Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Clay”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Polymer Retention Evaluation in a Heavy Oil Sand for a Polymer Flooding Application on Alaska’s North Slope

For a polymer flooding field trial in a heavy oil reservoir on Alaska’s North Slope, polymer retention is a key parameter. Because of the economic impact of retention, this parameter was extensively studied using field core material and conditions. Several important findings were noted. Polymer retention based on effluent viscosity measurements can be overestimated unless the correct (non-linear) relation between polymer concentration and viscosity is used. Polymer degradation (either mechanical or oxidative) can also lead viscosity-based measurements to overestimate retention. Inaccessible pore volume (IAPV) can be overestimated if insufficient brine is flushed through the sand between polymer banks. Around 100 pore volumes (PV) of brine may be needed to displace mobile polymer to approach a true residual resistance factor and properly measure IAPV. Even for a sand pack with kwsor = 20 mD, IAPV was zero for HPAM with molecular weight (Mw) of 18 million g/mol. Fine-grain particles (<20 μm) strongly impacted polymer retention values. Native NB#1 sand with a significant component of particles <20 μm exhibited 290 μg/g, while the same sand exhibited 28 μg/g after these small particles were removed. Polymer retention did not necessarily correlate with mineral composition. The NB#1, NB#3, and OA sands had similar elemental and clay compositions, but the NB#1 sand exhibited ~10 times higher retention than the NB#3 sand. Polymer retention did not necessarily correlate with permeability. NB#1 sand exhibited much higher retention than OA sand, even though NB#1 sand was twice as permeable as OA sand. No evidence of chromatographic separation of HPAM molecular weights was found in our experiments. Although retention tended to be greater without a residual oil saturation (than at Sor), the effect was not strong. Aging a core (with high oil saturation) at 60°C reduced HPAM retention by a factor of two. As expected, under similar conditions, polymer retention was greater for a higher Mw HPAM (18 million g/mol) than for a lower Mw HPAM (10-12 million g/mol). In many cases with high polymer retention values (e.g., 240 μg/g), polymer arrival at the end of the core was relatively quick, but achieving the injected concentration occurred gradually over many pore volumes. This effect was not due chromatographic separation of polymer molecular weights. Results from modeling of this behavior was consistent with concentrationdependent polymer retention. The form assumed for the retention function in a simulator can have an important impact on the timing and magnitude of the oil response from a polymer flood. Field-based observations can underestimate polymer retention, depending on when the tracer and polymer concentrations were measured and the assumptions made about reservoir heterogeneity.

Wang, Dongmei↗

Literature Review and Experimental Observations of the Effects of Salinity, Hardness, Lithology, and ATBS Content on HPAM Polymer Retention for the Milne Point Polymer Flood

Summary At the Milne Point polymer flood (North Slope of Alaska), polymer retention is dominated by the clay, illite. Illite, and kaolinite cause no delay in polymer propagation in Milne Point core material, but they reduce the effective polymer concentration and viscosity by a significant amount (e.g., 30%), thus reducing the efficiency of oil displacement until the full injected polymer concentration is regained [which requires several pore volumes (PVs) of throughput]. This work demonstrates that polymer retention on illite is not sensitive to monovalent ion concentration, but it increases significantly with increased divalent cation concentration. The incorporation of a small percentage of acrylamido tertiary butyl sulfonic acid (ATBS) monomers into hydrolyzed polyacrylamide (HPAM) polymers is shown to dramatically reduce retention. The results are discussed in context with previous literature reports. Bridging adsorption was proposed as a viable mechanism to explain our results. Interestingly, an extensive literature review reveals that polymer retention (on sands and sandstones) is typically only modestly sensitive to the presence of oil. Extensive examination of the literature on inaccessible pore volume (IAPV) suggests the parameter was commonly substantially overestimated, especially in rock/sand more permeable than 500 md (which comprises the vast majority of existing field polymer floods).

Engineering↗

Geochemical Impact of Acid Spearhead and Slickwater Stimulation on Wolfcamp Shale from the Hydraulic Fracturing Test Site

The Hydraulic Fracturing Test Site 1 (HFTS-1) was a field study performed in the Wolfcamp Formation in the West Texas Permian (Midland) Basin, USA, with a focus on improving the efficiency of hydraulic fracturing. Investigating site-specific rock-fluid geochemical interactions during hydraulic fracturing is an important step to understanding the impact on formation shale porosity, permeability, and long-term shale gas production. During field operations in this region, hydraulic fracturing fluid (HFF) injection usually starts with a concentrated acid spearhead for rapid rock dissolution, followed by the injection of near-neutral pH slickwater containing chemicals and proppants. A multistep sequential injection approach was used to investigate different stages of rock-fluid interactions. The carbonate content in the host rock is important when acid spearhead is considered, as carbonate mineral dissolution is rapid and can result in porosity and permeability changes in the shale matrix. Here, in this study, we designed flow-through experiments using fractured carbonate-rich and clay-rich Wolfcamp shale cores with (1) a short-time acid soaking step and (2) a long-term slickwater flow-through step to simulate the injection method used at HFTS-1. The fluid chemistry was analyzed. A thorough mineralogical progression [e.g., Calcium (Ca) dissolution and iron (Fe) redox progression] in the cores during HFF injection was also characterized and imaged by synchrotron microprobe. Reactive transport modeling was performed based on the experimental setup. The results showed that the acid spearhead is a crucial step in creating a reaction front by mineral dissolution, especially in carbonate-rich shales. A slight layer of ferrihydrite precipitated during the slickwater flow-through period. This study provides insights into potential geochemical impact due to hydraulic fracturing operations in the Permian Basin.

clastic rock↗

Data Report: X-Ray Diffraction of Sediments from Green Canyon Block 955, Gulf of Mexico

We performed 18 X-ray diffraction (XRD) measurements on sediment samples acquired at Holes H002 (6 samples) and H005 (12 samples) during the UT-GOM2-1 Expedition in Green Canyon Block 955, in the northern Gulf of Mexico. Results indicate a predominance of quartz, with significant proportions of alkali feldspar and carbonate, and minor amounts of amphibole, micas, and clays.

03 NATURAL GAS↗

Partitioning of Complex Fluids at Mineral Surfaces

This report summarizes the results obtained during the LDRD project entitled "Partitioning of Complex Fluids at Mineral Interfaces." This research addressed fundamental aspects of such interfaces, which are relevant to energy-water applications in the subsurface, including fossil energy extraction and carbon sequestration. This project directly addresses the problem of selectivity of complex fluid components at mineral-fluid interfaces, where complex fluids are defined as a mixture of hydrophobic and hydrophilic components: e.g., water, aqueous ions, polar/nonpolar organic compounds. Specifically, this project investigates how adsorption selectivity varies with surface properties and fluid composition. Both experimental and molecular modeling techniques were used to better understand trends in surface wettability on mineral surfaces. The experimental techniques spanned the macroscale (contact angle measurements) to the nanoscale (cryogenic electronic microscopy and vibrational spectroscopy). We focused on an anionic surfactant and a well-characterized mineral phase representative of clay phases present in oil- and gas-producing shale deposits. Collectively, the results consistently demonstrate that the presence of surfactant in the aqueous fluid significantly affects the mineral-fluid interfacial structure. Experimental and molecular modeling results reveal details of the surfactant structure at the interface, and how this structure varies with surfactant coverage and fluid composition.

04 OIL SHALES AND TAR SANDS↗

Evaluation of Engineered Barrier Systems FY20 Report

This report describes research and development (R&D) activities conducted during fiscal year 2020 (FY20) specifically related to the Engineered Barrier System (EBS) R&D Work Package in the Spent Fuel and Waste Science and Technology (SFWST) Campaign supported by the United States (U.S.) Department of Energy (DOE). The R&D activities focus on understanding EBS component evolution and interactions within the EBS, as well as interactions between the host media and the EBS. A primary goal is to advance the development of process models that can be implemented directly within the Generic Disposal System Analysis (GDSA) platform or that can contribute to the safety case in some manner such as building confidence, providing further insight into the processes being modeled, establishing better constraints on barrier performance, etc. The FY20 EBS activities involved not only modeling and analysis work, but experimental work as well. Despite delays to some planned activities due to COVID-19 precautions, progress was made during FY20 in multiple research areas and documented in this report as follows: (1) EBS Task Force: Task 9/FEBEX Modeling Final Report: Thermo-Hydrological Modeling with PFLOTRAN, (2) preliminary sensitivity analysis for the FEBEX in-situ heater test, (3) cement-carbonate rock interaction under saturated conditions: from laboratory to modeling, (4) hydrothermal experiments, (5) progress on investigating the high temperature behavior of the uranyl-carbonate complexes, (6) in-situ and electrochemical work for model validation, (7) investigation of the impact of high temperature on EBS bentonite with THMC modeling, (8) sorption and diffusion experiments on bentonite, (9) chemical controls on montmorillonite structure and swelling pressure, (10) microscopic origins of coupled transport processes in bentonite, (11) understanding the THMC evolution of bentonite in FEBEX-DP—coupled THMC modeling, (12) modeling in support of HotBENT, an experiment studying the effects of high temperatures on clay buffers/near-field, and (13) high temperature heating and hydration column test on bentonite.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NNSA-IAEC Science Area V Environmental ISR: Waste Management and Subsurface Science (Final Report FY18-FY20)

In August 2017, the U.S. National Nuclear Security Administration (NNSA) and the Israel Atomic Energy Commission (IAEC) launched a joint waste management program to evaluate the feasibility of siting a radioactive waste repository at intermediate depths in Israel. The bilateral collaboration involves three National Laboratories (LLNL, LANL, and Sandia), and the Nuclear Research Center, Negev, Geological Survey of Israel, and Ben Gurion University in Israel. This research is designed to assist with the evaluation of locations for an intermediate nuclear waste repository in Israel. This final report is a high-level summary of the results from the past three years by the team that worked on the WM-2: Radionuclide colloid-facilitated transport in fractured carbonate rock project for Science Area V, Environmental ISR: Subsurface Science and Waste Management. We have completed all of our tasks and met all of our milestones. MW-2 had three integrated tasks. Task 1 was laboratory experiments investigating colloid transport of radionuclides in natural fractured carbonate rocks from the Avdat formation, Israel. Task 2 was field experiments injecting radionuclide analogues pre-sorbed to clay colloids into fractured carbonate rock, and task 3 was numerical modeling of laboratory and field experimental results to assess the importance of colloids in the migration of relevant radionuclides. This task was incorporated into tasks 1 and 2. A 4 th task was initiated in FY20, to investigate the role of organics in facilitating radionuclide transport under the same conditions explored in task 1 due to the high organic content of the rocks being investigated for the immediate borehole locations. Preliminary results will be summarized here and the work will continue in FY21-23. The overall objective of this research is to evaluate the role of colloids (naturally occurring < 1 micron particles) in facilitating the transport of long-lived radionuclides from a nuclear waste repository situated in fractured carbonate rocks. Currently little data exists on radionuclide transport in carbonate rocks, but this is the main rock type available for siting a repository in Israel. Laboratory experiments were carried out in both Israel and the U.S., field experiments have taken place in Israel, and reactive transport modeling involved LLNL, LANL and Israel partner institutions. LLNL hosted a graduate student, Emily Tran, from Ben Gurion University in FY18 and FY19 and much of the work presented here was part of her PhD research.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DECOVALEX-2019 (Task B Final Report)

The DECOVALEX Project is an on-going international research collaboration, established in 1992, to advance the understanding and modeling of coupled Thermal (T), Hydrological (H), Mechanical (M) and Chemical (C) processes in geological in geological systems. DECOVALEX was initially motivated by the recognition that prediction of these coupled effects is an essential part of the performance and safety assessment of geologic disposal systems for radioactive waste and spent nuclear fuel. This document is the final report of Task B which was proposed and coordinated by the Swiss Federal Nuclear Safety Inspectorate (ENSI) and Lawrence Berkeley National Laboratory (LBNL), presenting the technical definitions of the problems studied, approaches applied, achievements made and outstanding issues for future research. Task B focused mainly on modelling of fault activation experiments (FS experiment) recently performed at the Mont Terri underground research laboratory, Switzerland. The FS experiment explores the coupling between fault reactivation in a clay host rock and the potential-enhanced fluid displacement through a previously low-permeability formation. Based on this experiment, the DECOVALEX-2019 Task B addresses how the change in permeability induced by the fault activation and the resulting fluid flow within the fault can be simulated including the dependence on its mechanical behavior. This will support the understanding of the processes during fault activation itself and it can help to determine consequences for contaminant transport due to potentially created permeable flow paths in otherwise low permeability argillaceous rocks.

58 GEOSCIENCES↗

Low-Temperature Plasma Treatment for Enhanced Recovery of Highly Valued Critical REEs from Coal (Final Technical Report)

The principle objective of this project was to develop a novel process flowsheet using low-temperature plasma treatment (LTP) integrated with conventional hydrometallurgical processes to recover rare earth elements (REEs), especially highly valued REEs (i.e. scandium and critical REEs), from coal and coal byproducts. LTP treatment was used to pretreat the solid feed material prior to leaching in an effort to improve the leaching characteristics of the REEs and potentially reduce acid consumption. Initially, a detailed experimental program was performed on a laboratory LTP furnace to identify a set of process parameter values to be used for assessing the enhanced leaching performance achieved on four specific gravity fractions of West Kentucky No. 13 and Fire Clay coarse coal refuse materials. High-temperature oxidation (HTO)) was also evaluated as a means for improving REE leachability on the same fractions of both coal sources. The lixiviants used to assess leachability improvements included i) untreated water, ii) 0.1 M ammonium sulfate solution and iii) 1.2 M sulfuric acid solution at a temperature of 75°C. The laboratory data was used to develop multiple process flow sheets using HTO only to produce a rare earth oxide mix concentrate or utilizing both LTP and HTO treatment processes to generate a high purity heavy REO mix concentrate and a light REO mix concentrate. A techno-economic analysis was performed on each circuit.

01 COAL, LIGNITE, AND PEAT↗

Integrated Multiphysics Modeling of Environmentally Assisted Brittle Fracture

Brittle materials, such as cement, compose major portions of built infrastructure and are vulnerable to degradation and fracture from chemo-mechanical effects. Currently, methods of modeling infrastructure do not account for the presence of a reactive environment, such as water, on the acceleration of failure. Here, we have developed methodologies and models of concrete and cement fracture that account for varying material properties, such as strength, shrinkage, and fracture toughness due to degradation or hydration. The models have been incorporated into peridynamics, non-local continuum mechanics methodology, that can model intersecting and branching brittle fracture that occurs in multicomponent brittle materials, such as concrete. Through development of new peridynamic capabilities, decalcification of cement and differential shrinkage in clay-cement composites have been evaluated, along with exemplar problems in nuclear waste cannisters and wellbores. We have developed methods to simulate multiphase phenomena in cement and cement-composite materials for energy and infrastructure applications.

36 MATERIALS SCIENCE↗

Sensitivity Analysis Comparisons on Geologic Case Studies: An International Collaboration

Over the past four years, an informal working group has developed to investigate existing sensitivity analysis methods, examine new methods, and identify best practices. The focus is on the use of sensitivity analysis in case studies involving geologic disposal of spent nuclear fuel or nuclear waste. To examine ideas and have applicable test cases for comparison purposes, we have developed multiple case studies. Four of these case studies are presented in this report: the GRS clay case, the SNL shale case, the Dessel case, and the IBRAE groundwater case. We present the different sensitivity analysis methods investigated by various groups, the results obtained by different groups and different implementations, and summarize our findings.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spectral Induced Polarization-Biogeochemical Relationships for Remediation Amendment Monitoring

Geophysical tools such as electrical resistivity (ER) can indirectly monitor subsurface changes in response to remedial injections. These methods exhibit relatively low spatial resolution compared to sediment core characterization but are advantageous due to the ability to collect measurements non-intrusively over time across large volumes of the subsurface. Moreover, along with confirmatory groundwater or core sampling, geophysical methods can be used during active biogeochemical remedies to monitor short-term contaminant transformations and mobility, as well as part of an overall strategy for long-term monitoring of subsurface contaminated sites. The use of alternating current spectral induced polarization (SIP) provides significantly more information than conventional geophysical methods like direct current ER. SIP allows for monitoring changes in both solution and surface conductivity by separation of real and imaginary conductivity, respectively, as well as surface capacitance. In principle, SIP can measure indicators of remedy progression such as precipitation reactions that sequester contaminants, potentially providing a better indication of amendment delivery and reactivity as compared to conventional ER methods. However, multiple processes and material properties have overlapping (interacting) electrical responses across a range of frequencies. Hence, the purpose of this scoping study was to evaluate if SIP can be used to monitor (a) amendment delivery and (b) precipitation and reactivity of amendments under consideration at Hanford. SIP measurements were collected in fully saturated columns packed with sand and Hanford formation sediments containing (a) amendments that were highly conductive with significant capacitance (zero valent iron – ZVI, sulfur modified iron – SMI) and (b) amendments that exhibited low electrical conductivity with a small capacitance (calcite, apatite, bismuth). The sand was a quartz material with homogenous particle size that exhibited a relatively low surface conductivity. It was used as a control for comparison with the sediments from the Hanford Site, which have a greater surface conductivity because of their complex mineralogy and heterogeneous particle size distribution and may have complex interactions with amendments. The amendment mass fraction was varied to represent the different stages and subsurface locations associated with the delivery of a remedy. The primary objective was to identify the solution and solid surface changes associated with the delivery amendments and their secondary reactions within the subsurface. The figure below summarizes results for the amendments tested through this project. The SIP phase shift or imaginary conductivity change for the high conductivity amendments was more than 10 times that of the low conductivity amendments, highlighting the relative ease of detection of ZVI and SMI independent of the background signal from sand or Hanford sediments. The ZVI phase shift and imaginary conductivity changes occur primarily at high frequency (> 100 Hz) whereas SMI changes were at low frequency (0.01 to 10 Hz). SIP signals of SMI also increased over time and the maximum shifted to lower frequencies. The low conductivity amendments (calcite, abiotic and biotic apatite, bismuth subnitrate) exhibited relatively small phase and imaginary conductivity changes when added to sediments. The changes were above minimum detection limits (0.5 mrad for phase shift, 0.03 µS/cm for imaginary conductivity) for the highest concentration except for the commercial bismuth material. The lowest amendment concentration that can be detected is likely sediment specific, as minerals in sediments (clays, magnetite, Fe-oxides) have some capacitance and, therefore, exhibit a variable phase shift.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HFTS-1 Natural Joint Data and Engineering Summary

This report provides an analysis of engineering and geologic data collected from the Hydraulic Fracturing Test Site #1 (HTSF-1) project in the southern Midland Basin, Reagan County, Texas. The site is being studied as part of the Science-informed Machine Learning for Accelerating Real-Time Decisions in Subsurface Applications (SMART) Initiative at the National Energy Technology Laboratory (NETL). The data collected is intended to provide a basis of understanding of the site and to construct simulation models. This report provides a summary analysis of the engineering and geologic data collected from the project to provide a basis of understanding of the site and to construct simulation models. The report examines various possible correlations in engineering properties based on natural fracture data from the program, which consisted of 11 horizontal wells, one vertical well, and one slant well. The horizontal wells are in two horizons: 1) Upper and 2) Middle Wolfcamp formations. Program data include: fracture frequency and fracture orientation data from four core runs in a slant well; fracture spacing and orientation from a vertical pilot well; laboratory triaxial testing and mineralogical determinations; and porosity results from magnetic resonance analyses from various wells, together with observations based on the data collection. In addition, available references were reviewed on the site for additional insights. As the focus of the report is on the natural system, hydraulic fracture data from the site were not examined in detail in this report. Data variability is the chief observation in examination of the database. Fracture frequency in the slant well can range from sections with values as high as five fractures per ft to sections up to 100+ ft in length with no natural observed fractures. Fracture spacing across is typically less than 10 ft, but can range up to hundreds of feet. Apparent fracturing shows the trends in two predominate orientations, E-SW and WNW-ESE, but minor variations exist. The rock units vary across the site from siliceous mudstones to calcareous mudstones, showing a general layering with depth. The laboratory properties such as strength and modulus show no apparent trend with depth, but appear to correlate with rock mineralogy with high strength and modulus values where calcium content is high. In addition, an attempt to examine variability and mineralogy on a larger scale was made using a color-coded system based on gamma ray measurements. A staged colored approach was adopted, presuming that lower gamma ray values indicate higher value of calcium content (blue scale) and that higher gamma ray values indicate higher clay mineral content (orange scale). As provided in report appendices, the system correlated well with visual examination of the slant core and the petrofabric analyses of the vertical pilot well. The results showed large variability in mineral content along the horizontal plane across the site. The change in mineral content was also rapid, on a scale less than that of the average hydraulic fracture stage length of about 180 ft.

42 ENGINEERING↗

Strategies to Recover Easily-Extractable Rare Earth Elements and Other Critical Metals from Coal Waste Streams and Adjacent Rock Strata Using Citric Acid

Maximum rare earth element (REE) extractability from a sample of Middle Kittanning coal seam underclay was previously demonstrated at ~30% of the total REE content with a citric acid solution (Montross et al., 2020). This report further refines the mechanisms of citrate application for leaching of coal seam underclays using an organic acid lixiviant and evaluates strategies to begin to scale this process to industrially relevant volumes. This study evaluates the suitability of citrate leaching solutions for downstream recovery and separation of the REEs via oxalic acid precipitation. The applicability of citric acid solutions to recover ion-adsorbed metals from clay surfaces was evaluated by leaching a prepared sample of kaolinite with known amounts of ion-adsorbed lanthanum. Citrate systematics was further defined through experiments varying the solution pH. Up-scaling investigations proceeded with percolation leaching columns and stirred tank reactors. Two embodiments were run in percolation leaching: a continuous flow-through process and a multi-stage saturated process. The results showed that in certain limited scenarios, low pH citrate solutions could be used to target REEs mineralized within secondary calcium phosphate minerals. Results from the upscaling attempts encountered difficulties in extraction efficiencies. For the percolation columns, hydrodynamic flow was insufficient to recover the extractable REE content fully. For the stirred barrels, mixing inefficiencies likely inhibited the extractability of the REEs. Oxalic acid precipitation experiments also highlighted difficulties in downstream operations. The REEs were removed from the citrate solution with high efficiency, but were accompanied by equally efficient removal of calcium in orders of magnitude of greater amounts. Overall, for citrate leaching to be effective, future studies will have to: 1) carefully consider the feedstock application (i.e., likely better suited for secondary mineralization of calcium phosphate minerals), and 2) overcome the technical barriers of large-scale processing, such as inefficient hydrodynamic regimes due to small crush sizes needed and difficulties in downstream separation and purification. Alternatively, citrate solutions may be better recommended as leaching amendments to other leaching solutions to enhance REE complexation in the solution.

01 COAL, LIGNITE, AND PEAT↗

Development of an Extremely Durable Concrete (EDC) - A Novel approach coupling Chemistry and Autogenous Crack Width Control (Final Report)

Concrete cracking is a challenging issue and a constant threat to the durability of modern physical infrastructure. It is most commonly produced by mechanical loading and environmental deformations endured under field conditions, and structural deterioration accelerates at large crack widths. There is an urgent need for dramatic reductions in O&M cost, energy use, and emissions for infrastructure. The goal of this project is to fundamentally design an Extremely Durable Concrete (EDC) with a life expectancy at least five times that of current concrete by deploying a coupled micromechanical and chemical approach in material design. EDC is expected to embody an autogenously tight crack width (<50μm), high ductility (>3%), and stable chemistry using a green binder based on Limestone Calcined Clay Cement (LC3), which together will produce a resilient formulation with self-healing capability.

36 MATERIALS SCIENCE↗

Decoding Zeolite Crystallization and Stage III in Nuclear Waste Glasses by Coupled Modeling and Experiments

Under specific conditions of pH and temperature, nuclear waste immobilization borosilicate glasses may exhibit a sudden acceleration in their corrosion kinetics (stage III)—a behavior that has been associated with the formation of zeolite crystals. Such accelerated dissolution may compromise the integrity of nuclear wasteforms placed in geological depositories. However, thus far, none of the available models is able to predict the thermodynamic propensity and kinetics of zeolite precipitation as a function of the solution conditions due to (i) a lack of fundamental knowledge regarding the nucleation & growth mechanisms of zeolitic phases, (ii) uncertainty regarding the compositions (types) of zeolites that may form and the rate-limiting step in their precipitation as a function of the solution conditions, and (iii) the complexities that arise due to the vast parametric space (i.e., solution chemistry, temperature, number of secondary phases, etc.) that encompass these systems under conditions of environmental exposure. To resolve these challenges, this project aimed to unambiguously identify the thermodynamic propensity for zeolite precipitation and the kinetics thereof as a function of the solution conditions (composition, pH, and temperature). To achieve this goal: 1) We identified the solution conditions and zeolite phases relevant to nuclear glass dissolution. 2) We performed a series of ab initio molecular dynamics (AIMD) simulations to compute the thermodynamic properties of a group of characteristic zeolites that features a large range of compositions, various hydration levels, a wide range of framework structures, and partial atomic site occupancies. 3) We released a first-of-a-kind self-consistent thermodynamic database that can be used to assess the kinetics and the stability fields of zeolitic phases within a Gibbs energy minimization (GEM) framework. 4) We developed a robust geochemical modeling method allowing us to predict the stability of secondary phases (including zeolites, calcium–silicate–hydrate gels, and clays) upon the dissolution of nuclear waste immobilization glasses. 5) We introduced a model that predicts the dissolution kinetics of a series of borosilicate nuclear waste immobilization glasses in terms of the topology of their atomic network. 6) We investigated the roles of the solution composition on the crystallization kinetics of phillipsite zeolites and tobermorite silicate hydrates. Via PNNL’s collaboration and engagement, this project directly supports DOE’s nuclear waste immobilization activities by offering a technical, science-based foundation that will (i) facilitate predictions of the long-term corrosion rates and extents of existing nuclear waste immobilization glasses to help ensure safe and successful vitrification operations, (ii) inform the development of advanced glass formulations with enhanced durability, and, (iii) enable cost-savings that result from making more decisive and hence less conservative predictions while offering higher levels of nuclear waste embedment in smaller, more compact glass volumes.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NETL Plastic Pipes Project - June 2022 Progress Report

Plastic or composite pipelines have been the bane of the utility locating industry because conduits are neither conductive nor magnetic, which are the properties traditionally used to locate buried utilities. Ground penetrating radar (GPR) is an effective geophysical tool for locating plastic/composite pipeline where the resistive cover allows for adequate penetration of radar energy. However, GPR cannot be used in areas where the soil cover is conductive due to significant clay and/or salt content. This study takes a comprehensive look at near-surface geophysical methods that potentially are useful for locating buried plastic/composite pipelines, either singly or in combination with other geophysical methods. Specifically, this modeling study uses computational numerical methods to forward model the response of GPR, resistivity, seismic, and gravity gradiometry methods to plastic/composite pipelines for various scenarios including: (1) pipe diameters ranging between 2 in. to 12 in.; (2) burial depths ranging between 3 ft to 4 ft; (3) various degrees in contrast in physical properties (i.e., permittivity, elasticity, electrical resistivity, density); and (4) various experimental acquisition choices (e.g., GPR radar frequencies, seismic source frequency, electrode spacing).

47 OTHER INSTRUMENTATION↗

Demonstration of Scaled-Production of Rare Earth Oxides and Critical Materials from U. S. Coal-Based Sources (Final Report)

The project objective was to demonstrate scaled production of high purity rare earth oxides (REO), nominally exceeding 90% grade, from coal refuse sources using innovative technologies that reduce cost and improve environmental outcomes relative to traditional rare earth processing technologies. The project utilized a critical material pilot plant constructed and tested as part of a previous U.S. Department of Energy project. Target performance criteria was a 50% reduction in production cost based on previous optimum values, 150% increase in recovery and greater than 2% concentrates of rare earth oxides, cobalt and manganese. Concentrate production goals were to produce a rare earth mix oxide product at a rate of 200 grams per day having a minimum purity of 50% as well as products of cobalt and manganese having a minimum purity of 2%. A previous pilot plant investigation identified acid cost as the major contributor to an operating cost that made the recovery of rare earth and other critical metals from bituminous coal sources economically challenging. As such, acid cost reduction was a major target using bio-oxidation reactors to produce sulfuric acid from naturally occurring coal pyrite. Based on laboratory data, a bio-oxidation circuit was designed for the pilot plant to produce 7.5 l/min of acid using two 11-m3 (3000 gallon) reactors equipped with 40 hp aerators for air dispersion. The pilot-scale tests revealed that acid concentration equivalent to as high as 1.0 M sulfuric acid could be continuously produced. However, the bio-acid contained exceptionally high iron concentrations, which complicated downstream processing of the pregnant leach solution (PLS). A TEA of the bio-oxidation circuit showed that production cost was approximately $0.13 per kg acid equivalent if produced using a four-day retention time in the reactors. This value represents a 48% reduction from that of purchased bulk sulfuric acid. Calcination (or roasting) studies were conducted on coarse refuse from West Kentucky No. 13 and Fire Clay coal seam sources. The test results revealed the potential to increase recovery by nearly 100% using temperatures between 500°C to 700°C with light REE recovery value being the most improved. Acid baking of the calcined products using sulfuric acid at 250°C increased heavy rare earth recovery from around 40% to 80% while decreasing the acid requirements by over 50%. The existing pilot plant was upgraded for the pilot scale demonstration of REE and CM recovery. The primary feedstocks were West Kentucky No.13 and heap leach pregnant leach solution (PLS) while a secondary feedstock was a lignite waste material from a construction sand operation. The pilot scale operation started with PLS generation through leaching followed by iron and aluminum removal, nominally at 3.3 and 4.5 pH, respectively. Leaching lixiviants used for the test were industrial grade sulfuric acid or bio-acid generated at the pilot scale facility. For most of the tests, the solid feed rate was 200 lb/hr whereas lixiviant was added at 2 gpm to provide an optimal residence time of 45 minutes. Following the contaminant removal step, several different process schematics were tested with the goal of maximizing REE recovery and purity. In the first test, direct processing of aluminum precipitation raffinate for REE recovery using oxalic acid at pH 1.5 was investigated. Overall REE recovery was approximately 45%. Unfortunately, elevated calcium content in the PLS significantly impacted the RE-Oxide product grade. Similarly, high calcium content decreased both the product purity and grades of CM products. As such, a new flowsheet was tested with the same initial process schematic but different precipitation stages for REEs and CMs at pH 6.0 and 9.0, respectively. It was noted that the overlapping precipitation behavior of Co, Ni and Zn with REEs limited the applicability of this process schematic. While this change increased the RE-Oxide grade from 36% in the first test to 87%, the loss of critical metals to the REE cake and bypass of the REEs to the CM cake significantly impacted the recovery of both REEs and CMs. Therefore, the modified process flowsheet combined oxalic acid precipitation stage raffinate and redissolved CM cake filtrate to maximize both the recovery and purity of the products. Consequently, a RE-Oxide product with 85% purity and CM cakes with over 19% Co, 38% Ni, 14% Zn and 9% Mn content were generated with significantly higher recoveries. While the modified process flowsheet improved recoveries and grades, elemental losses observed in separate precipitation and redissolution losses inspired the adaptation of a single precipitation stage at pH 9.0 for both REEs and CMs. This change was anticipated to maximize the REE recovery while minimizing the costs associated with separated redissolution and processing stages. As expected, REE recovery in this new circuit arrangement was over 56% with a product grade of over 87% RE-Oxide content. Similarly, Co, Ni, Mn, and Zn recoveries of 54%, 40%, 67%, and 66%, respectively, were achieved. Unfortunately, the elevated calcium content present in the solution due to its precipitation at pH 9.0 caused a decrease in the CM cake quality. Therefore, the final process flowsheet involved the addition of calcium oxalate precipitation following the oxalic acid precipitation stage, which effectively eliminated calcium contamination of the CM products. Finally, the pilot scale experiments conducted using bio-acid achieved comparable REE leaching recoveries to the conventional sulfuric acid leaching. Elevated iron concentration in the solution caused the co-precipitation of REEs with the iron and aluminum cake, resulting in the REE losses. Furthermore, elevated iron content bypassing the iron and aluminum precipitation stages contaminated the metal sulfide and manganese cake, respectively. A techno-economic analysis was performed based on a commercial facility capable of treating 500 tph of coal-based material. The production cost for West Kentucky No. 13 coarse refuse material ranged from approximately $500-$700/kg of total rare earth oxide whereas the lignite source had significantly lower production cost of $100-$300/kg. The significant difference in cost was due to the easier leaching characteristics of the lignite material and the higher feed concentrations. All process scenarios resulted in a negative net present value (NPV). For the lignite feedstock, laboratory REE leach recovery values were about 30% higher than the pilot plant data. Using the lab leach results, a positive net present value was achieved and the production cost decreased from $100-$300 $/kg to less than $150/kg of total REO.

01 COAL, LIGNITE, AND PEAT↗