Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

ASC L2 Milestone Review CTS-2 Production Readiness [Slides]

Open and secure CTS-2 are ready for production capability to include accessibility for users and integration with existing storage and network environment. Hardware testing, early user testing is accomplished, and the systems are generally available for ASC production users.

97 MATHEMATICS AND COMPUTING↗

Essence2.0 Development and Deployment (Final Report)

The objective of the project was to take two core technologies that have been developed under the Recipient’s solid laboratory products and integrate them into a single CyberPhysical awareness platform and complete development on current field-tested prototypes that will extend the integrated capability of the platform. During the final development phase, the Recipient development team and its selected industry partners tested and hardened the platform to ensure resilient and secure operation of the integrated platform. The team also executed substantial field testing and established the framework for defining the organization and/or commercial infrastructure needed to sustain operations and provide readiness for a national scale deployment. The focus of the project was (1) the improvement, refinement, and deployment of technology for the detection of cyber-attacks on utility operational technology (OT) and information technology (IT) networks and assets, including Supervisory Control and Data Acquisition Systems (SCADA) systems; and (2) support for containment and remediation of adversarial threats and actions against those systems and environments.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Adapter Signaling Evaluations on EVs [Slides]

In case J3400 and J3400/1 define a basic analog signaling approach for DC charging adapters to communicate over-temperature events to both the EV and EVSE. They also require the EV to implement mitigation and corrective actions in cases where the EVSE does not respond to adapter thermal signals. In this study, multiple production vehicles were evaluated for responsiveness to assess field readiness and ensure consistent performance in accordance with the SAE J1772, J3400 and J3400/1 standards. A series of test cases were developed and executed across different vehicles, using an adapter thermal breakout fixture designed by NLR for evaluations. The results revealed notable variations in behavior: some vehicles expected to comply with J1772 were found to be non-responsive under certain conditions. Additionally, while some EV OEMs appear to align with the J3400 standard, discrepancies exist due to its evolving nature, resulting in inconsistent implementation of the latest requirements. These findings highlight the need for alignment within standards organizations to ensure consistent interpretation, encourage compliance, and reduce potential confusion across implementations.

33 ADVANCED PROPULSION SYSTEMS↗

Performance of a 12-coil superconducting bumpy torus magnet facility

The bumpy torus facility consists of 12 superconducting coils, each 19 cm i.d. and capable of 3.0 teslas on their axes. The coils are equally spaced around a toroidal array with a major diameter of 1.52 m, and are mounted with the major axis of the torus vertical in a single vacuum tank 2.6 m in diameter. Final shakedown tests of the facility mapped out its magnetic, cryogenic, vacuum, mechanical, and electrical performance. The facility is now ready for use as a plasma physics research facility. A maximum magnetic field on the magnetic axis of 3.23 teslas was held for a period of more than sixty minutes without a coil normalcy. The design field was 3.00 teslas. The steady-state liquid helium boil-off rate was 87 liters per hour of liquid helium without the coils charged. The coil array was stable when subjected to an impulsive loading, even with the magnets fully charged. When the coils were charged to a maximum magnetic field of 3.35 teslas, the system was driven normal without damage.

Roth, J. R.↗

Performance of a 12-coil superconducting 'bumpy torus' magnet facility.

The NASA-Lewis 'bumpy torus' facility consists of 12 superconducting coils, each 19 cm ID and capable of 3.0 tesla on their axes. The coils are equally spaced around a toroidal array with a major diameter of 1.52 m, and are mounted with the major axis of the torus vertical in a single vacuum tank 2.6 m in diameter. Final shakedown tests of the facility mapped out its magnetic, cryogenic, vacuum, mechanical, and electrical performance. The facility is now ready for use as a plasma physics research facility. A maximum magnetic field on the magnetic axis of 3.23 teslas has been held for a period of more than sixty minutes without a coil normalcy.

Roth, J. R.↗

Solar Thermal Power Systems parabolic dish project

The status of the Solar Thermal Power Systems Project for FY 1980 is summarized. Included is: a discussion of the project's goals, program structure, and progress in parabolic dish technology. Analyses and test results of concentrators, receivers, and power converters are discussed. Progress toward the objectives of technology feasibility, technology readiness, system feasibility, and system readiness are covered.

Truscello, V. C.↗

Solar array flight experiment/dynamic augmentation experiment

This report presents the objectives, design, testing, and data analyses of the Solar Array Flight Experiment/Dynamic Augmentation Experiment (SAFE/DAE) that was tested aboard Shuttle in September 1984. The SAFE was a lightweight, flat-fold array that employed a thin polyimide film (Kapton) as a substrate for the solar cells. Extension/retraction, dynamics, electrical and thermal tests, were performed. Of particular interest is the dynamic behavior of such a large lightweight structure in space. Three techniques for measuring and analyzing this behavior were employed. The methodology for performing these tests, gathering data, and data analyses are presented. The report shows that the SAFE solar array technology is ready for application and that new methods are available to assess the dynamics of large structures in space.

Young, Leighton E.↗

Fabrication, Metrology and Modeling of the Space-Based Lidar Telescope for SPARCLE

Over the past 7 years, NASA Marshall Space Flight Center (MSFC) through the Global Hydrology and Climate Center (GHCC) has been working; in collaboration with the University of Alabama in Huntsville (UAH) Center for Applied Optics (CAO), and others; towards demonstrating a solid state coherent Doppler lidar instrument for space-based global measurement of atmospheric winds. The Space Readiness Coherent Lidar Experiment (SPARCLE) was selected by NASA's New Millennium Program to demonstrate the feasibility and technology readiness of space-based coherent wind lidar. The CAO was responsible for the design, development, integration, and testing of the SPARCLE optical system. Operating at 2-micron wavelength, SPARCLE system performance is dominated by the optical quality of the transmitter/receiver optical system. The stringent optical performance requirements coupled with the demanding physical and environmental constraints of a space-based instrument necessitate extensive characterization of the telescope optical performance that is critical to predicting the lidar system efficiency and operation in space. Individual components have been measured prior to assembly and compared to the designed specifications. Based on the individual components, the telescope design was optimized to produce a suitable telescope. Once the telescope is completed, it will be tested and evaluated and the data shall be used to anchor computer based models of the optical system. Commercial optical modeling codes were used to evaluate the performance of the telescope under a variety of anticipated on-orbit environments and will eventually be compared to environmental tests conducted in the course of qualifying the telescope for flight. Detailed analysis using the "as built" data will help to reduce uncertainties within the lidar system model and will increase the accuracy of the lidar performance predictions.

Peters, Bruce R.↗

Habitat Demonstration Unit-Deep Space Habitat (HDU-DSH) Integration and Preparation for Desert RATS 2011

The Habitat Demonstration Unit, or HDU, is a multi-purpose test bed that allows NASA scientists and engineers to design, develop, and test new living quarters, laboratories, and workspaces for the next generation space mission. Previous testing and integration has occurred during 2010 at the annual Desert Research and Technology Studies (Desert RATS) field testing campaign in the Arizona desert. There the HDU team tests the configuration developed for the fiscal year, or FY configuration. For FY2011, the NASA mission calls for simulating a deep space condition. The HDU-DSH, or Deep Space Habitat, will be configured with new systems and modules that will outfit the test bed with new deep space capabilities. One such addition is the new X-HAB (eXploration Habitat) Inflatable Loft. With any deep space mission there is the need for safe, suitable living quarters. The current HDU configuration does not allow for any living space at all. In fact, Desert RATS 2010 saw the crew sleeping in the Space Exploration Vehicles (SEV) instead of the HDU. The X-HAB Challenge pitted three universities against each other: Oklahoma State University, University of Maryland, and the University of Wisconsin. The winning team will have their design implemented by NASA for field testing at DRATS 2011. This paper will highlight the primary objective of getting the X-HAB field ready which involves the implementation of an elevator/handrail system along with smaller logistical and integration tasks associated with getting the HDU-DSH ready for shipment to DRATS.

Barbeau, Zack↗

A Miniaturized Variable Pressure Scanning Electron Microscope (MVP-SEM) for the Surface of Mars: An Instrument for the Planetary Science Community

The Miniaturized Variable Pressure Scanning Electron Microscope(MVP-SEM) project, funded by the NASA Planetary Instrument Concepts for the Advancement of Solar System Observations (PICASSO) Research Opportunities in Space and Earth Science (ROSES), will build upon previous miniaturized SEM designs for lunar and International Space Station (ISS) applications and recent advancements in variable pressure SEM's to design and build a SEM to complete analyses of samples on the surface of Mars using the atmosphere as an imaging medium. By the end of the PICASSO work, a prototype of the primary proof-of-concept components (i.e., the electron gun, focusing optics and scanning system)will be assembled and preliminary testing in a Mars analog chamber at the Jet Propulsion Laboratory will be completed to partially fulfill Technology Readiness Level to 5 requirements for those components. The team plans to have Secondary Electron Imaging(SEI), Backscattered Electron (BSE) detection, and Energy Dispersive Spectroscopy (EDS) capabilities through the MVP-SEM.

Mars↗

Tethered Space Satellite-1 (TSS-1): Technical Roundabouts

In the early 1990's US and Italian scientists collaborated to study the electrodynamics of dragging a satellite on a tether through the electrically charged portion of Earth's atmosphere called the ionosphere. An electrical current induced in the long wire could be used for power and thrust generation for a satellite. Other tether uses include momentum exchange, artificial gravity, deployment of sensors or antennas, and gravity-gradient stabilization for satellites. Before the Tethered Space Satellite (TSS-1), no long tether had ever been flown, so many questions existed on how it would actually behave. The TSS consisted of a satellite with science experiments attached to a 12.5 mile long, very thin (0.10 inch diameter) copper wire assembly wound around a spool in the deployer reel mechanism. With the Space Shuttle at an altitude of 160 nautical miles above earth, the satellite was to be deployed by raising it from the Shuttle bay on a boom facing away from Earth. Once cleared of the bay, the deployer mechanism was to slowly feed out the 12-plus miles of tether. Scientific data would be collected throughout the operation, after which the satellite would be reeled back in. Pre-flight testing system level tests involved setting up a tether receiver to catch the 12.5 mile tether onto another reel as it was being unwound by the deployer reel mechanism. Testing only the reel mechanism is straightforward. This test becomes more complicated when the TSS is mounted on the flight pallet at Kennedy Space Center (KSC). The system level tests must be passed before the pallet can be installed into the Space Shuttle cargo bay. A few months before flight, the TSS payload had been integrated onto the Spacelab pallet and system level tests, including unreeling and reeling the tether, had been successfully completed. Some of this testing equipment was then shipped back to the contractor Martin Marietta. Systems-level load analyses, which cannot be run until all information about each payload is finalized, was run in parallel with the physical integration of the hardware into the Shuttle payload bay. The coupled loads analysis, as it is called, incorporates any updates to the model due to system level tests, and any changes that were found during integration. The coupled loads analysis revealed that a single bolt attaching the deployer reel mechanism to the support structure had a "negative margin" - which is an indication that it might fail during operation. Hardware certification rules do not allow for hardware to fly with negative margins, so this issue had to be resolved before the flight. Since there is conservatism in engineering analysis, there is an option to "waive" the margin requirement, and fly the experiment as is. On the other hand, a structural failure of one payload could have serious or catastrophic consequences to other payloads and possibly the mission. Minor design changes or fixes might be feasible within the payload bay prior to launch. Any major design changes that required the spooling test to validate the hardware, or for the pallet to be removed, would cause TSS not to be ready for the Shuttle launch.

O'Connor, Brian↗

Characteristics of a high-power ion beam deflection system necessary to deflect the hypothetical asteroid 2017 PD

The July 2027 impact date for the hypothetical asteroid 2017 PDC, that is the subject of an emergency response exercise, leaves just over ten years to implement a deflection approach. The analyses herein allocates four years to the design, fabrication, assembly, test and launch of a notional high-power Ion Beam Deflection (IBD) vehicle to meet a launch readiness date no later than May 2021. Using this launch date along with estimates for the vehicle mass and performance characteristics of the electric propulsion system, low-thrust trajectory analyses indicate a 2.56-year flight time to rendezvous with 2017 PDC. This would leave 3.6 years to execute the actual deflection phase. A 160-kW IBD vehicle could deflect 2017 PDC by at least one Earth radius within this time provided the asteroid’s actual diameter was less than about 140 m and its density was 2 g/cm3 or less. Larger diameters and/or higher densities would require a higher power IBD vehicle, multiple IBD vehicles, or a longer deflection phase. Ion beam deflection is largely independent of the characteristics of the threat object, but its effectiveness, like all deflection approaches, is sensitive to both the asteroid mass and the time available for deflection. The characteristics of IBD, i.e., large standoff distance between the spacecraft and the asteroid surface, as well as ion beam divergence angles of a few degrees, facilitates the possible simultaneous use of multiple IBD vehicles to improve the performance and robustness of the asteroid deflection. The 65-cm diameter, 20-kW NEXIS ion thruster developed in support of the Jupiter Icy Moons Orbiter mission concept is particularly well suited for application to a high-power IBD system. It has demonstrated an ion beam divergence angle of approximately 2 degrees and operation at 20 kW for over 2,000 hours. Completion of the development and flight qualification of this technology would significantly reduce the risk and time necessary to respond to the discovery of potentially hazardous asteroid in the size range of 50- to 100-m diameter.

Reeves, David↗

Deployment Mechanisms for High Packing Efficiency OneMeter Reflectarray Antenna (OMERA)

While the capabilities of CubeSats have greatly increased in the past years, large, deployable high frequency apertures remain a limitation. The goal of this work was to develop a large 1 meter antenna operating at 35.75 Ghz for RADAR applications. A reflectarray design was selected, as the flat panels were compatible with the CubeSat form factor. A center-fed, Cassegrain configuration was selected for the feed, to minimize deployed height. The flat panel configuration and Cassegrain feed allowed the entire 1 meter antenna to be compatible with a 6U bus, leaving a little under 4U of volume for remaining instrument and spacecraft components. Several iterations of the design have been built and tested, with an RF test of a fully deployed assembly being completed most recently. The goal is to have the antenna flight ready before 2020.

Cwik, Tom↗

NASA Environmental Control and Life Support Technology Development for Exploration: 2020 to 2021 Overview

This paper provides an overview of NASA supported activities developing Environmental Control and Life Support (ECLSS) technologies in the following capability areas: life support, environmental monitoring, fire safety, and logistics. NASA has been refining technology needs for deep space missions including Gateway, lunar surface, Mars transit, and Mars surface missions. Validating technologies in relevant environments, both in low earth orbit (LEO) and ground tests is critical in understanding technology performance and long duration performance. On-orbit and ground tests inform NASA’s technology decisions to fill exploration gaps. NASA has multiple technology projects across the technology readiness spectrum with potential to fill or partially fill exploration gaps. For each capability area, this paper will describe select capability gaps, NASA technology project maturation over the past year, and how key performance parameters (KPPs) are being used to measure the degree of capability gap closure. KPPs are evolving but they still provide a useful measure in communicating progress and identifying development needs to fill exploration gaps. The intent is to provide a very high-level overview describing the strategic approach to gap closure and provide references to additional technical details, progress, and KPPs.

Life Support↗

NASA Environmental Control and Life Support Technology Development for Exploration: 2020 to 2021 Overview

This paper provides an overview of NASA supported activities developing Environmental Control and Life Support (ECLSS) technologies in the following capability areas: life support, environmental monitoring, fire safety, and logistics. NASA has been refining technology needs for deep space missions including Gateway, lunar surface, Mars transit, and Mars surface missions. Validating technologies in relevant environments, both in low earth orbit (LEO) and ground tests is critical in understanding technology performance and long duration performance. On-orbit and ground tests inform NASA’s technology decisions to fill exploration gaps. NASA has multiple technology projects across the technology readiness spectrum with potential to fill or partially fill exploration gaps. For each capability area, this paper will describe select capability gaps, NASA technology project maturation over the past year, and key performance parameters (KPPs). KPPs are evolving but they still provide a useful measure in communicating progress and identifying development needs to fill exploration gaps. The intent is to provide a very high-level overview describing the projects that are supporting gap closure and provide references to additional technical details, progress, and KPPs.

James Lee Broyan↗

NASA Environmental Control and Life Support Technology Development for Exploration: 2020 to 2021 Overview

This PowerPoint presentation supports the following paper submission's abstract (STRIVES 20210015025). This paper provides an overview of NASA supported activities developing Environmental Control and Life Support (ECLSS) technologies in the following capability areas: life support, environmental monitoring, fire safety, and logistics. NASA has been refining technology needs for deep space missions including Gateway, lunar surface, Mars transit, and Mars surface missions. Validating technologies in relevant environments, both in low earth orbit (LEO) and ground tests is critical in understanding technology performance and long duration performance. On-orbit and ground tests inform NASA’s technology decisions to fill exploration gaps. NASA has multiple technology projects across the technology readiness spectrum with potential to fill or partially fill exploration gaps. For each capability area, this paper will describe select capability gaps, NASA technology project maturation over the past year, and key performance parameters (KPPs). KPPs are evolving but they still provide a useful measure in communicating progress and identifying development needs to fill exploration gaps. The intent is to provide a very high-level overview describing the projects that are supporting gap closure and provide references to additional technical details, progress, and KPPs.

Life Support↗

Versatile Test Reactor Conceptual Core Design

The VTR is a 300-MW(thermal) sodium-cooled fast reactor (SFR) designed for the specific purpose of delivering unique testing capabilities to enable the advancement of all reactor technologies. With its flux level, irradiation volume, and operational flexibility, the VTR will enable accelerated testing of materials, fuels, and various components needing irradiation testing. Proven SFR technologies and design approaches have been leveraged in designing the VTR core, ensuring the highest possible readiness level. This resulted in the VTR using ternary metallic fuel and delivering fast flux levels in excess of 4 x 10 15 n/cm 2 ∙ s over large useful volumes, corresponding to about 60 dpa/year in steel. As part of the design efforts, the VTR core performance has been determined for a representative configuration, ensuring that the reactivity control systems offer sufficient shutdown margins, that the core can be safely cooled in all situations, and that reactivity feedback coefficients are conducive to a favorable safety behavior. Furthermore, the incorporation of features such as fuel assembly storage in the shield region supports the flexible and reliable operation of the VTR. Additional design work has been ongoing as well. This includes thorough shielding performance evaluations to ensure safe operation of the VTR, verification and validation of the design tools used to achieve compliance with Nuclear Quality Assurance (NQA-1) requirements, early assessment of the impact of irradiation experiments on the core performance envelope and associated margins, and in-depth uncertainty quantification efforts to quantify the anticipated range of performance characteristics. An experimental program supporting the VTR core design has been set up, with the current focus being on thermal-hydraulic experiments. The purpose of this experimental program is to obtain confirmatory measurements to serve directly as part of the core design basis or as part of the validation cases supporting the simulation tools used.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Legume Crop Testing for Space

Long-duration missions beyond low-Earth orbit will encounter challenges in maintaining adequate nutrition and crew acceptability in the food system. In situ production of fresh produce can supplement nutrient deficiencies in the prepackaged diet. Currently, there are a relatively small number of crops that can be reliably grown for space crop production efforts. Recent challenges with Veggie plant growth technical demonstrations, such as interveinal chlorosis and necrosis of Tokyo Bekana Chinese cabbage when grown under elevated CO 2 (~3000 ppm) and narrow-band LED lighting, have highlighted the necessity to conduct rigorous ISS-relevant crop screening on the ground. Additionally, crops should be selected to address specific nutritional deficits, as identified by NASA’s Human Research Program, with an emphasis on having a diversity of crops to meet nutritional requirements and crew acceptability. To achieve this, the concept of Crop Readiness Level (CRL) has been developed to gauge readiness of crops for spaceflight applications. CRL determination includes assessing environmental compatibility, food safety considerations, relevant nutritional analysis, and sensory analysis. Recent testing at Kennedy Space Center has focused on advancing the CRL of a variety of legumes. Twenty-four varieties of peas ( Pisum sativum ) and beans ( Phaseolus vulgaris ) were grown under 300 μmol m -2 s -1 PPFD from LED lights, 3000 ppm CO2, and 23 °C to simulate an ISS environment. Crops were harvested and size and yield were assessed. Then, baseline nutritional analysis (Vitamins B1, C, K; elemental analysis; proximate analysis) and sensory evaluation were performed on eight down-selected varieties. These baseline tests will help in selecting candidate crops for future missions and assessing crop production hardware and changes in environmental conditions on future crop performance and nutritional quality.

LaShelle E Spencer↗