Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Space Acceleration Measurement System (SAMS)/Orbital Acceleration Research Experiment (OARE)

The Life and Microgravity Spacelab (LMS) payload flew on the Orbiter Columbia on mission STS-78 from June 20th to July 7th, 1996. The LMS payload on STS-78 was dedicated to life sciences and microgravity experiments. Two accelerometer systems managed by the NASA Lewis Research Center (LERC) flew to support these experiments, namely the Orbital Acceleration Research Experiment (OARE) and the Space Acceleration Measurements System (SAMS). In addition, the Microgravity Measurement Assembly (NOAA), managed by the European Space Research and Technology Center (ESA/ESTEC), and sponsored by NASA, collected acceleration data in support of the experiments on-board the LMS mission. OARE downlinked real-time quasi-steady acceleration data, which was provided to the investigators. The SAMS recorded higher frequency data on-board for post-mission analysis. The MMA downlinked real-time quasi-steady as well as higher frequency acceleration data, which was provided to the investigators. The Principal Investigator Microgravity Services (PIMS) project at NASA LERC supports principal investigators of microgravity experiments as they evaluate the effects of varying acceleration levels on their experiments. A summary report was prepared by PIMS to furnish interested experiment investigators with a guide to evaluate the acceleration environment during STS-78, and as a means of identifying areas which require further study. The summary report provides an overview of the STS-78 mission, describes the accelerometer systems flown on this mission, discusses some specific analyses of the accelerometer data in relation to the various activities which occurred during the mission, and presents plots resulting from these analyses as a snapshot of the environment during the mission. Numerous activities occurred during the STS-78 mission that are of interest to the low-gravity community. Specific activities of interest during this mission were crew exercise, radiator deployment, Vernier Reaction Control System (VRCS) reboost, venting operations, Flight Control System (FCS) checkout, rack excitation, operation of the Life Sciences Laboratory Equipment Refrigerator/Freezer (LSLE R/F), operation of the JSC Projects Centrifuge, crew sleep, and attitude changes. The low-gravity environment related to these activities is discussed in the summary report.

Hakimzadeh, Roshanak↗

RHETT/EPDM Performance Characterization

The 0.6 kW Electric Propulsion Demonstration Module (EPDM) flight thruster system was tested in a large vacuum facility for performance measurements and functional checkout. The thruster was operated at a xenon flow rate of 3.01 mg/s, which was supplied through a self-contained propellant system. All power was provided through a flight-packaged power processing unit, which was mounted in vacuum on a cold plate. The thruster was cycled through 34 individual startup and shutdown sequences. Operating periods ranged from 3 to 3600 seconds. The system responded promptly to each command sequence and there were no involuntary shutdowns. Direct thrust measurements indicated that steady state thrust was temperature sensitive, and varied from a high of 41.7 mN at 16 C, to a low of 34.8 mN at 110 C. Short duration thruster firings showed rapid response and good repeatability.

Haag, T.↗

The Development of a User Inclusion Strategy for CLCS Display Design

This report summarizes a ten week effort to evaluate the software development process in the Checkout and Launch Control System (CLCS) for the presence of user inclusion in the design operation. A background is presented that highlights the value of achieving usability through user inclusion, progress-to-date is described, and future work is suggested so that a user inclusive design environment can be accomplished.

Jacko, Julie A.↗

A Real-Time Telemetry Simulator of the IUS Spacecraft

A real-time telemetry simulator of the IUS spacecraft has recently entered operation to train Flight Control Teams for the launch of the AXAF telescope from the Shuttle. The simulator has proven to be a successful higher fidelity implementation of its predecessor, while affirming the rapid development methodology used in its design. Although composed of COTS hardware and software, the system simulates the full breadth of the mission: Launch, Pre-Deployment-Checkout, Burn Sequence, and AXAF/IUS separation. Realism is increased through patching the system into the operations facility to simulate IUS telemetry, Shuttle telemetry, and the Tracking Station link (commands and status message).

Drews, Michael E.↗

Performance of Nickel-Cadmium Batteries on the POES Series of Weather Satellites

The advanced Television Infrared Observation satellite program is a cooperative effort between the National Aeronautics and Space Administration (NASA), the National Oceanic and Atmospheric Administration (NOAA), the United Kingdom, Canada and France, for providing day and night global environmental and associated data. NASA is responsible for procurement launch, and checkout of these spacecraft before transferring them over to NOAA, who operates the spacecraft to support weather forecasting, severe storm tracking, and 'meteorological research by the National Weather Service. These spacecraft with all weather monitoring instruments imposed challenging requirements for the onboard electrical power subsystem (EPS). This paper provides first a brief overview of the overall power subsystem, followed by a description of batteries. A unique power subsystem design which provides 'tender-loving-care' to these batteries is highlighted. This is followed by the on-orbit maintenance and performance data of the batteries since launch.

Rao, Gopalakrishna M.↗

Initial Flight Results of the TRMM Kalman Filter

The Tropical Rainfall Measuring Mission (TRMM) spacecraft is a nadir pointing spacecraft that nominally controls attitude based on the Earth Sensor Assembly (ESA) output. After a potential single point failure in the ESA was identified, the contingency attitude determination method chosen to backup the ESA-based system was a sixth-order extended Kalman filter that uses magnetometer and digital sun sensor measurements. A brief description of the TRMM Kalman filter will be given, including some implementation issues and algorithm heritage. Operational aspects of the Kalman filter and some failure detection and correction will be described. The Kalman filter was tested in a sun pointing attitude and in a nadir pointing attitude during the in-orbit checkout period, and results from those tests will be presented. This paper will describe some lessons learned from the experience of the TRMM team.

Andrews, Stephen F.↗

Real-Time Sensor Validation, Signal Reconstruction, and Feature Detection for an RLV Propulsion Testbed

A real-time system for validating sensor health has been developed in support of the reusable launch vehicle program. This system was designed for use in a propulsion testbed as part of an overall effort to improve the safety, diagnostic capability, and cost of operation of the testbed. The sensor validation system was designed and developed at the NASA Lewis Research Center and integrated into a propulsion checkout and control system as part of an industry-NASA partnership, led by Rockwell International for the Marshall Space Flight Center. The system includes modules for sensor validation, signal reconstruction, and feature detection and was designed to maximize portability to other applications. Review of test data from initial integration testing verified real-time operation and showed the system to perform correctly on both hard and soft sensor failure test cases. This paper discusses the design of the sensor validation and supporting modules developed at LeRC and reviews results obtained from initial test cases.

Jankovsky, Amy L.↗

STS-95 Day 09 Highlights

On this ninth day of the STS-95 mission, the flight crew, Cmdr. Curtis L. Brown, Pilot Steven W. Lindsey, Mission Specialists Scott E. Parazynski, Stephen K. Robinson, and Pedro Duque, and Payload Specialists Chiaki Mukai and John H. Glenn, spend a good part of their day checking out important spacecraft systems for entry and landing. The commander and pilot begin the flight control system checkout by powering up one auxiliary power unit and evaluating the performance of aerodynamic surfaces and flight controls. The flight crew conducts a reaction control system hot fire, followed by a test of the communications system.

Source record↗

Model-Based Fault Diagnosis for Turboshaft Engines

Tests are described which, when used to augment the existing periodic maintenance and pre-flight checks of T700 engines, can greatly improve the chances of uncovering a problem compared to the current practice. These test signals can be used to expose and differentiate between faults in various components by comparing the responses of particular engine variables to the expected. The responses can be processed on-line in a variety of ways which have been shown to reveal and identify faults. The combination of specific test signals and on-line processing methods provides an ad hoc approach to the isolation of faults which might not otherwise be detected during pre-flight checkout.

Green, Michael D.↗

STS-88 Day 02 Highlights

On this second day of the STS-88 mission, the flight crew, Commander Robert D. Cabana, Pilot Frederick W. Sturckow, and Mission Specialists Nancy J. Currie, James H. Newman, Jerry L. Ross, and Sergei Krikalev are awakened with the song "Get Ready" by the Temptations. Ross and Newman perform a checkout of the SAFER or Simplified Aid for EVA Rescue unit. SAFER is a mini maneuvering system that can provide self-rescue capability for a spacewalker if they inadvertently become separated from the spacecraft during a spacewalk. The crew then downlinks video taken inside the crew cabin during their ascent to orbit.

Source record↗

Principal Investigator Microgravity Services: USMP-3

Two accelerometers provided acceleration data during the STS-75 mission in support of the third United States Microgravity Payload (USMP-3) experiments. The Orbital Acceleration Research Experiment (OARE) and the Space Acceleration Measurement System (SAMS) provided a measure of the microgravity environment of the Space Shuttle Columbia. The OARE provided investigators with quasi-steady acceleration measurements after about a six hour time lag dictated by downlink constraints. SAMS data were downlinked in near-real-time and recorded on-board for post-mission analysis. These two accelerometer systems are briefly described. Using a combination of data analysis techniques, the microgravity environment related to several different Orbiter, crew, and experiment operations is presented and interpreted. The microgravity environment represented by SAMS and OARE data is comparable to the environments measured by these instruments on earlier microgravity science missions. Thruster activity on this mission seen in the SAMS data appear to be more frequent than on other microgravity missions with the combined firings of the F5L and F5R jets producing significant acceleration transients. Of the events studied, the crew activities performed in the middeck and flight deck, SPREE table rotations, a waste collection system compaction, and a fuel cell purge had negligible effects on the microgravity environment of the USMP-3 carriers. The Ku band antenna repositioning activity resulted in a brief interruption of the ubiquitous 17 Hz signal in the SAMS data. In addition, the auxiliary power unit operations during the Flight Control System checkout appeared to have a significant impact on the microgravity environment.

Rogers, Melissa J. B.↗

Work on Planetary Atmospheres and Planetary Atmosphere Probes

A summary final report of work accomplished is presented. Work was performed in the following areas: (1) Galileo Probe science analysis, (2) Galileo probe Atmosphere Structure Instrument, (3) Mars Pathfinder Atmosphere Structure/Meteorology instrument, (4) Mars Pathfinder data analysis, (5) Science Definition for future Mars missions, (6) Viking Lander data analysis, (7) winds in Mars atmosphere Venus atmospheric dynamics, (8) Pioneer Venus Probe data analysis, (9) Pioneer Venus anomaly analysis, (10) Discovery Venus Probe Titan probe instrument design, and (11) laboratory studies of Titan probe impact phenomena. The work has resulted in more than 10 articles published in archive journals, 2 encyclopedia articles, and many working papers. This final report is organized around the four planets on which there was activity, Jupiter, Mars, Venus, and Titan, with a closing section on Miscellaneous Activities. A major objective was to complete the fabrication, test, and evaluation of the atmosphere structure experiment on the Galileo probe, and to receive, analyze and interpret data received from the spacecraft. The instrument was launched on April 14, 1989. Calibration data were taken for all experiment sensors. The data were analyzed, fitted with algorithms, and summarized in a calibration report for use in analyzing and interpreting data returned from Jupiter's atmosphere. The sensors included were the primary science pressure, temperature and acceleration sensors, and the supporting engineering temperature sensors. Computer programs were written to decode the Experiment Data Record and convert the digital numbers to physical quantities, i.e., temperatures, pressures, and accelerations. The project office agreed to obtain telemetry of checkout data from the probe. Work to extend programs written for use on the Pioneer Venus project included: (1) massive heat shield ablation leading to important mass loss during entry; and (2) rapid planet rotation, which introduced terms of motion not needed on Venus. When the Galileo Probe encountered Jupiter, analysis and interpretation of data commenced. The early contributions of the experiment were to define (1) the basic structure of the deep atmosphere, (2) the stability of the atmosphere, (3) the upper atmospheric profiles of density, pressure, and temperature. The next major task in the Galileo Probe project was to refine, verify and extend the analysis of the data. It was the verified, and corrected data, which indicated a dry abiabatic atmosphere within measurement accuracy. Temperature in the thermosphere was measured at 900 K. Participation in the Mars atmospheric research included: (1) work as a team member of the Mars Atmosphere Working Group, (2) contribution to the Mars Exobiology Instrument workshop, (3) asssistance in planning the Mars global network and (4) assitance in planning the Soviet-French Mars mission in 1994. This included a return to the Viking Lander parachute data to refine and improve the definition of winds between 1.5 and 4 kilometer altitude at the two entry sites. The variability of the structure of Mars atmosphere was addressed, which is known to vary with season, latitude, hemisphere and dust loading of the atmosphere. This led to work on the Pathfinder project. The probe had a deployable meteorology mast that had three temperature sensors, and a wind sensor at the tip of the mast. Work on the Titan atmospheric probe was also accomplished. This included developing an experiment proposal to the European Space Agency (ESA), which was not selected. However, as an advisor in the design and preparation of the selected experiment the researcher interacted with scientist on the Huygens Probe Atmosphere Structure Experiment. The researcher also participated in the planning for the Venus Chemical Probe. The science objectives of the probe were to resolve unanswered questions concerning the minor species chemistry of Venus' atmosphere that control cloud formation, greenhouse effectiveness, and the thermal structure. The researcher also reviewed problems with the Pioneer Venus Probe, that caused anomalies which occurred on the Probes at and below 12.5 km level of the Venus' atmosphere. He convened and participated in a workshop that concluded the most likely hardware cause was insulation failure in the electrical harness outside the Probes' pressure vessels. It was discovered that the shrink tubing material failed at 600K. This failure could explain the anomalies experienced by the probes. The descent data of the Pioneer probes, and the Soviet Vega Lander was analyzed to evaluate the presence of small scale gravity waves in and below the Venus cloud layer.

Lester, Peter↗

On-Orbit Performance of the TRMM Mission Mode

This paper presents an overview of the Tropical Rainfall Measuring Mission (TRMM) Attitude Control System along with detailed in-flight performance results of the TRMM Mission mode. The TRMM spacecraft is an Earth-pointed, zero momentum bias satellite launched on November 27, 1997 from Tanegashima Space Center, Japan. TRMM is a joint mission between NASA and the National Space Development Agency of Japan designed to monitor and study tropical rainfall and the associated release of energy. Prior to calibration, the spacecraft attitude showed larger Sun sensor yaw updates than expected. This was traced to not just sensor misalignment but also to a misalignment between the two heads within each Sun sensor. In order to avoid alteration of the flight software, Sun sensor transfer function coefficients were determined to minimize the error due to head misalignment. This paper describes the design, on-orbit checkout, calibration and performance of the TRMM Mission Mode with respect to the mission level requirements.

Robertson, Brent↗

[X-33 Launch and Landing Facilities]

Sverdrup is responsible for the design, construction and activation of the X-33 Flight Operations Center at Edwards Air Force Base and for providing assistance in activating the X-33 Landing Sites. The past year has seen the completion of the construction of the X-33 Flight Operations Center. Construction was completed in December of 1998, with systems checkout and testing continuing into early 1999. Integration of the site with LMCMS and other partner-supplied systems began in December and will continue through rollout of the X-33 vehicle. The construction of the X-33 Launch Complex has been performed within the Edwards AFB and Air Force Research Laboratory (AFRL) systems with no substantial interference to either parties. A high level of cooperation exists between Sverdrup, Edwards AFB, and the Air Force Research Laboratory in the areas of access, training, security, and operations. There have been no conflicts between programs that have not been accommodated. Development of the landing sites is progressing with many of the modifications necessary underway. GSE commitments are in place. The personnel training program developed by Sverdrup for persons entering the launch site construction areas, was modified by Lockheed for use in training and access control to the Center during flight operations to maximize safety and minimize intrusion upon the environment. Close cooperation between Sverdrup, the construction workers, and the environmental biologist permitted construction to proceed in a timely fashion without harm to the wildlife, in particular, the Desert Tortoise. Although the entire X-33 site encompasses approximately 50 acres including a new access road, only the areas directly impacted by the construction were cleared to minimize the impact on the environment. A total of about 30 acres was actually disturbed.

Source record↗

Testing of a Spray-Bar Zero Gravity Cryogenic Vent System for Upper Stages

The capability to vent in zero gravity without resettling is a fundamental technology need that involves practically all uses of subcritical cryogenics in space. Venting without resettling would extend cryogenic orbital transfer vehicle capabilities. However, the lack of definition regarding liquid/ullage orientation coupled with the somewhat random nature of the thermal stratification and resulting pressure rise rates, lead to significant technical challenges. Typically a zero gravity vent concept, termed a thermodynamic vent system (TVS), consists of a tank mixer to destratify the propellant, combined with a Joule- Thomson (J-T) valve to extract then-nal energy from the propellant. In a cooperative effort, Marshall Space Flight Center's (MSFC's) Multipurpose Hydrogen Test Bed (N4HTB) was used to test a unique "spray bar" TVS system developed by Boeing. A schematic of this system is included in Figure 1. The system consists of a recirculation pump, a parallel flow concentric tube, heat exchanger, and a spray bar positioned close to the longitudinal axis of the tank. In the mixing mode, the recirculation pump withdraws liquid from the tank and sprays it radially into the tank liquid, ullage, and exposed tank surfaces. When energy extraction is required, a small portion of the recirculated liquid is passed sequentially through the J-T expansion valve, the spray bar heat exchanger element, and is vented overboard. The vented vapor cools the circulated bulk fluid, thereby removing thermal energy and reducing tank pressure. Figure 2 is a plot of ullage pressure (P4) and liquid vapor pressure (PSAI) versus time. The pump operates alone, cycling on and off, to destratify the tank liquid and ullage until the liquid vapor pressure reaches the lower set point. At that point, the J-T valve begins to cycle on and off with the pump. Thus, for short duration missions, only the mixer may operate, thus minimizing or even eliminating boil-off losses. The primary advantage of the spray bar configuration is that pressure reduction is achieved independent of liquid and vapor location, thereby enhancing the applicability of normal gravity test data to zero gravity conditions. The in-tank components are minimized with the proposed TVS design. Because the recirculation pump is external to the tank, no electrical power penetration of the tank is required for pump or valve operation. This is especially desirable for L02 tanks since the presence of an electrical ignition source in oxygen represents a critical failure mode. Also, since the critical components (pump, motor, valve, orifice) are external to the tank, system checkout and ground servicing/replacement are easier. For zero-g operation, component replacement external to the tank may be a significant benefit. In addition to satisfying the zero g TVS design objectives, the TVS concept tested offers additional benefits to the integrated subcritical cryogenic storage and launch system.

Lak, Tibor↗

STS-96 FD Highlights and Crew Activities Report: Flight Day 10

On this tenth day of the STS-96 Discovery mission, the flight crew, Commander Kent V. Rominger, Pilot Rick D. Husband, and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette, and Valery Ivanovich Tokarev are seen making final preparation for their return to Earth. Rominger Husband, and Ochoa checkout the flight control systems, perform hot-fired tests and verify the performance of Discovery's small steering jets. Jernigan and Tokarev stow all the equipment used in the mission. Payette deploys a small student-built payload called STARSHINE. The crew also tests all the communications channels.

Source record↗

Testing of the Strutjet RBCC Engine

The testing of the Strutjet Rocket-Based Combined Cycle (RBCC) engine is described in this presentation. Since 1996 Aerojet has conducted thousands of tests on its Strutjet RBCC Engine. The Strutjet is specifically designed as an RBCC engine. The tests included: (1) Inlet, (2) Rocket Checkouts, (3) Direct Connect Mach 6 and 8, and (4) Freejet M = 0, 2.4, 4.1. The modes tested include: (1) Air Augmented Rocket (AAR), (2) Ramjet (3) Scramjet (4) Scram/Rocket (5) Ascent/Rocket. The Strutjet RBCC engine has been tested across the complete airbreathing trajectory. The presentation shows the results of the tests, through diagrams, charts and pictures.

Bulman, Mel↗

Pre-Launch Noise Characterization of the Landsat-7 Enhanced Thematic Mapper Plus (ETM Plus)

A noise characterization of the Landsat-7 Enhanced Thematic Mapper Plus (ETM+) instrument was performed as part of a near-real time performance assessment and health monitoring program. Perl'ormance data for the integrated Landsat-7 spacecraft and ETM+ were collected before, during, and after the spacecraft thermal vacuum testing program at the Lockheed Martin Missiles and Space (LMMS) facilities in Valley Forge, PA. The Landsat-7 spacecraft and ETM+ instrument were successfully launched on April 15, 1999. The spacecraft and ETM+ are now nearing the end of the on orbit engineering checkout phase, and Landsat-7 is expected to be declared operational on or about July 15, 1999. A preliminary post-launch noise characterization was performed and compared with the pre-launch characterization. In general the overall noise levels in the ETM+ are at or below the specification levels. Coherent noise is seen in most bands, but is only operationally significant when imaging in (he panchromatic band (band 8). This coherent noise has an amplitude as high as approximately 3 DN (peak-to-peak, high gain) at the Nyquist rate of 104 kHz, and causes the noise levels in panchromatic band images at times to exceed the total noise specification by up to approximately 10%. However, this 104 kHz noise is now much weaker than it was prior to the successful repair of the ETM+ power supplies that was completed in May 1998. Weak and stable coherent noise at approximately 5 kHz is seen in all bands in the prime focal plane (bands 1-4 and 8) with the prime (side A) electronics. Very strong coherent noise at approximately 20 kHz is seen in a few detectors of bands 1 and 8, but this noise is almost entirely in the turn-around region between scans when the ETM+ is not imaging the Earth. Strong coherent noise was seen in 2 detectors of band 5 during some of the pre-launch testing; however, this noise seems to be temperature dependent, and has not been seen in the current on orbit environment. Strong 91 kHz coherent noise was observed in the redundant (side B) panchromatic band data after the completion of spacecraft thermal vacuum testing. The cause of this coherent noise was identified as a failed capacitor that was replaced prior to launch, and this noise has not been seen on orbit.

Pedelty, J. A.↗