Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “division”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

20/30 GHz satellite personal communications networks

The feasibility of personal communications networks that can provide 4.8-kbps voice communications between portable terminals and a hub station via a Ka-band geosynchronous satellite has been investigated. Tradeoffs are examined so that the combined system of hub and gateway earth stations, the satellite, and the personal terminals can provide a competitive service in terms of cost, availability, and quality. A baseline system is described using a spacecraft with approximately 140 spot beams that cover CONUS with 5-watt power amplifiers in each beam. Satellite access in both the forward and return directions uses frequency division multiple access/code division multiple access with a chip rate of 2.5 Mchip/sec.

Palmer, L. C.↗

Space Station communications and tracking systems modeling and RF link simulation

In this final report, the effort spent on Space Station Communications and Tracking System Modeling and RF Link Simulation is described in detail. The effort is mainly divided into three parts: frequency division multiple access (FDMA) system simulation modeling and software implementation; a study on design and evaluation of a functional computerized RF link simulation/analysis system for Space Station; and a study on design and evaluation of simulation system architecture. This report documents the results of these studies. In addition, a separate User's Manual on Space Communications Simulation System (SCSS) (Version 1) documents the software developed for the Space Station FDMA communications system simulation. The final report, SCSS user's manual, and the software located in the NASA JSC system analysis division's VAX 750 computer together serve as the deliverables from LinCom for this project effort.

Tsang, Chit-Sang↗

Space physics strategy: Implementation study. Volume 2: Program plan

In June, 1989, the Space Science and Applications Advisory Committee (SSAAC) authorized its Space Physics Subcommittee (SPS) to prepare a plan specifying the future missions, launch sequence, and encompassing themes of the Space Physics Division. The plan, now complete, is the product of a year-long study comprising two week-long workshops - in January and June 1990 - assisted by pre-workshop, inter-workshop, and post-workshop preparation and assessment activities. The workshops engaged about seventy participants, drawn equally from the Division's four science disciplines: cosmic and heliospheric physics, solar physics, magnetosphere physics, and ionosphere-thermosphere-mesospheric physics. An earlier report records the outcome of the first workshop; this is the report of the final workshop.

Source record↗

Neuroscience discipline science plan

Over the past two decades, NASA's efforts in the neurosciences have developed into a program of research directed at understanding the acute changes that occur in the neurovestibular and sensorimotor systems during short-duration space missions. However, the proposed extended-duration flights of up to 28 days on the Shuttle orbiter and 6 months on Space Station Freedom, a lunar outpost, and Mars missions of perhaps 1-3 years in space, make it imperative that NASA's Life Sciences Division begin to concentrate research in the neurosciences on the chronic effects of exposure to microgravity on the nervous system. Major areas of research will be directed at understanding (1) central processing, (2) motor systems, (3) cognitive/spatial orientation, and (4) sensory receptors. The purpose of the Discipline Science Plan is to provide a conceptual strategy for NASA's Life Sciences Division research and development activities in the comprehensive area of neurosciences. It covers the significant research areas critical to NASA's programmatic requirements for the Extended-Duration Orbiter, Space Station Freedom, and exploration mission science activities. These science activities include ground-based and flight; basic, applied, and operational; and animal and human research and development. This document summarizes the current status of the program, outlines available knowledge, establishes goals and objectives, identifies science priorities, and defines critical questions in the subdiscipline areas of nervous system function. It contains a general plan that will be used by NASA Headquarters Program Offices and the field centers to review and plan basic, applied, and operational intramural and extramural research and development activities in this area.

Source record↗

Rendezvous radar for the orbital maneuvering vehicle

The Rendezvous Radar Set (RRS) was designed at Motorola's Strategic Electronics Division in Chandler, Arizona, to be a key subsystem aboard NASA's Orbital Maneuvering Vehicle (OMV). The unmanned OMV, which was under development at TRW's Federal Systems Division in Redondo Beach, California, was designed to supplement the Shuttle's satellite delivery, retrieval, and maneuvering activities. The RRS was to be used to locate and then provide the OMV with vectoring information to the target satellite (or Shuttle or Space Station) to aid the OMV in making a minimum fuel consumption approach and rendezvous. The OMV development program was halted by NASA in 1990 just as parts were being ordered for the RRS engineering model. The paper presented describes the RRS design and then discusses new technologies, either under development or planned for development at Motorola, that can be applied to radar or alternative sensor solutions for the Automated Rendezvous and Capture problem.

Locke, John W.↗

Report of the SSME assessment team

In response to a request from the House of Representatives Committee on Science, Space, and Technology in its Report No. 102-500 of April 22, 1992, the Aerospace Safety Advisory Panel (ASAP) created an ad hoc task force to conduct a thorough assessment of the Space Shuttle Main Engine (SSME). The membership was drawn mostly from organizations other than ASAP, and this report represents the views of that task force. Its task was to assess the risk that the SSME poses to the safe operation of the Space Shuttle, to identify and evaluate improvements to the engine that would reduce the risk, and to recommend a set of priorities for the implementation of these improvements. The SSME Assessment Team, as it opted to call itself, convened in mid-1992 and, subsequently, met with and gathered information from all the principal organizations involved in the SSME program. These included the Rocketdyne Division of Rockwell International, the Marshall Space Flight Center of NASA, and the Pratt & Whitney Division of United Technologies Corporation. The information in this report reflects the program status as of October 1992. From the information received, the Team formed its conclusions and recommendations. Changes in the program status have, of course, occurred since that time; however, they did not affect the Team's conclusions and recommendations.

Source record↗

OSSA Space Station Freedom science utilization plans

Long duration exposure to an essentially zero-gravity environment is a phenomenon exclusive to the Space Station Freedom that cannot be duplicated on Earth. The Freedom Station will offer periods of time on orbit extending to weeks and months rather than hours or days, allowing for in-depth space based research and analysis to a degree never before achieved. OSSA remains committed to exploiting the unique capabilities provided by the Space Station as well as other space-based facilities to study the nature of physical, chemical, and biological processes in a low-gravity environment and to apply these studies to advance science and applications in such fields as biomedical research, plant and animal physiology, exobiology, biotechnology, materials science, fluid physics, and combustion science. The OSSA focus is on progressive science investigations, many requiring hands-on scientist involvement using sophisticated experiment hardware. OSSA science utilization planning for the Freedom Station is firmly established. For this presentation, this planning is discussed in three general areas: OSSA goals and overall approach, the current and on-going program, and plans for space station utilization. In the first area, OSSA addresses its overall approach to space science research, its commitment to transition to Space Station Freedom, and its top-level strategy for the utilization of Freedom. The current and on-going program is next discussed, focusing on the various Spacelab series of missions which are providing the stepping-stones to Space Station Freedom. Selected science results from SLS-1 and USML-1 are cited which underline the value of properly outfitted laboratories in space in which crew-intensive experiment interactions are possible. The presentation is concluded with a discussion of top-level goals and strategies for utilizing the Freedom Station by OSSA's Life Sciences Division and its Microgravity Science and Applications Division.

Cressy, Philip J.↗

Life sciences utilization of Space Station Freedom

Space Station Freedom will provide the United States' first permanently manned laboratory in space. It will allow, for the first time, long term systematic life sciences investigations in microgravity. This presentation provides a top-level overview of the planned utilization of Space Station Freedom by NASA's Life Sciences Division. The historical drivers for conducting life sciences research on a permanently manned laboratory in space as well as the advantages that a space station platform provides for life sciences research are discussed. This background information leads into a description of NASA's strategy for having a fully operational International Life Sciences Research Facility by the year 2000. Achieving this capability requires the development of the five discipline focused 'common core' facilities. Once developed, these facilities will be brought to the space station during the Man-Tended Capability phase, checked out and brought into operation. Their delivery must be integrated with the Space Station Freedom manifest. At the beginning of Permanent Manned Capability, the infrastructure is expected to be completed and the Life Sciences Division's SSF Program will become fully operational. A brief facility description, anticipated launch date and a focused objective is provided for each of the life sciences facilities, including the Biomedical Monitoring and Countermeasures (BMAC) Facility, Gravitational Biology Facility (GBF), Gas Grain Simulation Facility (GGSF), Centrifuge Facility (CF), and Controlled Ecological Life Support System (CELSS) Test Facility. In addition, hardware developed by other NASA organizations and the SSF International Partners for an International Life Sciences Research Facility is also discussed.

Chambers, Lawrence P.↗

Space biology initiative program definition review. Trade study 5: Modification of existing hardware (COTS) versus new hardware build cost analysis

The JSC Life Sciences Project Division has been directly supporting NASA Headquarters, Life Sciences Division, in the preparation of data from JSC and ARC to assist in defining the Space Biology Initiative (SBI). GE Government Services and Horizon Aerospace have provided contract support for the development and integration of review data, reports, presentations, and detailed supporting data. An SBI Definition (Non-Advocate) Review at NASA Headquarters, Code B, has been scheduled for the June-July 1989 time period. In a previous NASA Headquarters review, NASA determined that additional supporting data would be beneficial to determine the potential advantages in modifying commercial off-the-shelf (COTS) hardware for some SBI hardware items. In order to meet the demands of program implementation planning with the definition review in late spring of 1989, the definition trade study analysis must be adjusted in scope and schedule to be complete for the SBI Definition (Non-Advocate) Review. The relative costs of modifying existing commercial off-the-shelf (COTS) hardware is compared to fabricating new hardware. An historical basis for new build versus modifying COTS to meet current NMI specifications for manned space flight hardware is surveyed and identified. Selected SBI hardware are identified as potential candidates for off-the-shelf modification and statistical estimates on the relative cost of modifying COTS versus new build are provided.

Jackson, L. Neal↗

NASA's ultraviolet astrophysics branch - The next decade

We review some of the mission concepts currently being considered by NASA's Astrophysics Division to carry out future observations in the 100-3000 Angstrom region. Examples of possible future missions include UV and visible interferometric experiments, a next generation Space Telescope and lunar-based UV instrumentation. In order to match the science objectives of these future missions with new observational techniques, critical technology needs in the ultraviolet regime have been identified. Here we describe how NASA's Astrophysics Division Advanced Programs Branch is attempting to formulate an integrated technology plan called the 'Astrotech 21' program in order to provide the technology base for these astrophysics missions of the 21st century.

Welsh, Barry Y.↗

Efficient demultiplexing algorithm for noncontiguous carriers

A channel separation algorithm for the frequency division multiple access/time division multiplexing (FDMA/TDM) scheme is presented. It is shown that implementation using this algorithm can be more effective than the fast Fourier transform (FFT) algorithm when only a small number of carriers need to be selected from many, such as satellite Earth terminals. The algorithm is based on polyphase filtering followed by application of a generalized Walsh-Hadamard transform (GWHT). Comparison of the transform technique used in this algorithm with discrete Fourier transform (DFT) and FFT is given. Estimates of the computational rates and power requirements to implement this system are also given.

Thanawala, A. A.↗

On the theory of the turbulent boundary layer

As a rule, a division of the turbulent boundary layer is admissible: a division into a part near the wall, where the flow is governed only by the wall effects, and into an outer part, where the wall roughness and the viscosity of the flow medium affects only the wall shearing stress occurring as boundary condition but does not exert any other influence on the flow. Both parts may be investigated to a large extent independently. Under certain presuppositions there result for the outer part "similar" solutions. The theoretical considerations give a cue how to set up, by appropriate experiments and their evaluation, generally valid connections which are required for the approximate calculation of the turbulent boundary layer according to the momentum and energy theorem.

TURBULENCE↗

Acoustic design criteria in a general system for structural optimization

Passenger comfort is of great importance in most transport vehicles. For instance, in the new generation of regional turboprop aircraft, a low noise level is vital to be competitive on the market. The possibilities to predict noise levels analytically has improved rapidly in recent years. This will make it possible to take acoustic design criteria into account in early project stages. The development of the ASKA FE-system to include also acoustic analysis has been carried out at Saab Aircraft Division and the Aeronautical Research Institute of Sweden in a joint project. New finite elements have been developed to model the free fluid, porous damping materials, and the interaction between the fluid and structural degrees of freedom. The FE approach to the acoustic analysis is best suited for lower frequencies up to a few hundred Hz. For accurate analysis of interior cabin noise, large 3-D FE-models are built, but 2-D models are also considered to be useful for parametric studies and optimization. The interest is here focused on the introduction of an acoustic design criteria in the general structural optimization system OPTSYS available at the Saab Aircraft Division. The first implementation addresses a somewhat limited class of problems. The problems solved are formulated: Minimize the structural weight by modifying the dimensions of the structure while keeping the noise level in the cavity and other structural design criteria within specified limits.

Brama, Torsten↗

PTTI-aided ephemeris calculation and rapid data link acquisition for manned space flight

Complexity of future manned space flight mission control can be significantly reduced by integrating GPS, the PTTI source, into telemetry, tracking, and command (TT&C). Future telecommunications, space tracking electronic intelligence, metrology, navigation, and data acquisition will thereby be served, including: on-board ephemeris determination, reduced synchronization time for time division multiple access (TDMA) links, and in-flight clock calibration, increasing on-board autonomy and reducing ground support costs. Manned space transportation through the first quarter of the 21st century will probably depend on a mix of vehicles, including the Advanced Manned Launch System (AMLS), the Personnel Launch System (PLS), and continued use of the Shuttle Fleet. Precise Ephemeris is important on-board for mission success, status monitoring, also for rendezvous and docking. Use of GPS can eliminate ground based tracking/processing, enhancing autonomy and reducing communications bandwidth. GPS time can simplify complicated functions used in bandwidth efficient time division multiple access (TDMA) communications, such as: precise and realtime synchronization of receive reference timing, transmit-timing and acquisition control, unique synchronization word (UW) detection, and elastic buffering. High clock accuracy provides increased signal-to-noise (S/N) ratio during acquisition, permitting narrower acquisition frequency and time windows. Spaceborne systems requirements to provide capabilities such as: refinement of the GEM-72 gravity model based on satellite tracking observations from ATS-6 to GEOS-3, relativistic clock experiments, NASA crustal dynamics program for developing space geodetic techniques to study the earth's crust, its gravity field, and earthquake mechanisms, and multi-disciplinary space geodetic tracking for studying global climatic changes are also reviewed.

Anderman, Alfred↗

Catalysis and biocatalysis program

This final report presents a summary of research activities and accomplishments for the Catalysis and Biocatalysis Program, which was renamed the Biological and Chemical Technologies Research (BCTR) Program, currently of the Advanced Industrial Concepts Division (AICD), Office of Industrial Technologies of the Department of Energy (DOE). The Program was formerly under the Division of Energy Conversion and Utilization Technologies (ECUT) until the DOE reorganization in April, 1990. The goals of the BCTR Program are consistent with the initial ECUT goals, but represent an increased effort toward advances in chemical and biological technology transfer. In addition, the transition reflects a need for the BCTR Program to assume a greater R&D role in chemical catalysis as well as a need to position itself for a more encompassing involvement in a broader range of biological and chemical technology research. The mission of the AICD is to create a balanced Program of high risk, long-term, directed interdisciplinary research and development that will improve energy efficiency and enhance fuel flexibility in the industrial sector. Under AICD, the DOE Catalysis and Biocatalysis Program sponsors research and development in furthering industrial biotechnology applications and promotes the integrated participation of universities, industrial companies, and government research laboratories.

Ingham, J. D.↗

Technical support for digital systems technology development. Task order 1: ISP contention analysis and control

Alternatives for realizing a packet-based network switch for use on a frequency division multiple access/time division multiplexed (FDMA/TDM) geostationary communication satellite were investigated. Each of the eight downlink beams supports eight directed dwells. The design needed to accommodate multicast packets with very low probability of loss due to contention. Three switch architectures were designed and analyzed. An output-queued, shared bus system yielded a functionally simple system, utilizing a first-in, first-out (FIFO) memory per downlink dwell, but at the expense of a large total memory requirement. A shared memory architecture offered the most efficiency in memory requirements, requiring about half the memory of the shared bus design. The processing requirement for the shared-memory system adds system complexity that may offset the benefits of the smaller memory. An alternative design using a shared memory buffer per downlink beam decreases circuit complexity through a distributed design, and requires at most 1000 packets of memory more than the completely shared memory design. Modifications to the basic packet switch designs were proposed to accommodate circuit-switched traffic, which must be served on a periodic basis with minimal delay. Methods for dynamically controlling the downlink dwell lengths were developed and analyzed. These methods adapt quickly to changing traffic demands, and do not add significant complexity or cost to the satellite and ground station designs. Methods for reducing the memory requirement by not requiring the satellite to store full packets were also proposed and analyzed. In addition, optimal packet and dwell lengths were computed as functions of memory size for the three switch architectures.

Stehle, Roy H.↗

The power of cross-functional teams in driving total quality

Garrett Canada, a Division of Allied-Signal Aerospace Canada, has been a member of the Canadian aerospace industry for 40 years. Although Garrett Canada has always been a profitable division with a solid market share, the changing and turbulent business environment and globalization of the aerospace industry has created new demands and challenges. The marketplace is demanding faster introduction of new products, as well as shorter leadtimes for repairs and spares. It was recognized that reducing cycle times for new products and for ongoing production would not only satisfy our customers, it would also enhance our business performance through reduced inventories, lower past due, and more responsiveness to change. It was evident that drastic function changes were required if we were to maintain our position as a premier aerospace supplier. The challenge was to convert a stable, somewhat slow-paced work environment with strong functional boundaries into a boundaryless world class team functioning in a total quality environment and focused on customer satisfaction. Complete and uncompromised customer satisfaction has become our driving force, with Total Quality being our engine to continuously improve our processes and increase our speed. The way in which this transition has been brought about is the subject of this presentation.

Mcclung, Tim M.↗

The next century astrophysics program

The Astrophysics Division within the NASA Office of Space Science and Applications (OSSA) has defined a set of flagship and intermediate missions that are presently under study for possible launch during the next 20 years. These missions and tentative schedules, referred to as the Astrotech 21 Mission Set, are summarized. The missions are in three groups corresponding to the cognizant science branch within the Astrophysics Division. Phase C/D refers to the pre-launch construction and delivery of the spacecraft, and the Operations Phase refers to the period when the mission is active in space. Approximately 1.5 years before the start of Phase C/D, a non-advocate review (NAR) is held to ensure that the mission/system concept and the requisite technology are at an appropriate stage of readiness for full scale development to begin. Therefore, technology development is frozen (usually) as of the date of a successful NAR. An overview of the technology advances required for each of the three wavelength groups is provided in the following paragraphs, along with a brief description of the individual missions.

Swanson, Paul N.↗