Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hardware failure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

ISS EVA80 EMU Water in the Helmet Failure and Associated Analytical Response

On March 23rd, 2022, during Extra-Vehicular Activity (EVA) 80 aboard the International Space Station (ISS) crew identified an 8-10-inch diameter thin film of water in the pressure bubble of the suit during repress. This launched an investigation to determine the cause of the water in the helmet as well as short- and long-term mitigation efforts to enable return to EVA as quickly as possible. The investigation analysis efforts in combination with hardware inspection and testing determined the most likely cause of the water in the helmet to be sublimator carryover as a result of high latent loading put on the system. In parallel with this investigation, efforts were being made to mitigate any future water in the helmet events. The short-term mitigation strategy developed is to install absorbent material in the pressure bubble to capture water as it enters the helmet before it can impact the astronauts. This hardware is referred to as the Helmet Absorption Band (HAB) and Helmet Absorption Pad – Extender (HAP-E). Longer-term mitigation strategies include a device to capture small water events before entering the helmet by installing a water capture system in the vent loop of the Extravehicular Mobility Unit (EMU). This effort is coined the T2 Water Capture System. Additionally, developing an on-orbit sublimator challenge test which will be able to verify sublimator performance before and after EVAs. The sublimator is the hardware which condenses water vapor and removes it from the vent loop, and this hardware is referred to as the EMU Moisture Injection Test System (EMITS). Based on the investigation and short-term water capture solutions the ISS Program decided to return to nominal EVAs on October 7, 2022. With the addition of the long-term mitigation strategies, the team hopes to be able to prevent any future water in the helmet events.

Veronica Lee Pizor↗

The ACTS propagation program

The success or failure of the ACTS experiment will depend on how accurately the rain-fade statistics and fade dynamics can be predicted in order to derive an appropriate algorithm that will combat weather vagaries, specifically for links with small terminals, such as very small aperture terminals (VSAT's) where the power margin is a premium. The planning process and hardware development program that will comply with the recommendations of the ACTS propagation study groups are described.

Chakraborty, D.↗

Reliability history of the Apollo guidance computer

The Apollo guidance computer was designed to provide the computation necessary for guidance, navigation and control of the command module and the lunar landing module of the Apollo spacecraft. The computer was designed using the technology of the early 1960's and the production was completed by 1969. During the development, production, and operational phase of the program, the computer has accumulated a very interesting history which is valuable for evaluating the technology, production methods, system integration, and the reliability of the hardware. The operational experience in the Apollo guidance systems includes 17 computers which flew missions and another 26 flight type computers which are still in various phases of prelaunch activity including storage, system checkout, prelaunch spacecraft checkout, etc. These computers were manufactured and maintained under very strict quality control procedures with requirements for reporting and analyzing all indications of failure. Probably no other computer or electronic equipment with equivalent complexity has been as well documented and monitored. Since it has demonstrated a unique reliability history, it is important to evaluate the techniques and methods which have contributed to the high reliability of this computer.

Hall, E. C.↗

Entry Systems Panel

As general findings, lessons learned from shuttle are: (1) bridge established between development center (JSC) Research Centers (ARC, LARC), and industry (RI, LMSC, Corning, Mansville, 3M LTV, Union Carbide, Hexcel) for shuttle TPS; (2) not all test results adequately analyzed or in hindsight, completely encompassing all failure modes; (3) gap heating effects from ground facilities not totally indicative of flight experience; (4) need to design with operations in mind (not just to cost) example: moisture intrusion of GR/EP, many other examples; (5) RSI- developed as point design for maneuvering entry vehicle of high L/D; and (6) RSI - 15 years from invention to use on flight hardware.

Rasky, Daniel J.↗

Code Assesses Risks Posed by Meteoroids and Orbital Debris

BUMPER II version 1.92e is a computer code for assessing the risk of damage from impacts of micrometeoroids and orbital debris on the International Space Station (ISS), including those parts of the ISS covered by shielding that affords partial protection against such impacts. (Other versions of BUMPER II have been written for other spacecraft.) Bumper II quantifies the probability of penetration of shielding and the damage to spacecraft equipment as functions of the size, shape, and orientation of the spacecraft; the parameters of its orbit; failure criteria that quantify impact damage at the threshold of failure for each spacecraft surface; and the impact-damage resistance of each spacecraft surface as defined by "ballistic limit equations" that return the size of a failure-causing particle as a function of target parameters (including materials, configurations, thicknesses, and gap distances) and impact conditions (impact velocity and the density and shape of the impactor). BUMPER II version 1.92e contains several dozen ballistic limit equations that are based on results from thousands of hypervelocity impact tests conducted by NASA on ISS shielding and other hardware, and on results from numerical simulations of impacts.

Christiansen, Eric L.↗

X-33 Reusable Launch Vehicle Demonstrator, Spaceport and Range

The X-33 was a suborbital reusable spaceplane demonstrator, in development from 1996 to early 2001. The intent of the demonstrator was to lower the risk of building and operating a full-scale reusable vehicle fleet. Reusable spaceplanes offered the potential to lower the cost of access to space by an order of magnitude, compared with conventional expendable launch vehicles. Although a cryogenic tank failure during testing ultimately led to the end of the effort, the X-33 team celebrated many successes during the development. This paper summarizes some of the accomplishments and milestones of this X-vehicle program, from the perspective of an engineer who was a member of the team throughout the development. X-33 Program accomplishments include rapid, flight hardware design, subsystem testing and fabrication, aerospike engine development and testing, Flight Operations Center and Operations Control Center ground systems design and construction, rapid Environmental Impact Statement NEPA process approval, Range development and flight plan approval for test flights, and full-scale system concept design and refinement. Lessons from the X-33 Program may have potential application to new RLV and other aerospace systems being developed a decade later.

Letchworth, Gary F.↗

Radial Loading of Hydrodynamic Bearings Due to Magnetic Variation

Anomalies during integration of a small-scale hydrodynamic pump motor prompted an investigation into all sources of radial loading on the bearings, and revealed that overall loads were insufficiently characterized. Experimental measurements demonstrated that magnetic forces in the pump motor contributed to significant amounts of radial loading on the bearings, potentially causing wear over long periods of operation and premature failures. The magnitude of these magnetic forces was determined for the rotor and stator separately, as well as for the rotor-stator assembly by designing various experimental setups able to recreate the pump motor without hydrodynamic bearings. Characterization of these magnetic forces led to changes in manufacturing processes and enabled selective choices of components, improving the pump motor hardware in order to meet NASA’s Europa Clipper project requirements.

Underhill, Micheal↗

Apollo experience report: Spacecraft structural windows

The window structural design and verification experience is presented for the Apollo command and lunar modules. This report presents window design philosophy, design criteria, hardware description, and qualification and acceptance test programs and discusses the problems encountered and solutions developed in these areas. The structural characteristics of glass are not generally well understood by designers. The optics and instrument glass covers were not considered to be structural components and thus were not normally subjected to the design, qualification, and acceptance standards necessary to preclude failures. These two factors contributed significantly to window problems on both Apollo spacecraft.

Pigg, O. E.↗

ESSAA: Embedded system safety analysis assistant

The Embedded System Safety Analysis Assistant (ESSAA) is a knowledge-based tool that can assist in identifying disaster scenarios. Imbedded software issues hazardous control commands to the surrounding hardware. ESSAA is intended to work from outputs to inputs, as a complement to simulation and verification methods. Rather than treating the software in isolation, it examines the context in which the software is to be deployed. Given a specified disasterous outcome, ESSAA works from a qualitative, abstract model of the complete system to infer sets of environmental conditions and/or failures that could cause a disasterous outcome. The scenarios can then be examined in depth for plausibility using existing techniques.

Wallace, Peter↗

Solar thermal vacuum tests of Magellan spacecraft

The Magellen solar/thermal/vacuum test involved a number of unique requirements and approaches. Because of the need to operate in orbit around Venus, the solar intensity requirement ranged up to 2.3 suns or Earth equivalent solar constants. Extensive modification to the solar simulator portion of the test facility were required to achieve this solar intensity. Venus albedo and infrared emission were simulated using temperature controlled movable louver panels to allow the spacecraft to view either a selectable temperature black heat source with closed louvers, or the chamber coldwall behind open louvers. The test conditions included widely varying solar intensities, multiple sun angles, alternate hardware configurations, steady state and transient cases, and cruise and orbital power profiles. Margin testing was also performed, wherein supplemental heaters were mounted to internal thermal blankets to verify spacecraft performance at higher than expected temperatures. The test was successful, uncovering some spacecraft anomalies and verifying the thermal design. The test support equipment experienced some anomalous behavior and a significant failure during the test.

Neuman, James C.↗

Structural health monitoring apparatus and methodology

Disclosed is an apparatus and methodology for structural health monitoring (SHM) in which smart devices interrogate structural components to predict failure, expedite needed repairs, and thus increase the useful life of those components. Piezoelectric wafer active sensors (PWAS) are applied to or integrated with structural components and various data collected there from provide the ability to detect and locate cracking, corrosion, and disbanding through use of pitch-catch, pulse-echo, electro/mechanical impedance, and phased array technology. Stand alone hardware and an associated software program are provided that allow selection of multiple types of SHM investigations as well as multiple types of data analysis to perform a wholesome investigation of a structure.

Giurgiutiu, Victor↗

Automated mixed traffic transit vehicle microprocessor controller

An improved Automated Mixed Traffic Vehicle (AMTV) speed control system employing a microprocessor and transistor chopper motor current controller is described and its performance is presented in terms of velocity versus time curves. The on board computer hardware and software systems are described as is the software development system. All of the programming used in this controller was implemented using FORTRAN. This microprocessor controller made possible a number of safety features and improved the comfort associated with starting and shopping. In addition, most of the vehicle's performance characteristics can be altered by simple program parameter changes. A failure analysis of the microprocessor controller was generated and the results are included. Flow diagrams for the speed control algorithms and complete FORTRAN code listings are also included.

Marks, R. A.↗

The ACTS propagation program

The purpose of the Advanced Communications Technology Satellite (ACTS) is to demonstrate the feasibility of the Ka-band (20 and 30 GHz) spectrum for satellite communications, as well as to help maintain U.S. leadership in satellite communications. ACTS incorporates such innovative schemes as time division multiple access (TDMA), microwave and baseband switching, onboard regeneration, and adaptive application of coding during rain-fade conditions. The success or failure of the ACTS experiment will depend on how accurately the rain-fade statistics and fade dynamics can be predicted in order to derive an appropriate algorithm that will combat weather vagaries, specifically for links with small terminals, such as very small aperture terminals (VSAT's) where the power margin is a premium. This article describes the planning process and hardware development program that will comply with the recommendations of the ACTS propagation study groups.

Chakraborty, Dayamoy↗

Restoring Redundancy to the MAP Propulsion System

The Microwave Anisotropy Probe (MAP) is a follow-on to the Differential Microwave Radiometer (DMR) instrument on the Cosmic Background Explorer (COBE). Due to the MAP project's limited mass, power, and financial resources, a traditional reliability concept including fully redundant components was not feasible. The MAP design employs selective hardware redundancy, along with backup software modes and algorithms, to improve the odds of mission success. In particular, MAP's propulsion system, which is used for orbit maneuvers and momentum management, uses eight thrusters positioned and oriented in such a way that its thruster-based attitude control modes can maintain three-axis attitude control in the event of the failure of any one thruster.

O'Donnell, James R., Jr.↗

Assurance Equations: A Cost and Criticality Model for Optimizing Quality Assurance Surveillance

The cost of quality vs cost of failure correction has been a long-running topic of discussion within the Aerospace community. It leads directly to concepts of “risk tolerance”, and risk-based decision-making. It would be valuable if there was a way to compute the optimal investment in customer-executed quality assurance activities using defect significance with respect to performance objectives, the activities’ defect detection effectiveness, and the cost-penalty for late discovery of impactful defects. This optimization is particularly of interest to projects whose budget constraints significantly limit their risk management options.The cost to fix defects (i.e., failure correction) escalates as the project matures. There have been studies attempting to determine the relative cost of fixing defects discovered during various phases of a project life cycle with important implications, all of which suggest growth factors are large. The commonly referred to 1:10:100 rule represents a cost multiplier for repair/rework across the Design to Fab to Test hardware development phases. Cost premiums for QA activities also accumulate when they are treated as mandatory (due to schedule drag) or are performed later than their assigned phase.This paper describes the modeling of development phase -dependencies in the conduct of typical customer-executed quality assurance activities. Our initial modeling encompasses:• Distinct phases of the production lifecycle• Multiple kinds of Defects, each with some a-priori likelihood of being present• Each defect’s impact on performance Objectives for a type of hardware• The cost and efficacy of assurance techniques at detecting such Defects• The costs of fixing those Defects detected in a given phase of the production lifecycleThe model captures assurance activities’ abilities to Detect defects. Upon detection it is assumed that the Defect is immediately fixed. Defects that “escape” detection by some activity may thereafter be detected by a later activity, but by then the cost of fixing the Defect may have escalated. Defects are related to the performance Objectives they would detract from, were those Defects to remain present in the operating system.We have constructed and are exploring, a model that relates the importance of hardware system elements to mission objectives, the impact of types of Defects on those hardware types, the cost of customer-executed assurance activities (i.e., supplier controls) and their effectiveness towards reducing an impactful quality escape, and the cost of Defect correction across production phase. We describe the approach taken to select the key model aspects, why they are relevant to our NASA mission, and our efforts to populate it with relevant and contemporary data. We use a notional example to illustrate model design and function.

Plante, Jeannette↗

U.S. Space Shuttle Solid Rocket Booster - Return to flight

The Space Shuttle Solid Rocket Booster (SRB) redesign program instituted in the wake of the Challenger accident encompassed a design requirements review, a failure modes effect analysis/critical items list determination, a hazards analysis, an operational maintenance and requirements specification study, the definition of operational maintenance instructions and launch commit criteria, and design certification and flight readiness reviews. Attention is presently given to the SRB's thrust vector control, separation, and recovery functions, as well as its electrical and instrumentation systems and its case assembly and hardware interfaces.

Coates, K. D.↗

Performance Characterization of Loctite (Registered Trademark) 242 and 271 Liquid Locking Compounds (LLCs) as a Secondary Locking Feature for International Space Station (ISS) Fasteners

Several International Space Station (ISS) hardware components use Loctite (and other polymer based liquid locking compounds (LLCs)) as a means of meeting the secondary (redundant) locking feature requirement for fasteners. The primary locking method is the fastener preload, with the application of the Loctite compound which when cured is intended to resist preload reduction. The reliability of these compounds has been questioned due to a number of failures during ground testing. The ISS Program Manager requested the NASA Engineering and Safety Center (NESC) to characterize and quantify sensitivities of Loctite being used as a secondary locking feature. The findings and recommendations provided in this investigation apply to the anaerobic LLCs Loctite 242 and 271. No other anaerobic LLCs were evaluated for this investigation. This document contains the findings and recommendations of the NESC investigation

Dube, Michael J.↗

Solar Alpha Rotary Joint (SARJ) Lubrication Interval Test and Evaluation (LITE). Post-Test Grease Analysis

The Solar Alpha Rotary Joint (SARJ) is a mechanism of the International Space Station (ISS) that orients the solar power generating arrays toward the sun as the ISS orbits our planet. The orientation with the sun must be maintained to fully charge the ISS batteries and maintain all the other ISS electrical systems operating properly. In 2007, just a few months after full deployment, the starboard SARJ developed anomalies that warranted a full investigation including ISS Extravehicular Activity (EVA). The EVA uncovered unexpected debris that was due to degradation of a nitride layer on the SARJ bearing race. ISS personnel identified the failure root-cause and applied an aerospace grease to lubricate the area associated with the anomaly. The corrective action allowed the starboard SARJ to continue operating within the specified engineering parameters. The SARJ LITE (Lubrication Interval Test and Evaluation) program was initiated by NASA, Lockheed Martin, and Boeing to simulate the operation of the ISS SARJ for an extended time. The hardware was designed to test and evaluate the exact material components used aboard the ISS SARJ, but in a controlled area where engineers could continuously monitor the performance. After running the SARJ LITE test for an equivalent of 36+ years of continuous use, the test was opened to evaluate the metallography and lubrication. We have sampled the SARJ LITE rollers and plate to fully assess the grease used for lubrication. Chemical and thermal analysis of these samples has generated information that has allowed us to assess the location, migration, and current condition of the grease. The collective information will be key toward understanding and circumventing any performance deviations involving the ISS SARJ in the years to come.

Golden, Johnny L.↗