Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Canonical coordinates for partial differential equations

Necessary and sufficient conditions are found under which operators of the form Sigma(m, j=1) X(2)sub j + X sub 0 can be made constant coefficient. In addition, necessary and sufficient conditions are derived which classify those linear partial differential operators that can be moved to the Kolmogorov type.

Hunt, L. R.↗

Canonical coordinates for partial differential equations

Necessary and sufficient conditions are found under which operators of the form Sigma (m, j=1) x (2) sub j + X sub O can be made constant coefficient. In addition, necessary and sufficient conditions are derived which classify those linear partial differential operators that can be moved to the Kolmogorov type.

Hunt, L. R.↗

ISS Payload Operations Training Throughout the COVID-19 Pandemic: Impacts, Opportunities and Solutions

The onset of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity. The world’s space agencies and their missions were not immune to the wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that function. Mission support teams, especially for complex and crewed missions like the International Space Station (ISS) were forced to rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their missions, training and certifying flight controllers, as well as ensuring that new team members are ready to join their colleagues. Every element of training was impacted during the pandemic. From orientation and introductory classes for new controllers, simulations, and advanced lessons, On the Job Training (OJT) and final evaluations; all aspects faced challenges. Trainers at NASA’s Marshall Space Flight Center in Huntsville, Alabama were forced to become more efficient with trainees and resources to continue supporting ISS payload operations. The pandemic arrived in the USA in March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to key facilities was restricted. Trainers and trainees had to quickly shift to 100% remote learning. In the short term, this was not a problem. However, instructors discovered lessons they were accustomed to delivering in a classroom environment often did not translate to remote teaching. Another hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of even small simulations proved to be challenging due to Information Technology (IT) restrictions and public internet limitations. With simulations essentially halted, as well as the restrictions on most OJT, trainees were essentially stopped in their advancement towards certification. Once limitations were identified, trainers prioritized new options. Transitioning to all electronic learning materials was a relatively easy fix. Teaching to large groups took additional shifts in the training paradigm. Methods for preparing astronauts for their missions were revised. Simulation supervisors found efficient techniques to provide realistic training experiences. Communication and coordination with management was essential. In every case, the payload operations instructors found novel solutions to all functions listed. This paper discusses the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Psychophysiological Monitoring of Aerospace Crew State

As next-generation space exploration missions necessitate increasingly autonomous systems, there is a critical need to better detect and anticipate crewmember interactions with these systems. The success of present and future autonomous technology in exploration spaceflight is ultimately dependent upon safe and efficient interaction with the human operator. Optimal interaction is particularly important for surface missions during highly coordinated extravehicular activity (EVA), which consists of high physical and cognitive demands with limited ground support. Crew functional state may be affected by a number of variables including workload, stress, and motivation. Real-time assessments of crew state that do not require a crewmember’s time and attention to complete will be especially important to assess operational performance and behavioral health during flight. In response to the need for objective, passive assessment of crew state, the aim of this work is to develop an accurate and precise prediction model of human functional state for surface EVA using multi-modal psychophysiological sensing. The psychophysiological monitoring approach relies on extracting a set of features from physiological signals and using these features to classify an operator’s cognitive state. This work aims to compile a non-invasive sensor suite to collect physiological data in real-time. Training data during cognitive and more complex functional tasks will be used to develop a classifier to discriminate high and low cognitive workload crew states. The classifier will then be tested in an operationally relevant EVA simulation to predict cognitive workload over time. Once a crew state is determined, further research into specific countermeasures, such as decision support systems, would be necessary to optimize the automation and improve crew state and operational performance.

Wusk, Grace C.↗

Max 1991 and beyond

Max '91, a coordinated, broad based observational program, was designed to help maximize the scientific return of solar activity studies. Max '91 benefited from the support of the NOAA space environment laboratory. An important source that increases solar ground based support observations is the solar observing optical network (SOON) solar patrol on tape (SOONSPOT) solar image archival system which has started operations. The past means and the future plans for ground based coordination and communications of Max '91 are summarized. The current status and the future developments of SOONSPOT are presented.

Kiplinger, Alan L.↗

The System Modeling and Analysis of Resiliency in STEReO (SMARt-STEReO)

Wildfire emergency response has remained rooted in relatively low-tech solutions for coordination between ground and aerial assets. These low-tech solutions are robust for the remote environments in which wildfires are usually fought, but limit strategic cross-organizational support and the ability to deploy and effectively utilize aerial assets. As aircraft become more advanced and new technology, including drones, become available to firefighters, a new, more modern method of asset coordination is needed. NASA is working on a project called ‘Scalable Traffic Management for Emergency Response Operations’ (STEReO) to integrate unmanned aerial systems (UAS)and UAS traffic management (UTM)into wildfire response. STEReO’s goals include simplifying the coordination of aerial assets, improving the existing UAS framework, and increasing the role of additional autonomous systems to reduce human risk and to increase system resilience. This paper describes the development of the ‘System Modeling and Analysis of Resiliency in STEReO’ (SMARt-STEReO) project, which aims to model wildfire response and to quantify the additional system resilience that STEReO technology provides firefighters. This paper verifies SMARt-STEReO and defines its scope; it includes experimental and statistical analysis of the impact that the addition of UAS has on both performance metrics and also on performance resiliency response to a given fault. SMARt-STEReO is a grid-based model of fire propagation that incorporates varying crew responses. Through the use of a Python package called ‘fmdtools’, the model easily allows for the addition of faults to the system. These faults allow analysts to investigate various response parameters. Factors including terrain, fuel type and wind speed can be modified to affect the fire propagation; additionally, the number of ground crews, engines, fixed wing aircraft, helicopters, and UAS can be changed to affect the crew response. The communication lines between actors mimic those used in real life situations. This paper explains the development of SMARt-STEReO including background research, verification and validation, and preliminary experimental analysis of system resilience to both a minor and major fault in systems with and without UAS.

Resiliency↗

Unified Universal Control and Coordination of Inverter-Based Resources, and Validation for a PV + Battery Hybrid Plant

As renewable energy deployment grows, hybrid power plants (HPPs) combining photovoltaic (PV) and battery systems must evolve to offer both energy and grid stability services. These systems typically include a mix of grid-following (GFL) and grid-forming (GFM) inverters, presenting unique coordination and control challenges. This Department of Energy–funded project developed and validated a Unified Universal Control and Coordination (UUCC) framework for such PV + battery hybrid plants, enabling seamless and stable operation, including ultrafast black start, autonomous synchronization, and robust frequency and voltage regulation, under different grid conditions. The project significantly advanced the understanding of inverter-based resource (IBR) control by developing and validating three complementary system-level approaches for hybrid GFL/GFM operation: 1. A combined Virtual Resistance (VR)-based GFL and Virtual Oscillator Control (VOC)-based GFM method, where each inverter type is governed by a specialized control strategy. Together, these achieve stable, fast-response coordination, eliminating inrush current and enabling smooth black start and grid synchronization across a wide range of grid strengths. 2. A Deadbeat-based UUCC strategy, which uses discrete-time, switching-cycle-level control for both GFL and GFM inverters. This approach replaces traditional PI/PLL control with a control parameter-free, high-bandwidth framework that supports stable LVRT and instantaneous synchronization under all conditions. 3. A benchmark comparison with Siemens’ commercial GFM microgrid controller, which provided a fast baseline platform. The commercial approach decoupled v & f control was implemented on a commercial microgrid controller.The baseline commercial benchmark helped highlight superior transient response and black start performance offered by the deadbeat and VOC approaches. These technical contributions offer substantial improvements over conventional inverter control schemes, which often rely on slow phase-locked loop (PLL)-based synchronization, require careful control parameters tuning, and prone to unstable in weak grids with GFL inverters and in stiff grid with GFM inverters therefore challenging for hybrid GFL+GFM under all grid conditions. The deadbeat-based UUCC framework enables simpler, faster, and more robust operation of hybrid IBR systems using wide-bandgap (WBG) devices such as SiC power semiconductors. The rapid expansion of hybrid distributed energy resources (DERs), including residential and commercial PV-BESS installations such as Tesla Powerwall, PV with vehicle-to-grid (V2G) capability, and other integrated configurations, presents complex operational challenges for medium-voltage radial distribution feeders. These networks are subject to frequent disturbances such as faults, switching operations, rapid reclosing sequences, and feeder reconfigurations, all of which introduce dynamic stress on IBRs. In addition, planned feeder segmentation and deliberate islanding for resilience will require DERs that can autonomously perform blackstart, establish voltage and frequency references, and resynchronize with the main grid. The advanced deadbeat-based UUCC control and blackstart functionalities developed in this project directly address these requirements, enabling decentralized and autonomous operation of inverter-dominated DERs in distribution systems under a wide range of fault and reconfiguration scenarios. From a public benefit perspective, these innovations enable more reliable and cost-effective integration of renewable energy into distribution networks. The ability to autonomously black start and stabilize grids under varying grid conditions support accelerates recovery from outages and support decentralized resilient energy systems. By reducing system complexity and improving performance, this project lays critical groundwork for future inverter-dominated power grids that are clean, reliable, and accessible to all.

14 SOLAR ENERGY↗

Automation of Coordinated Planning Between Observatories: The Visual Observation Layout Tool (VOLT)

Fulfilling the promise of the era of great observatories, NASA now has more than three space-based astronomical telescopes operating in different wavebands. This situation provides astronomers with the unique opportunity of simultaneously observing a target in multiple wavebands with these observatories. Currently scheduling multiple observatories simultaneously, for coordinated observations, is highly inefficient. Coordinated observations require painstaking manual collaboration among the observatory staff at each observatory. Because they are time-consuming and expensive to schedule, observatories often limit the number of coordinated observations that can be conducted. In order to exploit new paradigms for observatory operation, the Advanced Architectures and Automation Branch of NASA's Goddard Space Flight Center has developed a tool called the Visual Observation Layout Tool (VOLT). The main objective of VOLT is to provide a visual tool to automate the planning of coordinated observations by multiple astronomical observatories. Four of NASA's space-based astronomical observatories - the Hubble Space Telescope (HST), Far Ultraviolet Spectroscopic Explorer (FUSE), Rossi X-ray Timing Explorer (RXTE) and Chandra - are enthusiastically pursuing the use of VOLT. This paper will focus on the purpose for developing VOLT, as well as the lessons learned during the infusion of VOLT into the planning and scheduling operations of these observatories.

Maks, Lori↗

A Generation-Storage Coordination Dispatch Strategy for Power System Based on Causal Reinforcement Learning

In the backdrop of global energy transformation, power systems integrating high proportions of renewable energy sources are facing unprecedented challenges in operational stability and dispatch efficiency. To address these challenges, this study introduces a generation-storage coordination real-time dispatch strategy based on Causal Power System Dynamic Reinforcement Learning (CPSDRL). Diverging from traditional reinforcement learning approaches, CPSDRL innovatively incorporates causal inference within the state prediction model - the crux of model-based reinforcement learning - thereby establishing the Power Causal Dynamic Model (PCDM). Assisted by the prior knowledge of power systems, the model significantly enhances prediction accuracy and reliability through a two-stage training process. Utilizing PCDM, this study further applies a direct policy search algorithm to optimize the real-time dispatch strategy. Experimental results indicate that the proposed method improves the stability of generation-storage coordination real-time dispatch and exhibits competitive advantages in sample efficiency and computational speed, compared to traditional model-based and model-free reinforcement learning algorithms. This method is expected to enhance the practicality and adaptability of causal reinforcement learning techniques in power system scheduling and control.

causal reinforcement learning↗

ADMS and DER Coordinated Capability Demonstrations to Assist Utilities to Increase Resilience and Reliability

The proliferation of distributed energy resources (DERs) presents opportunities and challenges to distribution grid operators. The National Renewable Energy Laboratory (NREL) and Survalent are collaborating to demonstrate advanced distribution management system (ADMS) and DER coordinated capability to assist utilities to increase resilience and reliability. ADMS and Distributed Energy Resource Management System (DERMS) Coordination for Peak Load Management (PLM). Fault Location, Isolation, and Service Restoration (FLISR) in the Presence of DERs. Grid-Edge Intelligent Distribution Automation System for Self-Healing Distribution Grids. These laboratory demonstrations use NREL's ADMS Test Bed.

ADMS↗

Video-Camera-Based Position-Measuring System

A prototype optoelectronic system measures the three-dimensional relative coordinates of objects of interest or of targets affixed to objects of interest in a workspace. The system includes a charge-coupled-device video camera mounted in a known position and orientation in the workspace, a frame grabber, and a personal computer running image-data-processing software. Relative to conventional optical surveying equipment, this system can be built and operated at much lower cost; however, it is less accurate. It is also much easier to operate than are conventional instrumentation systems. In addition, there is no need to establish a coordinate system through cooperative action by a team of surveyors. The system operates in real time at around 30 frames per second (limited mostly by the frame rate of the camera). It continuously tracks targets as long as they remain in the field of the camera. In this respect, it emulates more expensive, elaborate laser tracking equipment that costs of the order of 100 times as much. Unlike laser tracking equipment, this system does not pose a hazard of laser exposure. Images acquired by the camera are digitized and processed to extract all valid targets in the field of view. The three-dimensional coordinates (x, y, and z) of each target are computed from the pixel coordinates of the targets in the images to accuracy of the order of millimeters over distances of the orders of meters. The system was originally intended specifically for real-time position measurement of payload transfers from payload canisters into the payload bay of the Space Shuttle Orbiters (see Figure 1). The system may be easily adapted to other applications that involve similar coordinate-measuring requirements. Examples of such applications include manufacturing, construction, preliminary approximate land surveying, and aerial surveying. For some applications with rectangular symmetry, it is feasible and desirable to attach a target composed of black and white squares to an object of interest (see Figure 2). For other situations, where circular symmetry is more desirable, circular targets also can be created. Such a target can readily be generated and modified by use of commercially available software and printed by use of a standard office printer. All three relative coordinates (x, y, and z) of each target can be determined by processing the video image of the target. Because of the unique design of corresponding image-processing filters and targets, the vision-based position- measurement system is extremely robust and tolerant of widely varying fields of view, lighting conditions, and varying background imagery.

Lane, John↗

An Overview of the Process for Pre-Launch Checkout and Transition Activities in Support of the International Space Station (ISS) Payload Operations Integration Center

The objective of this paper is to provide future ISS scientists and/or engineers with an overview of the coordination process for the preparation and implementation of the pre-launch checkout and transition activities as observed from the Marshall Control Flight Center (MSFC) Payload Operations Integration Center perspective. This includes 4 major phases: (1) Verification and validation of the new command and telemetry databases that are needed for new payload experiments and new onboard formats; (2) Integration testing of the new ground control software and hardware; (3) Final internal and external pre-launch checkouts with cadre and experiment teams; (4) Performance of the actual synchronized transition between MSFC, Johnson Space Center (JSC), and ISS onboard configuration to new onboard software, ground software, and databases.

Digesu, Sam↗

Lunar Surface Concept of Operations for the Global Exploration Roadmap Lunar Surface Exploration Scenario

The International Space Exploration Coordination Group (ISECG) is a voluntary, non-binding coordination forum of 26 space agencies. Building on the 2018 Global Exploration Roadmap (GER) and on growing global interest in space exploration, ISECG’s GER Supplement (Aug 2020) captures the latest developments in lunar exploration planning in an updated Lunar Surface Exploration Scenario. The updated Lunar Surface Exploration Scenario describes a phased approach to implementing infrastructure and exploration on the lunar surface to meet the goals and objectives defined by the ISECG. The updated scenario starts with Boots on the Moon, where space agencies focus on sending humans to the Moon beginning in 2024 and robotic exploration missions to support the 2024 goal and later phases. Next is Phase 2, Lunar Exploration—Expanding and Building, with an emphasis on completion of the proposed lunar surface objectives by exploring the lunar surface diversely and ultimately settling at the most beneficial site. Initial focus is on lunar surface exploration objectives pertaining to human landing and ascent, logistic cargo landers, and long-range traverses. The later focus is on lunar surface exploration objectives pertaining to long duration habitation, crew health and performance, and in-situ resource utilisation (ISRU). The third phase, Sustained Lunar Opportunities, envisages laying the foundation for a sustained and vibrant lunar presence in the coming decades through partnerships with international governments, academia and industry. During this phase, governments would shift their investment focus to further expand the frontier, including Mars exploration missions. This paper will describe the concept of operations by phase that supported the development of the updated scenario, along with refinements to those concepts of operations since the release of the updated scenario. By phase, the paper will describe the scenario, give an overview of the applicable architecture elements, identify functional requirements/needs of those elements, and include a discussion of nominal operations and contingency scenarios.

Markus Landgraf↗

The NASA Space Environments and Effects Program (SEE): Over a Decade of Useful Products for Spacecraft Designers and Operators

SEE program management originated at LaRC in the early 1990's but was transferred to MSFC in FY 1995 and has remained at Marshall since that time, SEE uses 5 technical working groups and NRA's (three since 1994) to achieve its technical objectives. The SEE vision is to develop and maintain a preeminent program in SPACE ENVIRONMENTS AND EFFECTS which provides a coordinated national focus for innovative technology development to support design, development, and operation of spacecraft systems that will accommodate or mitigate effects due to the presence of the space environment. In working toward that goal, SEE has produced, through the years, over 30 major Space Environments and Effects Models and Databases, over 75 major Space Environments and Effects Publications, a website that has had over 112,000 hits since its inception (http://see.msfc.nasa.gov/), distribution of physical products that amounts to over a total of over 260 product deliveries, sponsorship of the last four international Spacecraft Charging Technology Conferences (the major subject matter conference in the world), and sponsorship of numerous technical standards and guidelines in the Space Environments area. Among the recent popular SEE products are the Electric Propulsion Interactions Code (EPIC), the NASA/Air Force Spacecraft Charging Analysis Program (NASCAP-2K), the Interactive Spacecraft Charging Handbook, the Cosmic Ray Effects on Microelectronics Code (CREME 96), the Spacecraft Contamination and Materials Outgassing Effects Knowledge base (SCMOEK), and the Lunar E-Library.

Ferguson, Dale C.↗

System and method for optical fiber preform preparation via high-surface-area coating

The present disclosure relates to a method for forming a glass, ceramic or composite material. The method may involve initially forming a plurality of tubes and then performing a coating operation to coat the plurality of tubes with materials containing metal or metalloid elements, including inorganic compounds, organometallic compounds, or coordination complexes to form coated tubes. The method may further include performing at least one of a thermal operation or a thermochemical operation on the coated tubes to form a solid glass, ceramic, or composite structure with dimensions representing at least one of a rod or fiber.

Lange, Andrew↗

Transformational Spaceport and Range Concept of Operations: A Vision to Transform Ground and Launch Operations

The Transformational Concept of Operations (CONOPS) provides a long-term, sustainable vision for future U.S. space transportation infrastructure and operations. This vision presents an interagency concept, developed cooperatively by the Department of Defense (DoD), the Federal Aviation Administration (FAA), and the National Aeronautics and Space Administration (NASA) for the upgrade, integration, and improved operation of major infrastructure elements of the nation s space access systems. The interagency vision described in the Transformational CONOPS would transform today s space launch infrastructure into a shared system that supports worldwide operations for a variety of users. The system concept is sufficiently flexible and adaptable to support new types of missions for exploration, commercial enterprise, and national security, as well as to endure further into the future when space transportation technology may be sufficiently advanced to enable routine public space travel as part of the global transportation system. The vision for future space transportation operations is based on a system-of-systems architecture that integrates the major elements of the future space transportation system - transportation nodes (spaceports), flight vehicles and payloads, tracking and communications assets, and flight traffic coordination centers - into a transportation network that concurrently accommodates multiple types of mission operators, payloads, and vehicle fleets. This system concept also establishes a common framework for defining a detailed CONOPS for the major elements of the future space transportation system. The resulting set of four CONOPS (see Figure 1 below) describes the common vision for a shared future space transportation system (FSTS) infrastructure from a variety of perspectives.

Source record↗

Field Evaluation of the Baseline Integrated Arrival, Departure, and Surface Capabilities at Charlotte Douglas International Airport

NASA is currently developing a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, through a strong partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The users of the IADS system include the personnel at the Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington Center. This paper describes the Phase 1 Baseline IADS capabilities and field evaluation conducted at CLT from September 2017 for a year. From the analysis of operations data, it is estimated that 538,915 kilograms of fuel savings, and 1,659 metric tons of CO2 emission reduction were achieved during the period with a total of 944 hours of engine run time reduction. The amount of CO2 savings is estimated as equivalent to planting 42,560 urban trees. The results have also shown that the surface metering had no negative impact on on-time arrival performance of both outbound and inbound flights. The technology transfer of Phase 1 Baseline IADS capabilities has been made to the FAA and aviation industry, and the development of additional capabilities for the subsequent phases is underway.

Jung, Yoon C.↗