Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “annual”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Energy I-Corps Annual Report 2024

The U.S. Department of Energy Office of Technology Transitions is pleased to provide an update on the Energy I-Corps program. Now in its ninth year, Energy I-Corps delivers workforce development training and funding support to accelerate clean energy technology commercialization. As of November 2024, 243 teams from 13 National Labs have participated in Energy I-Corps over the course of 19 cohorts and the pilot. Post Energy I-Corps, technologies have attracted more than $197 million in post-program funding and executed 85 licenses.

commercialization↗

FY24 Laboratory Directed Research and Development Annual Report

The Laboratory Directed Research and Development (LDRD) program yields foundational scientific research and development (R&D) essential to growing SRNL’s core competencies, in alignment with SRNL’s Strategic Plan to provide long-term benefits to the Department of Energy (DOE), the National Nuclear Security Administration (NNSA), and other customers and stakeholders. Five strategic goals are outlined in SRNL’s strategic plan: 1) Provide applied science and engineering for EM’s active clean-up sites and LM’s post closure management sites 2) Provide science-based solutions for gaps identified in nonproliferation strategic vision and support the government in activities impacting national security 3) Lead Science, Technology & Engineering as the central technical authority for processing tritium loaded reservoirs and support production of plutonium pits 4) Align science and energy security programs by focusing modern modeling, simulation, and data analytics tools on materials engineering and performance applications 5) Build a workforce for the future

Clark, Sue [Savannah River National Laboratory (SR↗

Advanced Computing Annual Report 2024

In fiscal year (FY) 2024, the National Renewable Energy Laboratory (NREL) took a major leap forward with the completed full buildout of Kestrel, the Office of Energy Efficiency and Renewable Energy's newest high-performance computing (HPC) system. Kestrel is already supporting science across the portfolio, bringing roughly 44 petaflops of computing power, which is more than five times the capacity of our previous supercomputer, Eagle. By delivering greater GPU capacity, Kestrel enables faster progress in artificial intelligence (AI) and opens new avenues in energy research - from defining long-term planning scenarios to accommodate a growing power system to material discovery to improving energy efficiency in photovoltaics (PV). Across the portfolio, research is being accelerated by Kestrel's impressive power. During FY24, 427 projects and more than 700 researchers used NREL's HPC, supporting the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy across 13 funding areas. Through these collaborations, researchers produced more than 450 technical outputs, including 195 articles in peer-reviewed publications, pushing the boundaries of science and engineering. This year's report features new sections spotlighting the expanding roles of Artificial Intelligence and Accelerated Computing. We also introduce an early career section to celebrate the accomplishments of our up-and-coming researchers, whose pioneering work is shaping the future of energy. We hope you enjoy the new insights and discoveries highlighted in these pages.

97 MATHEMATICS AND COMPUTING↗

State and Alternative Fuel Provider Fleet Program, Model Year 2023 Annual Report

The Energy Policy Act of 1992 (EPAct) was enacted in part to reduce the nation's dependence on imported petroleum. Provisions of EPAct require certain fleets to acquire alternative fuel vehicles (AFVs). The U.S. Department of Energy administers these requirements through its State and Alternative Fuel Provider Fleet Program, Federal Fleet Requirements, and Alternative Fuel Designation Authority. This report summarizes activities under the program during model year 2023.

33 ADVANCED PROPULSION SYSTEMS↗

Energy to Communities (E2C) Annual Highlights 2024

In 2024, E2C provided customized technical assistance to more than 200 organizations across the country on topics within four categories: energy generation and grid, transportation, buildings, and reliability and recovery.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY25 Laboratory Directed Research and Development Annual Report

Overview The Laboratory Directed Research and Development (LDRD) program represents a cornerstone of foundational scientific research and development (R&D) at SRNL. It is central to advancing SRNL’s mission areas—National Security, Environmental Stewardship, and Energy Resilience—while aligning with the laboratory’s Strategic Plan to deliver long-term benefits to the Department of Energy (DOE) and other key stakeholders

Taylor, Tammy P. [Savannah River National Laborato↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dose Rate Analysis of the WCS Consolidated Interim Storage Facility

This report describes a confirmatory calculation for a proposed consolidated interim storage facility (CISF) to support the US Nuclear Regulatory Commission’s review of the license application submitted by the Interim Storage Partners. The scope of this report is limited to an assessment of the annual dose from direct radiation associated with Phase 1 of the Waste Control Specialists (WCS) CISF and the determination of the minimum controlled area boundary based on the 10 CFR 72.104 limit of 25 mrem annual dose to the whole body. The confirmatory dose rate calculations used the source term and shielding calculation capabilities of the SCALE 6.2.3 computer code system. The calculation method employed in the confirmatory calculations uses a detailed Monte Carlo radiation transport simulation from source to dose rate. This method differs from the two-step method used in the safety analysis report (SAR), which requires determination of the photon and neutron energy and angular distributions on the cask external surface and then the use of this surface source in a new radiation transport calculation to determine dose rate as a function of distance from the storage facility. A simulation was made using the complete site geometry (all casks present) but with only one cask containing source, and a total of 467 independent calculations were performed to obtain the dose rate maps produced by each storage cask. Basic input data and assumptions used in the SAR (e.g., cask design parameters and design basis assembly characteristics) were used in this confirmatory calculation for consistency with the SAR. Local atmospheric conditions for skyshine calculations were simulated using US standard atmosphere data, which describe average air temperature, pressure, and density as a function of altitude. The determined minimum required distances from the WCS Phase 1 CISF to a contour defined by the 25 mrem annual dose limit were approximately 623 m (0.387 miles) in the N-NE direction, 594 m (0.369 miles) in the SSW direction, and 533 m (0.331 miles) in the E-SE direction and the W-NW direction. The annual dose results of the confirmatory calculation are in relatively good agreement with the annual dose values presented in the WCS SAR. The annual dose produced by the Phase 1 CISF at the nearest site boundary, 0.75 miles away from the CISF, was estimated by this study to be approximately 6.02E-02 ± 2.0E-04 mrem, which is significantly smaller than the 25 mrem annual dose limit provided in 10 CFR 72.104. The SAR annual dose rate value for the nearest site boundary was 7.52E-2 mrem, which included 7.73E-03 mrem due to postulated leakage of the FO-, FC-, and FF-canisters. A comparison with the dose rate values reported in the SAR for 16 detector locations, D1 through D16, on the protected area boundary is also included in this report. This comparison shows that the SAR determined higher annual dose values for detectors D1 through D14 by 12% to 45% and lower annual dose values for detectors D15 and D16 by 18% and 8%, respectively, as compared with this ORNL confirmatory calculation. Sensitivity studies have been performed to support a comprehensive review of the application. In these studies, the effects on dose rate of the modeled air volume, density, and humidity were analyzed. The sensitivity calculations showed that the air volume used in the Monte Carlo simulations was adequate and that a larger air volume would not further increase the dose rate due to skyshine contributions. The sensitivity analysis showed that simulation of local atmospheric conditions is important for the accuracy of dose rate estimates at large distances from the facility. Air humidity was demonstrated to have negligible effects on dose rate values for the simulated local atmospheric conditions.

61 RADIATION PROTECTION AND DOSIMETRY↗