Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Operationally Efficient Propulsion System Study (OEPSS) data book. Volume 1: Generic ground operations data

This study was initiated to identify operations problems and cost drivers for current propulsion systems and to identify technology and design approaches to increase the operational efficiency and reduce operations costs for future propulsion systems. To provide readily usable data for the Advance Launch System (ALS) program, the results of the Operationally Efficient Propulsion System Study (OEPSS) were organized into a series of OEPSS Data Books as follows: Volume 1, Generic Ground Operations Data; Volume 2, Ground Operations Problems; Volume 3, Operations Technology; Volume 4, OEPSS Design Concepts; and Volume 5, OEPSS Final Review Briefing, which summarizes the activities and results of the study. This volume presents ground processing data for a generic LOX/LH2 booster and core propulsion system based on current STS experience. The data presented includes: top logic diagram, process flow, activities bar-chart, loaded timelines, manpower requirements in terms of duration, headcount and skill mix per operations and maintenance instruction (OMI), and critical path tasks and durations.

Byrd, Raymond J.↗

Time management displays for shuttle countdown

The Intelligent Launch Decision Support System project is developing a Time Management System (TMS) for the NASA Test Director (NTD) to use for time management during Shuttle terminal countdown. TMS is being developed in three phases: an information phase; a tool phase; and an advisor phase. The information phase is an integrated display (TMID) of firing room clocks, of graphic timelines with Ground Launch Sequencer events, and of constraints. The tool phase is a what-if spreadsheet (TMWI) for devising plans for resuming from unplanned hold situations. It is tied to information in TMID, propagates constraints forward and backward to complete unspecified values, and checks the plan against constraints. The advisor phase is a situation advisor (TMSA), which proactively suggests tactics. A concept prototype for TMSA is under development. The TMID is currently undergoing field testing. Displays for TMID and TMWI are described. Descriptions include organization, rationale for organization, implementation choices and constraints, and use by NTD.

Beller, Arthur E.↗

SLS-PLAN-IT: A knowledge-based blackboard scheduling system for Spacelab life sciences missions

The primary scheduling tool in use during the Spacelab Life Science (SLS-1) planning phase was the operations research (OR) based, tabular form Experiment Scheduling System (ESS) developed by NASA Marshall. PLAN-IT is an artificial intelligence based interactive graphic timeline editor for ESS developed by JPL. The PLAN-IT software was enhanced for use in the scheduling of Spacelab experiments to support the SLS missions. The enhanced software SLS-PLAN-IT System was used to support the real-time reactive scheduling task during the SLS-1 mission. SLS-PLAN-IT is a frame-based blackboard scheduling shell which, from scheduling input, creates resource-requiring event duration objects and resource-usage duration objects. The blackboard structure is to keep track of the effects of event duration objects on the resource usage objects. Various scheduling heuristics are coded in procedural form and can be invoked any time at the user's request. The system architecture is described along with what has been learned with the SLS-PLAN-IT project.

Kao, Cheng-Yan↗

Planning and scheduling research at NASA Ames Research Center

Planning and scheduling is the area of artificial intelligence research that focuses on the determination of a series of operations to achieve some set of (possibly) interacting goals and the placement of those operations in a timeline that allows them to be accomplished given available resources. Work in this area at the NASA Ames Research Center ranging from basic research in constrain-based reasoning and machine learning, to the development of efficient scheduling tools, to the application of such tools to complex agency problems is described.

Friedland, Peter↗

Microgravity science experiment integration - When the PI and the PED differ

This paper addresses issues related to the integration of principal investigators (PIs) and payload-element developers (PEDs) for conducting effective microgravity experiments. The Crystal Growth Furnace (CGF) is used as an example to demonstrate the key issues related to the integration of a PI's sample into a facility run by a different organization. Attention is given to the typical preflight timeline, documentation required for experimental implementation, and hardware deliverables. A flow chart delineates the payload-integration process flow, and PI inputs required for an experiment include equipment and procedure definitions, detailed design and fabrication of the experiment-specific equipment, and specifications of the contract-end item. The present analysis is of interest to the coordination of effective microgravity experiments on the Space Station Freedom that incorporate PIs and PEDs from different organizations.

Baer-Peckham, M. S.↗

HST Servicing Mission Planning and Replanning Tool

An overview is presented of the Hubble Space Telescope (HST) Service Mission Planning and Replanning Tool (SM/PART) and the approach that was employed to develop the system. SM/PART is an AI expert system utilized by NASA to rapidly build complex timelines and command plans to control HST activities. HST servicing missions are Space Shuttle/Orbiter missions expected to occur every three to five years to rendezvous with the HST in orbit and replace, upgrade, or repair HST components. SM/PART runs on a UNIX-based workstation and is implemented in the C language with a Motif-based graphical user interface.

Johnson, J.↗

The NASA CSTI high capacity power project

The SP-100 Space Nuclear Power Program was established in 1983 by DOD, DOE, and NASA as a joint program to develop technology for military and civil applications. Starting in 1986, NASA has funded a technology program to maintain the momentum of promising aerospace technology advancement started during Phase 1 of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for a wide range of future space applications. The elements of the Civilian Space Technology Initiative (CSTI) High Capacity Power Project include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. Technology advancement in all elements is required to provide the growth capability, high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall project will develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements will be presented, along with revised goals and project timelines recently developed.

Winter, J.↗

Reusable Reentry Satellite (RRS): Recovery tradeoff study

The main objectives of the Recovery Tradeoff Study were as follows: (1) to determine whether a land or water recovery best suits RRS system requirements; (2) what type of terminal recovery system is best suited for the RRS; and (3) what are the recovery access timelines after system landing. Based on the trade parameters and evaluation criteria used in this study, the land-landing configuration has an advantage over the water-landing configuration. It is recommended that a land-landing configuration be developed assuming WSMR as the landing site. It is also recommended that natural orbits be used for low inclination missions and any orbit adjustments for landing site targeting be performed at the end of the mission. Near-integer orbits should be used for high inclination missions and allow orbital decay to precess the ground track over the landing site range.

Source record↗

Structural Development of Flight Systems

An overview of the typical process and timeline for the development of structural systems is presented. Structural design and verification requirements, along with the approaches used to implement these requirements, are discussed. Special considerations are given to limit loads estimation, structural qualification by analysis, modal survey and test/analysis correlation, and response limiting during vibration tests. Several controversal issues that cause inconsistencies and difficulties in the current structural development process are identified and an approach for resolving these issues is recommended.

Lou, Michael C.↗

Autonomous rendezvous targeting techniques for national launch system application

The rendezvous targeting techniques that can be utilized to achieve autonomous guidance for delivering a cargo to Space Station Freedom (SSF) using the National Launch System's (NLS) Heavy Lift Launch Vehicle (HLLV) and the on-orbit Cargo Transfer Vehicle (CTV) are described. This capability is made possible by advancements in autonomous navigation (Global Positioning System - GPS) on-board the CTV and SSF as well as the new generation flight computers. How the HLLV launch window can be decoupled from the CTV phasing window is described. The performance trades that have to be made to determine the length of the launch window and the phasing window between the CTV and SSF are identified and recommendations made that affect mission timelines.

Lomas, James J.↗

Ulysses operations at Jupiter - Planning for the unknown

The operational preparations for the Ulysses encounter with Jupiter are described with particular attention given to requirements for survival in the Jovian environment, ground-segment planning, a deep-space network, and encounter activities. It is concluded that the successful operation of the Ulysses spacecraft at Jupiter was the culmination of many years of activity, from spacecraft design and mission planning to the coordination of the encounter activities and production of the detailed timeline.

Angold, N.↗

The NASA CSTI High Capacity Power Project

The elements of the Civilian Space Technology Initiative (CSTI) High Capacity Power Project include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. The overall project will develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements are presented, along with revised goals and project timelines recently developed.

Winter, J.↗

An analysis of the history of dust activity on Mars

A comprehensive list of dust storm activity on Mars has been compiled from various published lists and additional data. For uniformity and clarity, each event is classified using a new system that includes a well-defined nomenclature. Maps showing the reported locations of events have been compiled. Detailed commentaries describe the events and/or circumstances of their observation. The seasonal distribution of Martian dust events is diagrammed and discussed together with a seasonal and annual (Mars years) timeline that includes the frequency of photographic coverage. Regional dust storms tend to occur most frequently, and all planet-encircling dust storms have been observed during the southern spring and summer seasons, although there is significant interannual variability.

Martin, Leonard J.↗

STS-49 - A demonstration of EMU operational capabilities for Space Station Freedom assembly

One of the primary objectives for Space Shuttle mission STS-49 is to perform three EVAs on consecutive days in a manner similar to those planned for Space Station Freedom (SSF) assembly missions. The preparation and completion of this mission will serve as a pathfinder for future EVA intensive SSF assembly flights. Several operational issues pertaining to the EMU have been addressed in preparation for this mission. Provisioning and orbiter stowage of the EMU and associated hardware have been optimized for four EVA crewmembers. EMU preparatory and maintenance activities have been streamlined to help minimize crew overhead and have been carefully integrated into a very demanding mission timeline. The constraints and limitations have been assessed in providing a backup EMU capability for each EVA crewmember. Several EMU concerns have also been addressed in supporting new EVA task requirements, such as large mass handling and performing SSF assembly operations over the crew cabin and nose of the Shuttle orbiter.

Bleisath, Scott A.↗

Assessment of a SSF servicing facility

A polygonal pseudo-cylindrical hangar that sustains only the Space Transfer Vehicle (STV) has been proposed as an optimal servicing facility at the Space Station Freedom (SSF). The drop tanks would be placed external to the hangar, with final integration occurring outside the sheltered hangar. The potential locations for the hangar are outboard of a lower keel and above the module pattern. A third possibility combines the two cases, extending a support structure/tunnel below the module pattern to the distance of a lower keel. Calculations of servicing timelines indicate that a single STV could be serviced for its next lunar mission in 2 months using a robot similar to the Flight Telerobotic Servicer.

Zaveri, Rohan↗

LEO/GSO cyclic depot transfer

This paper investigates the development and use of semi-analytic methods for propellant depot orbit selection in cyclic, coplanar, Keplerian GSO missions. The cyclic depot transfer strategy which allows for non-optimum (e.g. non-Hohmann) transfer, is constrained by resonance requirements allowing for descent rendezvous/refueling with fuel depots positioned during the ascent phase of the mission. The mission benefit using this transfer technique allows an improvement in propulsion system efficiency which can lead to approximately 43 percent reduction in initial launch mass when compared to traditional methods, but with the trade-off of longer mission timelines. A family of potential transfers is identified with an 'optimum' selection not based on conventional delta V minimization. The results of this analysis include reduced transfer times and greater potential initial launch mass savings over previous work.

Coffey, Randall E.↗

Space Station maintenance studies using plaid graphics

The Graphics Analysis Facility (GRAF) has been used frequently to study extravehicular activity (EVA) maintenance scenarios on Space Station Freedom. The ability to use 3-dimensional visualization gives one a more accurate estimate of the Space Station environment. Moreover, human EVA and robotic kinematics can be accurately simulated for columetric reach and collision detection analysis. An animation of this kind was developed for a research group at JSC to study and discover problem areas involved with doing external Space Station maintenance tasks. On the EVA side, it was discovered that items such as handholds and temporary restraint mechanisms should more effectively facilitate EVA movement about the Space Station structure for the suited personnel. Issues concerning CETA cart configuration, PWP storage locations, and locations of EVA storage areas were also identified by use of the animation. In the area of EVA versus robotics, it was found that there is a strong desire to make EVA and robotics interfaces compatible on items such as replacement units and unpressurized logistics carriers. The animation also showed that the use of robotics within an EVA task increases the difficulty and duration of the task setup, leaving less time available for the maintenance task itself. Graphics animation provides a mechanism to simultaneously analyze several mission parameters (i.e., EVA reach, volumetric analysis, and task timelines), and thus, it has proven to be an effective method for mission evaluation.

Helm, Mary E.↗