Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Saltpotentin Version3.f

The program inverts gravity and/or gravity gradient, and/or magnetic field (magnitude, in direction of Earth's magnetic field), at a number of points, for the position of bottom of a layer, in a structure with one or multiple layers of a uniform material (e.g., salt) in a host of known (and possibly varying) background density an/or susceptibility, is specified over a 3-D collection of rectangular blocks. For marine applications, water density (and/or susceptibility) and bathmetry is also specified. The interface found is the smoothest found for its level of data misfit, with the desired level of data misfie set as an input parameter. The densities and susceptibilites used for a block depend on its position relative to the interfaces. The first interface give the sea floor position. Blocks above the sea floor are treated as having the wate density and susceptibility given by the background density and susceptibility specified over the 3-D grid of blocks. For 1 even, blocks between the 1'th and 1+1'h interfaces are treated as having a uniform density and susceptibility specified as an input parameter.

Smith, Jeremy Torquil↗

Reactivity Effects at Mayak Production Association January 2, 1958 Criticality Accident Using Serpent 2 and OpenFOAM

The process nuclear criticality accident that occurred at the Mayak Production Association (Chelyabinsk 40) on January 2, 1958 involving a vessel of uranyl nitrate solution claimed the lives of three workers and left a fourth worker with continuing health problems. There are a myriad of uncertain parameters involved with this accident: What was the molarity of the solution? How much solution was in the vessel at the time of the accident? In what position was the vessel and the solution when it went critical? How important was the impact of reflection due to the workers and/or the floor? These uncertain parameters have made this accident particularly difficult to analyze in the past. This work aims to lower the uncertainty on some of these parameters. A most-probable solution composition is determined by comparing literature on the physical properties of uranyl nitrate solutions to those presented in LA-13638, which describes the accident in question. Using this most-probable solution, the main contributions to the reactivity of the system and hence the eventual accident, are identified through Serpent 2 and OpenFOAM analyses. Serpent 2, a Monte Carlo software tool, is used to perform calculations of the reactivity effects of lowering the vessel toward the floor and the reactivity added by the close proximity of workers. OpenFOAM, a C++ partial differential equation solver toolkit, is used to simulate the fluid inside the vessel as the vessel is tipped. This is done by treating the solution and air inside the vessel as two incompressible, isothermal, and immiscible fluids using a volume of fluid (VoF) approach. The goal of this approach is simply to track the interface between the two fluids, and hence give an accurate description of the geometrical structure of the solution as the vessel is tipped. These two unique tools are then coupled to provide a time-dependent flow simulation to study the effect that the changing geometrical structure had on the criticality of the system, which is novel to the criticality safety field. This work provides a more accurate picture of the accident going forward.

97 MATHEMATICS AND COMPUTING↗

A Web-Based Simulation Tool on The Performance of Different Roofing Systems

The Roof Savings Calculator (www.roofcalc.com) provides the general public with a web-based program for calculating the energy savings of different roofing and attic systems on four different building types (residential, office, retail, and warehouse) in 239 US TMY2 locations. The core simulation engine of the RSC is doe2attic, which couples the AtticSim program developed by Oak Ridge National Laboratory with the DOE-2.1E program originally developed by Lawrence Berkeley National Laboratory a widely used whole-building simulation program since the 1980 s. Although simulating heat flows through the roof may seem to be an easy task, simulating the net effect of roofing strategies on building heating and cooling energy use can be quite challenging. Few simulation programs can reliably capture dynamics including an attic or plenum with large day-night temperature swings, high ventilation rates, significant radiant exchange between the roof and the attic floor and thermal interactions when there are ducts in the attic, as is typical in North American buildings. The doe2attic program has been tested against detailed measurements gathered in two residential buildings in Fresno, California from cooling energy use to air and surface temperatures, and heat fluxes of the roof and attic floor. The focus of this paper is on the doe2attic simulation tool, but the user interface of the RSC will also be briefly described.

Huang, Joe↗

Using well casing as an electrical source to monitor hydraulic fracture fluid injection

The depth to surface resistivity (DSR) method transmits current from a source located in a cased or openhole well to a distant surface return electrode while electric field measurements are made at the surface over the target of interest. This paper presents both numerical modelling results and measured data from a hydraulic fracturing field test where conductive water was injected into a resistive shale reservoir during a hydraulic fracturing operation. Modelling experiments show that anomalies due to hydraulic fracturing are small but measureable with highly sensitive sensor technology. The field measurements confirm the model results,showing that measured differences in the surface fields due to hydraulic fracturing have been detected above the noise floor. Our results show that the DSR method is sensitive to the injection of frac fluids; they are detectable above the noise floor in a commercially active hydraulic fracturing operation, and therefore this method can be used for monitoring fracture fluid movement.

02 PETROLEUM↗

Building America Case Study: Standard- Versus High-Velocity Air Distribution in High-Performance Townhomes, Denver, Colorado

IBACOS investigated the performance of a small-diameter high velocity heat pump system compared to a conventional system in a new construction triplex townhouse. A ductless heat pump system also was installed for comparison, but the homebuyer backed out because of aesthetic concerns about that system. In total, two buildings, having identical solar orientation and comprised of six townhomes, were monitored for comfort and energy performance. Results show that the small-diameter system provides more uniform temperatures from floor to floor in the three-story townhome. No clear energy consumption benefit was observed from either system. The builder is continuing to explore the small-diameter system as its new standard system to provide better comfort and indoor air quality. The homebuilder also explored the possibility of shifting its townhome product to meet the U.S. Department of Energy Challenge Home National Program Requirements. Ultimately, the builder decided that adoption of these practices would be too disruptive midstream in the construction cycle. However, the townhomes met the ENERGY STAR Version 3.0 program requirements.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Solids-based concentrated solar power receiver

A concentrated solar power (CSP) system includes channels arranged to convey a flowing solids medium descending under gravity. The channels form a light-absorbing surface configured to absorb solar flux from a heliostat field. The channels may be independently supported, for example by suspension, and gaps between the channels are sized to accommodate thermal expansion. The light absorbing surface may be sloped so that the inside surfaces of the channels proximate to the light absorbing surface define downward-slanting channel floors, and the flowing solids medium flows along these floors. Baffles may be disposed inside the channels and oriented across the direction of descent of the flowing solids medium. The channels may include wedge-shaped walls forming the light-absorbing surface and defining multiple-reflection light paths for solar flux from the heliostat field incident on the light-absorbing surface.

14 SOLAR ENERGY↗

Optically-based interstory drift meter system for rapid assessment of the earthquake response of building structures

A sensor system provides measurement of building interstory drift based on a laser beam impinging on a discrete diode sensor array. The diode sensor array determines the location at which a projected laser bean strikes the array, which provides a direct measurement of interstory drift. The diode sensor array is a two dimensional array of discrete diodes that allow the location of an impinging laser beam to be very accurately tracked as the beam moves back-and-forth across the diode array. Local rotations of the laser source that result from rotations of structural members (e.g. floor beam rotation) are appropriately corrected for. This allows accurate, dynamic measurements of the interstory drift between two floor levels of a shaking building.

47 OTHER INSTRUMENTATION↗

Building framing system

A building framing system includes a floor portion or floor framing system, a wall portion or wall framing system, and a roof portion or roof framing system. Each framing system comprises a plurality of components. Each component defines a connection geometry for connecting one component to another. The connection geometries are such that mechanical or other similar fasteners are not required to hold the various components together; rather, the connection geometries connect the components and hold them in place with respect to one another. Further, the framing systems utilize pre-cut components such that the components of each framing system arrive onsite cut to a needed length and width and with the appropriate connection geometry.

Albright, Dustin Graham↗

Electrolysis' Potential Value for Supporting the Electrical Grid

The H2@Scale concept includes a value proposition for electrolysis that benefits both hydrogen markets and the electricity system. Electrolysis has the potential to be an alternative low-cost hydrogen source by using low-price electricity that may be available for only a limited number of hours annually. It also has the potential to provide value to the grid through use of that low-cost electricity. By doing so, electrolysis can create a price floor which could support additional investment in low-cost, dispatch-constrained electricity (LDE) generation such as photovoltaic solar, wind, and nuclear. The rapid-response characteristics of low-temperature electrolysis enables it to also provide ancillary services to the grid such as operating reserves and frequency control. We evaluate the economic performance of water electrolysis in a selection of electricity markets - both current and potential future markets. To perform that evaluation, we collect locational marginal prices (LMPs) in each market, calculate levelized hydrogen costs, and compare them to cost estimates of producing hydrogen via steam methane reforming of natural gas. Those calculations also include electolyzer capital and operating costs. We perform the calculations across a range of capacity factors to identify the minimum levelized hydrogen cost in that range. We discuss the implications of that capacity factor for each market analyzed. For a couple of the analyzed electricity markets, we include the potential value of providing ancillary services in the calculation and discuss those impacts. LDE generation has been shown to suppress electricity prices because it generates electricity when the resource is available (i.e., the sun is shining, wind is blowing, nuclear heat is being produced) and the generation cannot be reduced without an economic penalty. Price suppression is likely to reduce investment in those technologies due to reductions in projected income of each marginal unit. If electrolyzers are willing to pay for the LDE, it could provide a price floor for electricity. We analyze how setting a price for LDE could impact the electricity generation fleet, the availability of LDE, and the potential levelized costs of producing hydrogen using that LDE. Among other results, we will present a set of supply curves showing potential production costs and availability for hydrogen produced from LDE in a future with high penetrations of renewable electricity on the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Updated OpenStudio Small and Medium Office Prototype Models

The U.S. Department of Energy supports the development of commercial building energy codes and standards by participating in industry review, update processes, and providing technical analyses to support both published model codes and potential changes. In support of ANSI/ASHRAE/IES Standard 90.1 and International Energy Conservation Code, 16 commercial prototype building models were developed that cover 80% of the commercial building floor area in the United States for new construction, including both commercial buildings and mid- to high-rise residential buildings, across all U.S. climate zones. Of these, the small, medium, and large office buildings take about 12% of total commercial building floor area.Currently, small, medium, and large office prototype building models have simplified, single space type, while other building types includes more detailed space types. As such, the office prototype could not be easily used to properly assess changes (i.e. measures applied) to difference spaces commonly found in an office. This work has added new space types to the small and medium office, with properties based on several vintages of ASHRAE Standard 90.1 in different climate zones, and compared energy use of these newly-improved models with that of the original models.

Im, Piljae↗

Nuclear reactor support and seismic restraint with core retention cooling features

A nuclear island includes a nuclear reactor, a lateral seismic restraint, and a reactor core retention cooling system. The lateral seismic restraint includes a vertically oriented pin attached to one of the bottom of the lower vessel head and the floor underneath the nuclear reactor, and a mating pin socket is attached to the other of the bottom of the lower vessel head and the floor. The reactor core retention cooling system includes one or more baffles, optionally thermally insulating material, disposed alongside the exterior surface of a lower portion of the reactor pressure vessel including at least the lower vessel head. A plenum is defined between the one or more baffles and the exterior surface of a lower portion of the reactor pressure vessel. The one or more baffles may define a lower plenum inlet surrounding the lateral seismic restraint.

Edwards, Tyler A.↗

Evaporator stacks and electronic assemblies

Provided is an evaporator stack. The evaporator stack may be used in power-dense electronic assemblies. The evaporator stack includes a lower floor including at least one mounded portion, and an enclosure surrounding the lower floor, wherein a height of the enclosure is greater than a height of the at least one mounded portion, the at least one mounded portion extending between two walls of the enclosure.

Roan, Thomas J.↗

Cleanup of Nuclear Licensed Facility 57

This summary describes the operations to clean up the equipment of the Nuclear Licensed Facility 57 (NLF 57). Due to the diversity of the research and development work carried out on the reprocessing of spent fuel in it, this installation is emblematic of many of the technical and organizational issues liable to be encountered in the final closure of nuclear facilities. The French atomic energy commission's center at Fontenay aux Roses (CEA-FAR) was created in 1946 to house pile ZOE. Laboratories for fuel cycle research were installed in existing buildings at the site. Work was later concentrated on spent fuel reprocessing, in a pilot workshop referred to as the 'Usine Pu'. In the early sixties, after the dismantling of these first generation facilities, a radiochemistry laboratory dedicated to research and development work on reprocessing was constructed, designated Building 18. During the same decade, more buildings were added: Building 54, storehouses and offices, Building 91, a hall and laboratories for chemical engineering research on natural and depleted uranium. Together, these three building constitute NLF 57. Building 18 architecture featured four similar modules. Each module had three levels: a sub-level consisting of technical galleries and rooms for the liquid effluent tanks, a ground floor and roof space in which the ventilation was installed. Offices, change rooms, four laboratories and a hall were situated on the ground floor. The shielded lines were installed in the laboratories and the halls. Construction of the building took place between 1959 and 1962, and its commissioning began in 1961. The research and development programs performed in NLF 57 related to studies of the reprocessing of spent fuel, including dry methods and the Purex process, techniques for the treatment of waste (vitrification, alpha waste decontamination, etc.) as well as studies and production of transuranic elements for industry and research. In addition to this work, the necessary methods of analysis for monitoring it were also developed. The research and development program finally ended on 30 June 1995. The NLF 57 cleanup program was intended to reduce the nuclear and conventional hazards and minimize the quantities of HLW and MLW during the subsequent dismantling work. To facilitate the organization of the cleanup work, it was divided into categories by type: - treatment and removal of nuclear material, - removal of radioactive sources, - treatment and removal of aqueous liquid waste, - treatment and removal of organic effluents, - treatment and removal of solid waste, - pumping out of the PETRUS tank, - flushing and decontamination of the tanks, - cleanup of Buildings 18 and 91/54. To estimate the cost of the operations and to monitor the progress of the work, an indicator system was put in place based on work units representative of the operation. The values of the work units were periodically updated on the basis of experience feedback. The cleanup progress is now 92% complete (06/12/31): - treatment and removal of nuclear material: 100%, - removal of radioactive sources: 100%, - treatment and removal of aqueous liquid waste: 64%, - treatment and removal of organic effluents: 87%, - treatment and removal of solid waste: 99%, - pumping out of the PETRUS tank: 69%, - flushing and decontamination of tank: 75%, - section cleaning of Buildings 18 and 91/: 90%. The DRSN/SAFAR is the delegated Project Owner for cleanup and dismantling operations. It is also the prime contractor for the cleanup and dismantling operations. SAFAR itself is responsible for operations relating to the CEA activity and those with technical risks (Removal of nuclear materials, Removal of radioactive sources, Pumping out plutonium and transuranic contaminated solvent and Flushing and decontamination of tanks and pipes). All other operations are sub-contracted to specialist companies. The NLF57 cleanup program as executed is capable of attaining activity levels compatible with a future dismantling operation using known and mastered techniques and producing a minimum of HLW.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

K-25 Structural Separation and Demolition

The K-25 building is a former gaseous diffusion plant, built in 1944-1945 as part of the United States Manhattan Project. The structure was the largest structure under one roof, surpassed only by the Pentagon. Together the three wings represent about 17.8 hectare (44 acres) under roof and are generally about 18.3 meters (60 ft.) high on the outside face and approximately 12.2 meters (40 ft.) high on the inside face. The entire structure was built in the shape of a 'U', with a lateral distance of approximately one mile. It was constructed in individual building units with each unit connected using expansion joint-type connection. A single unit is approximately 24.4 meters (80 ft.) across and 122 meters (400 ft.) deep. The northern structure is connected to the eastern and western structures at the upper level floors. The four-level, U-shaped building is a steel-frame structure with corrugated cement-asbestos siding. The cell level is an elevated concrete structure supported by reinforced concrete columns located in the basement, or vault area. The vault area can be accessed at grade level from the outside perimeter. Inside the courtyard, the grade level has been raised to provide entry to the second or cell floor level. An engineering evaluation of the structure was performed to determine the condition of the structure and possibility of unplanned collapse of any portion of the structure. The evaluation included physical inspections, calculations for wind, pre-demolition loads, and evaluation of failure modes. The results of the evaluation have provided guidance for the demolition plan and the development of criteria for protection of personnel performing pre-demolition activities. Challenges include degradation of the structure that necessitated repair, dealing with changes in the code revisions from both the American Concrete Institute (ACI) and the American Institute of Steel Construction (AISC), access to areas of the structure that were not necessarily designed for access, and acceleration of the building degradation due to the pre-demolition activities. When a full building is evaluated, 50 percent of wind and applied forces are dissipated in 3 units and 80 percent is dissipated in 12 units. The forces are basically linear for the first 6 units once the building is opened at the start of demolition. Some column buckling, based on current codes, was noted in the analysis that would have to be mitigated to ensure a controlled demolition. Loading for the removal of the equipment required structural engineering evaluation of the certainty of the load and the application of the load. Corbels are being evaluated through an inspection program and criteria for repair based on current loading and anticipated additional live loads. Access issues continue to be a challenge and have created the need for a significant fall protection program. Other areas of access require different approaches and engineering solutions, sometime considering ultimate strength design versus standard yield stress design. An evaluation of separating a wing into two sections to allow for worker re-entry to perform pre-demolition activities during the demolition off shift was conducted. The evaluation has shown that because of both design and history of the K-25 and K-27 Buildings, significant care and attention is needed to demolish these structures from a structural perspective. When the project schedule issues are overlaid, that may demand workers in other parts of the structure after demolition has begun, the structural issues become severe, demanding exacting analysis and significant controls to ensure the safety of the workers both in and outside the building performing the demolition work.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Phased Demolition of an Occupied Facility

The U.S. government constructed the K-1401 facility in the late 1940's as a support building for various projects supporting the uranium gaseous diffusion process. In 2004 the U.S. Department of Energy authorized Bechtel Jacobs Company, LLC (BJC) to decontaminate and demolish the facility. The K-1401 facility was used for a variety of industrial purposes supporting the gaseous diffusion process. Many different substances were used to support these processes over the years and as a result different parts of the facility were contaminated with fluorine, chlorine trifluoride, uranium and technetium radiological contamination, asbestos, and mercury. The total facility area is 46,015 m{sup 2} (495,000 sf) including a 6,800 m{sup 2} basement (73,200 sf). In addition to the contamination areas in the facility, a large portion was leased to businesses for re-industrialization when the D and D activities began. The work scope associated with the facility included purging and steam cleaning the former fluorine and chlorine trifluoride systems, decontaminating loose radiologically contaminated and mercury spill areas, dismantling former radiological lines contaminated with uranium oxide compounds and technetium, abating all asbestos containing material, and demolishing the facility. These various situations contributed to the challenge of successfully conducting D and D tasks on the facility. In order to efficiently utilize the work force, demolition equipment, and waste hauling trucks the normal approach of decontaminating the facility of the hazardous materials, and then conducting demolition in series required a project schedule of five years, which is not cost effective. The entire project was planned with continuous demolition as the goal end state. As a result, the first activities, Phase 1, required to prepare sections for demolition, including steam cleaning fluorine and chlorine trifluoride process lines in basement and facility asbestos abatement, were conducted while the tenants who were leasing floor space in the facility moved out. Upon completion of this phase the facility was turned over to the demolition project and the most hazardous materials were removed from the facility. Phase 2 activities included removing the process gas lines from sections C/D/E while decontaminating and preparing sections A and B for demolition. Demolition preparation activities include removing transit siding and universal waste from the area. Phase 3 began with demolition activities in sections A and B1 while continuing process gas line removal from sections C/D/E, as well as conducting demolition preparation activities to these sections. Area B was split into two sections, allowing demolition activities to occur in section B1 while personnel could still access the upper floor in sections C, D, and E. Once demolition began in section B2, personnel entry was only authorized in the basement. This timeline initiated phase 4, and the project completed cleaning the process components from the basement while section B2 demolition began. The final phase, phase 5, began once the basement was cleared. Final demolition activities began on sections C, D, E, and the basement. This material will ship for disposal and is scheduled for completion during FY07. Because the project was able to successfully phase demolition activities, the total facility demolition schedule was reduced by half to 2-1/2 years. The project was able to move portions of the demolition schedule from working in series to working in parallel, allowing the job to deliver facility demolition debris to ship for disposal 'just in time' as the facility was demolished.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decommissioning Lines-of-Inquiry for Design Review of New Nuclear Facilities

An independent review of the design of the Salt Waste Processing Facility (SWPF) at Savannah River included a requirement to address the ability to decommission the facility. This paper addresses the lines of inquiry (that were developed for the review and their use in future for reviews of other projects, referred to herein as 'DDLOI'. Decommissioning activities for almost any type of facility are well within the technological state-of-the-art. The major impacts for complications resulting from insufficient consideration during design of a new facility that involves radioactive processes and/or material is the cost of: a) gaining access to high radiation areas and b) dealing with high levels of contamination. For this reason, the DDLOI were developed as a way of raising the awareness of designers and design reviewers to design features that can impede or facilitate ultimate decommissioning. The intent is that this report can be used not only for review, but also by engineers in the early stages of design development when requirements are being assembled. The focus for the DDLOI is on types of facilities that contain nuclear and/or radioactive processes and materials. The level of detail is more specific than would be found in decommissioning plans prepared for regulatory purposes. In commencing this review, the author's could find no precedent for a systematic review of design for decommissioning that included results of a review. Therefore, it was decided to create a report that would provide detailed lines of inquiry along with the rationale for each. The resulting DDLOI report included 21 topical areas for design review. The DDLOI combined the authors' experience in developing baselines for facilities to be deactivated or demolished with prior publications by the U.S. Army and the International Atomic Energy Agency. These two references were found via an Internet search and were the only ones judged to be useful at a field application level. Most others addressed principles or methods but did not have specific recommendations at a detailed design level. The DDLOI not only recommended what reviewers should look for, but also provides the reason as to why each item is important. Overall, the 21 topical areas there are presented in four main sections, which are: - Yard and Exterior Spaces addresses yard areas, underground tunnels, vaults, roofs and siding. - Structures and Interior Spaces addresses interior spaces, use of hazardous materials, placement of large or heavy equipment, and walls and floors designed for shielding. - Systems and Equipment first addresses systems for deactivation, service and utility systems isolation, pipes and ducts, tanks, and crud traps. In addition, DDLOI for laboratories, gloveboxes, and hot cells are included. - Contamination Control addresses the design of, walls, floors, ceilings, sumps, and drains with regard to contamination control. The ability to decontaminate is also included. The final section of the report is a listing of the individual DDLOI topics in a table format, which is designed as a tool that for use as a review checklist. In applying the DDLOI, two cautions are advised: - Designing for the operational mission of the facility is a higher priority than accommodating ease of decommissioning. The recommendations should be considered as preferable design practices when they can be accommodated without compromising the primary design objectives. - The DDLOI should be considered as guidance and not design requirements; noting some will become requirements because they are incorporated in modern building codes. Applying the DDLOI to the SWPF resulted in an overall conclusion that the design for the most part was compatible with the ability to decommission the facility. The most significant recommendation was to completely line the walls of a hot cell with stainless steel that was originally designed with two of its sides as the concrete wall of the building. This recommendation was subsequently incorporated in the design. Future design reviews of nuclear or radioactively contaminated facilities, whether by independent parties or the designers themselves, can benefit from the lines-of-inquiry that are the subject of this paper. The DDLOI, with an example of their use, are in a public domain report, which is freely available from the authors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shielded Payload Containers Will Enhance the Safety and Efficiency of the DOE's Remote Handled Transuranic Waste Disposal Operations

The Waste Isolation Pilot Plant (WIPP) disposal operation currently employs two different disposal methods: one for Contact Handled (CH) waste and another for Remote Handled (RH) waste. CH waste is emplaced in a variety of payload container configurations on the floor of each disposal room. In contrast, RH waste is packaged into a single type of canister and emplaced in pre-drilled holes in the walls of disposal rooms. Emplacement of the RH waste in the walls must proceed in advance of CH waste emplacement. This poses a significant logistical constraint on waste handling operations by requiring significant coordination between waste characterization and preparations for shipping among the various generators. To improve operational efficiency, the Department of Energy (DOE) is proposing a new waste emplacement process for certain RH waste streams that can be safely managed in shielded containers. RH waste with relatively low gamma-emitting activity would be packaged in lead-lined containers, shipped to WIPP in existing certified transportation packages for CH waste, and emplaced in WIPP among the stacks of CH waste containers on the floor of a disposal room. RH waste with high gamma-emitting activity would continue to be emplaced in the boreholes along the walls. The new RH container appears essentially the same as a nominal 208-liter drum, but is built with about 2.5 cm of lead, sandwiched between thick steel sheet. The top and bottom are made of very thick plate steel, for strengthening the package to meet transportation requirements, and provide similar gamma attenuation. This robust configuration provides an overpack for waste that otherwise would be remotely handled. Up to a 3:1 reduction in number of shipments is projected if RH waste were transported in the proposed shielded containers. This paper describes the container design and testing, as well as the regulatory approach used to meet the requirements that apply to WIPP and its associated transportation system. This paper describes the RH transuranic waste inventory that may be candidates for packaging and emplacement in shielded containers. DOE does not propose to use shielded containers to increase the amount of RH waste allowed at WIPP. DOE's approach to gain approval for the transportation of shielded containers and to secure regulatory approval for use of shielded containers from WIPP regulators is discussed. Finally, the paper describes how DOE proposes to count the waste packaged into shielded containers against the RH waste inventory and how this will comply with the volume and radioactivity limitations imposed in the many and sometimes overlapping regulations that apply to WIPP. (authors)

42 ENGINEERING↗

Overview of the Westinghouse Small Modular Reactor building layout

The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (>225 MWe) integral pressurized water reactor (iPWR), in which all of the components typically associated with the nuclear steam supply system (NSSS) of a nuclear power plant are incorporated within a single reactor pressure vessel. This paper is the third in a series of four papers, which describe the design and functionality of the Westinghouse SMR. It focuses in particular upon the plant building layout and modular design of the Westinghouse SMR. In the development of small modular reactors, the building layout is an area where the safety of the plant can be improved by applying new design approaches. This paper will present an overview of the Westinghouse SMR building layout and indicate how the design features improve the safety and robustness of the plant. The Westinghouse SMR is designed with no shared systems between individual reactor units. The main buildings inside the security fence are the nuclear island, the rad-waste building, the annex building, and the turbine building. All safety related equipment is located in the nuclear island, which is a seismic class 1 building. To further enhance the safety and robustness of the design, the reactor, containment, and most of the safety related equipment are located below grade on the nuclear island. This reduces the possibility of severe damage from external threats or natural disasters. Two safety related ultimate heat sink (UHS) water tanks that are used for decay heat removal are located above grade, but are redundant and physically separated as far as possible for improved safety. The reactor and containment vessel are located below grade in the center of the nuclear island. The rad-waste and other radioactive systems are located on the bottom floors to limit the radiation exposure to personnel. The Westinghouse SMR safety trains are completely separated into four unconnected quadrants of the building, with access between quadrants only allowed above grade. This is an improvement to conventional reactor design since it prevents failures of multiple trains during floods or fires and other external events. The main control room is located below grade, with a remote shutdown room in a different quadrant. All defense in depth systems are placed on the nuclear island, primarily above grade, while the safety systems are located on lower floors. The economics of the Westinghouse SMR challenges the established approach of large Light Water Reactors (LWR) that utilized the economies of scale to reach economic competitiveness. To serve the market expectation of smaller capital investment and cost competitive energy, a modular design approach is implemented within the Westinghouse SMR. The Westinghouse SMR building layout integrates the three basic design constraints of modularization; transportation, handling and module-joining technology. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗