Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Can Resilience Assessments Inform Early Design Human Factors Decision-making?

There is a growing call among researchers for tighter coupling between human factors and human reliability assessments. In this research, we explore if early design stage resilience assessments can help bridge some of the gaps between human factors and human reliability assessments. Resilience in systems is their ability to recover reasonably and operate within acceptable bounds during failures and unexpected events. The fmdtools toolkit allows designers to assess the resilience of a system by modeling the human error and machine-related failure propagation in both nominal and faulty scenarios during the early design stages. As a result, the fmdtools toolkit has a low-fidelity dynamic human reliability assessment component built into it. In this paper, we study if the results from the fmdtools simulations can help inform and prioritize human factors design decision-making, resulting in tighter coupling between human factors and human reliability assessments during the design process. Specifically, we explore the results from a rover design example to understand the types of information that can help guide human factor-related decision-making.

Resilience-based Design↗

Connecting Federal Agencies to Satellite Earth Observations: NASA’s Satellite Needs Working Group Assessment Process

The Satellite Needs Working Group (SNWG), part of the U.S. Group on Earth Observations (USGEO), surveys agencies across the U.S. Government to identify the satellite Earth observations each agency needs to fulfill its high-priority objectives and responsibilities. Around 20 civilian agencies participate in the SNWG survey every two years. After receiving the surveys, the National Aeronautics and Space Administration (NASA) conducts an in-depth evaluation of each agency's needs in collaboration with fellow satellite Earth data providers, the National Oceanic and Atmospheric Administration (NOAA) and the U.S. Geological Survey (USGS). This assessment process, which takes place over an eight-month period, is divided into distinct phases. NASA first assembles an assessment team with the necessary subject matter expertise to evaluate each submitted need. An in-depth interview with each submitting agency then follows, featuring discussion of current and upcoming satellite missions as well as potential new activities that NASA, NOAA, and/or USGS could undertake to meet the agency's needs. The assessment teams then further evaluate these potential activities or solutions to identify how many agencies would benefit and estimate how much their level of satisfaction would increase. Solutions expected to have broad-reaching and significant agency benefits are proposed by NASA for funding. SNWG agencies receive an assessment report for each submitted need, in which the tri-agency assessment teams provide a detailed evaluation of the agency need, information on relevant satellite missions, and links to specific datasets or training resources. The SNWG Management Office at NASA’s Interagency Implementation and Advanced Concepts Team (IMPACT) contributes to NASA’s SNWG assessment in a variety of capacities, including statistical analysis of the survey responses to identify trends and similar needs across multiple agencies. The Management Office also provides analytics for the new proposed solutions, demonstrating and quantifying their potential value. For activities that receive funding, the Management Office manages the implementation process and works to maximize the benefit to SNWG agencies via a Stakeholder Engagement Program.

Katrina Virts↗

Independent Reliability Assessment of the Laser Transmitter for the ESA-NASA Laser Interferometer Space Antenna (LISA) Program

As part of the laser development process, NASA’s Goddard Space Flight Center (GSFC) requested support from the NASA Engineering and Safety Center (NESC) to independently assess the Technology Readiness Level (TRL) of the LISA Laser System (LS). The independent assessment included the following tasks: (a) assess the design for weaknesses and suggest improvements to mitigate risks, (b) assess the laser reliability plan for weaknesses and suggest improvements to mitigate risks and improve effectiveness, and (c) assess the current redundancy plan on laser subsystems for weaknesses and suggest improvements to mitigate risks and improve effectiveness. The presentation will focus on the assessment findings and the current development progress of the LISA laser to meet the mission requirements with a delivery of a form, fit, and functional TRL6 laser to the LISA mission by late 2023.

Laser Interferometry↗

Independent Technical Assessment of NASA and External Quantum Sensing Capability

The recent FY 2020 federal Research and Development Budget Priorities memo addresses the leadership need in Quantum Information Science (QIS) directing agencies to “prioritize QIS research and development (R&D), which will build the technical and scientific base necessary to explore the next generation of QIS theory, devices, and applications.” Quantum Sensing (QS) is an integral part of QIS. NASA is a key part of the directive to forward American space exploration and commercialization by providing “capabilities that have broad potential applications in space and on Earth.” QS provides an arena for NASA to demonstrate leadership in both areas of the administrative directive. QS uses quantum properties to achieve unprecedented measurement sensitivity and performance, including quantum-enhanced methodologies that outperform their classical counterparts. Typical quantum sensors exploit techniques such as atomic systems, matter waves, quantum entanglement, quantum superposition of states, quantum illumination methods, and manipulation of photons and atoms, in general. Guided by advancements in our ability to generate, manipulate, and control quantum systems, the emerging quantum sensing technologies promise unrivalled sensitivity, resolution, and precision, potentially leading to game-changing applications. Significant gains include technologies important for a range of NASA missions such as remote sensing, in situ measurements, metrology, interferometry, quantum communication, ranging, imaging, radar and lidar receivers, and gravity measurements. NASA Engineering and Safety Center has convened an independent external panel, comprising of Quantum Sensing Experts from Government, DoD, academia, and Federally funded Research and Development Center to conduct an independent technical assessment of the agency's capabilities in Quantum Sensing to understand NASA's internal needs and competencies related to Quantum Sensing and compare agency capabilities with those available externally including industry, academia, and other government agencies. The outcomes of the assessment will help the agency in establishing appropriate strategies and investments to develop and maintain the state-of-the-art sensing competence and capabilities required to meet the agency’s future needs. The External Experts Panel (EEP) is collaborating with HQ, various NASA Center and the representatives in the NASA Quantum Sensing Community of Practice (QS CoP), a part of NASA Sensors and Instrumentation Technical Fellow Technical Discipline Team, in obtaining common, current understanding of agency mission needs where QS can be an important enabler for future needs, and any programs, projects, assets, and technologists working in QS. The EEP organized a Quantum Sensing Workshop of practitioners from industry, academia, other government agencies, external experts, and interested NASA personnel to gather the assessment information. EEP also conducted information gathering on the industry at large, educational institutions, and other government agency research efforts for capture in the assessment database. At the conclusion of this assessment, EEP team will develop findings and conclusions describing NASA’s capabilities for the mission needs, NASA's relative position on new, enabling technologies, and an analysis of the gaps that may present any risks to near-term or far-term mission needs. This presentation will give details of the NASA and External Quantum Sensing Assessment outcomes, findings, observations, and its recommendation to NASA as how it can advance Quantum Sensing technologies and techniques for its science and explorations related missions.

External Quantum Sensing Capability↗

Assessment of High Resolution Commercial Satellite Geolocation Accuracy

Commercial companies such as Maxar, PlanetScope, and BlackSky have launched many satellites with revisit times ranging from two hours to one day and have built large archives of high resolution (1-3 m) Earth observing data. The high temporal resolution and global coverage of these satellites makes commercial satellite images ideal for scientists studying rapidly changing processes such as flooding and fires. A key step in assessing changes in these images is co-registration of various images to each other. High geolocation accuracy (at most 0.5 pixels of offset) allows for easy co-registration of images across different times and sensors. Here, we assess the latest PlanetScope imagery and evaluate it for geolocation accuracy. For our assessment, we compare the target image to a reference image with known geolocation accuracy (WorldView imagery) and determine the offset between these images by shifting them to maximize their Pearson Cross-Correlation (PCC) value. Offsets required to maximize the PCC give the geolocation accuracy of the target image relative to the reference image. Previously, our global assessment of Planet data revealed large variability in geolocation accuracy from one continent to another. The measured root mean squared errors (RMSEs) range from 5.4 m in North America to 14.9 m in Africa. We have updated this previous assessment to include both their newest SuperDove series as well as a more robust assessment of the temporal stability of PlanetScope's geolocation accuracy.

Alana G. Semple↗

Volumetric Assessment of UPRITE Exercises From Marker-Based Motion Capture

BACKGROUND Lack of volumetric data on full-body movement of exercises presents a challenge to ensuring the fit of crew member’s full range of motion on the International Space Station (ISS). The Upright Proprioception Retention via In-flight Training and Evaluation (UPRITE) is a sensorimotor countermeasure device designed for maintaining crew members’ proprioception in a microgravity environment. A footplate—attached to a static base—rotates in two degrees of freedom (pitch and roll) up to a 20 deg angle. An initial volumetric assessment assuming an upright standing posture produced a cone-like shape with a narrow bottom and wide top. Such general volumetric assessments risk creating an overly conservative volume estimate, taking up more space than is necessary on the already limited interior space of the ISS, and neglecting necessary volume due to oversimplifying assumptions. Rather, higher-fidelity volumetric assessments offer more comprehensive insights in an environment where every area counts. The main objective of this work is to provide the spatial parameters of exercises on the UPRITE such that it is placed on the ISS according to its volumetric demands or that usage is adjusted to fit the available space. METHODS In 2023, a data collection was performed originally to inform loads and dynamics of system use and was recently leveraged for volumetric assessment. Three human subjects representing different body types (~63-76 inches in stature) performed a variety of board manipulations using UPRITE with body weight offload. The test collected the 3D positional data of a modified full-body Plug-in Gait marker set [1] via a 16-camera OptiTrack MoCap system. After processing – filling marker gaps and trimming data – in OptiTrack Motive, the recorded marker location data, which included device markers, was exported to a readable trajectory file. To accurately represent the full volume defining landmarks, additional markers were digitally added to an unscaled Modified Full Body Model [2]. The model was then scaled according to its subject parameters upon which an inverse kinematics analysis was performed. A custom plugin yielded model marker location data files. Volumetric analyses were performed on the recorded trajectory and model trajectory files using a custom Python-built tool that extracted the marker location data and plotted it in a 3D space. Concerned with only the maximum volume of the motion, a 3D convex hull analysis was applied to the plot, extracting the vertices or external points of the eventual 3D CAD output, dubbed aptly as a “volume shell”. This overall approach was based on guidance in a NASA-STD-3001 Technical Brief [3]. RESULTS AND DISCUSSION Batch volumetric assessment on the exercises for each subject was performed, producing high-fidelity volume shells in minimal time. Preliminary results highlighted the value in higher-fidelity volumes based on collected data when possible. For example, revolving a single posture in the cone assessment would not have sufficiently captured a single leg stance; rather, it would need to involve swinging the leg both forward and back. Additional observations and the maximal dimensions of the volumes, including those based on scaled data for ISS anthropometric requirements, will be presented at the Human Research Program Investigator’s Workshop. CONCLUSIONS While this work’s primary objective was for the UPRITE-to-ISS integration, the tool built to conduct this analysis has wide applications for future exercise systems as an informational tool for optimal device placement. The tool and its findings also have implications for exercise device design and spacecraft interior considerations on Gateway, the Lunar Pressurized Rover, and beyond. REFERENCES [1] Bell, C. A., et al. (2023) Recent Improvements and Verification of a Full Body Model in OpenSim. NASA Human Research Program Investigator’s Workshop. https://ntrs.nasa.gov/citations/20230001080 [2] Lostroscio, K., et al (2023) The Digital Astronaut Simulation. AHFE International Conference on Human Factors in Design, Engineering, and Computing for All. [3] Exercise Overview. (2023) NASA-STD-3001 Technical Brief. https://www.nasa.gov/wp-content/uploads/2023/12/ochmo-tb-031-exercise-overview.pdf?emrc=9d454c?emrc=9d454c

L D Quinto↗

Mars Sample Return: Risk Management & Sample Safety Assessment

Returning samples from Mars has long been a major planetary science objective due to the high scientific value and transformative potential of the resulting data. An exciting dimension of this objective is the potential for the detection of ancient microbiological life, and the possibility of improving our understanding of the evolution of habitable environments on Mars and the development of life on Earth. To ensure that returned samples meet stringent planetary protection requirements and do not expose Earth to potential biohazards, the joint NASA/ESA Sample Receiving Project (SRP) assembled the Sample Safety Assessment Protocol Tiger Team (SSAP-TT). Members were recruited with the specific goal of creating a multi-disciplinary and internationally distributed team of experts in their respective fields across the federal government, academia, and private industry. This team was chartered with reassessing previous sample safety assessment strategies, defining what constitutes a biological hazard, developing a protocol to test for potential biohazards, and establishing a statistical framework to determine if samples are “safe” for release. The team developed a three-step protocol, supported by a Bayesian statistical framework, to assess whether returned samples contain potential biohazards that could present a risk to Earth’s biosphere. Initial conclusions indicated that an effective and comprehensive safety assessment protocol is feasible using modern techniques and does not require an excessive amount of sample consumption or traditional microbiological detection methodology. Herein, we will present an overview of the MSR SRP, the proposed safety assessment protocol, and how aspects of this novel approach can be applied to biological assessment in healthcare product manufacturing practices.

Alvin L Smith↗

Application of Direct Assessment Approaches and Methodologies to Cathodically Protected Nuclear Waste Transfer Lines

The U.S. Department of Energy's (DOE) Hanford Site is responsible for the safe storage, retrieval, treatment, and disposal of approximately 54 million gallons (204 million liters) of radioactive waste generated since the site's inception in 1943. Today, the major structures involved in waste management at Hanford include 149 carbon steel single-shell tanks, 28 carbon-steel double-shell tanks, plus a network of buried metallic transfer lines and ancillary systems (pits, vaults, catch tanks, etc.) required to store, retrieve, and transfer waste within the tank farm system. Many of the waste management systems at Hanford are still in use today. In response to uncertainties regarding the structural integrity of these systems,' an independent, comprehensive integrity assessment of the Hanford Site piping system was performed. It was found that regulators do not require the cathodically protected pipelines located within the Hanford Site to be assessed by External Corrosion Direct Assessment (ECDA) or any other method used to ensure integrity. However, a case study is presented discussing the application of the direct assessment process on pipelines in such a nuclear environment. Assessment methodology and assessment results are contained herein. An approach is described for the monitoring, integration of outside data, and analysis of this information in order to identify whether coating deterioration accompanied by external corrosion is a threat for these waste transfer lines.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing Technology Performance Level Assessments for Early-Stage Wave Energy Converter Technologies: Preprint

The advantage of using Technology Performance Level (TPL) in conjunction with Technology Readiness Level (TRL) assessments in guiding technology development trajectories to successful outcomes in less time, at less overall cost, and with less encountered risk has been well articulated in the literature. In partnership with industry and international collaborators, a TPL assessment methodology for grid-connected applications has been developed through the application of the systems engineering approach. Metrics under seven different categories have been developed, weighted based on their relative relevance, and combined to yield a composite score. The methodology has been implemented in a spreadsheet tool plus a web application specifically aimed at assessing early stage (TRL 1-3) concepts. The target use cases are (a) technology developers improving their design, to find fatal flaws early, to get feedback on current design, to identify areas of improvement that will yield the highest return on investment, (b) reviewers assessing technologies in competitions or for making funding decisions, (c) investor or project developer doing due diligence, (d) policy makers landscaping the technology domain for formulating R&D strategy. The methodology and the tools are undergoing continuous improvement based on the experience and lessons learnt from applying it to internal and external marine energy technology development projects. The methodology is also being adapted for assessing WECs servicing markets outside the continental grid - broadly categorized as Powering the Blue Economy (PBE) applications. Such applications have vastly different functional requirements entailing a modification of the methodology to account for their higher risk tolerance, reduced price sensitivities, lower power needs, different permitting protocols, etc. This paper presents the latest status of the TPL assessment methodology and tools, describes its adaptation to select PBE markets, and explores its extension to other domains where it could provide a comprehensive and holistic measure of a nascent or disruptive technology's technoeconomic performance potential.

metrics↗

Developing Technology Performance Level Assessments for Early-Stage Wave Energy Converter Technologies

The advantage of using Technology Performance Level (TPL) in conjunction with Technology Readiness Level (TRL) assessments in guiding technology development trajectories to successful outcomes in less time, at less overall cost, and with less encountered risk has been well articulated in the literature. In partnership with industry and international collaborators, a TPL assessment methodology for grid-connected applications has been developed through the application of the systems engineering approach. Metrics under seven different categories have been developed, weighted based on their relative relevance, and combined to yield a composite score. The methodology has been implemented in a spreadsheet tool plus a web application specifically aimed at assessing early stage (TRL 1-3) concepts. The target use cases are (a) technology developers improving their design, to find fatal flaws early, to get feedback on current design, to identify areas of improvement that will yield the highest return on investment, (b) reviewers assessing technologies in competitions or for making funding decisions, (c) investor or project developer doing due diligence, (d) policy makers landscaping the technology domain for formulating R&D strategy. The methodology and the tools are undergoing continuous improvement based on the experience and lessons learnt from applying it to internal and external marine energy technology development projects. The methodology is also being adapted for assessing WECs servicing markets outside the continental grid - broadly categorized as Powering the Blue Economy (PBE) applications. Such applications have vastly different functional requirements entailing a modification of the methodology to account for their higher risk tolerance, reduced price sensitivities, lower power needs, different permitting protocols, etc. This paper presents the latest status of the TPL assessment methodology and tools, describes its adaptation to select PBE markets, and explores its extension to other domains where it could provide a comprehensive and holistic measure of a nascent or disruptive technology's technoeconomic performance potential.

metrics↗

Uncertainties In Performance Assessments For The Yucca Mountain Site And The Edge-of-Compliance

Numerical performance assessments of deep geologic disposal systems of long-lived radioactive wastes serve as the primary tool for quantitatively assessing projected performance and for making regulatory compliance decisions, both in the U.S. and disposal programs abroad. However there is a significant body of opinion, expressed in the international literature, that the confidence that can be placed on such assessments decreases significantly as the analysis time frames increase into the many hundreds of thousands of years. With the inclusion of highly corrosion resistant metals in the planned waste package designs for the Yucca Mountain (YM) system commercial spent fuel and defense-generated high-level radioactive waste disposal, published projections for the site show doses to the receptor at times extending into the many hundreds of thousands of years. The question of relative confidence in dose projections becomes more important at very long time frames, particularly when the time frame for significant doses increases dramatically reflecting the effects of using highly corrosion resistant materials. To examine uncertainties in performance assessments of the YM disposal system over very long time frames, a site model developed by the U.S. Department of Energy to assess sensitivities in peak dose performance was modified and used to examine the propagation of uncertainties for a hypothetical disposal system. These analyses start with a hypothetical disposal system at the 'edge-of-compliance' at 10,000 years, reflecting the generic repository standard in 40 CFR Part 191. The hypothetical system was poised to give a mean dose of 0.15 milli-sievert/year (15 mrem/yr.) at 10,000 years, by allowing a fixed number of waste packages to 'fail' within the first 5,000 years after closure. By maintaining the number failed waste packages constant over time, the spread in dose estimates over the time to peak dose was calculated for this system perched at the 'edge-of-compliance' at 10,000 years. This hypothetical construct removes waste package performance from the analyses and allows the site model to explore the effects of uncertainties in the natural barrier and site conditions on the dose projections out to the time of peak dose. The sensitivities of these projections to various 'driver' parameters were examined, including infiltration rates, solubility constraints, water chemistry and roof collapse assumptions. Overall, the initial construct showed a one and one-half order of magnitude spread between the 5. and 95. percentiles at 10,000 years, the initial state for the analyses. This spread increased to approximately three and one-half orders of magnitude at peak dose, reflecting the effects of transport and retardation mechanisms on the fixed source term. The model eliminated portions of the transport path from the repository where relatively little retardation would be expected. Travel times were therefore significantly reduced thereby eliminating radioactive decay as an important mechanism in reducing projected doses. Solubility controls appear to be a major source of uncertainties in the dose projections for the model used. These results support the general international consensus that confidence in dose projections over very long time frames does decrease, and illustrates that this conclusion also applies to assessments of the YM projected performance as well. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of External Hazards at Radioactive Waste and Used Fuel Management Facilities - 13505

One of the key lessons from the Fukushima accident is the importance of having a comprehensive identification and evaluation of risks posed by external events to nuclear facilities. While the primary focus has been on nuclear power plants, the Canadian nuclear industry has also been updating hazard assessments for radioactive waste and used fuel management facilities to ensure that lessons learnt from Fukushima are addressed. External events are events that originate either physically outside the nuclear site or outside its control. They include natural events, such as high winds, lightning, earthquakes or flood due to extreme rainfall. The approaches that have been applied to the identification and assessment of external hazards in Canada are presented and analyzed. Specific aspects and considerations concerning hazards posed to radioactive waste and used fuel management operations are identified. Relevant hazard identification techniques are described, which draw upon available regulatory guidance and standard assessment techniques such as Hazard and Operability Studies (HAZOPs) and 'What-if' analysis. Consideration is given to ensuring that hazard combinations (for example: high winds and flooding due to rainfall) are properly taken into account. Approaches that can be used to screen out external hazards, through a combination of frequency and impact assessments, are summarized. For those hazards that cannot be screened out, a brief overview of methods that can be used to conduct more detailed hazard assessments is also provided. The lessons learnt from the Fukushima accident have had a significant impact on specific aspects of the approaches used to hazard assessment for waste management. Practical examples of the effect of these impacts are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

F-Tank Farm Performance Assessment Updates through the Special Analysis Process at Savannah River Site - 12169

The F-Area Tank Farm (FTF) is owned by the U.S. Department of Energy and operated by Savannah River Remediation, LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF is in the north-central portion of the SRS and occupies approximately 22 acres within F-Area. The FTF is an active radioactive waste storage facility consisting of 22 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. An FTF Performance Assessment (PA) was prepared to support the eventual closure of the FTF underground radioactive waste tanks and ancillary equipment. The PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified below for final closure of FTF. The FTank Farm is subject to a state industrial waste water permit and Federal Facility Agreement. Closure documentation will include an F-Tank Farm Closure Plan and tank-specific closure modules utilizing information from the performance assessment. For this reason, the State of South Carolina and the Environmental Protection Agency must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. The projected waste tank inventories in the FTF PA provide reasonably bounding FTF inventory projections while taking into account uncertainties in the effectiveness of future tank cleaning technologies. As waste is removed from the FTF waste tanks, the residual contaminants will be sampled and the remaining residual inventory is characterized. In this manner, tank specific data for the tank inventories at closure will be available to supplement the waste tank inventory projections currently used in the FTF PA. For FTF, the new tank specific data will be evaluated through the Special Analysis process. The FTF Special Analyses process will be utilized to evaluate information regarding the final residual waste that will be grouted in place in the FTF Tanks and assess the potential impact the new inventory information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. The purpose of this paper is to discuss the Special Analysis process and share insights gained while implementing this process. An example of an area of interest in the revision process is balancing continuous improvement versus configuration control of agreed upon methodologies. Other subjects to be covered include: 1) defining the scope of the revisions included in the Special Analysis, 2) determining which PA results should be addressed in the Special Analysis, and 3) deciding whether the Special Analysis should utilize more qualitative or quantitative assessments. For the SRS FTF, an FTF PA has been prepared to provide the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of FTF. The FTF Special Analyses process will be utilized to evaluate the impact new information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. In preparing SAs, it is crucial that the scope of the SA be well defined within the SA, since the specific scope will vary from SA to SA. Since the SAs are essentially addendums to the PA, the SA scope should utilize the PA as the baseline from which the SA scope is defined. The SA needs to focus on evaluating the change associated with the scope, and not let other changes interfere with the ability to perform that evaluation by masking the impact of the change. In preparing the SA, it is also important to let the scope determine whether the Special Analysis should utilize more qualitative or quantitative assessments and also which results from the PA should be addressed in the Special Analysis. These decisions can vary from SA and should not be predetermined. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhancing performance assessments using the ASCEM tool-set - 15222

The Office of Soil and Groundwater Remediation within the U.S. Department of Energy's Office of Environmental Management (EM) is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is an open source and modular computing framework that incorporates new advances and tools for predicting contaminant fate and transport in natural and engineered systems. ASCEM integrates modeling tools into a common work-flow that facilitates integrated approaches to modeling and site characterization, and enables robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project includes collaboration with end users engaged in performance assessments and subsurface simulation. Two working groups are engaged in performance assessment activities at the Hanford Site and Savannah River Site (SRS). The Hanford Site working group is focused on evaluating an alternative conceptual model that includes fine-scale heterogeneities. The baseline conceptual model for the performance assessment includes the large-scale stratigraphy at the site. The working group is applying the ASCEM tool-set to develop and evaluate alternative conceptual models and evaluate the effect of heterogeneities on long-term transport under rainfall-driven conditions. Because the heterogeneous models require long compute times due to increased model complexity, the simulations are implemented on a high-performance computing platform to reduce simulation times. The ASCEM Akuna work-flow enables efficient organization, simulation execution, and processing and visualization of results. Current performance assessments for waste tank closure at the SRS are limited to two-dimensional axi-symmetric representations. The SRS working group is collaborating with the site contractor to address technical review issues by resolving fine-scale tank features and simulating three-dimensional flow with Richards equation for selected closure scenarios using the ASCEM simulator, Amanzi. The Akuna tool-set is being applied to support model setup, sensitivity analysis, uncertainty quantification, and visualization. Both of the ASCEM working groups are addressing issues that cannot readily be evaluated with the existing tools. In these efforts, ASCEM is being used to provide technical underpinnings for ongoing performance assessments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of IAEA MODARIA II Program Working Group 1 on Assessment and Decision Making of Existing Exposure Situations for NORM and Nuclear Legacy Sites - 18308

The International Atomic Energy Agency (IAEA) launched the Modelling and Data for Radiological Impact Assessments (MODARIA) II Programme in October. As part of the IAEA effort to enhance the capabilities of its Member States in assessing radiological impacts of radionuclides released to the environment from sites that were not operated in accordance with current standards, and to ensure protection of the public and the environment, the MODARIA II Programme aims to: (1) test the performance of models developed for predicting the transfer of radionuclides in the environment and assessing radiological impacts to the public and the environment; (2) develop and improve models for particular environments and, where appropriate, to agree on data sets that are generally applicable for use in testing environmental transfer models; and (3) provide an international forum for the exchange of experiences, ideas and research information. The Programme will run for 3 years from 2016 to 2019. The Programme comprises seven working groups covering a wide range of topics (https://wwwns.iaea.org/projects/modaria/modaria2.asp?s=8 and l=129). MODARIA II Working Group 1 (WG1) is focused on dose assessment and decision making regarding existing exposure situations due to naturally occurring radioactive material (NORM) and nuclear legacy sites. WG1 was formed as a combination of two MODARIA I WGs: WG1 focused on application of decision-aiding tools in remediation; and WG3 focused on risk assessment for NORM and radioactively contaminated legacy sites (https://wwwns.iaea.org/projects/modaria/default.asp?s=8 and l=129). It was recognized that the decision-making needs will inform the scope of risk assessments, and the risk insights and structured decision analyses will aid in informed decision-making. Therefore, MODARIA II WG1 is focused on developing methods and toolsets for risk-informed decision-making for NORM and nuclear legacy sites, including demonstration of decision-making processes and tools through case studies. MODARIA II WG1 has 91 registered participants from 33 Member States and IAEA (as of November 2017), some 30 of whom are actively engaged in various collaborative research and development activities within WG1. Members of WG1 participated in the First Technical Meeting of MODARIA II, which was held in Vienna, Austria from 31 October to 4 November 2016. The group then held its First Interim Meeting in Brussels, Belgium from 26 to 30 June 2017, which included a field trip to the legacy Tessenderlo Chemie (TCH) Phosphate Processing Site. At this meeting, the TCH Site and the Pridneprovsky Chemical Plant (PChP) in Ukraine were selected for case studies. The Los Alamos National Laboratory (LANL) Material Disposal Area B in the USA and the Beaverlodge Uranium Mill and Mill Site in northern Canada were selected as examples for sharing of good practices and lessons learned in risk-informed decision-making for environmental remediation and land conveyance. At the Second Technical Meeting held in Vienna on 30 October to 3 November 2017, an additional NORM site for tin processing in Brazil was added to the case studies, with another NORM site in Yunnan, China included for consideration at the Second Interim Meeting of WG1. The Second Interim Meeting will be held in in early to mid-May, 2018. The group has also decided to prepare an Interim Report by October 2018 to document the WG1 discussions and analyses for the period of 2016-2018, which will be finalized at the conclusion of MODARIA II in October 2019. Initial assignments have been discussed for IM1 participants to collect data, conduct modelling and analyses, and prepare draft sections for the Interim Report. This paper will provide an overview of the work plans for WG1. It will also highlight some near-term activities that the group is currently working on. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MY EXES and EDM for Automated Remediation Data Quality Assessments - 19053

MY Electronic data exchange and Evaluation System (EXES) is a new web-based technology providing external admin access and full control to the Web-based EXES tool developed by GD for EPA for automated environmental remediation data quality assessments. EXES replaces most manual assessment processes, reducing remediation data review time and costs and ensuring that data are of known and documented quality. This tool is available from EPA to federal agencies and remediation firms and has successfully been used to support over 190 site investigations, 105 Remedial investigations and over 20 compliance monitoring efforts. The new MY EXES functionality has been developed for project managers and decision makers to setup projects, track receipt of environmental remediation monitoring data, assess data quality, and manage data. It is designed to be flexible and configurable to meet any government agency's data review and data management needs. It is accessible 24/7 through a secure portal. MY EXES efficiently evaluates analytical data regardless of the underlying method and data reporting requirements. It is a centralized project and data assessment tool that is scalable, flexible and configurable; improving data quality while reducing cost through the following: - Provides users with the ability to create a project and to specify the analytical methods corresponding to the data that will be submitted for that project. A project can be modified and managed anytime during the project's life cycle. - Allows users to manage a library of analytical methods that can be made available for association to their projects. - Users can specify the automated tests and assessment that needs to be performed on the analytical data deliverables based on specific requirements in the project's Quality Assurance Project Plan (QAPP). - Users specify: - The format of the incoming data deliverables from the laboratory; - The type and level of review services to be performed; - The assessment deliverables to be generated - output spreadsheets and reports; - Project owner sets up system access and permissions for members of the project team. - A faster (600%) and less expensive (85%) process than the traditional data usability/validation. The EXES Data Manager application (EDM) provides a centralized data repository to view and retrieve generated reports, spreadsheets, and other data deliverables as defined by the client, eliminating the need for data transfer between project team members. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Framework for Quantitative Assessment of Impacts Related to Energy and Mineral Resource Development

Natural resource planning at all scales demands methods for assessing the impacts of resource development and use, and in particular it requires standardized methods that yield robust and unbiased results. Building from existing probabilistic methods for assessing the volumes of energy and mineral resources, we provide an algorithm for consistent, reproducible, quantitative assessment of resource development impacts. The approach combines probabilistic input data with Monte Carlo statistical methods to determine probabilistic outputs that convey the uncertainties inherent in the data. For example, one can utilize our algorithm to combine data from a natural gas resource assessment with maps of sage grouse leks and pinon-juniper woodlands in the same area to estimate possible future habitat impacts due to possible future gas development. As another example: one could combine geochemical data and maps of lynx habitat with data from a mineral deposit assessment in the same area to determine possible future mining impacts on water resources and lynx habitat. The approach can be applied to a broad range of positive and negative resource development impacts, such as water quantity or quality, economic benefits, or air quality, limited only by the availability of necessary input data and quantified relationships among geologic resources, development alternatives, and impacts. In conclusion, the framework enables quantitative evaluation of the trade-offs inherent in resource management decision-making, including cumulative impacts, to address societal concerns and policy aspects of resource development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dynamic risk assessment for geologic CO 2 sequestration

At a geologic CO 2 sequestration (GCS) site, geologic uncertainty usually leads to large uncertainty in the predictions of properties that influence metrics for leakage risk assessment, such as CO 2 saturations and pressures in potentially leaky wellbores, CO 2 /brine leakage rates, and leakage consequences such as changes in drinking water quality in groundwater aquifers. The large uncertainty in these risk-related system properties and risk metrics can lead to over-conservative risk management decisions to ensure safe operations of GCS sites. The objective of this work is to develop a novel approach based on dynamic risk assessment to effectively reduce the uncertainty in the predicted risk-related system properties and risk metrics. We demonstrate our framework for dynamic risk assessment on two case studies: a 3D synthetic example and a synthetic field example based on the Rock Springs Uplift (RSU) storage site in Wyoming, USA. Results show that the U.S. National Risk Assessment Partnership’s Open Source Integrated Assessment Model (NRAP-Open-IAM) coupled with a conformance evaluation can be used to effectively quantify and reduce the uncertainty in the predictions of risk-related system properties and risk metrics in GCS.

58 GEOSCIENCES↗