. To this end, a sequence of images selected to cover the full dynamic range of the sun will be executed routinely. As the dynamics of the sun have differing temporal cadences, the frequency of various images will differ. These images must be routinely received at the forecast center in near real-time, 24-hours a day, with a minimum of interruptions. While these requirements clearly lead to a 'routine patrol' of images, the parameters for each do not form a static set. The dynamics of the sun will change with the I 1-year solar cycle. The performance of the imaging will vary with on-orbit conditions and time. And while the SXI is not intended as a research instrument, forecasting techniques may change with time, which in turn will further alter the imaging sequences. An additional complication is the highly restricted commanding window, and a very slow commanding rate. To fulfill these requirements, the SXI was designed to utilize a table-driven approach. Sequences are defined using structured loops, with nested repetitions and delays. These sequences reference combinations of imaging parameters which in turn reference tables of parameters than can be loaded by ground commands. Multiple sequences can be built and stored in preparation for execution when determined appropriate by the NOAA forecasters. The result is an approach that can be used to provide a flexible, yet autonomous SXI capable of meeting both arbitrary forecasting requirements, and operating within the commanding constraints.

Wallace, Shawn↗

Autonomous Science Decision Making for Mars Sample Return

In the near future NASA intends to explore Mars in preparation for a sample return mission using robotic devices such as landers, rovers, orbiters, airplanes, and/or balloons. Such platforms will likely carry imaging devices to characterize the surface morphology, and a variety of analytical instruments intended to evaluate the chemical and mineralogical nature of the environment(s) that they encounter. Historically, mission operations have involved the following sequence of activities: (1) return of scientific data from the vehicle; (2) evaluation of the data by space scientists; (3) recommendations of the scientists regarding future mission activity; (4) transmission of commands to the vehicle to achieve this activity; and (5) new activity by the vehicle in response to those commands. This is repeated for the duration of the mission, with command opportunities once or perhaps twice per day. In a rapidly changing environment, such as might be encountered by a rover traversing hundreds of meters a day or an airplane soaring over several hundred of kilometers, this traditional cycle of data evaluation and commands is not amenable to rapid long range traverses, discovery of novelty, or rapid response to any unanticipated situations. In addition, to issues of response time, the nature of imaging and/or spectroscopic devices are such that tremendous data volumes can be acquired, for example during a traverse. These data volumes can rapidly exceed on-board memory capabilities prior to an opportunity to transmit it to Earth.

Roush, Ted L.↗

STS-108 Flight Day 8 Highlights

On this eighth day of the STS-108 mission, the STS-108 crew (Commander Dominic Gorie, Pilot Mark Kelly, and Mission Specialists Linda Godwin and Daniel Tani), Expedition 3 crew (Commander Frank Culbertson, Jr. and Flight Engineers Mikhail Turin and Vladimir Dezhurov), and Expedition 4 crew (Commander Yuri Onufrienko and Flight Engineers Carl Walz and Daniel Bursch) work to reload the Rafaello Multipurpose Logistics Module. Commander Culbertson is seen on the International Space Station's treadmill.

Source record↗

STS-108 Flight Day 11 Highlights

On this eleventh day of the STS-108 mission, the Expedition 3 crew (Commander Frank Culbertson, Jr. and Flight Engineers Mikhail Turin and Vladimir Dezhurov), Expedition 4 crew (Commander Yuri Onufrienko and Flight Engineers Carl Walz and Daniel Bursch), and STS-108 crew (Commander Dominic Gorie, Pilot Mark Kelly, and Mission Specialists Linda Godwin and Daniel Tani) are seen as the E3 crew bids farewell to the International Space Station (ISS) that has been their home for the previous several months. Endeavour undocks from ISS and performs the customary flyaround. The STS-108 crew and Commander Culbertson answer questions from the press in an on-orbit interview.

Source record↗

STS-105 Mission Highlights Resource Tape: Flight Days 4-6

A continuation of 'STS-105 Mission Highlights Resource Tape: Flight Days 1-3' (internal ID 2002046550), this video shows footage from flight days four through six of the STS-105 mission. Commander Scott Horowitz helps Mission Specialist Pat Forrester maneuver the Space Shuttle's robotic arm as it grapples the Multipurpose Logistics Module (MPLM) from Discovery's payload bay to the International Space Station (ISS). The three crews, STS-105 (Commander Horowitz, Pilot Fred Sturckow, and Mission Specialists Dan Barry and Forrester), Expedition 2 (Commander Yuriy Usachev and Flight Engineers James Voss and Susan Helms), and Expedition 3 (Commander Frank Culbertson, Jr. and Flight Engineers Mikhail Turin and Vladimir Dezhurov), are seen during unloading operations as they transfer equipment from the MPLM to the ISS. Forrester and Barry check their equipment and suits for the next day's spacewalks. The E2 crew shows the E3 crew around ISS. The crescent moon and the end of a sunset are seen from space. For activities from flight days 7-13, see 'STS-105 Mission Highlights Resource Tape: Flight Days 7-9' (internal ID 2002046552) and 'STS-105 Mission Highlights Resource Tape: Flight Days 10-13' (internal ID 2002046551).

Source record↗

The Maneuver Planning Process for the Microwave Anisotropy Probe (MAP) Mission

The Microwave Anisotropy Probe (MAP) was successfully launched from Kennedy Space Center's Eastern Range on June 30, 2001. MAP will measure the cosmic microwave background as a follow up to NASA's Cosmic Background Explorer (COBE) mission from the early 1990's. MAP will take advantage of its mission orbit about the Sun-Earth/Moon L2 Lagrangian point to produce results with higher resolution, sensitivity, and accuracy than COBE. A strategy comprising highly eccentric phasing loops with a lunar gravity assist was utilized to provide a zero-cost insertion into a lissajous orbit about L2. Maneuvers were executed at the phasing loop perigees to correct for launch vehicle errors and to target the lunar gravity assist so that a suitable orbit at L2 was achieved. This paper will discuss the maneuver planning process for designing, verifying, and executing MAP's maneuvers. A discussion of the tools and how they interacted will also be included. The maneuver planning process was iterative and crossed several disciplines, including trajectory design, attitude control, propulsion, power, thermal, communications, and ground planning. Several commercial, off-the-shelf (COTS) packages were used to design the maneuvers. STK/Astrogator was used as the trajectory design tool. All maneuvers were designed in Astrogator to ensure that the Moon was met at the correct time and orientation to provide the energy needed to achieve an orbit about L2. The Mathworks Matlab product was used to develop a tool for generating command quaternions. The command quaternion table (CQT) was used to drive the attitude during the perigee maneuvers. The MatrixX toolset, originally written by Integrated Systems, Inc., now distributed by Mathworks, was used to create HiFi, a high fidelity simulator of the MAP attitude control system. HiFi was used to test the CQT and to make sure that all attitude requirements were met during the maneuver. In addition, all ACS data plotting and output were generated in MatrixX. A final test used FlatSat, a real-time hardware-in-the-loop simulator, which used identical MAP flight code to simulate operations on the spacecraft. Simulations in FlatSat allowed the MAP team to verify maneuver commands, timing, and spacecraft configuration before the commands were sent up to the spacecraft for execution. The MAP maneuver team successfully pieced together all of these COTS tools for designing MAP's maneuvers and MAP is now collecting data at L2.

Mesarch, Michael A.↗

Rovers for Mars Polar Exploration

Mobility is a generic capability needed for Mars exploration. Requirements for mobility range from those to get observations of individual rocks all the way to getting high resolution observations of regional areas. Table 1 shows the required-range of mobility to achieve various tasks. The Pathfinder mission and field experiments simulating rover missions [1, 2, 3, 4, 5] provide guidance as to rover capabilities that can reasonably be expected in the next decade. Rover mobility can be accomplished in a variety of ways, the most common being wheels or tracks and legged-walkers. Wheeled vehicles can traverse over rocks smaller than 1/2 wheel diameter, and with path planning to avoid larger rocks, can traverse terrains comparable to those seen on Mars in the Viking and Pathfinder landing sites. Slopes of 45 deg can be easily negotiated by wheeled rovers. Walking vehicles can negotiate even more complex terrain but requires computation capability to select each leg placement. Extremely complex terrain was traversed by the Nomad II walker which descended into (and most of the way out of) an active volcanic caldera (Mount Spur, AK) in 1995, although a slope failure eventually resulted in broken legs. The traverse range of a rover is limited by its science objectives, performance capabilities, and operational lifetime. The speed of rover traverse is a relative minor factor. With a different communication system, and no stops for science experiments, Sojourner could probably have traveled a kilometer. But, achieving land speed records is not a major objective of a science mission. Achieving science objectives requires targeting particular objects and studying them in detail, and the associated operational requirements will likely limit rover traverse range significantly. Traversing from target to target requires relatively few command cycles provided the traverse is over a short enough distance that it can be adequately planned. An operational goal of 100 m traverse per command cycle, arriving at a predetermined target, seems achievable. Investigating science targets requiring manipulator or instrument placement and sample collection will likely take several command cycles per target. Mission simulations [6] have demonstrated that traverse dI stances of 100-300 m, with detailed investigation of 5-10 targets take 50-100 command cycles, not unlike the Pathfinder experience in spite of the use of larger, faster, more capable rovers. Significant advances in rover autonomy will be needed to improve this Situation and it is not clear how much improvement will be brought to flight programs in the next decade. Dust accumulation on solar panels degrades power over time and, without dust removal, rover operational lifetimes may be limited to 90 sols.

Stoker, Carol↗

STS-113 Flight Day 7 Highlights

The STS-113 seventh flight day begins with a view of the Russian Segment of the International Space Station from a camera at the end of the S1 truss. Live footage of Michael Lopez-Alegria and John Herrington are shown aboard the International Space Station. A change of command ceremony is presented to welcome the Expedition Six Crew and to say farewell to the Expedition Five crew. Commander Valery Korzun, Flight Engineer Sergei Treschev, NASA ISS Science Officer Peggy Whitson, Expedition Six Commander Ken Bowersox, Flight Engineer Nikolai Budarin, NASA ISS Science Officer Don Pettit, Commander Jim Wetherbee, Pilot Paul Lockhart and Mission Specialists Michael Lopez-Alegria and John Herrington are all are shown during the ceremony.

Source record↗

Direct Fault Tolerant RLV Altitude Control: A Singular Perturbation Approach

In this paper, we present a direct fault tolerant control (DFTC) technique, where by "direct" we mean that no explicit fault identification is used. The technique will be presented for the attitude controller (autopilot) for a reusable launch vehicle (RLV), although in principle it can be applied to many other applications. Any partial or complete failure of control actuators and effectors will be inferred from saturation of one or more commanded control signals generated by the controller. The saturation causes a reduction in the effective gain, or bandwidth of the feedback loop, which can be modeled as an increase in singular perturbation in the loop. In order to maintain stability, the bandwidth of the nominal (reduced-order) system will be reduced proportionally according to the singular perturbation theory. The presented DFTC technique automatically handles momentary saturations and integrator windup caused by excessive disturbances, guidance command or dispersions under normal vehicle conditions. For multi-input, multi-output (MIMO) systems with redundant control effectors, such as the RLV attitude control system, an algorithm is presented for determining the direction of bandwidth cutback using the method of minimum-time optimal control with constrained control in order to maintain the best performance that is possible with the reduced control authority. Other bandwidth cutback logic, such as one that preserves the commanded direction of the bandwidth or favors a preferred direction when the commanded direction cannot be achieved, is also discussed. In this extended abstract, a simplistic example is proved to demonstrate the idea. In the final paper, test results on the high fidelity 6-DOF X-33 model with severe dispersions will be presented.

Zhu, J. J.↗

STS-102 Photo-op/Suit-up/Depart O&C/Launch Discovery On Orbit/Landing/Crew Egress

The spacecrews of STS-102 and the Expedition 1 and 2 crews of the International Space Station (ISS) are seen in this video, which presents an overview of their activities. The crew consists of Commander Jim Wetherbee, Pilot James Kelly, and Mission Specialists Andrew Thomas, and Paul Richards. The sections of the video include: Photo-op, Suit-up, Depart O&C, Ingress, Launch with Playbacks, On-orbit, Landing with Playbacks, and Crew Egress & Departs. The prelaunch activities are explained by two narrators, and the crew members are assisted in the White Room just before boarding the Space Shuttle Discovery. Isolated views of the shuttle's launch include: VAB, PAD-B, DLTR-3, UCS-23 Tracker, PATRICK IGOR, UCS-10 Tracker, Grandstand, Tower-1, OTV-160, OTV-170, OTV-171, and On-board Camera. The video shows two extravehicular activities (EVAs) to perform work on the ISS, one by astronauts Helms and Voss from Expedition 2, and another by Richards and Thomas. The attachment of the Leonardo Multipurpose Logistics Module, a temporary resupply module, is shown in a series of still images. The on-orbit footage also includes a view of the Nile River, and a crew exhange ceremony between Expedition 1 (Commander Yuri Gidzenko, Flight Engineer Sergei Krikalev) and Expedition 2 (Commander Yury Usachev, Flight Engineers James Voss, Susan Helms). Isolated views of the landing at Kennedy Space Center include: North Runway Camera, VAB, Tower-1, Mid-field, Midfield IR, Tower-2, and UCS-12 IR. The Crew Transfer Vehicle (CTV) for unloading the astronauts is shown, administrators greet the crew upon landing, and Commander Wetherbee gives a briefing.

Source record↗

STS-105/Discovery/ISS 7A.1: Pre-Launch Activities, Launch, Orbit Activities and Landing

The crew of Space Shuttle Discovery on STS-105 is introduced at their pre-launch meal and at suit-up. The crew members include Commander Scott Horowitz, Pilot Rick Sturckow, and Mission Specialists Patrick Forrester and Daniel Barry, together with the Expedition 3 crew of the International Space Station (ISS). The Expedition 3 crew includes Commander Frank Culbertson, Soyuz Commander Vladimir Dezhurov, and Flight Engineer Mikhail Tyurin. When the astronauts depart for the launch pad in the Astrovan, their convoy is shown from above. Upon reaching the launch pad, they conduct a walk around of the shuttle, display signs for family members while being inspected in the White Room, and are strapped into their seats onboard Disciovery. The video includes footage of Discovery in the Orbiter Processing Facility, and some of the pre-launch procedures at the Launch Control Center are shown. The angles of launch replays include: TV-1, Beach Tracker, VAB, Pad A, Tower 1, UCS-15, Grandstand, OTV-70, Onboard, IGOR, and UCS-23. The moment of docking between Discovery and the ISS is shown from inside Discovery's cabin. While in orbit, the crew conducted extravehicular activities (EVAs) to attach an experiments container, and install handrails on the Destiny module of the ISS. The video shows the docking and unloading of the Leonardo Multipurpose Logistics Module (MPLM) onto the ISS. The deployment of a satellite from Discovery with the coast of the Gulf of Mexico in the background is shown. Cape Canaveral is also shown from space. Landing replays include VAB, Tower 1, mid-field, South End SLF, North End SLF, Tower 2, Playalinda DOAMS, UCS-23, and Pilot Point of View (PPOV). NASA Administrator Dan Goldin meets the crew upon landing and participates in their walk around of Discovery. The video concludes with a short speech by commander Horowitz.

Source record↗

Mobile Sensor Technologies Being Developed

The NASA Glenn Research Center is developing small mobile platforms for sensor placement, as well as methods for communicating between roving platforms and a central command location. The first part of this project is to use commercially available equipment to miniaturize an existing sensor platform. We developed a five-circuit-board suite, with an average board size of 1.5 by 3 cm. Shown in the preceding photograph, this suite provides all motor control, direction finding, and communications capabilities for a 27- by 21- by 40-mm prototype mobile platform. The second part of the project is to provide communications between mobile platforms, and also between multiple platforms and a central command location. This is accomplished with a low-power network labeled "SPAN," Sensor Platform Area Network, a local area network made up of proximity elements. In practice, these proximity elements are composed of fixed- and mobile-sensor-laden science packages that communicate to each other via radiofrequency links. Data in the network will be shared by a central command location that will pass information into and out of the network through its access to a backbone element. The result will be a protocol portable to general purpose microcontrollers satisfying a host of sensor networking tasks. This network will enter the gap somewhere between television remotes and Bluetooth but, unlike 802.15.4, will not specify a physical layer, thus allowing for many data rates over optical, acoustical, radiofrequency, hardwire, or other media. Since the protocol will exist as portable C-code, developers may be able to embed it in a host of microcontrollers from commercial to space grade and, of course, to design it into ASICs. Unlike in 802.15.4, the nodes will relate to each other as peers. A demonstration of this protocol using the two test bed platforms was recently held. Two NASA modified, commercially available, mobile platforms communicated and shared data with each other and a central command location. Web-based control and interrogation of similar mobile sensor platforms have also been demonstrated. Expected applications of this technology include robotic planetary exploration, astronaut-to-equipment communication, and remote aerospace engine inspections.

FROM↗

James Webb Space Telescope XML Database: From the Beginning to Today

The James Webb Space Telescope (JWST) Project has been defining, developing, and exercising the use of a common eXtensible Markup Language (XML) for the command and telemetry (C&T) database structure. JWST is the first large NASA space mission to use XML for databases. The JWST project started developing the concepts for the C&T database in 2002. The database will need to last at least 20 years since it will be used beginning with flight software development, continuing through Observatory integration and test (I&T) and through operations. Also, a database tool kit has been provided to the 18 various flight software development laboratories located in the United States, Europe, and Canada that allows the local users to create their own databases. Recently the JWST Project has been working with the Jet Propulsion Laboratory (JPL) and Object Management Group (OMG) XML Telemetry and Command Exchange (XTCE) personnel to provide all the information needed by JWST and JPL for exchanging database information using a XML standard structure. The lack of standardization requires custom ingest scripts for each ground system segment, increasing the cost of the total system. Providing a non-proprietary standard of the telemetry and command database definition formation will allow dissimilar systems to communicate without the need for expensive mission specific database tools and testing of the systems after the database translation. The various ground system components that would benefit from a standardized database are the telemetry and command systems, archives, simulators, and trending tools. JWST has exchanged the XML database with the Eclipse, EPOCH, ASIST ground systems, Portable spacecraft simulator (PSS), a front-end system, and Integrated Trending and Plotting System (ITPS) successfully. This paper will discuss how JWST decided to use XML, the barriers to a new concept, experiences utilizing the XML structure, exchanging databases with other users, and issues that have been experienced in creating databases for the C&T system.

Gal-Edd, Jonathan↗

In-Flight Validation of a Pilot Rating Scale for Evaluating Failure Transients in Electronic Flight Control Systems

Engineering development and qualification of a Research Flight Control System (RFCS) for the Rotorcraft Aircrew Systems Concepts Airborne Laboratory (RASCAL) JUH-60A has motivated the development of a pilot rating scale for evaluating failure transients in fly-by-wire flight control systems. The RASCAL RFCS includes a highly-reliable, dual-channel Servo Control Unit (SCU) to command and monitor the performance of the fly-by-wire actuators and protect against the effects of erroneous commands from the flexible, but single-thread Flight Control Computer. During the design phase of the RFCS, two piloted simulations were conducted on the Ames Research Center Vertical Motion Simulator (VMS) to help define the required performance characteristics of the safety monitoring algorithms in the SCU. Simulated failures, including hard-over and slow-over commands, were injected into the command path, and the aircraft response and safety monitor performance were evaluated. A subjective Failure/Recovery Rating (F/RR) scale was developed as a means of quantifying the effects of the injected failures on the aircraft state and the degree of pilot effort required to safely recover the aircraft. A brief evaluation of the rating scale was also conducted on the Army/NASA CH-47B variable stability helicopter to confirm that the rating scale was likely to be equally applicable to in-flight evaluations. Following the initial research flight qualification of the RFCS in 2002, a flight test effort was begun to validate the performance of the safety monitors and to validate their design for the safe conduct of research flight testing. Simulated failures were injected into the SCU, and the F/RR scale was applied to assess the results. The results validate the performance of the monitors, and indicate that the Failure/Recovery Rating scale is a very useful tool for evaluating failure transients in fly-by-wire flight control systems.

Kalinowski, Kevin F.↗

Pointing compensation system for spacecraft instruments

A closed loop system reduces pointing errors in one or more spacecraft instruments. Associated with each instrument is a electronics package (3) for commanding motion in that instrument and a pointing control system (5) for imparting motion in that instrument in response to a command (4) from the commanding package (3). Spacecraft motion compensation logic (25) compensates for instrument pointing errors caused by instrument-motion-induced spacecraft motion. Any finite number of instruments can be so compensated, by providing each pointing control system (5) and each commanding package (3), for the instruments desired to be compensated, with a link to the spacecraft motion compensation logic (25). The spacecraft motion compensation logic (25) is an electronic manifestation of the algebraic negative of a model of the dynamics of motion of the spacecraft. An example of a suitable model, and computer-simulated results, are presented.

Plescia, Carl T.↗