Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrative analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

NASA Passive Thermal Control Engineering Guidebook

The NASA Passive Thermal Control Engineering Guidebook provides recommendations, including best practices and lessons learned, related to the passive thermal control engineering discipline. Topics include analysis (including documentation and review), thermal hardware (design/selection, vendors, and integration), testing, and flight operations. The passive thermal discipline includes thermal control and thermal protection systems. The passive thermal control discipline, which is addressed in this Guidebook, is broad and covers internal and external systems, component passive thermal analysis, vehicle on-orbit attitude timeline analysis, integrated thermal analysis, various thermal control apparatus (heaters and controls, coatings, blankets and insulations, isolators, geometric design for view factors, materials emissivity/absorptivity properties), passive cooling of avionics, purge, vent, and drain for vehicle cavities and compartments, thermal model development and correlation, thermal cycle and thermal-vacuum testing. Topics related to thermal protection systems (TPS) are not within the scope of this document. The Guidebook provides a consolidated reference for early career as well as experienced engineers embarking on a new task. Leveraging the experience of the group minimizes the learning curve that exists at the start of new projects, reduces the risk of repeating mistakes, and improves the organization’s ability to deliver high-quality products efficiently. The intent of this document is to provide guidance based on collective experience, and is not intended impose constraints on project work. Best practices can vary substantially and it is important to apply judgment wisely based on careful consideration of the specific design and requirements. Implementation of the methods described will vary from project to project and should be applied in conjunction with the judgment of the thermal engineers performing and reviewing the work. The recommendations in this document are not intended to replace program, project, branch, Center, or NASA requirements and/or policies.

thermal↗

NASA Passive Thermal Control Engineering Guidebook

The NASA Passive Thermal Control Engineering Guidebook provides recommendations, including best practices and lessons learned, related to the passive thermal control engineering discipline. Topics include analysis (including documentation and review), thermal hardware (design/selection, vendors, and integration), testing, and flight operations. The passive thermal discipline includes thermal control and thermal protection systems. The passive thermal control discipline, which is addressed in this Guidebook, is broad and covers internal and external systems, component passive thermal analysis, vehicle on-orbit attitude timeline analysis, integrated thermal analysis, various thermal control apparatus (heaters and controls, coatings, blankets and insulations, isolators, geometric design for view factors, materials emissivity/absorptivity properties), passive cooling of avionics, purge, vent, and drain for vehicle cavities and compartments, thermal model development and correlation, thermal cycle and thermal-vacuum testing. Topics related to thermal protection systems (TPS) are not within the scope of this document. The Guidebook provides a consolidated reference for early career as well as experienced engineers embarking on a new task. Leveraging the experience of the group minimizes the learning curve that exists at the start of new projects, reduces the risk of repeating mistakes, and improves the organization’s ability to deliver high-quality products efficiently. The intent of this document is to provide guidance based on collective experience, and is not intended impose constraints on project work. Best practices can vary substantially and it is important to apply judgment wisely based on careful consideration of the specific design and requirements. Implementation of the methods described will vary from project to project and should be applied in conjunction with the judgment of the thermal engineers performing and reviewing the work. The recommendations in this document are not intended to replace program, project, branch, Center, or NASA requirements and/or policies.

thermal↗

Analytical Methods in Vibrations.

Book on analytical methods in vibrations covering general mathematical formulations of common features of various vibrating systems

STATISTICAL ANALYSIS↗

Guidance and Control Division

Flight computers and sequencers, spacecraft power and control systems, and guidance and control analysis and integration

Source record↗

Apollo management: A key to the solution of the social-economical dilemma - The transferability of space-travel managerial techniques to the civil sector

An analysis has been conducted to find out whether the management techniques developed in connection with the Apollo project could be used for dealing with such urgent problems of modern society as the crisis of the cities, the increasing environmental pollution, and the steadily growing traffic. Basic concepts and definitions of program and system management are discussed together with details regarding the employment of these concepts in connection with the solution of the problems of the Apollo program. Principles and significance of a systems approach are considered, giving attention to planning, system analysis, system integration, and project management. An application of the methods of project management to the problems of the civil sector is possible if the special characteristics of each particular case are taken into account.

Puttkamer, J. V.↗

Documentation of structures branch programs and program updates. Project 3200

Update programming of applications programs for the integrated structural analysis system is reported. An attempt is made to layout a standard document format for the preparation of program documents. Documentation which involves changes, additions, and I/O capability revisions to existing programs includes a checklist which should be reviewed each time a programming effort is documented.

Probe, D. G.↗

Research studies using OSO-6 zodiacal light experiment data

The results of research studies on the OSO-6 zodiacal light experiment, conducted during the period from May 1976 to October 1977 are described. A discussion is included of the instrument performance and the empirical calibrations developed. Main areas of the research performed, i.e., (1) zodiacal light variation analysis; (2) integrated starlight and diffuse galactic light; and (3) earth/moon libration region counterglow, are covered. Considerable data processing was performed during these studies and it is summarized. Recommendations for future research to complete the interim results are given.

Source record↗

SAMIS - A simulation of the solar array manufacturing industry

SAMIS is a continuing activity of the Project Analysis and Integration Task of the Low-cost Silicon Solar Array Project (LSSA). It provides a standardized procedure for producing reliable estimates of the cost of manufacturing solar arrays or their components. These estimates are based on descriptions of the manufacturing processes which are being studied and developed by LSSA subcontractors and will be used to assess the commercial viability of those processes and to set research priorities.

Chamberlain, R. G.↗

Thermal integration of Spacelab experiments

The method of thermally integrating the experiments for Spacelab is discussed. The scientific payload consists of a combination of European and United States sponsored experiments located in the module as well as on a single Spacelab pallet. The thermal integration must result in accomodating the individual experiment requirements as well as ensuring that the total payload is within the Spacelab Environmental Control System (ECS) resource capability. An integrated thermal/ECS analysis of the module and pallet is performed in concert with the mission timeline to ensure that the agreed upon experiment requirements are accommodated and to ensure the total payload is within the Spacelab ECS resources.

Patterson, W. C.↗