Retrieval and Management of TRU Sludge at Hanford K-Basin - 19641
At the US Department of Energy Hanford site, the K-East and K-West reactor fuel storage basins (KE or KW Basin) were used in the 1970's and 1980's to store more than 100,000 uranium fuel rods and rod fragments that had been irradiated in the Hanford N Reactor. Approximately 2,100 metric tons of spent nuclear fuel that had been stored in the KW Basin were removed in 2004. Over time a mixture of small fuel corrosion particles, fuel rod metal fragments, and other debris accumulated in the KW Basin from the degradation of the spent nuclear fuel during storage. This is the source of the TRU sludge stored in the KW Basin. The corrosion products mixed with windblown sand, concrete dust, and other debris in the basin to form what is known as sludge. In 2006/2007 KE Basin sludge of similar origin as the KW Basin was transferred to KW Basin. Approximately 27 m{sup 3} of highly radioactive sludge was collected and consolidated underwater in six specially designed engineered containers. The mission of the Hanford Sludge Treatment Project (STP) is to develop and deploy technologies to safely retrieve, transport, and interim store the approximately 27 m{sup 3} of remote-handled transuranic (RH-TRU) sludge that is stored in the KW Basin. After extensive technology development, testing (with a bounding range of simulants), design, and procurement a sludge removal and storage system called the Engineered Container Retrieval and Transfer System (ECRTS) completed acceptance testing in 2018. The ECRTS system is designed to remotely retrieve and transport high density, highly erosive, uranium metal pieces as well as small low-density particles. The ECRTS system includes a retrieval tool based on the XAGO{sup tm} design from the United Kingdom, a heavily modified positive displacement pump, a hose-in-hose transfer system, a Sludge Transport and Storage Container (STSC), a settling and decant system, and a shielded transport system. The first sludge transfer was successfully completed on June 12, 2018 proving that the ECRTS process equipment worked as intended on the actual sludge. Three batches (i.e. transfer and decant) were required to obtain a ∼ 100% fill of the first STSC. The STSC was then transported to the on-site storage facility. Over 20 STSCs will be filled with RH-TRU sludge over approximately 16 months. This paper will discuss the issues and successes associated with this project including the operational aspects of this new system. Experience gained from this successful project should assist anyone with the need to retrieve and manage remote handled sludge from fuel storage basins. (authors)