Promising Results from Three NASA SBIR Solar Array Technology Development Programs

Results from three NASA SBIR solar array technology programs are presented. The programs discussed are: 1) Thin Film Photovoltaic UltraFlex Solar Array; 2) Low Cost/Mass Electrostatically Clean Solar Array (ESCA); and 3) Stretched Lens Array SquareRigger (SLASR). The purpose of the Thin Film UltraFlex (TFUF) Program is to mature and validate the use of advanced flexible thin film photovoltaics blankets as the electrical subsystem element within an UltraFlex solar array structural system. In this program operational prototype flexible array segments, using United Solar amorphous silicon cells, are being manufactured and tested for the flight qualified UltraFlex structure. In addition, large size (e.g. 10 kW GEO) TFUF wing systems are being designed and analyzed. Thermal cycle and electrical test and analysis results from the TFUF program are presented. The purpose of the second program entitled, Low Cost/Mass Electrostatically Clean Solar Array (ESCA) System, is to develop an Electrostatically Clean Solar Array meeting NASA s design requirements and ready this technology for commercialization and use on the NASA MMS and GED missions. The ESCA designs developed use flight proven materials and processes to create a ESCA system that yields low cost, low mass, high reliability, high power density, and is adaptable to any cell type and coverglass thickness. All program objectives, which included developing specifications, creating ESCA concepts, concept analysis and trade studies, producing detailed designs of the most promising ESCA treatments, manufacturing ESCA demonstration panels, and LEO (2,000 cycles) and GEO (1,350 cycles) thermal cycling testing of the down-selected designs were successfully achieved. The purpose of the third program entitled, "High Power Platform for the Stretched Lens Array," is to develop an extremely lightweight, high efficiency, high power, high voltage, and low stowed volume solar array suitable for very high power (multi-kW to MW) applications. These objectives are achieved by combining two cutting edge technologies, the SquareRigger solar array structure and the Stretched Lens Array (SLA). The SLA SquareRigger solar array is termed SLASR. All program objectives, which included developing specifications, creating preliminary designs for a near-term SLASR, detailed structural, mass, power, and sizing analyses, fabrication and power testing of a functional flight-like SLASR solar blanket, were successfully achieved.

Eskenazi, Mike↗

Workforce for the Future Development of Space Access Vehicles

The development of advanced vehicles that will travel between planetary surfaces with atmospheres and space requires the availability of experimental and computational capabilities that accomplish the research leading to new technologies and the development, test, and evaluation (RDT&E) of new flight systems. The United States is at risk of not having the required RDT&E workforce – qualified and in sufficient numbers – in place and ready to meet the future market’s commercial and defense needs. Systemic challenges include uncertain Federal budgets that limit and interrupt government research and development, the projectized nature of new space access systems that drive boom/bust cycles, an aging aerospace workforce (compounded by a mid-age demographic gap), limited to declining investment in sustaining and advancing experimental and computational tools infrastructure, lack of standards for sharing (and leveraging) data, dramatically changing technologies, changing social norms, and potentially large increases in commercial market needs. Flight systems have mission-based trajectories to and from space and designers must ensure risk is properly assessed across the entire trajectory. Thus, physics questions must be answered at each stage of flight, which requires a suite of experimental and computational tools. The RDT&E workforce utilizing these tools include subject matter experts from the producers, interested in acquiring data and information on the product, and from the capabilities being utilized, interested in addressing the product customer’s needs (providing robust data collection techniques, data quality, timeliness – available when needed, efficient with cost management, and teaming on data analysis). This requires a range of skills – in addition to aerospace, other engineers, and software developers, a highly trained and certified craft and technician workforce is critical to future success. This paper will present a human resources construct that addresses the system of needs for people – including, but more than just technical skills and an application of that construct in the hypersonic Test and Evaluation (T&E) community. This is part of a larger AIAA effort to document challenges and associated best practices for the aerospace RDT&E workforce.

Steven C Dunn↗

GENIE Flight Test Results and System Overview

NASA has envisioned a suite of lander test vehicles that will be flown in Earth s atmosphere to incrementally demonstrate applicable lunar lander performance in the terrestrial environment. As each terrestrial rocket progresses in maturity, relevant space flight technology matures to a higher technology readiness level, preparing it for inclusion on a future lunar lander design.. NASA s "Project M" lunar mission concept flew its first terrestrial rocket, RR1, in June 2010 in Caddo Mills, Texas. The Draper Laboratory built GENIE (Guidance Embedded Navigator Integration Environment) successfully demonstrated accurate, real time, embedded performance of Project M navigation and guidance algorithms in a highly dynamic environment. The RR1 vehicle, built by Armadillo Aerospace, performed a successful 60 second free flight and gave the team great confidence in Project M s highly reliable and robust GNC system design and implementation. This paper provides an overview of the GENIE system and describes recent flight performance test results onboard the RR1 terrestrial rocket.

Brady, Tye↗

Operational Implications from Field Test Results: Sensorimotor Guidelines for Exploration Missions

Two key sensorimotor objectives of the joint NASA-Russian Field Test (FT) study were (1) to quantify functional performance on long duration crewmembers as close to landing as possible, and (2) to develop a recovery timeline back to preflight baseline. The purpose of this presentation is to provide an overview of the FT results and discuss the operational implications for future exploration missions. The NASA and Russian teams conducted a total of 48 Field Tests, including 18 using a reduced Pilot FT (PFT) protocol. The combined PFT/FT cohort included 14 first-time fliers, 4F, and nine cosmonauts who repeated FT during a second mission. The mission durations were 185 ± 42 days, mean ± std. Nominally, the initial postflight session was performed in the medical test at the Soyuz landing site or at the nearby airport (R+2.2 ± 1.3 hrs, mean ± std), and then repeated multiple times throughout the postflight recovery. The common tasks performed across PFT and full FT protocols included sit-to-stand, recovery from fall (prone to stand) and tandem walk, performed in that order of increasing difficulty. The full FT protocol also included seated tasks (eccentric gaze, dysmetria finger to nose, eye-hand coordination on a tablet, grip force discrimination), a standing posture test with an upper body perturbation, a timed up and go mobility test with obstacles, and a dynamic visual acuity task during vertical oscillations. While there was considerable variability in the postflight outcome measures across crewmembers, the level of vestibular/cerebellar and sensorimotor impairment was greater than previously observed during shorter spaceflight missions. Most striking was the higher incidence of motion sickness even without constraining the standard medical interventions. Motion sensitivity prevented some crewmembers from attempting and/or completing the early testing. The recovery timeline varied with task complexity, generally taking longer when either the basis of support was limited (e.g., tandem walk) or visual cues were deprived (eyes closed). Based on this evidence, mission planners need to expect a range of response across individuals and tasks following G-transitions. Individual health assessments are recommended along with development of pre-worked, prioritized content and timelines, with the ability to change roles depending on crew readiness. Handholds and balance aids are recommended to help stabilize the crewmembers to perform specific tasks (e.g., touch screen selection) or to allow the crewmember the ability to rest with onset of symptoms. Based on anecdotal reports and performance on computerized dynamic posturography, multiple testing on landing day appeared to be beneficial for some participants, while others may have pushed beyond their motion tolerance limit in an effort to complete more FT objectives. Instead of delaying planetary surface operations to allow for recovery, our results suggest that early mobility may be important. Early active self-administered retraining, individualized based on the level of initial impairment and motion sensitivity, will enable a more efficient motor learning and enhance crew performance.

S J Wood↗

Recent Advances in the U.S. in Ablative TPS for In-situ Exploration of Giant Planets

The Decadal Survey report released [1] prioritizes Uranus as the highest priority Flagship class mission to be explored with an orbiter and a probe and it also recommended Saturn Probe under New Frontiers mission class. Thermal protection system (TPS) is essential for Uranus and Saturn probe missions. The two cardinal requirements are that it must be fail-safe and yet be mass efficient. The Decadal Survey report also pointed out the readiness of heatshield for extreme entry environment technology (HEEET) at TRL 6 for probe missions at Gas Giants. HEEET relies on 3-D weaving and is shown to be a robust and mass efficient TPS through ground testing and analysis. HEEET was matured to TRL 6 in 2019. HEEET was reported at the Ice Giant Workshop in 2019 at Marseille. Since 2019, significant advances have been made primarily because of Mars Sample Return (MSR) mission. MSR baselined 3-D Woven TPS as its heatshield for the earth entry system. MSR earth entry system (EES) requirements and the resulting heatshield/TPS requirements are most stringent of all entry missions. This is a result of backward contamination protection which classifies MSR as a “restricted class 5” mission to safeguard the accidental release of potentially hazardous Mars Sample into Earth’s atmosphere. Complex requirements for the heatshield start with micro-meteor impact tolerance followed by the requirement for steep entry to minimize the size of the impact footprint which results in extreme heating. The heatshield is part of the impact attenuation system. The EES architecture does not use a parachute and is designed to tolerate impact loads. Hence heatshield TPS selection and design becomes one of the key challenges. After completion of the HEEET technology maturation in 2019, IRAD efforts focused on assessing the 3-D Woven family of TPS to MSR EES. After nearly two years of evaluation of alternate TPS such as carbon phenolic, C-C hot structure, PICA, and 3-D woven family of TPS, a single layer 3-D woven TPS derived from the dual-layer HEEET was down selected and is currently the baseline. A new loom capable of weaving the single-layer 3-D woven preform at 80” wide has been designed, assembled and is currently on the verge of weaving the MSR EES TPS. During the HEEET maturation and the follow-on development, the single-layer TPS has been tested at extreme heating conditions. As a result, single layer TPS was recommended and evaluated during the Planetary Mission Concept Studies funded by NASA in preparation for the Decadal committee. In addition, in anticipation of Saturn mission proposals, single layer was evaluated as well. Aerocapture can reduce the trip time, also allow bigger payload fraction and in addition, it allows for the possibility of probe delivery once the spacecraft is in orbit. This can lead to obtaining both in-situ data as well as data from orbit simultaneously. Since Aerocapture depletes energy/velocity, probe delivery from orbit reduces the demand on TPS. Aerocapture was mentioned in the Decadal Study report as ready for implementation, but due to perceived risk it is not adopted by the mission designers. Establishing TPS readiness for aerocapture missions will be addressed. Going one step beyond aerocapture is aerogravity assist if fast return is the goal. Recent studies [4] looked at aerogravity assist and the TPS readiness. This talk will highlight both aerocapture and aerogravity assist from a TPS perspective. The main objective of this proposed talk is to present a comprehensive picture of the SOA TPS technology including recent developments. The talk will highlight advances in manufacturing, results from the Decadal White Papers, PMCS and other studies, and aerocapture and aerogravity assist that could play a role in the near or far term in-situ exploration.

E. Venkatapathy↗

Aircraft wake turbulence avoidance

Analytical studies and flight tests are used to describe the formation and severity of trailing vortices and the spatial extent of their influence. This information is then used to outline procedures for ready application by pilots, tower operators, and others concerned with the flow of traffic. The procedures provide the necessary appreciation of the physical attributes of trailing vortices, the potential hazards involved when encountering them, and how best to avoid the dangerous portions of the wake during flight operations.

Mcgowan, W. A.↗

Army-NASA aircrew/aircraft integration program. Phase 5: A3I Man-Machine Integration Design and Analysis System (MIDAS) software concept document

This is the Software Concept Document for the Man-machine Integration Design and Analysis System (MIDAS) being developed as part of Phase V of the Army-NASA Aircrew/Aircraft Integration (A3I) Progam. The approach taken in this program since its inception in 1984 is that of incremental development with clearly defined phases. Phase 1 began in 1984 and subsequent phases have progressed at approximately 10-16 month intervals. Each phase of development consists of planning, setting requirements, preliminary design, detailed design, implementation, testing, demonstration and documentation. Phase 5 began with an off-site planning meeting in November, 1990. It is expected that Phase 5 development will be complete and ready for demonstration to invited visitors from industry, government and academia in May, 1992. This document, produced during the preliminary design period of Phase 5, is intended to record the top level design concept for MIDAS as it is currently conceived. This document has two main objectives: (1) to inform interested readers of the goals of the MIDAS Phase 5 development period, and (2) to serve as the initial version of the MIDAS design document which will be continuously updated as the design evolves. Since this document is written fairly early in the design period, many design issues still remain unresolved. Some of the unresolved issues are mentioned later in this document in the sections on specific components. Readers are cautioned that this is not a final design document and that, as the design of MIDAS matures, some of the design ideas recorded in this document will change. The final design will be documented in a detailed design document published after the demonstrations.

Banda, Carolyn↗

Spectroscopic Determination of the Physical Conditions in Hot Optically Thin Sources

The Astrophysics Plasma Emission Code and Database (APEC/APED), developed in part under this grant, have been upgraded to Version 1.3.0 and are now beginning to find widespread applications to X-ray spectral data from Chandra and XMM-Newton. These models represent the best theoretical data currently available and are reasonably complete below about 30 A. We are making significant progress in improving the spectral models between 30 and 90 A, by the addition of HULLAC calculations and NIST wavelengths for L-shell ions of Ne, Mg, Si, S, Ar, and Ca. While the output models are now public, the code itself is not ready for public release. We have made significant progress toward this goal through programming improvements, including optimized error codes, a major (elusive) bug fix, and additions to our testing protocols. Secondarily, we are beginning to investigate limited uses of APEC for X-ray photoionized plasma, as for opacity modeling. Stellar coronae are being used to benchmark the atomic data in APED as part of the Emission Line Project. The models appear to be in good agreement with the observations for most of the strong lines; however, we have identified significant discrepancies in the 3s/3d line ratios not only for Fe XVII, but also for Fe XVIII and XIX. The careful analysis of these high quality X-ray spectra has also shown that there are serious problems with some of the analysis techniques in widespread use. There are several manifestations of the problem, but the main problem is that line-to-continuum ratios may be seriously mismeasured. We continue to collaborate widely with atomic physicists in order to find the best atomic data, and to solicit calculations and measurements that are needed.

Brickhouse, Nancy↗

The Development of Solar Sail Propulsion for NASA Science Missions to the Inner Solar System

This paper examines recent assessments of the technology challenges facing solar sails, identifies the systems and technologies needing development, and the approach employed by NASA's In-space Propulsion Program in NASA to achieve near term products that move this important technology from low technology readiness level (TRL) toward the goal of application to science missions in near earth space and beyond. The status of on-going efforts to design, build, and test ground demonstrators of alternate approaches to structures (inflatable versus rigid), membrane materials, optical shape sensing, and attitude control will be presented along with planned future investments.

Montgomery, Edward E, IV↗

New Compressor Added to Glenn's 450- psig Combustion Air System

In September 1999, the Central Process Systems Engineering Branch and the Maintenance and the Central Process Systems Operations Branch, released for service a new high pressure compressor to supplement the 450-psig Combustion Air System at the NASA Glenn Research Center at Lewis Field. The new compressor, designated C-18, is located in Glenn s Central Air Equipment Building and is remotely operated from the Central Control Building. C-18 can provide 40 pounds per second (pps) of airflow at pressure to our research customers. This capability augments our existing system capacity (compressors C 4 at 38 pps and C-5 at 32 pps), which is generated from Glenn's Engine Research Building. The C-18 compressor was originally part of Glenn's 21-Inch Hypersonic Tunnel, which was transferred from the Jet Propulsion Laboratory to Glenn in the mid-1980's. With the investment of construction of facilities funding, the compressor was modified, new mechanical and electrical support equipment were purchased, and the unit was installed in the basement of the Central Air Equipment Building. After several weeks of checkout and troubleshooting, the new compressor was ready for long-term, reliable operations. With a total of 110 pps in airflow now available, Glenn is well positioned to support the high-pressure air test requirements of our research customers.

Swan, Jeffrey A.↗

Definition and Development of Habitation Readiness Levels (HRLs) for Planetary Surface Habitats

One could argue that NASA has never developed a true habitat for a planetary surface, with only the Lunar Module from the 1960's-era Apollo Program providing for a sparse 2 person, 3 day capability. An integral part of NASA's current National Vision for Space Exploration is missions back to the moon and eventually to Mars. One of the largest leaps i11 lunar surface exploration beyond the Apollo lunar missions will be the conduct of these extended duration human missions. These missions could range from 30 to 90 days in length initially and may eventually range up to 500 days in length. To enable these extended duration human missions, probably the single-most important lunar surface element is the Surface Habitat. The requirements that must be met by the Surface Habitat will go far beyond the safety, performance and operational requirements of the Lunar Module, and NASA needs to develop a basis for making intelligent, technically correct habitat design decisions. This paper will discuss the possibilities of the definition and development of a Habitation Readiness Level (HRL) scale that might be mapped to current Technology Readiness Levels (TRLs) for technology development. HRLs could help measure how well a particular technology thrust is advanced by a proposed planetary habitat concept. The readiness level would have to be measured differently than TRLs, and may include such milestones as habitat design performance under simulated mission operations and constraints (including relevant field testing), functional allocation demonstrations, crew interface evaluation and post-occupancy evaluation. With many concepts for planetary habitats proposed over the past 20 years, there are many strategic technical challenges facing designers of planetary habitats that will support NASA's exploration of the moon and Mars. The systematic assessment of a variety of planetary habitat options will be an important approach and will influence the associated requirements for human design, volumetrics, functionality, systems hardware and operations.

Connolly, Janis H.↗

Ares I and Ares V First Stage - Powering Exploration

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the first stage propulsion system for the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Ares I and Ares V will provide the space launch capabilities needed to fulfill NASA' s exploration strategy of sending human beings to the Moon, Mars, and beyond. As primary propulsion for the Ares launch vehicles, the Space Shuttle-derived Reusable Solid Rocket Motor (RSRM) is one of the first and most important components to be tested. The first flight of Ares I, called Ares I-X, will occur in April 2009, with booster integration to begin at Kennedy Space Center (KSC) by autumn 2008. The Ares I-X flight will use a combination of flight and simulation hardware to obtain data on controlling the long and narrow crew launch vehicle configuration. The test will use a four-segment RSRM from the Shuttle inventory and a fifth spacer segment to simulate the size and weight of the operational five-segment motor to be used on later flights. The upper stage, Orion crew exploration vehicle, and launch abort system will all be replaced with simulator hardware. Manufacturing work has begun on the spacer segment, as well as the new forward hardware for the booster. Atlas V avionics will be adapted to control Ares I-X' s first stage. That hardware is undergoing hardware-in-the-loop testing in a contractor-provided systems integration laboratory (SIL); a critical design review (CDR) was completed in December 2007. Drogue and main parachute drop tests have also been conducted successfully at Yuma Proving Grounds, allowing the First Stage team to begin fabricating parachutes for Ares I-X. The Ares I-X flight test will be the first flight test for the parachutes. A series of preliminary design technical interchange meetings is being conducted prior to the Ares I-X CDR in January 2007 to ensure readiness for the flight. Much of the First Stage activity in 2007 has focused on a series of preliminary design (PDR) activities associated with each booster subsystem. These events will culminate in a formal preliminary design review in 2008, where subsystems and component specifications will be developed and associated analyses and drawings will be evaluated for technical adequacy. The first stage also has been undergoing a series of trade studies to determine means for upgrading booster performance and reducing operational costs. Performance improvement studies have included changing from polybutadiene acrylonitrile (PBAN) propellant to hydroxyl-terminated polybutadiene (HTPB); replacing aluminum with composite motor casings; and optimizing or upgrading the propellant grain and nozzle structures. Some or all of these changes could result in a block upgrade to the Ares I first stage, after becoming the standard configuration for the Ares V. The cost reduction studies included a change from reusable or recoverable boosters to completely expendable boosters; changing from hydrazine-powered to more environmentally friendly electrohydrostatic actuators (EHAs) on the thrust vector control (TVC) system; and changing the location of the separation plane to reduce the likelihood of recontact upon booster separation. The expendability trade study resulted in a decision to keep the recoverable boosters, as the new hardware costs significantly outweighed the potential operational cost savings due to reduced ground operations. Likewise, due to cost considerations, the team continued using existing hydrazine-powered actuators for the TVC system. The separation plane location for Ares I is still being studied, with results to be announced in 2008. In short, the Ares launch vehicles' first stage is building upon NASA's close familiarity with this Shuttle-derived system, while continuing to seek out improvements for long-term exploration.

Priskos, Alex S.↗

Ultraspectral Infrared Measurements from the Atmospheric Infrared Sounder (AIRS) on the EOS Aqua Spacecraft

Aqua measures the Earth's water cycle, energy fluxes, vegetation and temperatures. The Atmospheric Infrared Sounder (AIRS), Advanced Microwave Sounding Unit (AMSU) and Humidity Sounder for Brazil (HSB) were launched on the EOS Aqua spacecraft in May 2002. AIRS has had good radiometric and spectral sensitivity, stability, and accuracy and is suitable for climate studies. Temperature products compare well with radiosondes and models over the limited test range (|LAT| less than 40 degrees). Early trace gas products demonstrate the potential of AIRS. NASA is developing the next generation of hyperspectral IR imagers. JPL is ready to participate with US government agencies and US industry to transfer AIRS technology and science experience.

infrared↗

Gravity and Extreme Magnetism SMEX

The Gravity and Extreme Magnetism SMEX mission will be the first mission to catalogue the X-ray polarisation of many astrophysical objects including black-holes and pulsars. This first of its kind mission is enabled by the novel use of a time projection chamber as an X-ray polarimeter. The detector has been developed over the last 5 years, with the current effort charged toward a demonstration of it's technical readiness to be at level 6 prior to the preliminary design review. This talk will describe the design GEMS polarimeter and the results to date from the engineering test unit.

Source record↗

NASA's Gravitational-Wave Mission Concept Study

With the conclusion of the NASA/ESA partnership on the Laser interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consists of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance. Three mission concepts have been studied by Team-X, JPL's concurrent design facility, to refine the conceptual design, evaluate key performance parameters, assess risk and estimate cost and schedule. The status of the Study are reported.

Stebbins, Robin↗

NASA's Gravitational - Wave Mission Concept Study

With the conclusion of the NASA/ESA partnership on the Laser Interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consisted of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded were 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance by calculating the horizons. the detection rates and the accuracy of astrophysical parameter estimation for massive black hole mergers, stellar-mass compact objects inspiraling into central engines. and close compact binary systems. Three mission concepts have been studied by Team-X, JPL's concurrent design facility. to define a conceptual design evaluate kt,y performance parameters. assess risk and estimate cost and schedule. The Study results are summarized.

Stebbins, Robin↗

Affordable Development and Qualification Strategy for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is a concept which uses a nuclear reactor to heat a propellant to high temperatures without combustion and can achieve significantly greater specific impulse than chemical engines. NTP has been considered many times for human and cargo missions beyond low earth orbit. A lot of development and technical maturation of NTP components took place during the Rover/NERVA program of the 60's and early 70's. Other NTP programs and studies followed attempting to further mature the NTP concept and identify a champion customer willing to devote the funds and support the development schedule to a demonstration mission. Budgetary constraints require the use of an affordable development and qualification strategy that takes into account all the previous work performed on NTP to construct an existing database, and include lessons learned and past guidelines followed. Current guidelines and standards NASA uses for human rating chemical rocket engines is referenced. The long lead items for NTP development involve the fuel elements of the reactor and ground testing the engine system, subsystem, and components. Other considerations which greatly impact the development plans includes the National Space Policy, National Environmental Policy Act, Presidential Directive/National Security Council Memorandum #25 (Scientific or Technological Experiments with Possible Large-Scale Adverse Environmental Effects and Launch of Nuclear Systems into Space), and Safeguards and Security. Ground testing will utilize non-nuclear test capabilities to help down select components and subsystems before testing in a nuclear environment to save time and cost. Existing test facilities with minor modifications will be considered to the maximum extent practical. New facilities will be designed to meet minimum requirements. Engine and test facility requirements are based on the driving mission requirements with added factors of safety for better assurance and reliability. Emphasis will be placed on small engines, since the smaller the NTP engine, the easier it is to transport, assemble/disassemble, and filter the exhaust during tests. A new ground test concept using underground bore holes (modeled after the underground nuclear test program) to filter the NTP engine exhaust is being considered. The NTP engine system design, development, test, and evaluation plan includes many engine components and subsystems, which are very similar to those used in chemical engines, and can be developed in conjunction with them Other less mature NTP engine components and subsystems (e.g., reactor) will be thoroughly analyzed and tested to acceptable levels recommended by the referenced standards and guidelines. The affordable development strategy also considers a prototype flight test, as a final step in the development process. Preliminary development schedule estimates show that an aggressive development schedule (without much margin) will be required to be flight ready for a 2033 human mission to Mars.

Gerrish, Harold P., Jr.↗

Affordable Development and Qualification Strategy for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is a concept which uses a nuclear reactor to heat a propellant to high temperatures without combustion and can achieve significantly greater specific impulse than chemical engines. NTP has been considered many times for human and cargo missions beyond low earth orbit. A lot of development and technical maturation of NTP components took place during the Rover/NERVA program of the 60's and early 70's. Other NTP programs and studies followed attempting to further mature the NTP concept and identify a champion customer willing to devote the funds and support the development schedule to a demonstration mission. Budgetary constraints require the use of an affordable development and qualification strategy that takes into account all the previous work performed on NTP to construct an existing database, and include lessons learned and past guidelines followed. Current guidelines and standards NASA uses for human rating chemical rocket engines is referenced. The long lead items for NTP development involve the fuel elements of the reactor and ground testing the engine system, subsystem, and components. Other considerations which greatly impact the development plans includes the National Space Policy, National Environmental Policy Act, Presidential Directive/National Security Council Memorandum #25 (Scientific or Technological Experiments with Possible Large-Scale Adverse Environmental Effects and Launch of Nuclear Systems into Space), and Safeguards and Security. Ground testing will utilize non-nuclear test capabilities to help down select components and subsystems before testing in a nuclear environment to save time and cost. Existing test facilities with minor modifications will be considered to the maximum extent practical. New facilities will be designed to meet minimum requirements. Engine and test facility requirements are based on the driving mission requirements with added factors of safety for better assurance and reliability. Emphasis will be placed on small engines, since the smaller the NTP engine, the easier it is to transport, assemble/disassemble, and filter the exhaust during tests. A new ground test concept using underground bore holes (modeled after the underground nuclear test program) to filter the NTP engine exhaust is being considered. The NTP engine system design, development, test, and evaluation plan includes many engine components and subsystems, which are very similar to those used in chemical engines, and can be developed in conjunction with them Other less mature NTP engine components and subsystems (e.g., reactor) will be thoroughly analyzed and tested to acceptable levels recommended by the referenced standards and guidelines. The affordable development strategy also considers a prototype flight test, as a final step in the development process. Preliminary development schedule estimates show that an aggressive development schedule (without much margin) will be required to be flight ready for a 2033 human mission to Mars.

Gerrish, Harold P., Jr.↗