Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

The orbiting deep space relay station - A study report

This paper is an interim report on a study being carried out to assess the requirements for tracking and communications with deep-space probes in the post-1985 time frame and to evaluate approaches to meeting those requirements. The orbiting deep-space relay station (ODSRS) is one approach to meeting those requirements that appears to have some significant advantages over ground-based stations. A detailed conceptual design of an ODSRS is compared with other tracking and communications system configuration options. The comparison includes a life-cycle cost analysis as well as operations and performance capabilities. Reported results of the study to date include a preliminary assessment of post-1985 requirements, a discussion of planned ODSRS system capabilities as well as of tracking and communications system advantages and problems that are peculiar to an OSDRS, a look at the current status of the conceptual design of the ODSRS, and a summary of the plan for the remainder of the study.

Hunter, J. A.↗

Computer-Assisted Scheduling System (COMPASS)

COMPASS is interactive planning and scheduling software system used like spreadsheet. System places activities only at feasible times, taking into consideration all constraints imposed upon activity and resources it requires. Version 1.4 written in Ada and contains standard X-Windows interfaces written in C.

Fox, Barry R.↗

Development of an Adsorption System for the Trash Compaction Processing System designed for operation in the International Space Station Express Rack

A water recovery system that utilizes adsorption to work with the Trash Compaction Processing System, formerly known as the Heat Melt Compactor, is being designed at NASA Ames Research Center as an option to current state of the art micro-gravity water management systems and contaminant control systems used in space. The adsorption system will be used in conjunction with the International Space Station Vacuum Exhaust system to avoid both the complexities of gas liquid phase separation in micro-gravity and venting of Trash Compaction Processing System effluents to the spacecraft cabin. The adsorption system will allow the water and gaseous effluents generated during the Trash Compaction System operation to be removed in a matter that meets the Vacuum Exhaust System venting rate requirements. The Trash Compaction Processing System is planned to fly as a Technology Demonstration on the International Space Station in the space station EXPRESS Rack facility. This paper describes the trade space that the adsorption system must operate in using the EXPRESS Rack facilities resources including the use of the Space Station Vacuum Exhaust System. Also described in this paper are design solutions to allow the adsorption system to function within the Express Rack and Vacuum Exhaust System Parameters.

Heat Melt Compactor↗

Iterative Repair Planning for Spacecraft Operations Using the Aspen System

This paper describes the Automated Scheduling and Planning Environment (ASPEN). ASPEN encodes complex spacecraft knowledge of operability constraints, flight rules, spacecraft hardware, science experiments and operations procedures to allow for automated generation of low level spacecraft sequences.

planning↗

Tracking and Data System Support for the Mariner Venus/Mercury 1973 Project

The Tracking and Data System, which provided outstanding support to the Mariner Venus/Mercury 1973 project during the period from January 1970 through March 1975 are chronologically described. In the Tracking and Data System organizations, plans, processes, and technical configurations, which were developed and employed to facilitate achievement of mission objectives, are described. In the Deep Space Network position of the tracking and data system, a number of special actions were taken to greatly increase the scientific data return and to assist the project in coping with in-flight problems. The benefits of such actions were high; however, there was also a significant increase in risk as a function of the experimental equipment and procedures required.

Davis, E. K.↗

Visco Jet Joule-Thomson Device Characterization Tests in Liquid Methane

Joule-Thomson (J-T) devices have been identified as critical components for Thermodynamic Vent Systems (TVS) planned for future space exploration missions. Lee Visco Jets (The Lee Company) (Ref. 4) are one type of J-T device that may be used for LCH4 propellant systems. Visco Jets have been previously tested and characterized in LN2 and LH2 (Refs. 6 and 7), but have not been characterized in LOX or LCH4. Previous Visco Jet tests with LH2 resulted in clogging of the Visco Jet orifice under certain conditions. It has been postulated that this clogging was due to the presence of neon impurities in the LH2 that solidified in the orifices. Visco Jets therefore require testing in LCH4 to verify that they will not clog under normal operating conditions. This report describes a series of tests that were performed at the NASA Glenn Research Center to determine if Visco Jets would clog under normal operating conditions with LCH4 propellant. Test results from this program indicate that no decrease in flow rate was observed for the Visco Jets tested, and that current equation used for predicting flow rate appears to under-predict actual flow at high Lohm ratings.

Jurns, John M.↗

Planned flight test of a mercury ion auxiliary propulsion system. 1: Objectives, systems descriptions, and mission operations

A planned flight test of an 8 cm diameter, electron-bombardment mercury ion thruster system is described. The primary objective of the test is to flight qualify the 5 mN (1 mlb.) thruster system for auxiliary propulsion applications. A seven year north-south stationkeeping mission was selected as the basis for the flight test operating profile. The flight test, which will employ two thruster systems, will also generate thruster system space performance data, measure thruster-spacecraft interactions, and demonstrate thruster operation in a number of operating modes. The flight test is designated as SAMSO-601 and will be flown aboard the shuttle-launched Air Force space test program P80-1 satellite in 1981. The spacecraft will be 3- axis stabilized in its final 740 km circular orbit, which will have an inclination of approximately greater than 73 degrees. The spacecraft design lifetime is three years.

Power, J. C.↗

Planned flight test of a mercury ion auxiliary propulsion system. I - Objectives, systems descriptions, and mission operations

A planned flight test of an 8-cm diameter, electron-bombardment mercury ion thruster system is described. The primary objective of the test is to flight qualify the 5 mN thruster system for auxiliary propulsion applications. A seven year north-south stationkeeping mission was selected as the basis for the flight test operating profile. The flight test, which will employ two thruster systems, will also generate thruster system space performance data, measure thruster-spacecraft interactions, and demonstrate thruster operation in a number of operating modes. The flight test is designated as SAMSO-601 and will be flown aboard the Shuttle-launched Air Force Space Test Program P80-1 satellite in 1981. The spacecraft will be 3-axis stabilized in its final 740 km circular orbit, which will have an inclination of at least 73 degrees. The spacecraft design lifetime is three years.

Power, J. L.↗

Results of phase one of land use information Delphi study

The Land Use Management Information System (LUMIS) is being developed for the city portion of the Santa Monica mountains. LUMIS incorporates data developed from maps and aerial photos as well as traditional land based data associated with routine city and county record keeping activities and traditional census data. To achieve the merging of natural resource data with governmental data LUMIS is being designed in accordance with restrictions associated with two other land use information systems currently being constructed by Los Angeles city staff. The two city systems are LUPAMS (Land Use Planning and Management System) which is based on data recorded by the County Assessor's office for each individual parcel of land in the city, and Geo-BEDS, a geographically based environmental data system.

Paul, C. K.↗

Research and Technology Report. Goddard Space Flight Center

This issue of Goddard Space Flight Center's annual report highlights the importance of mission operations and data systems covering mission planning and operations; TDRSS, positioning systems, and orbit determination; ground system and networks, hardware and software; data processing and analysis; and World Wide Web use. The report also includes flight projects, space sciences, Earth system science, and engineering and materials.

Soffen, Gerald↗

The International Orion Spacecraft Is off Towards the Stars

Following a very successful year of manufacturing, assembly and testing in factories located around the globe, NASA and ESA are preparing to deliver the major Exploration Mission-1 (EM-1) Orion flight elements, including the Crew Module, ESA Service Module and Launch Abort System. This international effort to design and develop a deep space exploration capable human spacecraft is rapidly transitioning from the design, development and test phase to the early test flight and production phase. Two major flight tests, an Ascent Abort test and EM-1, Orion's first flight onboard NASA's new heavy lift Space Launch System, are planned for the near future. Further, Orion will play a crucial role in the ambitious new Deep Space Gateway human exploration Program. This paper gives a short overview of the system and subsystem configuration of the Orion spacecraft, including NASA and ESA contributions, a status of EM-1, AA-2 and EM-2 spacecraft production, and a look at Orion's role in the construction and operation of the Deep Space Gateway. The paper will also address the innovative international cooperation methods being employed to conduct Orion and Service Module integration.

Kirasich, Mark↗

Designing Autonomy into Interfaces for Long-Duration Missions

As NASA develops technologies for long-duration crewed missions, we must understand how communication between ground control teams and astronauts differs from the current dynamic to adapt new concepts for long-duration mission operations. Today, ground control teams support astronauts with immediate availability to answer questions, resolve issues, and manage activities. In the near future, however, extended communication delays during long-duration missions will require astronauts to become more autonomous. As many of the responsibilities shift from the ground control teams to the astronauts on-board, the concept of operations must also change from how it functions today. With increased astronaut autonomy, software tools must be developed that enable efficient completion of mission tasks without increased mental workload. Designing software tools to facilitate crew autonomy requires development teams to know which data will enhance quick decision making while providing necessary context for situational awareness of systems being managed on-board. NASA's Autonomous Systems and Operations (ASO) team is presently developing a software interface tool, EXPRESS (EXpedite the PRocessing of Experiments for Space Station) 2.5 to enable a long-duration crew to schedule activities for and operate autonomous systems. This paper describes details of the integrated human factors approach that drove the design of the elements of the software tool, including self-managed scheduling, constraint-driven planning, autonomous system fault recovery, and recommended troubleshooting actions. Additionally, this paper will chronicle ASO modifications of the user interface after the team's first flight demonstration, how it was based on lessons learned during software development, as well as from crew feedback in order to develop the current version which will be demonstrated on ISS in 2021. In the upcoming ISS demonstration, the astronaut crew will be given scenarios for scheduling and operating autonomous system activities, including off-nominal scenarios and autonomous system recoveries. The demonstration of the EXPRESS 2.5 tool is a step towards improved levels of autonomy as our new journeys take us farther into space.

autonomy↗

Mission Planning for Trident: Discovery proposal to Neptune’s moon, Triton

Trident was one of the four Discovery-class Step-1 mission proposals selected by NASA in 2020 for further development and study; however, in 2021, the Step-2 proposal was not down-selected to transition into the next phase of mission development, i.e., a mission for flight.Neptune’s largest moon, Triton, was the primary focus of study for Trident. Triton’s physical and orbital characteristics make it a unique planetary target for scientific exploration, providing opportunities for investigations in a wide variety of scientific fields, including geomorphological, atmospheric, geophysical, magnetospheric, and ionospheric studies. The science objectives of the Trident mission encompassed an in-depth interior-to-exterior set of objectives, focused on multiple outstanding questions resulting from the 1989 encounter of Voyager 2, and subsequent analysis.Ball Aerospace Corp. was tasked with building the Trident spacecraft, with JPL responsible for providing Engineering Support (Mission Design & Navigation, Mission Planning, Flight Operations, Ground Data Systems, Systems Engineering) and leading Project Management. The observatory would carry a wide-ranging suite of scientific instruments onboard, including an Infrared Spectrometer (IRS) and Narrow Angle Camera (NAC) to be provided by Ball Aerospace Corp., a Wide Angle Camera (WAC) from JPL, a Magnetometer from UCLA, a contributed Plasma Science Suite from IRF (Sweden), and a contributed Radio Science instrument from ASI (Italy). All of these instruments would be used to collect unique datasets during the Triton encounter. Trident would have taken advantage of an ~13-yr, nearly-ballistic trajectory to Triton, utilizing a timely Jupiter Gravity Assist, to execute a 10-day long encounter in the Neptunian system. Launch was planned for October 2025, with Triton arrival scheduled for December 2038. The timeline for this mission would have been sub-divided into seven major phases: Launch, Commissioning, Inner Planet Cruise, Outer Planet Cruise, Approach, Encounter, and Science Data Return. Multiple planetary flybys were planned to be performed during the cruise, including three Earth flybys and one Venus flyby in the Inner Planet Cruise phase, and one Jupiter flyby in the Outer Planet Cruise phase. Along with conventional (Range and Doppler) tracking data, Delta-DOR and Optical Navigation data were also to be acquired to assist with spacecraft navigation during the Approach and Encounter phases. A 3 meter X-Band High Gain Antenna would allow playback of all science data at 1 kbps within 1 year after the Triton Encounter. The Mission Planning element on Trident encompassed and informed multiple aspects of this proposal, ranging from science observation planning during the Triton Encounter phase, to generation of activity timelines for all mission phases; performing ground coverage analysis for science observations to be acquired by all instruments and tracing them to science requirements; evaluation of spacecraft resources including data volume stored onboard, power/energy consumption, telecom (commanding/telemetry) requirements, and overall, working at the interface of science and engineering teams on the mission. All of these functions that were performed by the Mission Planning team on this proposal are discussed in this paper.

Prockter, Louise↗

Space network interoperability panel (SNIP) study

The history and status of the SNIP study conducted by NASA, ESA, and NASDA are reviewed. Particular attention is given to data relay systems development plans; agency load situations; cross support; the top managers agreement about implementation of S-band interoperability and accelerating the K-alpha band high data rate exploration; testing of actual systems; NASA interim architecture for an S-band era system to make NASA spacecraft and TDRSS/TDRS-II compatible with ESA and NASDA systems; tropical rainfall measuring mission support; S-band cross support; and K-alpha band status.

Fahnestock, Dale↗

Certification Considerations for Adaptive Systems

Advanced capabilities planned for the next generation of aircraft, including those that will operate within the Next Generation Air Transportation System (NextGen), will necessarily include complex new algorithms and non-traditional software elements. These aircraft will likely incorporate adaptive control algorithms that will provide enhanced safety, autonomy, and robustness during adverse conditions. Unmanned aircraft will operate alongside manned aircraft in the National Airspace (NAS), with intelligent software performing the high-level decision-making functions normally performed by human pilots. Even human-piloted aircraft will necessarily include more autonomy. However, there are serious barriers to the deployment of new capabilities, especially for those based upon software including adaptive control (AC) and artificial intelligence (AI) algorithms. Current civil aviation certification processes are based on the idea that the correct behavior of a system must be completely specified and verified prior to operation. This report by Rockwell Collins and SIFT documents our comprehensive study of the state of the art in intelligent and adaptive algorithms for the civil aviation domain, categorizing the approaches used and identifying gaps and challenges associated with certification of each approach.

Bhattacharyya, Siddhartha↗

Roman Space Telescope Optical System: Status and Test

A conference presentation providing an overview of the Roman Space Telescope optical system. Details on the optical system verification plan and Spacecraft Bus + Integrated Payload Assembly (SCIPA) thermal vacuum optical test program are provided.

space telescope↗

A CubeSat Asteroid Mission: Design Study and Trade-Offs

There is considerable interest in expanding the applicability of cubesat spacecraft into lightweight, low cost missions beyond Low Earth Orbit. A conceptual design was done for a 6-U cubesat for a technology demonstration to demonstrate use of electric propulsion systems on a small satellite platform. The candidate objective was a mission to be launched on the SLS test launch EM-1 to visit a Near-Earth asteroid. Both asteroid fly-by and asteroid rendezvous missions were analyzed. Propulsion systems analyzed included cold-gas thruster systems, Hall and ion thrusters, incorporating either Xenon or Iodine propellant, and an electrospray thruster. The mission takes advantage of the ability of the SLS launch to place it into an initial trajectory of C3=0. Targeting asteroids that fly close to earth minimizes the propulsion required for fly-by/rendezvous. Due to mass constraints, high specific impulse is required, and volume constraints mean the propellant density was also of great importance to the ability to achieve the required deltaV. This improves the relative usefulness of the electrospray salt, with higher propellant density. In order to minimize high pressure tanks and volatiles, the salt electrospray and iodine ion propulsion systems were the optimum designs for the fly-by and rendezvous missions respectively combined with a thruster gimbal and wheel system For the candidate fly-by mission, with a mission deltaV of about 400 m/s, the mission objectives could be accomplished with a 800s electrospray propulsion system, incorporating a propellant-less cathode and a bellows salt tank. This propulsion system is planned for demonstration on 2015 LEO and 2016 GEO DARPA flights. For the rendezvous mission, at a ΔV of 2000 m/s, the mission could be accomplished with a 50W miniature ion propulsion system running iodine propellant. This propulsion system is not yet demonstrated in space. The conceptual design shows that an asteroid mission is possible using a cubesat platform with high-efficiency electric propulsion.

cubesat↗