Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STARTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Lawrence Livermore National Laboratory 2007 Annual Report

Lawrence Livermore National Laboratory's many outstanding accomplishments in 2007 are a tribute to a dedicated staff, which is shaping the Laboratory's future as we go through a period of transition and transformation. The achievements highlighted in this annual report illustrate our focus on the important problems that affect our nation's security and global stability, our application of breakthrough science and technology to tackle those problems, and our commitment to safe, secure, and efficient operations. In May 2007, the Department of Energy (DOE) awarded Lawrence Livermore National Security, LLC (LLNS), a new public-private partnership, the contract to manage and operate the Laboratory starting in October. Since its inception in 1952, the Laboratory had been managed by the University of California (UC) for the DOE's National Nuclear Security Administration (NNSA) and predecessor organizations. UC is one of the parent organizations that make up LLNS, and UC's presence in the new management entity will help us carry forward our strong tradition of multidisciplinary science and technology. 'Team science' applied to big problems was pioneered by the Laboratory's co-founder and namesake, Ernest O. Lawrence, and has been our hallmark ever since. Transition began fully a year before DOE's announcement. More than 1,600 activities had to be carried out to transition the Laboratory from management by a not-for-profit to a private entity. People, property, and procedures as well as contracts, formal agreements, and liabilities had to be transferred to LLNS. The pre-transition and transition teams did a superb job, and I thank them for their hard work. Transformation is an ongoing process at Livermore. We continually reinvent ourselves as we seek breakthroughs that impact emerging national needs. An example is our development in the late 1990s of a portable instrument that could rapidly detect DNA signatures, research that started with a view toward the potential threat of terrorist use of biological weapons. As featured in our annual report, activities in this area have grown to many important projects contributing to homeland security and disease prevention and control. At times transformation happens in large steps. Such was the case when nuclear testing stopped in the early 1990s. As one of the nation's nuclear weapon design laboratories, Livermore embarked on the Stockpile Stewardship Program. The objectives are to ensure the safety, security, and reliability of the nation's nuclear weapons stockpile and to develop a science-based, thorough understanding of the performance of nuclear weapons. The ultimate goal is to sustain confidence in an aging stockpile without nuclear testing. Now is another time of major change for the Laboratory as the nation is resizing its nuclear deterrent and NNSA begins taking steps to transform the nuclear weapons complex to meet 21st-century national security needs. As you will notice in the opening commentary to each section of this report, the Laboratory's senior management team is a mixture of new and familiar faces. LLNS drew the best talent from its parent organizations--Bechtel National, UC, Babcock & Wilcox, the Washington Group Division of URS, and Battelle--to lead the Laboratory. We are honored to take on the responsibility and see a future with great opportunities for Livermore to apply its exceptional science and technology to important national problems. We will work with NNSA to build on the successful Stockpile Stewardship Program and transform the nation's nuclear weapons complex to become smaller, safer, more secure, and more cost effective. Our annual report highlights progress in many relevant areas. Laboratory scientists are using astonishing computational capabilities--including BlueGene/L, the world's fastest supercomputer with a revolutionary architecture and over 200,000 processors--to gain key insights about performance of aging nuclear weapons. What we learn will help us sustain the stockpile without nuclear testing. Preparations are underway to start experiments at the National Ignition Facility (NIF), the world's largest laser. They will help us resolve the most important questions we still have about nuclear weapons performance. Future NIF experiments will also explore the promise of an essentially inexhaustible source of clean energy from nuclear fusion. In addition, we have begun the process of eliminating significant quantities of special nuclear materials from the Livermore site. We will carry forward Livermore's tradition of exceptional science and technology. This is the S&T that led to the design and construction of NIF and leadership in an international consortium that is developing the Gemini Planet Imager. When the Imager comes on line in 2010 at an observatory in Chile, the Imager will bring into sharp focus planets that are 30 to 150 light years from our solar system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wind-To-Hydrogen Energy Pilot Project

WIND-TO-HYDROGEN ENERGY PILOT PROJECT: BASIN ELECTRIC POWER COOPERATIVE In an effort to address the hurdles of wind-generated electricity (specifically wind's intermittency and transmission capacity limitations) and support development of electrolysis technology, Basin Electric Power Cooperative (BEPC) conducted a research project involving a wind-to-hydrogen system. Through this effort, BEPC, with the support of the Energy & Environmental Research Center at the University of North Dakota, evaluated the feasibility of dynamically scheduling wind energy to power an electrolysis-based hydrogen production system. The goal of this project was to research the application of hydrogen production from wind energy, allowing for continued wind energy development in remote wind-rich areas and mitigating the necessity for electrical transmission expansion. Prior to expending significant funding on equipment and site development, a feasibility study was performed. The primary objective of the feasibility study was to provide BEPC and The U.S. Department of Energy (DOE) with sufficient information to make a determination whether or not to proceed with Phase II of the project, which was equipment procurement, installation, and operation. Four modes of operation were considered in the feasibility report to evaluate technical and economic merits. Mode 1 - scaled wind, Mode 2 - scaled wind with off-peak, Mode 3 - full wind, and Mode 4 - full wind with off-peak In summary, the feasibility report, completed on August 11, 2005, found that the proposed hydrogen production system would produce between 8000 and 20,000 kg of hydrogen annually depending on the mode of operation. This estimate was based on actual wind energy production from one of the North Dakota (ND) wind farms of which BEPC is the electrical off-taker. The cost of the hydrogen produced ranged from $20 to $10 per kg (depending on the mode of operation). The economic sensitivity analysis performed as part of the feasibility study showed that several factors can greatly affect, both positively and negatively, the "per kg" cost of hydrogen. After a September 15, 2005, meeting to evaluate the advisability of funding Phase II of the project DOE concurred with BEPC that Phase I results did warrant a "go" recommendation to proceed with Phase II activities. The hydrogen production system was built by Hydrogenics and consisted of several main components: hydrogen production system, gas control panel, hydrogen storage assembly and hydrogen-fueling dispenser The hydrogen production system utilizes a bipolar alkaline electrolyzer nominally capable of producing 30 Nm3/h (2.7 kg/h). The hydrogen is compressed to 6000 psi and delivered to an on-site three-bank cascading storage assembly with 80 kg of storage capacity. Vehicle fueling is made possible through a Hydrogenics-provided gas control panel and dispenser able to fuel vehicles to 5000 psi. A key component of this project was the development of a dynamic scheduling system to control the wind energy's variable output to the electrolyzer cell stacks. The dynamic scheduling system received an output signal from the wind farm, processed this signal based on the operational mode, and dispatched the appropriate signal to the electrolyzer cell stacks. For the study BEPC chose to utilize output from the Wilton wind farm located in central ND. Site design was performed from May 2006 through August 2006. Site construction activities were from August to November 2006 which involved earthwork, infrastructure installation, and concrete slab construction. From April - October 2007, the system components were installed and connected. Beginning in November 2007, the system was operated in a start-up/shakedown mode. Because of numerous issues, the start-up/shakedown period essentially lasted until the end of January 2008, at which time a site acceptance test was performed. Official system operation began on February 14, 2008, and continued through the end of December 2008. Several issues continued to prevent consistent operation, resulting in operation of the system in fits and starts. During the operational period, three ramp tests were performed on the electrolyzer cell stacks to evaluate cell stack degradation, if present. In addition, from December 23 - 30 2008, the hydrogen system was operated using Mode 1 protocol. From February 14, 2008 - December 31, 2008, the system produced a total of just less than 26,000,000 liters (2320 kg), including approximately 3,300,000 liters (295 kg) of hydrogen during Mode 1 operation. Unfortunately, the chronic shutdown issues prevented consistent operation and, therefore, did not allow for any accurate economic analysis as originally intended. With that said, much valuable experience was gained in the form of "lessons learned," and the project served as an extremely valuable platform for educating the public.

17 WIND ENERGY↗

Little Goose Dam Full Flow PIT-Tag Detection System Project Summary.

In 2006, the design phase of this project was kicked off and was for the most part modeled after the Full Flow PIT installation installed at Lower Monumental Dam during winter and spring of 2006 and 2007. As the Goose Full Flow design progressed and the project started to move towards construction, issues within contracting occurred and the project was put on delay for 1 year. Starting in mid December of 2008, Harcon Inc. was awarded the contract and construction of the new Goose Full Flow PIT-tag detection system began. The purpose of this document is to summarize the installation of the Little Goose Full Flow project from start to finish and to highlight the notable successes and challenges that the installation presented along with the final results and current status.

13 HYDRO ENERGY↗

Development of Regenerable High Capacity Boron Nitrogen Hydrides as Hydrogen Storage Materials

The objective of this three-phase project is to develop synthesis and hydrogen extraction processes for nitrogen/boron hydride compounds that will permit exploitation of the high hydrogen content of these materials. The primary compound of interest in this project is ammonia-borane (NH{sub 3}BH{sub 3}), a white solid, stable at ambient conditions, containing 19.6% of its weight as hydrogen. With a low-pressure on-board storage and an efficient heating system to release hydrogen, ammonia-borane has a potential to meet DOE's year 2015 specific energy and energy density targets. If the ammonia-borane synthesis process could use the ammonia-borane decomposition products as the starting raw material, an efficient recycle loop could be set up for converting the decomposition products back into the starting boron-nitrogen hydride. This project is addressing two key challenges facing the exploitation of the boron/nitrogen hydrides (ammonia-borane), as hydrogen storage material: (1) Development of a simple, efficient, and controllable system for extracting most of the available hydrogen, realizing the high hydrogen density on a system weight/volume basis, and (2) Development of a large-capacity, inexpensive, ammonia-borane regeneration process starting from its decomposition products (BNHx) for recycle. During Phase I of the program both catalytic and non-catalytic decomposition of ammonia borane are being investigated to determine optimum decomposition conditions in terms of temperature for decomposition, rate of hydrogen release, purity of hydrogen produced, thermal efficiency of decomposition, and regenerability of the decomposition products. The non-catalytic studies provide a base-line performance to evaluate catalytic decomposition. Utilization of solid phase catalysts mixed with ammonia-borane was explored for its potential to lower the decomposition temperature, to increase the rate of hydrogen release at a given temperature, to lead to decomposition products amenable for regeneration, and direct catalytic hydrogenation of the decomposition products. Two different approaches of heating ammonia-borane are being investigated: (a) 'heat to material approach' in which a fixed compartmentalized ammonia-borane is heated by a carefully controlled heating pattern, and (b) 'material to heat approach' in which a small amount of ammonia-borane is dispensed at a time in a fixed hot zone. All stages of AB decomposition are exothermic which should allow the small 'hot zone' used in the second approach for heating to be self-sustaining. During the past year hydrogen release efforts focused on the second approach determining the amount of hydrogen released, kinetics of hydrogen release, and the amounts of impurities released as a function of AB decomposition temperature in the 'hot zone.'

08 HYDROGEN↗

Search for $p \bar{p} \rightarrow WZ \rightarrow l\nu_l b \bar{b}$ signal with the CDF experiment at Tevatron

The high energy physics has made huge steps forward the comprehension of the inner most nature of our universe and the matter we are composed of. The experimental discoveries, and the theories of the last 50 years that the experimental discoveries had confirmed or inspired, made possible to build a theory of the interactions. Weak interactions have been discovered and unified with the Electromagnetic ones in the Standard Model, which is the most widely experimentally tested and confirmed model of this century. The only prediction which is still unconfirmed is the existence of a particle, the Higgs boson, which provides particles with mass, interacting with them, in a spontaneous symmetry breakdown that doesn't violate the natural gauge symmetry of the Lagrangian of the system. One of the ways in which the Standard Model has been tested during the last 20 years is by accelerating e{sup +}e{sup -} (LEP) or p{bar p} (Tevatron) particles in a circular ring and colliding them inside a detector which is designed to reveal the final reaction products. We now have two operating hadron colliders in the world. The Tevatron at Fermilab laboratory of Chicago, collides protons against anti-protons since 1989 and has reached its maximum energy in the mass center of 1.96 TeV since 2001. It has collected approximately 7 fb{sup -1} of data so far, that allowed important discoveries, as the top quark one, B{sub s} mixing, precision measurements of some of the Standard Model free parameters, e.g. the W mass, and search for New Phenomena. The LHC at CERN in Geneva is a proton proton collider and has started the data acquisition in March 2010, at a center of mass energy of 7 TeV, thus beating the world record of the Tevatron. LHC however has not yet either the integrated luminosity nor the detailed understanding of the detectors to start investigating Higgs or di-boson production. The purpose of this work is to analyse the data of the CDF experiment at Tevatron to search for the associate production of a W{sup {+-}} and Z gauge boson, looking for them in the lepton, neutrino plus jets final state, This process is predicted by the Standard Model but not revealed yet in this particular channel, both for its small cross section ({sigma}{sub WW/WZ} {approx} 16 pb{sup -1}) and for the huge backgrounds we have to deal with. The W{sup +}W{sup -} or W{sup {+-}}Z in l {bar {nu}}{sub l} j j process has been measured for the first time in [4] and represents the starting point of this work. Our aim is to discriminate W{sup {+-}}Z process from W{sup +}W{sup -} one requiring the decay of the Z boson in two b-quarks. The evidence of a peak on the invariant mass distribution will allow a tuning of the invariant mass resolution of b-jets. In addition, one of the main motivations for this quest is the similarity of this exactly predicted process with the W{sup {+-}}H associate production signature, for which it represents a test of the searching tools and techniques, as long as an irreducible background that must be understood before such Higgs search is performed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

INITIATION PROCESSES FOR THE 2013 MAY 13 X1.7 LIMB FLARE

For the X1.7 class flare on 2013 May 13 (SOL2013-05-13T01:53), its initiation process was well observed by the Atmospheric Imaging Assembly (AIA) on board the Solar Dynamic Observatory and the Extreme UltraViolet Imager (EUVI) on board STEREO-B . The initiation process incorporates the following phenomena: an X-ray precursor that started ∼9 minutes before flare onset, two hot magnetic loops (as seen with AIA hot channels) forming a sigmoidal core magnetic structure (as seen with the EUVI), a rapidly formed magnetic flux rope (MFR) that expands outward, and a flare loop that contracts inward. The two hot magnetic loops were activated after the occurrence of the X-ray precursor. After activation, magnetic reconnection occurred between the two hot magnetic loops (inside the sigmoid structure), which produced the expanding MFR and the contracting flare loop (CFL). The MFR and CFL can only be seen with AIA hot and cool channels, respectively. For this flare, the real initiation time can be regarded as being from the starting time of the precursor, and its impulsive phase started when the MFR began its fast expansion. In addition, the CFL and the growing postflare magnetic loops are different loop systems, and the CFL was the product of magnetic reconnection between sheared magnetic fields that also produced the MFR.

79 ASTRONOMY AND ASTROPHYSICS↗

Neutrinos from the Galactic Center Hosting a Hypernova Remnant

Similar to star-forming galaxies or starburst galaxies, star-forming regions in our Galaxy can host cosmic-ray (CR) accelerators and rich gas as targets of hadronuclear interaction. By our estimations, the IceCube neutrino observatory might detect muon neutrinos from a CR accelerator associated with a molecular cloud complex in our Galaxy. The associated high-energy gamma-ray emission might be observed by the Cherenkov Telescope Array (CTA), High-Altitude Water Cherenkov Gamma-Ray Observatory (HAWC), and Large High Altitude Air Shower Observatory (LHAASO). Furthermore, taking the Galactic Center (GC) region as an example, we assume that a hypernova exploded in the past in the GC. We simulate the acceleration of CRs in the hypernova remnant (HNR) as well as their confinement and escape. The high-energy protons escape from the HNR, diffuse around the GC, interact with molecular clouds, and then produce gamma-rays and neutrinos. In the optimal cases, the GC would be a promising 100 TeV gamma-ray source for LHAASO’s one-month observation. We propose that neutrino-induced searching for starting track-like and high-energy starting events (HESEs) observed by IceCube, from the GC region with a radius of 1°.8, would help us discover the particle accelerator in the GC or constrain our models. Under the constraint from high-energy gamma-ray observations by the H.E.S.S. telescope, we estimate the exposure time needed to make a significant discovery for the optimal cases. The analysis combining observations of IceCube and ANTARES, starting track-like events and HESEs, future observations by neutrino detectors IceCube-Gen2 and KM3net, and gamma-ray telescopes CTA, HAWC, and LHAASO would help to constrain our models.

79 ASTRONOMY AND ASTROPHYSICS↗

Three-dimensional Core-collapse Supernova Simulations with 160 Isotopic Species Evolved to Shock Breakout

We present three-dimensional simulations of core-collapse supernovae using the FLASH code that follow the progression of the explosion to the stellar surface, starting from neutrino radiation hydrodynamic simulations of the neutrino-driven phase performed with the Chimera code. We consider a 9.6 M ⊙ zero-metallicity progenitor starting from both 2D and 3D Chimera models and a 10 M ⊙ solar-metallicity progenitor starting from a 2D Chimera model, all simulated until shock breakout in 3D while tracking 160 nuclear species. The relative velocity difference between the supernova shock and the metal-rich Rayleigh–Taylor (R-T) "bullets" determines how the metal-rich ejecta evolves as it propagates through the density profile of the progenitor and dictates the final morphology of the explosion. We find maximum 56 Ni velocities of ~1950 and ~1750 km s -1 at shock breakout from 2D and 3D 9.6 M ⊙ Chimera models, respectively, due to the bullets' ability to penetrate the He/H shell. When mapping from 2D, we find that the development of higher-velocity structures is suppressed when the 2D Chimera model and 3D FLASH model meshes are aligned. The development of faster-growing spherical-bubble structures, as opposed to the slower-growing toroidal structure imposed by axisymmetry, allows for interaction of the bullets with the shock and seeds further R-T instabilities at the He/H interface. We see similar effects in the 10 M ⊙ model, which achieves maximum 56 Ni velocities of ~2500 km s -1 at shock breakout.

79 ASTRONOMY AND ASTROPHYSICS↗

Open Data from the Third Observing Run of LIGO, Virgo, KAGRA, and GEO

The global network of gravitational-wave observatories now includes five detectors, namely LIGO Hanford, LIGO Livingston, Virgo, KAGRA, and GEO 600. These detectors collected data during their third observing run, O3, composed of three phases: O3a starting in 2019 April and lasting six months, O3b starting in 2019 November and lasting five months, and O3GK starting in 2020 April and lasting two weeks. In this paper we describe these data and various other science products that can be freely accessed through the Gravitational Wave Open Science Center at https://gwosc.org. The main data set, consisting of the gravitational-wave strain time series that contains the astrophysical signals, is released together with supporting data useful for their analysis and documentation, tutorials, as well as analysis software packages.

79 ASTRONOMY AND ASTROPHYSICS↗

How to Turn Jets into Cylinders near Supermassive Black Holes in 3D General Relativistic Magnetohydrodynamic Simulations

Abstract Accreting supermassive black holes (SMBHs) produce highly magnetized relativistic jets that tend to collimate gradually as they propagate outward. However, recent radio interferometric observations of the 3C 84 galaxy reveal a stunning, cylindrical jet already at several hundred SMBH gravitational radii,r≳ 350r g . We explore how such extreme collimation emerges via a suite of 3D general relativistic magnetohydrodynamic simulations. We consider an SMBH surrounded by a magnetized torus immersed in a constant-density ambient medium that starts at the edge of the SMBH sphere of influence, chosen to be much larger than the SMBH gravitational radius,r B = 10 3 r g . We find that radiatively inefficient accretion flows (e.g., M87) produce winds that collimate the jets into parabolas near the black hole. After the disk winds stop collimating the jets atr≲r B , they turn conical. Once outsider B , the jets run into the ambient medium and form backflows that collimate the jets into cylinders some distance beyondr B . Interestingly, for radiatively efficient accretion, as in 3C 84, the radiative cooling saps the energy out of the disk winds; at early times, they cannot efficiently collimate the jets, which skip the initial parabolic collimation stage, start out conical near the SMBH, and turn into cylinders already atr≃ 300r g , as observed in 3C 84. Over time, the jet power remains approximately constant, whereas the mass accretion rate increases; the winds grow in strength and start to collimate the jets, which become quasi-parabolic near the base, and the transition point to a nearly cylindrical jet profile moves outward while remaining insider B .

Astronomy & Astrophysics↗

PSTN-055: Survey Cadence Optimization Committee's Phase 2 Recommendations

This document describes the recommendations formulated by the Survey Cadence Optimization Committee (SCOC) of Vera C. Rubin Observatory for the observing strategy of the Legacy Survey of Space and Time (LSST). These "Phase 2" recommendations follow the initial "Phase 1" recommendations released in December 2021 as PSTN-053, and convey the current recommendations for the initial implementation of the LSST. These recommendations are based on the SCOC analysis of LSST simulations generated according to PSTN-053 and the feedback received from the scientific community on those simulations. These recommendations should be considered as the current guidance for implementing the LSST observing survey at the start of the survey, a strategy to be reviewed regularly over the survey lifetime, and are accompanied by a simulation, baseline_v3.0, which represents a specific implementation of these recommendations. While these recommendations dramatically narrow the possible LSST observing parameter choices, we emphasize that at this stage they do not yet represent a final or complete set of recommendations for the survey strategy, and several details are still to be refined. Furthermore, the strategy should be considered "living" and subject to evolution throughout the survey. The SCOC continues to engage with the community to finalize its recommendations. At the time of the release of this document, the final phases of construction of Rubin Observatory are ongoing with an expected first light in mid-2024. We expect the SCOC recommendations to be revised as needed, as knowledge of the system as built and the outcome of commissioning and Science Verification mature. This document describes the Phase 2 SCOC recommendations —highlighting elements that can be considered final and elements that remain to be finalized—, the process through which the SCOC has converged on these recommendations, and the working plan for the SCOC starting in January 2023 through the start of the survey to finalize the initial implementation of the Legacy Survey of Space and Time.

79 ASTRONOMY AND ASTROPHYSICS↗

The Fermilab Short-Baseline Program: MicroBooNE

The MicroBooNE experiment is the first of three detectors of the Fermilab short-baseline neutrino program that started operation in the Booster Neutrino Beamline in October 2015 [1]. When completed, the three-detector lineup will explore short-baseline neutrino oscillations and will be sensitive to sterile neutrino scenarios. MicroBooNE in itself is now starting its own physics program, with the measurement of neutrino-argon cross sections in the ~1GeV range being one of its main physics goals. These proceedings describe the status of the detector, the start of operation, and the automated reconstruction of the first neutrino events observed with MicroBooNE. Prospects for upcoming cross section measurements are also given.

43 PARTICLE ACCELERATORS↗

Optimization for Single-Spike X-Ray FELs at LCLS with a Low Charge Beam

The Linac Coherent Light Source is an x-ray free-electron laser at the SLAC National Accelerator Laboratory, which is operating at x-ray wavelengths of 20-1.2 Angstrom with peak brightness nearly ten orders of magnitude beyond conventional synchrotron radiation sources. At the low charge operation mode (20 pC), the x-ray pulse length can be <10 fs. In this paper we report our numerical optimization and simulations to produce even shorter x-ray pulses by optimizing the machine and undulator setup at 20 pC charge. In the soft x-ray regime, with combination of slotted-foil or undulator taper, a single spike x-ray pulse is achievable with peak FEL power of a few 10s GW. Linac Coherent Light Source (LCLS), the world's first hard x-ray Free electron laser (FEL), has started operation since 2009. With nominal operation charge of 250 pC, the generated x-ray pulse length is from 70 fs to a few hundred fs. This marks the beginning of a new era of ultrashort x-ray sciences. In addition, a low charge (20pC) operation mode has also been established. Since the collective effects are reduced at the low charge mode, we can increase the compression factor and still achieve a few kA peak current. The expected electron beam and x-ray pulses are less than 10 fs. There are growing interests in even shorter x-ray pulses, such as fs to sub-fs regime. One of the simple solutions is going to even lower charge. As discussed, single-spike x-ray pulses can be generated using 1 pC charge. However, this charge level is out of the present LCLS diagnostic range. 20 pC is a reasonable operation charge at LCLS, based on the present diagnostic system. At 20 pC in the soft x-ray wavelength regime, we have experimentally demonstrated that FEL can work at undercompression or over-compression mode, such as 1 degree off the full-compression; at full-compression, however, there is almost no lasing. In hard x-ray wavelength regime, we observed that there are reasonable photons generated even at full-compression mode, although the photon number is less than that from under-compression or over-compression mode. Since we cannot measure the x-ray pulse length at this time scale, the machine is typically optimized for generating maximum photons, not minimum pulse length. In this paper, we study the methods of producing femtosecond (or single-spike) x-ray pulses at LCLS with 20 pC charge, based on start-to-end simulations. Figure 1 shows a layout of LCLS. The compression in the second bunch compressor (BC2) determines the final e-beam bunch length. However, the laser heater, dog-leg after the main linac (DL2) and collective effects also affect the final bunch length. To adjust BC2 compression, we can either change the L2 phase or BC2 R{sub 56}. In this paper we only tune L2 phase while keep BC2 R{sub 56} fixed. For the start-to-end simulations, we used IMPACT-T and ELEGANT tracking from the photocathode to the entrance of the undulator, after that the FEL radiation was simulated with GENESIS. IMPACT-T tracks about 10{sup 6} particles in the injector part until 135 MeV, including 3D space charge force. The output particles from IMPACT-T are smoothed and increased to 12 x 10{sup 6} to reduce high-frequency numerical noise for subsequent ELEGANT simulations, which include linear and nonlinear transport effects, a 1D transient model of CSR, and longitudinal space charge effects, as well as geometric and resistive wake fields in the accelerator. In GENESIS part, the longitudinal wake field from undulator chamber and longitudinal space field are also included.

43 PARTICLE ACCELERATORS↗

Big bucks not always needed for new business

Monthly Economic Diversity column for Tri-City Herald (first 2 paragraphs pasted below): I think many of us at one time or another has at least wondered what self-employment would be like. Amidst romantic visions about easygoing schedules and the reduced pressure of not having to answer to someone else, the daydreaming eventually gives way to reality. What would my value proposition be? Where would I start? And would that secret trust fund indeed be revealed to me at the right moment to make it possible? Since for most of us that last question is little more than a pipe dream, the money dilemma is top of mind when it comes to the proposition of starting a business from scratch. But it doesn't have to dig to the bottom of your wallet or your net worth as was recently affirmed in a great Wall Street Journal article about starting successful companies on a shoestring budget.

99 GENERAL AND MISCELLANEOUS↗

Model of Procedure Usage – Results from a Qualitative Study to Inform Design of Computer-Based Procedures

The nuclear industry is constantly trying to find ways to decrease the human error rate, especially the human errors associated with procedure use. As a step toward the goal of improving procedure use performance, researchers, together with the nuclear industry, have been looking at replacing the current paper-based procedures with computer-based procedure systems. The concept of computer-based procedures is not new by any means; however most research has focused on procedures used in the main control room. Procedures reviewed in these efforts are mainly emergency operating procedures and normal operating procedures. Based on lessons learned for these previous efforts we are now exploring a more unknown application for computer based procedures - field procedures, i.e. procedures used by nuclear equipment operators and maintenance technicians. The Idaho National Laboratory, the Institute for Energy Technology, and participants from the U.S. commercial nuclear industry are collaborating in an applied research effort with the objective of developing requirements and specifications for a computer-based procedure system to be used by field operators. The goal is to identify the types of human errors that can be mitigated by using computer-based procedures and how to best design the computer-based procedures to do this. The underlying philosophy in the research effort is “Stop – Start – Continue”, i.e. what features from the use of paper-based procedures should we not incorporate (Stop), what should we keep (Continue), and what new features or work processes should be added (Start). One step in identifying the Stop – Start – Continue was to conduct a baseline study where affordances related to the current usage of paper-based procedures were identified. The purpose of the study was to develop a model of paper based procedure use which will help to identify desirable features for computer based procedure prototypes. Affordances such as note taking, markups, sharing procedures between fellow coworkers, the use of multiple procedures at once, etc. were considered. The model describes which affordances associated with paper based procedures should be transferred to computer-based procedures as well as what features should not be incorporated. The model also provides a means to identify what new features not present in paper based procedures need to be added to the computer-based procedures to further enhance performance. The next step is to use the requirements and specifications to develop concepts and prototypes of computer-based procedures. User tests and other data collection efforts will be conducted to ensure that the real issues with field procedures and their usage are being addressed and solved in the best manner possible. This paper describes the baseline study, the construction of the model of procedure use, and the requirements and specifications for computer-based procedures that were developed based on the model. It also addresses how the model and the insights gained from it were used to develop concepts and prototypes for computer based procedures.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design and Status of the NGNP Fuel Experiment AGR-3/4 Irradiated in the Advanced Test Reactor

The United States Department of Energy’s Next Generation Nuclear Plant (NGNP) Advanced Gas Reactor (AGR) Fuel Development and Qualification Program will be irradiating up to seven separate low enriched uranium (LEU) tri-isotopic (TRISO) particle fuel (in compact form) experiments in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory (INL). These irradiations and fuel development are being accomplished to support development of the next generation reactors in the United States, and will be irradiated over the next several years to demonstrate and qualify new TRISO coated particle fuel for use in high temperature gas reactors. The goals of the irradiation experiments are to provide irradiation performance data to support fuel process development, to qualify fuel for normal operating conditions, to support development and validation of fuel performance and fission product transport models and codes, and to provide irradiated fuel and materials for post irradiation examination (PIE) and safety testing. The experiments, which will each consist of at least six separate capsules, will be irradiated in an inert sweep gas atmosphere with individual on-line temperature monitoring and control of each capsule. The sweep gas will also have on-line fission product monitoring on its effluent to track performance of the fuel in each individual capsule during irradiation. The first experiment (designated AGR-1) started irradiation in December 2006 and was completed in November 2009. The second experiment (AGR-2) started irradiation in June 2010 and is currently scheduled to be completed in April 2013. The third and fourth experiments have been combined into a single experiment designated AGR-3/4, which started its irradiation in December 2011 and is currently scheduled to be completed in November 2013. Since the purpose of this experiment is to provide data on fission product migration and retention in the NGNP reactor, the design of this experiment is significantly different from the first two experiments, though the control and monitoring systems are very similar. The purpose and design of this experiment will be discussed followed by its progress and status to date.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Status of the Combined Third and Fourth NGNP Fuel Irradiations In the Advanced Test Reactor

The United States Department of Energy’s Next Generation Nuclear Plant (NGNP) Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is irradiating up to seven low enriched uranium (LEU) tri-isotopic (TRISO) particle fuel (in compact form) experiments in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory (INL). These irradiations and fuel development are being accomplished to support development of the next generation reactors in the United States. The experiments will be irradiated over the next several years to demonstrate and qualify new TRISO coated particle fuel for use in high temperature gas reactors. The goals of the experiments are to provide irradiation performance data to support fuel process development, to qualify fuel for normal operating conditions, to support development and validation of fuel performance and fission product transport models and codes, and to provide irradiated fuel and materials for post irradiation examination (PIE) and safety testing. The experiments, which will each consist of several independent capsules, will be irradiated in an inert sweep gas atmosphere with individual on-line temperature monitoring and control of each capsule. The sweep gas will also have on-line fission product monitoring on its effluent to track performance of the fuel in each individual capsule during irradiation. The first experiment (designated AGR-1) started irradiation in December 2006 and was completed in November 2009. The second experiment (AGR-2) started irradiation in June 2010 and is currently scheduled to be completed in September 2013. The third and fourth experiments have been combined into a single experiment designated (AGR-3/4), which started its irradiation in December 2011 and is currently scheduled to be completed in April 2014. Since the purpose of this combined experiment is to provide data on fission product migration and retention in the NGNP reactor, the design of this experiment is significantly different from the first two experiments, though the control and monitoring systems are extremely similar. The design of the experiment will be discussed followed by its progress and status to date.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Compensatable muon collider calorimeter with manageable backgrounds

A method and system for reducing background noise in a particle collider, comprises identifying an interaction point among a plurality of particles within a particle collider associated with a detector element, defining a trigger start time for each of the pixels as the time taken for light to travel from the interaction point to the pixel and a trigger stop time as a selected time after the trigger start time, and collecting only detections that occur between the start trigger time and the stop trigger time in order to thereafter compensate the result from the particle collider to reduce unwanted background detection.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗